Vous êtes sur la page 1sur 1

Final Examination - Hydrology

PROBLEMS.
1) Name all processes displayed in figure 1.

Figure 1: Hydrological processes

2) Compute the mean annual precipitation for the watershed in the below figure using the arithmetic mean, the
Thiessen polygon method, and the Isohyetal method. The gauge readings for gauges A-K respectively are:
29.79, 34.97, 25.6, 24.27, 24.6, 42.61, 42.35, 15.51, 39.99, 43.04, and 28.41.

Vous aimerez peut-être aussi