JOB NO:
PROCESS AND
SERVICE
CONDITION
DESIGN
MATERIAL
TESTING
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Size
Quantity
Fluid Type
Operating Pressure
Design Pressure
Design Temperature
Ambient Temperature
Relative Humidity
Wind Velocity
Design Flow
Gas Specific Gravity
Gas Composition
Code and Standard
Design Factor
Welding
Design Life
Type
Pipe Wall Thickness/Schedule
Weld Joint Type
Grounding Lug
End Connection
Pipe Pup Piece for End Connection
Pipe Pup Piece Length
Insulating Joint Welding Neck Flange
Insulating Joint Retainer Wing
Insulating Spacer
Insulating Filler
O-Ring
Secondary Sealing
Adhesive Sealant
External Coating
Internal Coating
Surface Preparation
Radiography for Buttweld
UT for Other Than Buttweld
Hydrostatic Test Including Pipe Pup Piece
Electrical Resistance Test
Leakage Current Test
Dielectric Strength Test
Painting/Coating DFT Check
(Note 1)
(Note 1)
Hydrocarbon (Natural Gas
Min:
(Note 1)
(Note 1)
Min:
Min:
Max:
(Note 1)
(Note 1)
(Note 1)
ASME BPVC Section VIII D
(Note 1)
ASME BPVC Section IX (Joi
20
Monolithic Non-Bolt
(Note 1, 5)
Full Penetration
Yes, Both end of insulating
Bevel end refer to ASME B
Seamless Pipe or Forged M
1.5 x Outside Diameter
(Note 2, 3)
(Note 2, 3)
(Note 2, 3)
(Note 2, 3)
(Note 2, 3)
(Note 2, 3)
(Note 2, 3)
(Note 4)
(Note 6)
(Note 4)
Yes
Yes
Yes, 2 hours, 1.5 x DP hold
Yes, more than 60 Mega O
Yes, max 5 mA leakage at
Yes, min 2.5 kV/mm per A
Yes
TESTING
41
42
43
44
45
Notes
1
2
3
4
5
6
7
8
Yes
Yes
Yes
Yes
Yes, as per BS EN 10204
Max:
Max:
Max:
(Note 1)
psig
90 F
90 %
(Tropical Climate)
es,
es,
es,
es,
(Note 1, 5)
Type: