Vous êtes sur la page 1sur 3

QUALITY CONTROL CHECKLISTS

This is the html version of the file http://gekengineering.com/Downloads/Free_Downloads/Quality_Control_Starting_Point.pdf .


Google automatically generates html versions of documents as we crawl the web.

Page 1

Quality Control A Starting Place


pofsot drrilling operations and
treatments
The specifics of quality control necessary to deliver good performance in
any treatments depends upon the knowledge and understanding of the
controlling factors for a job and the ability to check the items identified
before the job, during the job and in some cases, after the
job.
This list contains work of many industry specialists. It is a list of
suggestions that could form a starting point, but check points will need to
be added and/or removed to fit a job. Always involve knowledgable
specialists in the specific technology and use local experienced field
people as the first resource. Some errors may be found and applications
are never uniform across the industry, thus absolutely no guarantees are
made for accuracy or
responsibility.
QUALITY CONTROL IS WHAT YOU INSPECT, NOT WHAT YOU
EXPECT..........
(author
unknown)

file:///F|/ACID/QUALITY%20CONTROL%20CHECKLISTS.htm (1 of 57)27-Mar-02 3:37:02 AM

QUALITY CONTROL CHECKLISTS

Page 2

Index
Page
Acidizing

Acid
FBrincetus ring

Casing
uemnneinntging

Chemical Treating (non


aCchidro) me Pipe Handling

14

Coiled Tubing

15

Drill Stem
TEelesctitnrigc

16

7
10

21

LFiilntreation

22

Fracturing

24

Gravel
aocgkgiing

28

Oil Base Mud


RPeermfoorvaatling
33

32

Tanks
Slickline

37
38

Specialists

41

file:///F|/ACID/QUALITY%20CONTROL%20CHECKLISTS.htm (2 of 57)27-Mar-02 3:37:02 AM

30

Page 3

Acidizing
Workover Brief Specifications
workover objective clear?
are sour gas or other liquid, solid, fume or vapor precautions identified to meet
safety and local regulations?
Job
pad, weather, access, and light adequate for job?
acid storage time in unlined steel tanks minimized?

Vous aimerez peut-être aussi