Académique Documents
Professionnel Documents
Culture Documents
NC Level 1
KRA
SAH
high efficiency
more machines
infrastructure
Maximize ext.
capacities
Ontime input
Skill level
Quality
procedure/Standers
Motivation
Satisfaction
Commitment
Logistic
Automation
Maintaine
LTO/Absenteeism
Commitment /
Motivation
Low LTO/Absenteeism
Proper Proccess
Stranderds
Culture
Skill Level
Activity
Do a Survey
Awareness of the benifits
Maintain Factory leave plan
Allocate guardians
Allocate jumper cadre
right remuneration
Activity
Prepare the skill matrix
prepare training shedules
select suitable operators
Arrange machines
build up better working-enviornment
Rituals
Maintain Leave plan
get the commitments
Absent visit
keep relationships with family
counselling
Aware of the pre production
(critical operations)
Skill/unskill leave monitoring
continuing training for operators
Rituals
Analys critical operations
functioning the skill matrix
Allocate the time
fix the pre production area
Aknowledge about the incentive
scheme
Correct SMV
Activity
Take GSD License
Launch GSD
Initial training for IE Team
Rituals
Train IE Officers
Advertise that GSD is theStanderd of the factory
Design conditions andmeasuring systems based onGSD
Connect Incentive andperformance to with GSD
Right Decision at
the right time
Reputation
Maximize Orders
Improve Efficiency
Activity
ANalys factory capacity and
investments
Plant to reduce material cost
plan to reduce wastages
Acceptable costing based on
buyer requirements
Achieve sdample quality
standers and OTD to buyer
Achieve bulk production quality
and delivery
request to increase orders
searching for new buyers
Activity
Training Plan
Skill inventory (grade wise)
Input plan(Accurate/Ontime)
Ladder plan
Automation/process-improvements
preventive maintanance plan
work place arrangement
critical operation trainings
motivation programs to-enhance efficiency
Introduce jumper pool
Rituals
Collecting data /Analysing /
solutions and corrective actions
Rituals
conduct trainings
maintaine grade wise %
maintain required input -Availability
Reduce ladder
preventive maintanance
work place audits
Use jumpers for absenteeism
etc../Review jumper plan
On Time Input
Activity
Analys and fix the WIP
Required storage capacity forinputs
proper shedule for material
transportation
properly trained team for
recieving and issuing inputs
input planning team from
relative departments
Rituals
Ontime material booking
Ontime material inhouse
Capacity planning (Cutting,
emblishments )
Maximize Orders
Correct SMV
Structure
Production process
automation
Culture
Activity
Need to define the culture
-(innovation) Attention to details
and alligned with Org. culture
- Emphasise on outcome
-Emphasis on people
- Team work
- Agresiveness
-Stability
Rituals
Teach it (Need to inject the
defined culture to cultivate
across the Org.
Live it (by doing behavioral
modifications , creating learning
org. to allign people
believes/Attitudes)
Measure it (Through the
continuing practices such as
surveys)
Reward it (Sustainable
approach)
Activity
Training on Automation for a
selected team
Best practice visits to
Automated manufactures
provide expert coaching and
trainings
promote innovation related
suggesion shceme for all levels
Recognize, Award for best SMV
saving innovations
facilitate for innovators
Rituals
conduct meeting with related
teams to find out areas for
improvements
promote new concepts
collect new ideas from employe
documet identified arears for
improvements
database for technological
innovations
train people
NC Level 2
NC Level 1
KRA
Sales
Competitive Price
Complient factories
On Time Delivery
Product innovation
(R&D)
Market penitration
Branding
Attractive
Remuneration
Buyer Accepted
Quality Level
Attracting New
Customers
Government Support/Polotical
Stability
Genuine Top
Management
Commitment
Product Capability
Infrastructure, Emplowerment
and guidance
People competancies