Vous êtes sur la page 1sur 5

JOB NO.

DOC. NO.

REV.
9697-MECH-RFP-001

9697

TRIPATRA

DATE : AUG 23, 2016

ENGINEERS & CONSTRUCTORS

PREPD

Albertus Anditan

AAT

CHKD

Momon Yasri

MMY

APPD

Momon Yasri

MMY

FIXED GAS ENGINE POWER PLANT PACKAGE 1 PROJECT

SHEET 1 OF 5

REQUISITION FOR
MECHANICAL, TANK, AND PIPING WORKS
SITE SABANG AND MALINAU

23/08/2016

ALL

REV

DATE

PAGES

ISSUED FOR INQUIRY


DESCRIPTION

AAT

MMY

MMY

PREPD

CHKD

APPD

Fixed Gas Engine Power Plant Package - 1 Project,

PT. TRIPATRA Engineers and Constructors

Document No. 9697-MECH-RFP-001

REQUISITION FOR PROPOSAL


MECHANICAL, TANK, AND, PIPING WORKS SITE SABANG AND MALINAU

TABLE OF CONTENT

1.

GENERAL .............................................................................................................................. 3

2.

PROJECT DATA ..................................................................................................................... 3

3.

WORK ITEM REQUIRED ......................................................................................................... 3

4.

REFERNCE DOCUMENTS ATTACHED TO THIS REQUISITION ................................................... 3

5.

PRICE AND UNIT PRICE ......................................................................................................... 3

6.

SCHEDULE ............................................................................................................................ 4

7.

DOCUMENT TO BE SUBMITTED BY SUBCONTRACTOR/VENDOR IN THE PROPOSAL .................. 4

Appendix :
Appendix A

Scope of Work

Appendix B

Split of Work

Appendix C

Schedule of Price

Appendix D

Drawing and Specification

Appendix E

Tentative Schedule of Project

Appendix F

Form of Subcontractor Cover Letter

Page 2 of 5

Fixed Gas Engine Power Plant Package - 1 Project,

PT. TRIPATRA Engineers and Constructors

Document No. 9697-MECH-RFP-001

REQUISITION FOR PROPOSAL


MECHANICAL, TANK, AND PIPING WORKS SITE SABANG AND MALINAU

1.

GENERAL
PT. PERUSAHAAN LISTRIK NEGARA (PERSERO) has plan to implement the EPC services, Fixed
Gas Engine Power Plant Package - 1 Project and has issued an invitation to Tender Documents to
undertake of such development plans. PT TRIPATRA Engineers and Constructors (TPEC) had prequalified and had been invited to participate to the tender.
PT TRIPATRA Engineers and Constructors (TPEC) intends to subcontract construction of
Mechanical, Tank, and Piping Works.
It is (to be) clearly understood that all costs related to the preparation of subcontractor proposal
is to be borne solely by the SUBCONTRACTOR and that the selection of the proposed
subcontractors list and the selected subcontractor will be at TPECs sole discretion.
In relation to the above TPEC herewith intends to subcontract part of the work and the work
covered under this RFP is the Mechanical Installation Works.

2.

3.

PROJECT DATA
Name of Owner

: PT. PERUSAHAAN LISTRIK NEGARA (PERSERO)

Project Name

: Fixed Gas Engine Power Plant Package - 1

Location

Malinau, North Kalimantan


Sabang, Nangroe Aceh Darusalam

WORK ITEM REQUIRED


SUBCONTRACTOR shall quote the Mechanical, Tank, and Piping Works and in accordance
with the Requirements and Condition as stipulated on the document mentioned on Section-4
below.

4.

5.

REFERENCE DOCUMENTS ATTACHED TO THIS REQUISITION


Appendix A -

Scope of Work

Appendix B -

Split of Work

Appendix C -

Schedule of Price

Appendix D -

Specification and Drawing References

Appendix E -

Tentative Schedule of Work

Appendix F -

Form of Subcontractor Cover Letter

PRICE AND UNIT PRICE


The price shall be Unit Price in accordance with Appendix C: Schedule of Price.
The condition of unit price is follow:

Page 3 of 5

Fixed Gas Engine Power Plant Package - 1 Project,

PT. TRIPATRA Engineers and Constructors

1.

Document No. 9697-MECH-RFP-001

Unit price shall be fixed and is not subject to any escalation or adjustments whatsoever.
However in the event of any change to the Scope of Work then the unit price shall be
adjusted through a Change Order process.

2.

Taxes (with the exception of VAT) charges, fees, profit, and all other expenses are included
in this Price.

3.

The said unit price shall be the only sum payable by the TPEC to the SUBCONTRACTOR for
the performance of the Scope of Work.

4.

SUBCONTRACTOR acknowledges that all appropriate allowances for the matter and conditions
available at the site have been taken into account in calculating the Rate/Price and determining
the Time of Completion. No increase in the Rate/Price and no extension of the Time of
Completion of the Services based in whole or in part upon any discrepancy between the actual
conditions encountered by the SUBCONTRACTOR and those which SUBCONTRACTOR anticipated
shall be considered by the TPEC/COMPANY.

6.

SCHEDULE
Tentative project schedule is as defined in the attachment E: Schedule of Work.
SUBCONTRACTOR shall submit Detail Schedule based on schedule attachment E.

7.

DOCUMENT TO BE SUBMITTED BY SUBCONTRACTOR/VENDOR IN THE PROPOSAL


1 (one) original and 1 (one) copy of the Proposal shall be submitted on, September 5, 2016 to
the following address:
PT. TRIPATRA Engineers and Constructors
Indy Bintaro Office Park
Jl. Boulevard Bintaro Jaya Blok B7/A6 Sektor VII CBD Bintaro Jaya
Tangerang Selatan 15224, Indonesia
Telp : 021-29770700 Fax : 021-29770701
Attn : Ahmad Hamid Zacky Shebubakar / SCM
The content of the Subcontractors Proposal shall be as follow:
TECHNICAL
a. Proposed Subcontractor Project Organization
b. Proposed Subcontractor Key Personnel
c.

Proposed Detailed Construction Schedule

d. Execution Plan/Work Methodology, complete with Rigging Plan


e. Evidence of Local Government Permit
f.

Construction Equipment List and Data

g. Equipment Loading
Page 4 of 5

Fixed Gas Engine Power Plant Package - 1 Project,

PT. TRIPATRA Engineers and Constructors

Document No. 9697-MECH-RFP-001

h. Man Power Loading


i.

Subcontractor Temporary Facility Layout

j.

QA/QC Plan

k.

Safety Plan

l.

Subcontractor Company Profile

m. Relevant Major Work Experiences of Subcontractor


COMMERCIAL
a. Subcontractor Cover Letter (Refer to Appendix F: Form of Subcontractor Cover Letter)
b. Unit Price Schedule (Refer to Appendix C: Schedule of Price )

Page 5 of 5