Vous êtes sur la page 1sur 14

Project: Registral of Distance &

Continuing Education
Directorate Building
Location: Debrebirha
TAKE OFF SHEET
Client:Debrebirha University (DBU)
Consultant: Yohannes Abbay Consulting Architects and Engineers
Contractor: ***
Thursday, November 24, 2016
Timizing Dimension

55.043
37.350

1 2,009.900
1.500

1 2,009.900
1.500

1 2,009.900
1.500

11

10

5.900
5.900
1.500
5.500
5.500
1.500
5.300
5.300
1.500
5.000
5.000
1.500
4.700
4.700
1.500
4.500
4.500

Quantity

2056 m
2055.9 m

3015 m
3014.9 m

3015 m
3014.9 m

3015 m
3014.9 m

Item

Description
A.SUB-STRUCTURE
1.Excavation & earthwork
1.1 Site clearing

total
Bulk excavation in ordinary soil to an
1.2 average depth of 1500 mm from reduced
level.

total
Bulk excavation in ordinary soil to an
1.3 average not exceeding 3000 mm from
reduced level.

total
Bulk excavation in ordinary soil to an
1.3 average not exceeding 4.5 mm from
reduced level.

total
Pit excavation in ordinary soil to a depth
1.3 not exceeding 1500 mm from reduced
level.
F-1

365.5 m
F-2
226.9 m
F-3
463.5 m
F-4
375.0 m
F-5
198.8 m
F-6
151.9 m
1

10

10

F-6
1.500
3.700
3.700
1.500
3.100
3.100
1.500
2.500
2.500
1.500

5.900
5.900
0.500
5.500
5.500
0.500
5.300
5.300
0.500
5.000
5.000
0.500
4.700
4.700
0.500
4.500
4.500
0.500
3.700
3.700
0.500
3.100
3.100
0.500
2.500
2.500
0.500

202.640
1.000
1.000

151.9 m
F-7
41.1 m
F-8
115.3 m
F-9
37.5 m
1975.5 m
Pit excavation in ordinary soil to a depth
1.4 not exceeding 3000 mm from reduced
level.
F-1
121.8 m
F-2
60.5 m
F-3
140.5 m
F-4
125.0 m
F-5
66.3 m
F-6
50.6 m
F-7
13.7 m
F-8
38.4 m
F-9
12.5 m
629.3 m
Trench excavation in ordinary soil for
1.5 concrete wall to a depth of 1000 mm from
reduced level in ordinary soil
TOTAL L=94.11 ml peripheral
202.64 m
202.64 m

2604.8 m

Fill around foundation from granular


1.6 material imported from outside( from
quarry) and compact in layers not
exceeding 20cm thick.

-1087.1 m
1517.7 m
3014.9 m
-90.4 m
-525.1 m
2399.4 m

202.643
7.300
1.000

Fill around shear wall with imported


selected (granular materials with mix of 04
1.8 & 05 aggregate ) from quarry waste well
rolled and compact in layers not exceeding
200 mm thick.
1479 m
1479.3 m
12061 m

1500.2 m

10

10

2.700
2.600
5.900
5.900
5.500
5.500
5.300
5.300
5.000
5.000
4.700
4.700
4.500
4.500
3.700
3.700
3.100
3.100
2.500
2.500

670.292
0.300

1.7 Ditto as item No. 1.19, but under hard core


.

35.10 m
243.7 m
121.0 m
280.9 m
250.0 m
132.5 m
101.3 m
27.38 m
76.88 m
25.00 m
1293.7 m

1.8 Load and cart away excavated material as


per engineers direction.
25cm thick basaltic or equivalent stone
1.9 hardcore, well rolled, consolidated and
blinded with crushed stone.
2.Concrete Works
5cm lean concrete quality C-5 150kg of
2.1 cement/m3 : "type of cement to be
PPC"under:
a)footing pad
F-1
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9

b) Basement Beam
201.1 m
201.09 m

total

1 1,500.180
1.000

10

10

13

202.643
0.700

202.64
0.50

5.400
5.400
1.200
5.000
5.000
1.100
4.800
4.800
1.050
4.500
4.500
1.000
4.200
4.200
0.950
4.500
4.500
0.900
3.200
3.200
0.700
2.600
2.600
0.550
2.000
2.000
0.400

0.600
0.600
1.900
0.600
0.600
1.900

c)basement floor slab


1500 m
1500.2 m

142 m
141.9 m

101.32 m
101.32 m

total
d)shear wall

total
e)stone masonary

total
Reinforced concrete work in c-25 with
minimum cement content of 360 kgs/m3 to
2.2 be filled in forms and vibrated around steel
reinforcement. (steel reinforcement and
forms measured separately.)
a) In footings.
F-1

244.9 m
F-2
110.0 m
F-3
241.9 m
F-4
202.5 m
F-5
100.6 m
F-6
91.1 m
F-7
14.3 m
F-8
29.7 m
F-9
6.4 m
1041.5 m
b) foundation column
C-1
8.89 m
C-2
6.16 m

1 1,500.180
0.180

13

0.600
0.600
1.900
0.600
0.600
1.900
0.600
0.600
1.900
0.600
0.600
1.900
0.600
0.600
1.900
0.600
0.600
1.900
0.700
0.700
1.900
0.500
0.500
1.900
0.500
0.500
1.900

0.600
0.600
2.540
0.600
0.600
2.540
0.600
0.600
2.540
0.600
0.600
2.540
0.600
0.600
2.540
0.600
0.600
2.540
0.600
0.600

C-2'
6.16 m
C-3'
4.79 m
C-3
4.79 m
C-4
2.74 m
C-5
3.42 m
C-6
2.05 m
C-7
2.79 m
C-8
0.95 m
C-9
2.85 m
45.59 m

270 m
270.0 m

c)In 18cm thick basement floor slab.


Area=1500.18m2

d) basement column
C-1
11.89 m
C-2
8.23 m
C-2'
8.23 m
C-3'
6.40 m
C-3
6.40 m
C-4
3.66 m
C-5
4.57 m
1

C-5
2.540
0.600
0.600
2.540
0.700
0.700
2.540
0.500
0.500
2.540
0.500
0.500
2.540

1 1,500.180
0.180

4.57 m
C-6
2.74 m
C-7
3.73 m
C-8
1.27 m
C-9
3.81 m
60.93 m

270 m

e)In 18cm thick ground floor slab.


Area=1500.18m2

270.0 m
1

10

10

13

670.292
0.300
0.500

723.097
0.250
0.500

202.643
7.300
0.200

5.040
8.539
0.300

21.600
1.200
20.000
1.100
19.200
1.050
18.000
1.000
4.240
0.950
16.000
0.900
3.240
0.700
10.400
0.550
8.000
0.400

2.400
1.900
2.400
1.900
2.400
1.900
2.400
1.900

f) Basement Beam

100.5 m
100.54 m

90.39 m
90.39 m

296 m
295.9 m

12.9 m
12.91 m

181.4 m
88.0 m
201.6 m
180.0 m
24.2 m
72.0 m
4.54 m
45.76 m
12.80 m
810.31 m

59.28 m
41.04 m
41.04 m
31.92 m

total
g) gread Beam

total
h) shear wall

total
i) lift shaft

total
Provide, cut and fix in position sawn
2.3 wooden or steel formwork which ever
appropriate.
a) To footings
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9

b) foundation column
C-1
C-2
C-2'
C-3'

2.400
1.900
2.400
1.900
2.400
1.900
2.400
1.900
2.400
1.900
2.400
1.900
2.400
1.900

670.292
0.500

13

2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540
2.400
2.540

723.097
0.500

31.92 m
18.24 m
22.80 m
13.68 m
13.68 m
9.12 m
27.36 m
310.08 m

C-3
C-4
C-5
C-6
C-7
C-8
C-9

b) Basement Beam
670.3 m
670.29 m

79.25 m
54.86 m
54.86 m
42.67 m
42.67 m
24.38 m
30.48 m
18.29 m
18.29 m
12.19 m
36.58 m
414.52 m

b) basement column
C-1
C-2
C-2'
C-3'
C-3
C-4
C-5
C-6
C-7
C-8
C-9

b) gread Beam
723.1 m
723.10 m

202.643
7.300

5.040
8.539

1 1,500.180
1.000

993.000
1.000

b) shear wall
2959 m
2958.6 m
c)for lift shaft
86.1 m
86.1 m

1500.2 m
1500.2 m

e)In 18cm thick ground floor slab.


Area=1500.18m2

10cm high Styrofoam for the expansion


2.4 joint
993.0 m
993.00 m
B.SUPER-STRUCTURE

13

13

13

0.600
0.600
8.120
0.500
0.500
10.080
0.400
0.400
6.720
0.600
0.600
8.120
0.500
0.500
10.080
0.400
0.400
9.120
0.280
4.760
0.600
0.600
3.360
0.500
0.500
10.080
0.400
0.400
9.120
0.280
4.760
0.600
0.600
3.360
0.500
0.500
10.080
0.400
0.400
9.120
0.600
0.600
8.120
0.500
0.500
10.080

1.Concrete Works
Reinforced concrete work in c-25 with
minimum cement content of 360 kgs/m3 to
1.1 be filled in forms and vibrated around steel
reinforcement. (steel reinforcement and
forms measured separately.)
a) elevation column
C-1
38.00 m

32.76 m

13.98 m
C-2
26.31 m

22.68 m

13.13 m
12.00 m

C-2' A=3.14X(0.3)2 =0.28m2


C-2'

10.89 m

22.68 m

13.13 m
9.33 m

C-3' A=3.14X(0.3)2 =0.28m2


C-3'

8.47 m

17.64 m

10.21 m
C-3
20.46 m

17.64 m

0.400
0.400
9.120
0.600
0.600
8.120
0.500
0.500
10.080
0.400
0.400
6.720
0.600
0.600
8.120
0.500
0.500
10.080
0.400
0.400
9.120
0.600
0.600
8.120
0.500
0.500
10.080
0.400
0.400
6.720
0.700
0.700
8.120
0.500
0.500
10.080
0.400
0.400
6.720
0.280
4.760

714.500
0.250
0.500
501.110
0.250
0.500
774.907
0.250
0.500
801.000

10.21 m
C-4
8.77 m

7.56 m

3.23 m
C-5
14.62 m

12.60 m

7.30 m
C-6
8.77 m

7.56 m

3.23 m
C-7
11.94 m

7.56 m

3.23 m
8.00 m
403.89 m

C-3' A=3.14X(0.3)2 =0.28m2

b) floor Beam
1st floor
89.31 m
2nd & 4th floor
125.3 m
3rd floor
96.86 m
5th & 6th floor
200.3 m
1

0.250
0.500

667.850
0.250
0.400

1,525.81
0.180
1,125.06
0.180
1,172.74
0.180

404.88
0.180

1.500
3.000
0.150
1.450
3.230
0.150
1.500
0.500
0.045

20

12

10

1.500
3.000
0.150
2.150
3.000
0.150
1.500
0.500
0.045

7.175
8.250
0.200
1.500
0.500
0.135

5th & 6th floor


200.3 m
511.70 m

66.79 m
66.79 m

274.7 m
810.0 m
422.2 m
1506.9 m

72.9 m
72.9 m

total
c) Roof Beam

total
d) In 180mm Suspended slab
1st floor ,Area=1525.81m2,
2nd ,4th,5th & 6th floor ,Area=1525.81m2,
3rd floor ,Area=1525.81m2,

e) roof slab
Area=404.88m2,

e) In staircase including landing .


soffit
5.40 m
landing
2.81 m
Steps Area=1/2*0.15*0.3 =0.5*.045
2.70 m
e) In staircase including landing .
soffit
8.10 m
landing
5.81 m
Steps Area=1/2*0.15*0.3 =0.5*.045
3.24 m
17.15 m

total
f) staircase in class room
soffit

23.68 m
Steps Area=1/2*0.15*0.9 =0.5*.135
3.04 m
26.72 m
43.87 m

22.280
8.539

total
total
i) lift shaft

57.1 m
1

1
0.300

13

13

13

2.400
8.120
2.000
10.080
1.600
6.720
2.400
8.120
2.000
10.080
1.600
9.120
1.160
4.760
2.400
3.360
2.000
10.080
1.600
9.120
1.160
4.760
2.400
3.360
2.000
10.080
1.600
9.120
2.400
8.120
0.500
10.080
0.400
9.120
0.600
8.120
2.000
10.080
1.600
6.720
2.400
8.120
2.000
10.080
1.600
9.120
2.400

57.1 m
57.07 m

253.34 m

total
Provide, cut and fix in position sawn
wooden or steel formwork which ever
1.2 appropriate.
a)elevation column
C-1

262.08 m
139.78 m
175.39 m

C-2

181.44 m
131.33 m
49.69 m
72.58 m

C-2' A=3.14X(0.3)2 =0.28m2


C-2'

181.44 m
131.33 m
38.65 m
56.45 m

C-3' A=3.14X(0.3)2 =0.28m2


C-3'

141.12 m
102.14 m
136.42 m

C-3

35.28 m
25.54 m
14.62 m

C-4

60.48 m
32.26 m
97.44 m

C-5

100.80 m
72.96 m
58.46 m

C-6

8.120
2.000
10.080
1.600
6.720
2.800
8.120
2.000
10.080
1.600
6.720
1.160
4.760

58.46 m

C-6

60.48 m
32.26 m
68.21 m

C-7

60.48 m
32.26 m
33.13 m

C-3' A=3.14X(0.3)2 =0.28m2

2837.8 m
1

2 4,093.627
0.500

1 8,371.516
1.000

667.850
0.400

1 1,175.735
1.000

22.280
8.539

3.000
2.150
2.150
0.150
3.000
1.500
3.000
0.150
0.150
0.150
0.150
1.450

a) floor Beam
4094 m
4093.6 m
a) roof Beam
534 m
534.3 m
b) Floor slabs
8372 m
8371.5 m

1176 m
1175.7 m

total
b) roof slabs

total
c)for lift shaft

380.5 m
380.5 m

38.70 m
3.87 m
54.00 m
10.8 m
0.36 m
1.74 m
109.47 m

c) Stair case
landing
landing
soffit
soffit
raiser
steps