Descripcion
Relleno Material propio
Over
Sub Base
Base
Bicapa
Concreto
Piedra 1/2"
Piedra Mediana de 4"
Hormigon
Arena Gruesa
Arena Fina
Relleno estructural Material propio
Afirmado
Volumen
Integral
Esponjamiento
Sub Total
Desperdicio
Rendimiento
11,435.39
16,020.00
25,591.80
23,333.70
2,622.01
4,743.59
2,907.54
14.53
25.16
2,463.13
51.58
1.25
1.25
1.25
1.25
1.20
14,294.23
20,025.00
31,989.75
29,167.13
3,146.41
1.20
1.00
1.20
0.94
0.90
0.90
1.25
1.25
1.25
1.25
1.25
3,634.43
18.16
31.45
3,078.92
64.47
1.10
1.10
1.10
1.10
1.10
0.90
0.90
0.90
0.90
0.90
377.90
54.64
84,897.37
1.25
1.25
472.38
68.30
1.20
1.20
0.90
0.90
Concreto
Alcantarillas
fc=210 kg/cm2
fc=100 kg/cm2
Cunetas
fc=175 kg/cm2
Muros de Contencion
fc=210 kg/cm2
Emboquillados
Tarrajeo
Junta asfaltica
Cama de apoyo
Unidad
Cantidad
Cemento
(bls)
Piedra 1/2"
(m3)
Arena Gruesa
(m3)
m3
m2
224.19
267.65
2,017.71
76.01
145.72
123.30
m3
4,214.35
33,714.80
2,739.33
2,317.89
m3
m2
m2
ml
m3
34.60
145.29
2.80
14,712.48
311.40
21.79
0.42
22.49
19.03
2.91
36,142.14
2,907.54
2,463.13
4,743.59
2,093.72
Volumen Total a
extraer(m3)
Canteras
Ambato
17,153.08
20,025.00
34,081.94
32,513.75
4,195.22
17,040.97
32,513.75
4,195.22
4,456.58
22.27
38.56
3,775.41
79.06
4,456.58
22.27
38.56
3,775.41
79.06
631.89
91.36
117,064.11
62,121.82
Naranjo
17,153.08
20,025.00
17,040.97
631.89
91.36
54,942.30
Hormigon
Piedra
(m3) Mediana de
4" (m3)
Arena Fina
(m3)
Afirmado
(m3)
25.16
14.53
0.08
51.49
25.16
14.53
51.58
54.64
54.64
117,064.11
58,532.06
MC-30
(glns)
3,383.87
3,383.87
Cuadro de Agregados
Descripcion
Und
Esponjamiento
Metrado a preparar
PA
m2
0.15
0.50
0.15
25,591.80
16,020.00
23,333.70
1.25
1.25
1.25
29,167.13
m2
137,995.00
0.02
2,621.91
1.40
3,670.67
m2
m2
Base Necesaria
Base Recuperable (40%)
31,989.75
20,025.00
29,167.13
TS1 (20 kg/m2)
0.77
TS2 (6 gk/m2)
0.23
Piedra 1/2"
Piedra Mediana de 4"
m3
m3
Arena Fina
Arena Gruesa
Relleno Estructural
m3
m3
m3
Hormign
m3
m3
und
Cantera Naranjos
m3
Cantera Ambato
m3
Total
Espesor
170,612.00
32,040.00
155,558.00
Sub Base
Over
Base a preparar
Bicapa
Metrado Proyecto
Desperdicio
1.00
1.00
1.00
1.20
1.20
Metrado extraer
Cantera
Cantera
Uso
Pavimento
Mejoramiento
Pavimento
###
4,404.80 De ro
Pavimento
2,823.59
847.08
2,907.54
14.52
51.57
2,460.51
167.42
25.15
2,907.54
14.52
51.57
2,460.51
167.42
25.15
54.63
Pago Cantera
1.25
1.35
1.25
1.25
1.25
1.25
54.63
Transporte
36,019.88
58,090.55
36,019.88
58,090.55
94,110.43
94,110.43
Preparacin
1.25
TRAMO I
36,019.88
55,935.79
27,993.75
29,016.59
###
###
3,634.43
19.60
64.46
3,075.64
209.28
31.44
1.20
1.20
1.20
1.20
1.20
1.20
68.29
1.20
TRAMO II
8,026.13
29,073.96
4,361.31
23.52
77.36
3,690.77
251.13
37.73
De ro
De ro
Concreto
Concreto
De ro
De ro
De ro
Concreto
Concreto
Relleno
De ro
Concreto
81.95 De ro
Relleno
DESCRIPCION
CEMENTO PORTLAND TIPO 1 (42.5 Kg)
ACERO FY`4200 1/2"
ACERO FY`4200 3/8"
ACERO FY`4200 3/4"
ACERO FY`4200 5/8"
MC-30
ALCANTARILLA TMC 36"
UNIDAD
BLS
KG
KG
KG
KG
GLNS
m
CANTIDAD
36,142.14
1,347.78
6,177.49
1,245.76
6,132.09
3,383.87
205.52
DESCRIPCION
CEMENTO PORTLAND TIPO 1 (42.5 Kg)
ACERO FY`4200 1/2"
ACERO FY`4200 3/8"
ACERO FY`4200 3/4"
ACERO FY`4200 5/8"
UNIDAD
BLS
und
und
und
und
CANTIDAD
36,142.14
150.00
1,226.00
62.00
440.00
6,142.14
Metrado
PARTIDAS
OBRAS DE ARTE
ALCANTARILLAS TMC
TMC
Concreto 210 kg/cm2
Concreto 100kg/cm2
Emboquillado en salida de Alcantarilla
ALCANTARILLAS DE CONCRETO
Concreto 210 kg/cm2
CUNETAS
Concreto 175 kg/cm2
Tarrajeo de muros de concreto
MUROS DE CONTENCION
Concreto 210 kg/cm2
Solado
Acero
PARTIDAS
08.SEALIZACION
08.01.Postes Kilometricos
08.02.Seal Reglamentaria 0.60mx0.90m con poste
08.03.Seal preventiva 0.60mx0.60m
08.04.Seal Informativa 1.00mx2.20m
08.07.Guardavias(Incluye Terminales)
CALEN
2016
Unidad-Partida
m
m3
m2
m2
DICIEMBRE
30.92 278.28
38.58 10.96
10.73
1.61
ENERO
34.23
39.87
25.59
308.07
11.32
3.84
FEBRERO
30.92
36.01
23.11
278.28
10.23
3.47
MARZO
34.23
39.87
25.59
m3
m3
m2
m3
m2
290.85
323.23
291.97
2016
Unidad-Partida
Und
Und
Und
Und
m
DICIEMBRE
ENERO
FEBRERO
MARZO
308.07
11.32
3.84
ABRIL
33.13 298.17
38.58 10.96
24.77
3.72
MAYO
JUNIO
32.02 288.18
34.73
9.86
25.59
3.84
9.91
1.49
12.03
###
0.75
9.54
13.79
323.23
312.84
85.86
3.92
391.66
25.06
26.21
JULIO
AGOSTO
16.70 150.30
602.05
0.11
1.93
###
0.29
622.12
0.12
###
7.44
###
###
CALENDARIO DE MATERIALES-08.SEALIZ
2017
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
OBRAS DE ARTE
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
4976.98
4816.40
4976.96
DICIEMBRE
622.12 4976.96
4816.40
4976.96
LES-08.SEALIZACION
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
26.00
17.14
26.00
17.00
DICIEMBRE
6.86
92.00
7.00
92.00
1364.00 1364.00
2018
ENERO
541.85 4334.80
4334.80 36142.12
2018
ENERO
124.00
124.00
1922.00 1922.00
FEBRERO
MARZO
112.00 112.00
1736.00
###
16.00
21.00
1178.00
16.00
21.00
###