FOR
M/s. BLUE STREAM FZCO
PROPOSED CONSTRUCTION OF
WAREHOUSE & OFFICE ON PLOT NO. TP040101
AT TECHNO PARK, DUBAI U.A.E.
VOLUME 1
Section I
INSTRUCTION TO TENDERERS
Section II
CONDITIONS OF CONTRACT
Section III
Section IV
BILL OF QUANTITIES
July 2016
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
Section I
INSTRUCTION TO TENDERERS
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
INSTRUCTION TO TENDERERS
Instruction to Tenderers
INSTRUCTIONS TO TENDERERS
The following instructions should be carefully noted by intending Tenderers and failure to
comply with them may lead to invalidation of the tender. Furthermore it is to be noted that
these instructions to Tenderers will form part of the Contract Documents.
1. General
One set of the following tender documents are issued for tendering:
Volume 1
Volume 2
Volume 3
Volume 4
Instruction to Tenderers
Instruction to Tenderers
9. Alternative Tenders
Alternative Tenders based on specifications other than those in the tender documents
will be considered provided that a Tender fully complying with the conditions laid
down in the tender documents is also submitted. The Tenderer shall give full details of
such alternative specifications together with the effect, if any, on the Tender Sum. The
Employer shall be free to accept whichever Tender he may choose. Alternative
Tenderers must be submitted in the manner in Clause 14 and 16 of these Instructions to
Tenderers and be endorsed Alternative No. 1.
10. Expenses of Tender
The Employer will not be responsible for nor pay any expense which may be incurred
by any Tenderer in the preparation and submission of his Tender.
11. Documents Confidential
All documents issued and information given to the Tenderers shall be treated as
confidential.
12. Currency
The currency of the Contract will be in the Dirhams (AED or Dhs)
13. Language
During the period of tendering all correspondence with the Engineer shall be in the
English Language.
14. Tender Document to be submitted
The Tenderer shall submit the complete set of the tender documents together with two
copies (excluding drawings) each shall be clearly marked COPY. In the event of any
discrepancy the information entered in the original shall take precedence. Also a copy
Instruction to Tenderers
In addition to the documents issued to the Tender for the purpose of submission of the
Tender:
(a) An outline statement of the methods proposed for the construction of the
works.
(b) A programme, in bar chart or network form, showing the sequence of the
construction date/ s for the Works or parts thereof.
(c) A list of the major items of plant or equipment to be used with numbers,
types and capacities.
(d) A chart showing the proposed site staff and management organization for
the work, and the numbers of supervisors and labour including those to be
employed by the sub-contractors.
(e) A list of proposed sub-contractors and suppliers, including local firms, with
particulars of the work which shall be undertaken by them.
(f) The proposed sources of local naturally occurring materials and aggregates.
(g) Any other documentation required to clarify the submission.
15. Tender Bond
The Tender shall submit with his Tender a Tender Bond in the form of an unconditional
bank guarantee from an approved bank in the United Arab Emirates . The bank terms
of the guarantee shall be subject to the approval of the Employer. The amount of the
bond shall be not less than 5% (five percent) of the total Tender Sum as surety against
withdrawal of the Tender before the expiry of the period of validity of Tenders or
otherwise failing to comply with the terms of the Tender. The Employer reserves the
right to instruct the Contractor to extend the Tender Bond validity period for a further
30 days.
Instruction to Tenderers
Failure by the Employer or the Engineer to discover any error during the checking of
the tender shall not entitle the successful Tenderer (or any other Tenderer) to make a
claim for payment against the error if it is subsequently discovered.
Instruction to Tenderers
18. Acceptance
The Employer does not bind himself to accept the lowest or any Tender and will not
state a reason for the acceptance or rejection of a Tender.
19. Return of Tender Bond
After the contract has been awarded, the Tender Bonds will be returned by the
Employer to the unsuccessful Tenderers, provided that the Bond has not been forfeited.
The successful Tenderer shall extend the validity of the Tender Bond until he provides
the Performance Security in accordance with Clause 10 of the Conditions of Contract,
at which time the Tender Bond will be returned.
20. Address of the Contractor
The Tenderer shall state in his Tender the address in the United Arab Emirates to which
all correspondence concerning his Tender shall be addressed.
21. No alteration to be made to Documents
No alteration, other than fill in all the blanks intended to be filled in, shall be made in
any of the documents issued. If any alteration is made and if these instructions are not
fully complied with, the Tender may be rejected.
Instruction to Tenderers
Instruction to Tenderers
Section II
CONDITIONS OF CONTRACT
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
CONDITIONSOFCONTRACT
PART1GENERALCONDITIONS.
TheconditionsofContractshallbeConditionsofContract(International)forWorksofCivilEngineering
Construction, as prepared by the Federation Internationale des Engineers Conseils (FIDIC) Fourth
Edition1987(Reprinted1999withfurtheramendments)asmodifiedoraddedtobythefollowingPart
IIConditionsofParticularapplicationwhichshallbereadandconstruedwithGeneralConditionsasif
theywereincorporatedtherewith.InSofarasanyofthesaidConditionsofparticularApplicationmay
conflictorbeinconsistentwithanyoftheGeneralconditions,TheConditionsofparticularApplication
shallalwaysprevail.
ItisdeemedthattheTendererisinpossessionoftheabovedocument.
PARTIICONDITIONSOFPARTICULARAPPLICATION
Definitions
1.1
IntheContractashereinafterdefined,thefollowingwordsandexplanations
shallhavethemeaningherebyassignedtothem,exceptwherethecontext
otherwiserequires:
A(i)Employeris
BlueStreamFZCO
Dubai,UnitedArabEmirates.
B(iv)TheEngineeris
CorporatePlannersEngineeringConsultants
P.O.Box31548,Dubai.
UnitedArabEmirates.
EngineersDuties
AndAuthority
2.1
Addthefollowing
(d) TheContractorshallmakedueconsiderationinhisTenderforcomplyingwithall
requirements contained in these Conditions whereby specific approval of the
Employerisrequired.
(e) Notwithstandingtheobligation,assetoutabove,toobtainapproval,if,inthe
opinion of the Engineer, an emergency occurs affecting the safety of life or of
theworksorofadjoiningproperty,hemay,withoutrelievingtheContractorof
CorporatePlannersEngineeringConsultants Page1of14
ConditionsofContract
anyofhisdutiesandresponsibilitiesundertheContract,instructthecontractor
toexecuteallsuchwork ortodoallsuch thingsasmay,in the opinionofthe
Engineer, be necessary to abate or reduce the risk. The Contractor shall
forthwith comply, despite the absence of approval of the Employer, with any
such instruction of the Engineer. The Engineer shall determine an addition to
theContractPrice,inrespectofsuchinstruction,inaccordancewithClause52
andshallnotifytheContractoraccordingly,withacopytotheEmployer.
Languagesand
Law
5.1(a) ThelanguageoftheContractshallbetheEnglishlanguage.
However should the Employer request the translation of any document
submittedbytheContractorintoArabicitshallbepreparedbyandatthecost
oftheContractor.
(b) ThelawsgoverningtheContractshallbetheLawsoftheUnitedArabEmirates
andDubai.
(c)The contractor shall conduct all correspondence with the Employer, the
EngineerandEngineersRepresentativeintheEnglishLanguage.
(d) All dates and periods of time shall be construed in accordance with the
Gregoriancalendar.
PriorityofContract
Documents
5.2
Deletethedocumentslisted16andinsert:
(1) TheContractAgreement(ifcompleted);
(2) TheletterofAcceptance;
(3) TheConditionsofContractPartII;
(4) TheConditionsofContractPartI;
(5) TheParticularSpecifications;
(6) TheGeneralspectifications;
(7) TheDrawings;
(8) TheBillofQuantitites;and
(9) AnyotherdocumentformingpartoftheContract.
Performance
Security
AddnewsubClause:
10.4 WherethePerformanceSecurityisintheformofabankguarantee,itshallbe
issuedbyanApprovedbanklocatedinDubaiUAE.
Programmetobe
Submitted
14.1 AddtheFollowing:
ThetimewithinwhichtheprogrammeshallbesubmittedshallbeFourteen(14)
days.
CorporatePlannersEngineeringConsultants Page2of14
ConditionsofContract
TheContractorshallatthesametimediscussandagreewiththeEngineertimes
for receipt of information required. The programmed shall be separated into
sectionstoshowhowthevarioussectionsoftheworkaretobeintegratedand
shall incorporate in detail the work of all sub Contractors, nominated or
otherwise. The programme shall be in the form of detailed bar chart with
declared logic constraints. It should be computer generated and readily
availableinelectronicdataformattobealteredandadaptedtosuiteventson
site. The computer printout should be in clear format and presented in a
compactandreadablemanner.
The Contractor must be aware that he will be working alongside other
contractorsandmustthereforeallowinhisprogrammingforcoordinationwith
othercontractors.
CashFlowEstimate
Estimatetobe
Submitted
14.3
14.5
Languageabilityof
Contractors
Representative
15.2
Languageabilityof
Superintending
Staff
16.3
Thetimewithinwhichthedetailedcashflowestimateshallbesubmittedshall
be14days.
Addthefollowing:
Thecashflowshallbeupdatedwheneverarevisedconstructionprogrammeis
issuedorasrequiredinmonthlyreportbytheEngineer.
Addnewclause:
TheContractorsauthorisedrepresentativeshallbefluentintheEnglish
language.
Addnewclause:
ThereasonableproportionoftheContractorssuperintendingstaffshallhavea
workingknowledgeoftheEnglishlanguage.
Safety,Securityand
Protectionofthe
Environment
19.1 Addthefollowing:
(d)TheContractorshallcomplywiththeregulationsoftheEmployerandany
controllingauthorityinforceattheSiteoftheWorksrelatingtotheprecautions
tobetakenagainstfirehazards.
(e)TheContractorshallcomplyinallrespectswiththeregulationsofallService
AuthoritiesincarryingouthisobligationsundertheContractwhetherfor
TemporaryorPermanentWorks.
CorporatePlannersEngineeringConsultants Page3of14
ConditionsofContract
(f)
Provideandmaintain,ingoodoperatingcondition,suitableandadequatefire
Protectionequipmentandservicesandshallcomplywithallrecommendations
regardingFireprotectionmadebytherepresentativesoftheCivildefenceFire
Service, fire insurance company carrying insurance on the works or the
Engineerandhisrepresentatives.
(g) Provideandmaintainadequatefireprotectionintheformofbarrelsofwater
withbuckets,firebuckettanks,fireextinguishers,orothereffectivemeansof
extinguishingfire,readyforinstantuse,distributedaroundtheprojectandin
andabouttemporaryinflammablestructuresduringconstructionofWorkallas
pertherequirementofLocalCivilDefenceAuthority.
(h) Store and dispense gasoline and other flammable liquids in/from safety
containers. Storage shall not be within buildings. Necessary approval shall be
obtainedfromtheLocalCivilDefenceAuthority.
(j) Approve torch cutting and welding operations performed by Subcontractors.
Before such work is started, and chemical extinguishers shall be available at
eachlocationwheresuchworkisinprogress.
(k) Keep the works orderly and free from all combustible rubbish which shall be
promptlyandlegallyremovedfromsite.
Careofthe
Works
20.1
(c)
(d)
InsuranceofWorks
&Contractors
Equipment
21.1
(d)
(e)
(f)
InsurancePolicy
TobeEndorsed
23.4
Addthefollowing:
TheContractorshallremoveanysand,orrubbishblownorotherwise,which
mightresultindamageordelay.
Duringtheprogressoftheworkandatalltimespriortothedatecompletionor
OccupancyoftheworkbytheEmployer,Whicheverearlier,theContractorshall
providetemporaryventilationenclosure,adequatetopreventdamageto
completedworkorworkprogressortomaterialsstoredonthepremises.
Addthefollowing:
PropertyinTransit
AllrisksTransitInsurancecoveringcarriageofmaterialsandequipments
(IncludingthoseequipmentssuppliedbyDEWA,ETISALAToranyother
concernedauthorities)whicharetobecomepermanentpartoftheproject.
Vehicles
VehiclesThirdPartyinsurancecoveringautomobilesownedorhiredbythe
ContractorinaccordancewithUAELaw.
FireandExplosion
FireandExplosionriskshallbecovered.
AddtheFollowing
Thepolicyorpoliciesofinsuranceshallbeendorsedbytheinsurerstating
compliancewiththetermsofthisClause.
CorporatePlannersEngineeringConsultants Page4of14
ConditionsofContract
Evidenceand
TermsofInsurance.
25.1
Compliancewith
Statutes,Regulations.
26.1
ServiceAuthorities
26.2
Opportunitiesfor
OtherContactors
31.1
Delete:within84daysinline3.
Insert:within28days
nsurancetobebyanapprovedUAEregisteredcompany.
AddtheFollowing
TheContractormustallowinhistenderforallcostsincurredbytheprovisionof
thisClauseincludingthecostofarrangingfor,andcollecting,allpermits,and
obtainingallapprovalsandforpayingallchargesleviedbythevarious
authoritiesinrespectoftemporaryserviceconnections.TheContractoris
responsibleforobtainingallnecessaryinformationrequiredinordertoarrange
forthePermanentElectricalconnections.ForthePermanentconnection,
chargesshallbebornebytheEmployer.
TheContractorshallcomplyinallrespectswiththeregulationsofallService
Authoritieswhetherfortemporaryorpermanentworkinconnectionwiththose
AuthoritiesincarryingouthisobligationsundertheContract.
Addthefollowing
(d)
(e)
(f)
Thecontractorwillberesponsibleforcoordinationwithother
contractorsunderthedirectionsoftheEngineerorunilaterallytohold
andattendnecessarymeetings,etc.,andtherebytopartakeinthe
overallmanagementoftheinterfaceofdifferentpackages,with
respecttoaccessforothercontractor,handoverofsectionsorpartsof
ininterfacewithothercontractorsonsite,toallowaccesssforservices
connectionsorothertemporaryorpermanentworksbyotherpackages
contractors.
Ifthereareothercontractors,subcontractorsorotherpersons
authorizedbytheEngineerortheEmployerworkingin,orusingthe
samearewheretheContractorisperformingitswork,theContractor
shallfullycooperatewiththesepersonstoreduceandeliminateall
delaysorhindranceintheorderlyprogressoftheworkandtoassure
orderlyandexpeditionsperformanceandcompletionsoftheentire
project.
ShouldtheContractorinstallanyportionoftheworkspriorto
coordinationorinsuchmannerasthecauseinterferencewiththework
ofothers,theContractorshall,atitsownexpensearrangeforits
removalormodification,orcuttingandpatchingwhichshallbetothe
approvaloftheEngineer.
CorporatePlannersEngineeringConsultants Page5of14
ConditionsofContract
Contractortokeep
SiteClear
32.1
ClearanceofSiteon
Completion
33.1
Employmentof
StaffandLabour
34.1
SupplyofWater
34.2
AlcoholicLiquoror
Drugs
34.3
Addthefollowing:
Shouldatanytimeafter2daysperiodwarningnoticefromtheEngineerthesite
notbekeptclear,TheEmployermayclearandtidythesitehimselfanddeduct
thecostofdoingsofrommoniesdueortobecomeduetotheContractor,or
recoverthesameasdebtduefromtheContractor.
AddtheFollowing:
ImmediatelypriortotheEngineersinspectionfortheissueoftheTakingOver
Certificate,/theContractorshallclearawayandremove,fromthatpartofthe
sitetowhichsuchTakingOverCertificaterelates,allsurplusmaterial,rubbish
anddebrisandleavetheareacleanfortheinspection.
Addthefollowing
InaccordancewiththeLawsofUnitedArabEmirates.
Addthefollowingsubclauses:
TheContractorshallprovidedonthesite,tothesatisfactionoftheEngineers
Representative,anadequatesupplyofdrinkingwaterfortheuseofthe
ContractorsstaffandworkpeopleincludingtheEngineer.
TheContractorshallnot,otherwisethaninaccordancewiththeLawsofthe
UnitedArabEmiratesforthetimebeinginforce,import,sell,givebarteror
otherwisedisposeofanyalcoholicliquor,ordrugs,orpermitorsufferanysuch
importation,salegift,barterordisposalbyhissubcontractors,agentsor
Employees.
ArmsandAmmunition
34.4
Festivalsand
ReligiousCustoms
34.5
Thecontractorshallnotgive,barterorotherwisedisposeoftoanypersonor
persons,anyarmorammunitionofanykindorpermitorsufferthesameas
aforesaid.
TheContractorshallinalldealingswithlabourinhisemploymenthavedue
regardtoallnationallyrecognisedfestivals,daysofrestandreligiousorother
customs.
CorporatePlannersEngineeringConsultants Page6of14
ConditionsofContract
Epidemics
34.6
Disorderly
Conduct,etc., 34.7
Intheeventofanyoutbreakofillnessofanepidemicnature,theContractor
shallcomplywithandcarryoutsuchregulations,ordersandrequirementsas
maybemadebytheGovernmentorthelocalmedicalorsanitaryauthorities
forthepurposesofdealingwithandovercomingthesame.
TheContractorShallatalltimestakeallreasonableprecautionstopreventany
unlawfulriotousordisorderlyconductbyoramongsthisemployeesandforthe
preservationofpeaceandprotectionofpersonsandpropertyinthe
neighbourhoodoftheWorksagainstthesame.
Observanceby
Subcontractors
34.8
Salaries,etc. 34.9
Recruitment
Statutory
Regulations
TheContractorShallberesponsiblefortheobservancebyhissubcontractorsof
alltheprovisionsofthisClause.
TheContractorshallpayallratesandwages,observehoursandconditionsand
complywithallregulationswhichaffectlabourandothermatterssodefinedby
theLabourLawofUnitedArabEmiratesandtocomplywiththerequirements
sodefinedbytheSocialsecurityregulationsinforceduringthecurrencyofthe
contract,andtocomplywithanyadjustmentsandrevisionsapplicabletothese
LawsandRegulationswhichmaybebroughtintoforceduringtheContract.The
Employershallnotberesponsibleforanyadditionalexpenditurewhichmaybe
incurredbytheContractorinconsequenceofanyincreaseinthewagesor
salariesofworkmenandemployees.
34.10 TheContractorshallnotrecruitorattempttorecruithisstaffandlabourfrom
amongstpersonsintheserviceoftheEmployerorEngineer.
34.11 TheContractorshallobeyallpolice,healthandallotherregulationswhichmay
fromtimetotimerequirehisobservanceandheshallinstructhisagents,
servantsandotheremployeestoobeysuchregulations.TheContractorshallbe
responsibleforkeepingdisciplineontheSiteandShalldismisswithin24hours
fromreceiptofwritteninstructionsbytheEngineertothateffectanyservant,
labourerorotheremployeewhoneglectstoobservetheregulationsorwho
refusestocarryoutinstructionsgiventohimbytheEngineer.
DisorderlyConduct
34.12 TheContractorshalldismissanypersonguiltyofattempteddishonestytothe
EmployerandtheEngineerorofdisobedienceoftheregulationsaforesaidor
ofbadbehaviourorwhocausesorattemptstocausetroubleandunrestamong
thelabourforce.
Addressesofallhisemployeesandholdthisrecordfortheinspectionofthe
Engineer.
Illness
34.14 TheContractorshallreporttheillnessofanyemployeetothenearestdoctor
andalsotheabsencefromworkortransferbecauseofillnessofanyemployee
andshallcomplywiththerequirementsofthelabourLawregardingmedical
inspection.
CorporatePlannersEngineeringConsultants Page7of14
ConditionsofContract
Sanitaryfacilities
34.15 SanitaryconveniencesfortheuseofpersonsemployedontheWorksshallbe
providedandmaintainedbytheContractortotheextent,andsuchamanner,
andatsuchplacesasshallbeapprovedbytheEngineerandtheauthority
concernedandallpersonsconnectedwiththeWorksshallbeobligedtouse
them.TheContractorshallmakealltemporaryarrangementsfortheproper
dischargeofsewageanddrainagefromorinconnectionswiththeworkand
shallmaintainthesametothesatisfactionoftheEngineerandtheauthority
concernedaslongastheymayberequired.
Politicalactivities
34.16 NeithertheContractor,hissubcontractors,hisassociatesnoranyexpatriate
staffandtheirfamilieswillindulgeinanywayinanypoliticalactivitieswhilst
theyareresidentintheUnitedArabEmirates.
Costs,Charges
AndExpenses 34.17 TheContractorshallincludeintheContractpriceallcosts,chargesand
expenseswhatsoeverwhichmaybeincurredbyhimandallrisksinvolvedin
givingeffecttotheprovisionsofthisclause.
Immigration
Procedures
34.18 TheContractorshallmakehisownarrangementstoobtainimmigration
approvalforexpatriatepersonnelorlabourandshallbeheldentirely
responsibletherefore.
LocalLabour
Legislation
34.19 TheContractorshallbedeemedtohaveincludedinhistenderpricefor
Complianceswithanylocallabourlegislationnowinforce,orlikelytocomeinto
force,duringthecurrencyoftheContract.
AccidentPrevention
Officer,Accidents
34.20 TheContractorshallhaveonhisstaffatsiteanofficerdealingonlywith
questionsregardingthesafetyandprotectionagainstallaccidentsofstaffand
labour.Thisofficershallbequalifiedforthisworkandshallhavetheauthority
toissueinstructionsandshalltakeprotectivemeasurestopreventaccidents.
Healthandsafety
34.21 DueprecautionsshallbetakenbytheContractor,andathisowncost,to
ensurethesafetyofhisstaffandlabourand,incollaborationwithandtothe
requirementsofthelocalhealthauthorities,toensurethatmedicalstaff,first
aidequipmentandstores,sickandsuitableambulanceserviceareaavailableat
thecamps,housingandonSiteatalltimesthroughouttheperiodofthe
Contractandthatsuitablearrangementaremadeforthatpreventionof
epidemicsandforallnecessarywelfareandhygienerequirements.
CorporatePlannersEngineeringConsultants Page8of14
ConditionsofContract
RecordsofSafety
AndHealth
35.2
Reportingof
Accidents
35.3
Suspension
40
Contractornotto
SuspendWorks
40.4
Commencementof
Works
41.1
PossessionofSite
AndAccessthereto
42.1
Restrictionson
WorkingHours 45.1
Engineers
Overtime
45.2
PenaltyforDelays
47.1
Addthefollowingclauses:
TheContractorshallmaintainsuchrecordsandmakesuchreportsconcerning
safety,healthandwelfareofpersonsanddamagetopropertyastheEngineer
mayfromtimetotimeprescribe.
TheContractorshallreporttotheEngineerdetailsofanyaccidentassoonas
possibleafteritsoccurrence.InthecaseofanyfatalitytheContractorshall
informtotheconcernedLocalAuthorityandnotifytheEngineerimmediatelyby
thequickestavailablemeans.
Addthefollowingsubclause:
TheContractorshallnotsuspendtheWorksunlesssoorderedbytheEngineer,
pendingtheEngineersdecisiononanymatterunderthecontract.
Delete;assoonasisreasonablypossible.
Insert:within15days.
Addthefollowing
TheContractorshall,atalltimes,keepcleartheaccessroadfrompersons,
deleteriousanddamagingmaterialsandplantandmachinery.
Addthefollowing
TheEmployerreservestherighttopermitworkingattimesoutsidethesehours.
IftheContractorwishesorrequirestoworkoutsidethesehoursheshouldgive
noticetotheEngineerwithinareasonableperiodpriortohisduedatefor
extendingdailyhours.TheEngineerwillrequiredetailsoftheworktobecarried
out,byhowmanymenandwithwhichplantbeforemakinghisdecision.
Addthefollowing:
IntheeventthattheEngineerortheEngineersRepresentativeortheir
assistantsareobligedtosupervisetheContractorsoperationsinexcessof8
hoursperworkingday,oronFridaysordeclaredholidaysintheUAE.Thecost
totheEngineerofsuchovertimeshallbeagreedbetweentheEngineerandthe
Contractor.PaymentwillbemadetotheEngineerbyContractor.
DeleteClause47andaddthefollowing:
Note:AnyreferencetoLiquidatedDamageswithintheContractshallberead
asPenalty.
IftheContractorshallfailtoachievecompletionoftheworks,or,
CommissioningandTestingadescribedinClause43hereofwithinthetime
prescribed,then
CorporatePlannersEngineeringConsultants Page9of14
ConditionsofContract
theContractorshallpaytotheEmployerthesumstatedintheContractas
Penaltyfordelayforsuchdefaultforeverydayorpartofadaywhichshall
elapsebetweenthetimeprescribedbyClause43hereofandthedateof
certifiedcompletionoftheworks.TheEmployermay,withoutprejudicetoany
othermethodofrecovery,deducttheamountofsuchPenaltyfromanymonies
inhishands,dueorwhichmaybecomeduetotheContractor.Thepaymentor
deductionofsuchpenaltyshallnotrelievetheContractorfromhisobligationto
completetheworks,orfromanyotherofhisobligationsandliabilitiesunder
theContract.
Paymentof
Penalty
47.4
Variations
51.2
Variations
Exceeding15% 52.3
NoticeofClaims
53.1
Customs
Clearance
54.3
CustomsDuties
ImportDuties
HarbourDues,etc.,
54.9
Quantities
55.1
AnySumorSumspayableunderthisClause,asstatedintheAppendixtothe
FormofTender,Shallbesopayableandenforceablebythesolefactofthe
delaywithoutlegalorotherformalityandwithoutproofoffinancialloss.
DeletethefollowingfromthisClause
Providedthatthatnoorderinwriting..............................statedintheBillof
Quantities.
Deletethisclauseentirely.
Deletewithin28daysinline4.
Insertwithin14days.
Deletethissubclauseentirely&Addthefollowing:
TheContractorshallmakeallnecessaryarrangementsandshallbesolely
responsibleforobtainingclearancethroughtheCustomsofConstructionPlant,
materialsandotherthingsrequiredfortheWorks.
Addthefollowing
TheContractorshallbedeemedtohaveincludedforpaymentofallcustoms
andotherImportDuties,HarbourandPortDues,Wharfage,landing,Pilotage
andanyotherChargesorduesincludingdemurragechargesonanyPlant,
materialsorotherthingsrequiredfortheWorksenteringtheU.A.E.
Addthefollowing
TheContractorisresponsiblefortheaccuracyoftheQuantitiesandno
adjustmentwillbemadeintheeventofanyerrororomissionintheQuantities.
TheRatesintheBillsofQuantitiesandtheScheduleofratesarevalidforthe
durationoftheContractandwillbeusedtovalueanyVariationswhichmay
occur.
CorporatePlannersEngineeringConsultants Page10of14
ConditionsofContract
Workstobe
Measured
56.1
Nominated
Subcontractors
59.2
(c)
Currencyof
Accountand
Payments
60.11
AdvancePayment
60.12
Delete
And
AddthefollowingClauses:
TheTenderersattentionisdrawntothefactthatthisContractisaFIXEDPRICE,
LUMPSUMCONTRACTforalltheWorks.TheTendereristotally,andwithout
exception,responsiblefordeterminingtheQuantitiesforMaterialsrequired
andforpricinghisbidincompliancewiththeSpecificationsandDrawings.
ThetotalofpricesgiveninthePricingDocument,includingtheGeneralitems,
mustequalthetendersum.
Addthefollowing:
UnlessnotifiedotherwisebytheEngineer,theconditionsofSubcontractwillbe
TheFIDICConditionsofSubcontractforworksofCivilEngineeringConstruction.
Addthefollowing:
TheCurrencyoftheaccountshallbethecurrencyoftheUnitedArabEmirates
andallpaymentsmadeinaccordancewiththeContractshallbeinthecurrency
oftheUnitedArabEmirates.
Addthefollowing:
An advance payment of the amount stated in the Appendix to Tender shall,
following the presentation by the Contractor to the Employer of an approved
performance security in accordance with SubClause 10.1 and a Guarantee in
the form annexed to these conditions or in such other form approved by the
Employerforthefullvalueoftheadvancepayment,becertifiedbytheEngineer
forpayment totheContractor.Such Guaranteeshallbeprogressivelyreduced
by the amount repaid by the Contractor as indicated in Interim Payment
CertificatesoftheEngineerissuedinaccordancewiththisClause.Theadvance
paymentshallnotbesubjecttoretention.Theadvancepaymentshallberepaid
bywayofreductioninInterimPaymentCertificatescommencingwiththenext
certificateissuedafterthetotalcertifiedvalueofthepermanentWorksandany
other items in the pricing document (excluding the deduction of retention)
exceeds10%ofthesumstatedintheLetterofAcceptance.Theamountofthe
reduction in each Interim Payment Certificate shall be one tenth (10%) of the
differencebetweenthetotalvalueofthepermanentworksandanyotheritems
in the Pricing Document (excluding the deduction of retention) due for
certification in such Interim Payment Certificate and the said value in the last
preceding Interim payment Certificate until the advance payment has been
repaidinfull.ProvidedthatupontheissueofaTakingOverCertificateforthe
wholeoftheworksoruponthehappeningofanyoftheeventsspecifiedinSub
Clause63.1orterminationunderClauses65,66or69,thewholeofthebalance
CorporatePlannersEngineeringConsultants Page11of14
ConditionsofContract
Arbitration
Noticeto
Employer
AndEngineer
67.3
thenoutstandingshallimmediatelybecomedueandpayablebytheContractor
totheEmployer.
Delete undertherulesofConciliationandarbitrationoftheInternational
ChamberofCommerce.
Insert accordingtotherulesandregulationsofDubaiInternational
Arbitrationcentre(DIAC)andapplicableLawinUnitedArabEmirates
andintheEmirateofDubai.
68.2
Forthepurposesofthissubclausetherespectiveaddressesare:
(a) TheEmployer: BlueStreamFZCO
Dubai,UnitedArabEmirates
(b) TheEngineer:CorporatePlannersEngineeringConsultants
P.O.Box31548.Dubai.
UnitedArabEmirates.
Noticesentby
RegisteredPost
68.4
Increaseor
Decreaseof
Cost
70.1
Addthefollowing
Anoticesentbyregisteredpostshallbedeemedtobegivenatthetimethree
daysaftertheposting.
DeletethissubclauseentirelyandinsertthefollowingClause:
NoadjustmenttotheContractPriceshallbemadeinrespectofanyincreaseor
decrease in rate of wages, custom and import duties or of market prices of
materialorgoodsspecifiedforincorporationinthework,whichoccurafterthe
dateofsubmissionofTender.
Subsequent
Legislation
Currency
Restrictions
70.2
DeletethissubclauseentirelyandinsertthefollowingClause:
NoadjustmenttotheContractPriceshallbemadeinrespectofanyincreaseor
decreaseinthecosttothecontractorofgoodsandmaterials(whetherfor
permanentortemporaryworks),consumablestoresorplantorinthecostto
theContractorofoceanorairfreightandotherassociatedchargeswhichmay
takeplaceduetoSubsequentLegislationafterthedateofTender.
71.1
DeletethissubclauseentirelyandinsertthefollowingClause:
CorporatePlannersEngineeringConsultants Page12of14
ConditionsofContract
Taxation
AndDuties
71.1
StatutoryTaxes,
CustomDuties,
DuesorFees
73.1
73.2
Detailstobe
Confidential
Releaseof
Information
Explosives
74.1
74.2
75
TheContractormustallowinhistenderforthepaymentofallGovernmentand
Municipal taxes and duties including , but not limited to, road taxes , vehicle
registrationfees,anytaxeswhichmayinthefuturebeleviedonthecontractor
orhisemployeeswhilstemployedonthisprojectandallimportduties.Where
import duties or taxes are refundable it shall be the responsibility of the
Contracttopayallsuchdutiesandtaxesandtoseeksubsequentrepaymentand
noliabilitywhatsoeverforsuchdutiesandtaxesorsubsequentrepaymentshall
fallontheEmployer.
Addthefollowingclauses:
TheContractorwillberequiredtopayallStatutoryTaxes,CustomDuties,Dues
and Fees which are in existence at the date of Tender or Which may be
introducedoramendedduringthecontractperiod.
NoadjustmenttotheContractPriceshallbemadeinrespectofanyincreaseor
decrease in Statutory Taxes, Duties and Fees or introduction of new Statutory
Taxes,Duesand/orFeeswhicheffectsubsequenttothedateofTender.
The Contractor shall treat the contract and everything contained therein a
private and confidential. In particular the Contractor shall not publish any
information,drawingorphotographconcerningtheWorksandshallnotusethe
Site for the purpose of advertising except with the written consent of the
Engineerandsubjecttosuchconditionsashemayprescribe.
All information gathered under this Contract by the Contractor and all reports
and recommendations hereunder shall be treated as confidential by the
contractorandshallnot,withoutthepriorwrittenapprovaloftheEmployer,
bedisclosedormadeavailabletoanypersonorpartyotherthantheEmployer
andtheEngineer.
The obligation on the part of the Contractor to keep all such information
confidentialshallbeofageneralnatureandshallbewithoutlimitationoftime.
TheContractorshallnotuseanyexplosivewithoutthepermissioninwritingof
theEngineerwhowillrequirethattheContractorhascompiledinfullwiththe
regulationsintheUA.E.regardingsuchuse.TheEngineersrefusaltopermitthe
useofexplosivesshallnotconstitutegroundsforclaims.
CorporatePlannersEngineeringConsultants Page13of14
ConditionsofContract
Bribery
76.1
76.2
Anycommission,advantage,gift,gratuity,rewardorbribegiven,promisedor
offered by or on behalf of the Contractor or his agent or servant or anyother
person on his or their behalf to the Employer or to the Engineer or the
Engineers Representative or to any of their respective members, officers,
servants,advisers,agentsoremployeesortoanypersonontheirbehalforon
behalfofanyoftheminrelationtotheobtainingortheexecutionofthisorany
otherContractwiththeEmployermayinadditiontoanycriminalliabilitywhich
maybetherebyincurredsubjecttheContractortothecancellationofthisand
all other Contracts which he may have entered into the Employer and also to
the payment of any loss or damage resulting to the Employer from such
cancellation.
TheEmployershallbeentitleduponacertificateiwritingfromtheEngineerto
deduct the amount so certified from any monies otherwise due to the
ContractorunderthisoranyotherContractortorecoverthesaidamountasa
debt due or partly the one and partly the other as the Employer shall deem
advisable.
CorporatePlannersEngineeringConsultants Page14of14
ConditionsofContract
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
41.1
43.1
43.1
:
:
47.1
47.1
49.1
60.1
Amount of Penalty
Limit of Penalty for Delay
Period of Maintenance
Intervals for Interim Payments
:
:
:
:
23.2
:
:
10 % of Contract Sum
110 % of Contract Sum
60.2
Percentage of Retention
60.2
30 Calendar Days
FORM OF TENDER
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
FORM OF TENDER
SUBJECT :
Dear Sirs,
Having examined the Drawings, Specifications, Instructions to Tenderers, Conditions
of the Contract, and all other documents covered by Table of Contents of Tender
Documents including all addendums, if any, for the execution of the above works,
the undersigned offer to construct, complete and maintain the whole of the said works
in conformity with the said documents for the sum of Dhs.
________________________________________________________
_____________________________________________________) or such other sums
as may be ascertained in accordance with the said Conditions.
We undertake, if our Tender is accepted, to commence work within
_____________days from the date of being given written instructions to proceed and
to complete construction of the whole of the Works comprised in the Contract within
___________calendar days calculated from the date of commencement.
We agree to abide by this Tender for the period of 90 days from the date fixed for
receiving the same, and it shall remain binding upon us and may be accepted at any
time before the expiration of the period.
Unless and until a formal Agreement is prepared and executed, this Tender together
with your written acceptance thereof, shall constitute a binding Contract between both
parties.
We understand that you are not bound to accept the lowest or any Tender you may
receive, nor will you be responsible for, or pay for, expenses or losses which may
have been incurred by us in preparation of this Tender.
Yours faithfully,
Date : _____________________
(Signed)
: ________________________
Name
: ________________________
Designation : ________________________
Name of Firm
: _________________________________________________
Address of Firm
: _________________________________________________
Witnessed By
: _________________________________________________
Address
: _________________________________________________
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
APPENDIX
PROFORMAFORPERFORMANCEBOND
Date:
To:
PostBox:
Dubai
UnitedArabEmirates
OurPerformanceGuaranteeNoforDhs..ProposedWarehouse&OfficeonPlotno.
TP040101atTechnoParkforM/s.BlueStreamFZCO,DubaiUnitedArabEmirates
WhereasourClient,M/s.
hereinaftercalledtheContractor)hasenteredintoacontractwithyoudated.for.
for the above referred works,
weherbyundertaketoholdatyourdisposalthesumofDirhams.
....
(U.A.E.Dirhams...)beingtenpercent(10%)ofSubcontractSumas
PerformanceBond/Surety.ThisBondorSuretyshallbefreeofinterestandpayableincashonyourfirst
demandinthemannerordered,withoutthecontractororanypersononthisbehalforourselveshaving
therighttosuspendordelaypaymentortoobjecttheretoforanyreasonwhatsoever.
This guarantee is valid until .. and shall, before expiry be automatically renewed
until the final Completion Certificate has been issued or until, advise by you that the subcontract has
beenfulfilled.
Yoursfaithfully,
AuthorisedSignatory
AuthorisedSignatory
CorporatePlannersEngineeringConsultants
AppendixtoTender
FORM OF AGREEMENT
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
CONTRACTAGREEMENT
WhereastheEmployerisdesirousthatthecertainWorksshouldbeexecutedbytheContractor,viz:
THE
CONSTRUCTION,
COMPLETION
AND
MAINTENANCE
OF
PROPOSED____________________________________________________________________________
___________________________________and has accepted the Contractors Offer for the execution,
completionandmaintenanceofsuchWorksandremedyingofanydefectsherein.
NOWTHISCONTRACTAGREEMENTWITNESSEDasfollows:
1)
In this Contract Agreement words and expressions shall have the same meaning as are
respectivelyassignedtothemintheConditionsofContracthereinafterreferredto.
2)
The following documents shall be deemed to form and be read and construed as part of this
Agreement,viz:
a) TheLetterofAcceptance
b) ThesaidTender
c) TheInstructionstoTenderers
d) TheConditionsofContract(PartI&II)
e) TheDrawings
f) TheSpecifications
g) ThePriceScheduleandScheduleRates
h) TheBulletins(TenderAddendums)
i) SoilInvestigationReport
3)
InconsiderationofthepaymentstobemadebytheEmployertotheContractorashereinafter
mentioned, the Contractor hereby covenants with the Employer to execute, complete and
maintaintheContractWorksinconformityinallaspectswiththeprovisionsoftheContract.
4)
The Employer hereby covenants to pay the Contractor in consideration of the execution and
Completion of Contract Works and remedying of the any defects therein the sum of UAE
Dirhams._______________________________________________________________________
(InfiguresUAEDirhams____________________________________)orsuchothersumasmay
become payable under the provisions of the Contract and in the manner prescribed by the
Contract.
CorporatePlannersEngineeringConsultants
AppendixtoTender
InwitnesswhereofthepartiesheretohavecausedtheirrespectiveCommonSealstobehereunto
affixedorhavehereuntosettheirrespectivehands,thedayandyearfirstabovewritten.
SIGNEDBY
Dulyauthorizedtosignthis
Contractonbehalfofthe
Name:
Inthepresenceof:
Name:
SIGNEDBY
Dulyauthorizedtosignthis
Contractonbehalfofthe
Name:
Inthepresenceof:
Name:
CorporatePlannersEngineeringConsultants
AppendixtoTender
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
APPENDIX
FORMOFADVANCEPAYMENTBOND
Date:______________________
To:
PostBox:
Dubai
UnitedArabEmirates
AdvancePaymentBondNo..forDhs.
ProposedWarehouse&OfficeonPlotno.TP040101atTechnoParkforM/s.BlueStreamFZCO,DubaiUnitedArab
Emirates
Whereas,ourClient.(hereinafter
calledtheContractor)hasenteredintoacontractwithyou...
.dated..forthe
..of..fortheValueofDhs.
(U.A.EDirhams)
andinconsiderationofyourmakinganAdvancePaymentofDhs..tothe
ContractorbeingTenPercent(10%)oftheContractValue,bythisbond,we..whose
addressis
guaranteetopayyouasumnotexceedingDhs..onyourfirst
writtendemandwithoutreferencetoorcontestationonbehalfoftheContractor.
Itisunderstoodthatourliabilitytowardsyouwillbeprogressivelyreducedbytheamountrepaidtoyou
bytheContractorascontainedintheCertificatesandpaymentsagainstthesaidadvancepayment.
Thisbondwillbeeffectivefrom..andshallbevaliduntil
,oruntiltheamountoftheadvancepaymentisfullyrecovered,whicheverislate.
Thisbondshouldbereturnedtousuponitsexpiryoruponfulfillmentofourundertakingwhicheveris
theearlier.
AuthorisedSignatory
(Tobeissuedbyalocallyregisteredbank)
CorporatePlannersEngineeringConsultants
AppendixtoTender
Section III
SOIL REPORT
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
Project Site
Project Name:
Client:
DXB/0267/16
Corporate Planners
Engg Consultants
NATIONAL LABORATORY, Dubai
BH-3
BH-1
BH-6
BH-4
BH-2
BH-5
LEGEND:
BH-1
- Borehole
A
BOREHOLES LOCATION
PLAN
Project Name:
Client:
A - Cross-section
Line
DXB/0267/16
Corporate Planners
Engg Consultants
NATIONAL LABORATORY, Dubai
Strong
0.1
Very
Weak
10
Weak
Mod.
Weak
100
Mod Strong
Strong
-2
-4
-6
-8
BH1-UCT
SITE:
BH2-UCT
BH3-UCT
BH4-UCT
BH5-UCT
UCS Results
JOB REF :
DATE:
7-Sep-16
BH6-UCT
PLATE No:
DXB/0267/16
2
0
0
BH-1N Value/UCS
BH-2N Value/UCS
BH-3N Value/UCS
dense SAND
LAYER-1
>50
35
BH-6N Value/UCS
A'
350
LAYER-1
dense SAND
>50
?
-2
LAYER-3
v. dense
cemented SAND
4.80MPa
>50
>50
>50
>50
v. dense
cemented SAND
>50
>50
>50
>50
>50 LAYER-2
v. dense
cemented SAND
>50
k
Bedroc
LAYER-3
eak
to w NE
eak STO
w
v. ND
SA
1.35MPa
34
>50
?
-3
34
(-1.0m BEGL)
LAYER-2
>50
3.81MPa
v. weak to weak
SANDSTONE
0.39MPa
-4
-5
BH-5N Value/UCS
Foundation Level
-1
BH-4N Value/UCS
0.48MPa
6.56MPa
LAYER-4
LAYER-4
2.70MPa
-6
4.42MPa
5.16MPa
-7
NL CROSS SECTION DXB_0267_16 - COPY.GPJ GINT STD AGS 3_1.GDT 9/10/16
0.66MPa
6.12MPa
13.8MPa
-8
EOB=8m
EOB=8m
EOB=8m
EOB=8m
EOB=8m
EOB=8m
LITHOLOGY GRAPHICS:
silty SAND with
cemented pieces
SANDSTONE
CALCISILTITE
Plate No: 3
GEOLOGIC/GEOTECHNICAL
CROSS-SECTION ALONG LINE
A-A'
Project Name:
Client:
DXB/0267/16
DXB/0267/16
Client
Corporate Planners
Engineering Consultants
Project
Job No.
BH No.
Location
Client
Corporate Planners
Engineering Consultants
Project
Depth
(m)
Box No.
Job No.
BH No.
Location
Depth
(m)
Box No.
DXB/0267/16
BH-1
1.77 to 6.00m
1
DXB/0267/16
BH-1
6.00 to 8.00m
2
DXB/0267/16
Client
Corporate Planners
Engineering Consultants
Project
Location
Job No.
BH No.
Client
Corporate Planners
Engineering Consultants
Project
Depth
(m)
Box No.
Job No.
BH No.
Location
Depth
(m)
Box No.
DXB/0267/16
BH-2
3.35 to 7.35m
1
DXB/0267/16
BH-2
7.35 to 8.00m
2
DXB/0267/16
Client
Corporate Planners
Engineering Consultants
Project
Location
Job No.
BH No.
Client
Corporate Planners
Engineering Consultants
Project
Location
Depth
(m)
Box No.
Job No.
BH No.
Depth
(m)
Box No.
DXB/0267/16
BH-3
1.85 to 5.20m
1
DXB/0267/16
BH-3
5.20 to 8.00m
2
DXB/0267/16
Client
Corporate Planners
Engineering Consultants
Project
Job No.
BH No.
Location
Client
Corporate Planners
Engineering Consultants
Project
Depth
(m)
Box No.
Job No.
BH No.
Location
Depth
(m)
Box No.
DXB/0267/16
BH-4
2.34 to 6.00m
1
DXB/0267/16
BH-4
6.00 to 8.00m
2
DXB/0267/16
Client
Corporate Planners
Engineering Consultants
Project
Job No.
BH No.
Location
Depth
(m)
DXB/0267/16
BH-5
3.35 to 8.00m
Box No.
Client
Corporate Planners
Engineering Consultants
Project
Job No.
BH No.
Location
Depth
(m)
Box No.
DXB/0267/16
BH-6
1.93 to 6.00m
1
DXB/0267/16
Client
Corporate Planners
Engineering Consultants
Project
Location
Job No.
BH No.
Depth
(m)
Box No.
DXB/0267/16
BH-6
6.00 to 8.00m
2
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
GENERAL
The Contract shall be a Lump Sum Contract based on drawings, Specifications and Bills of
Quantities.
Any drawings issued with the documents indicating existing site levels, etc. are issued for
general information only and it is the responsibility of the Tenderer to satisfy himself as to the
accuracy of the levels, etc. in computation of his quantities and no claim will be entertained for
any variation between levels indicated and actual levels.
The Contractor is advised to carefully comprehend his contractual obligations under the
provisions of the above contract and fully understand the proposed Scope of Works.
It is the Contractors responsibility to insert the correct rates against each item in the unit rate
column of the Bills of Quantities. Omitted items or incorrectly inserted rate shall be the sole
responsibility of the Contractor. No claim for additional payment will be allowed for any error
or misunderstanding by the Contractor in these respects.
The rates for each item must be comprehensive and must include for complying with the
Specification, cover all the obligations under the Contract and all matters and things necessary
for the proper construction, completion and maintenance of the works. No claims for additional
payment will be allowed for any error or misunderstanding by the Contractor of the work
involved.
These Preamble clauses shall be read in conjunction with the Conditions of Contract, Tender
Drawings and Specifications, and they shall not be considered as exhaustive but merely as
highlighting certain points. These documents shall be taken as mutually explanatory of one
another.
The schedule of rates will be used to measure and value variations in the Contract described in
the relevant Clause of the Conditions of Contract. Any item in the Bill of Quantities that is not
used for the project, the Client has the right to deduct the said amount.
The descriptions included in the Bill of Quantities to describe the workmanship and materials
necessary for each item are not necessarily complete. The Tenderer is referred to the
Specifications, Conditions of Contract and other documents and the Drawings for further
information concerning the Works and no claim or variations will be considered on account of
his failure to acquaint himself with such information.
The selected Contractor will be required to provide the Engineer with a full and detailed
Tender breakdown upon being awarded the Contract.
If the Contractor should strike any scaffolding before ascertaining whether it is required by any
Subcontractor and contractor or other employed direct he will have to re-erect it, if so required,
at his own expense.
GENERAL (cont.)
The Tenderer should submit together with his tender, the breakdown of the tendered rates in
the Rate Analysis schedule. Further, the Contractor will be required to provide the Engineer
with a full and detailed Rate Breakdown within 48 hours of being so requested. The breakdown
is to show the actual calculations of the Preliminaries, labour, Plant and Materials cost for the
Works, build-up of measured rates with on-costs and overheads and any other allowances used
to arrive at the Tender Price.
Variations The rates inserted in the Bills of Quantities with the application of the adjustment
item will be used to value to any variations to the Works, whether omissions or additions. The
Contractor shall not be entitled to payment for profit and overheads on the value of Work
omitted. Any variations from the Contract Drawings will be valued by the Engineer and the
Contract Price adjusted accordingly.
Bill Items for Site Offices, Plant, Workshop and Site Laboratory Facilities
Payment for the establishment of these items will be lump sum which will be made only after
the completion of all facilities. Breakdown of all lump-sum amounts to be submitted together
with the Tender Submission.
Payment for the maintenance of these items will be in monthly installments.
Payment for the removal of these items will be by lump sum which will be made only after the
completion of their removal. The removal of the Site Office for the Engineer shall be one
month after completion of the Works.
Bill Items for Contractors Site Management, Site Protection, Etc.
Payment for these Bill Items shall be in monthly installments.
These installments can be suspended, reduced or deleted from any Contract Payment, if in the
opinion of the Engineer; the Contractor is not fulfilling his obligations.
The rate inserted for General Protection of the site shall include for the cost to maintain access
to areas adjacent to the work site.
The item for Traffic safety and control shall include the cost of all temporary traffic diversion
and traffic management necessary to complete the Works. The item shall include for liaison
with the Police and Local Municipality and conforming to their requirements for safety.
Bill items for Traffic Safety, temporary Diversion & Cleaning of Site
Temporary Works, diversions, site cleaning, etc. and other items not otherwise covered in this
preamble or otherwise detailed in this Bills of Quantities will be cost related items and will be
paid as a percentage of work completed to total value of work.
GENERAL (cont.)
Bills for Surveying Equipment
Payment for the establishment of this surveying equipment will be by lump sum and it will be
made only after the delivery of all equipment specified. Payment for items maintained will be
in monthly installments.
Bills for Providing Assistance to the Engineer
Payment for this item shall be in monthly installments and is deemed to cover all costs in
providing assistance to the Engineer by the Contractor as stated in the Contract.
Bill Item for Project Sign Boards
Payment for project Sign boards shall include for erection, maintenance, removal within the
month of substantial completion and reinstatement of ground to its original state.
Bill Item for Progress Photograph
Payment for progress photographs will be by set of monthly photographs as defined in the
Specification.
Bill item for Conditions of Contract
Payment for this item will be by monthly installments and shall cover all costs and expenses
including overhead and profits incurred by the Contractor in carrying out the requirements of
the Conditions of Contract not otherwise included in the Bill of Quantities. Breakdown of all
lump sum amounts to be submitted together with the tender Submission.
Items for which the measurement unit is in days, such items shall be measured for the actual
period for which facilities, services, etc., are provided in accordance with the construction
programme. Measurement will commence only after the completion of the Mobilization period
and on the day as approved by the Engineer in agreement for the facilities, service, etc., when
fully provided.
These installments can be suspended, reduced or deleted from any Contract Payment, if in the
opinion of the Engineer; the Contractor is not fulfilling his obligations.
Bill for Items not Included in the BOQ
The Tenderer is to detail any additional items with quantities and rates not previously included
to complete the build up of the lump sum tender price for this section of the works.
Should the Tenderer fail to insert any items here, it will be deemed that his lump sum price for
the tender includes all items necessary to make the various systems outlined in the
specifications & drawings, an no subsequent claim for any additional item will be entertained.
Definition
linear meter
square meter
cubic meter
kilogram
millimeter
centimeter
number
Lump Sum
UAE Dirhams
British Standard
American Society for Testing and Material Standards
minimum
maximum
quantity
drawing(s)
diameter
continued
Specification
Measured Separately
Heating, Ventilation and Air Conditioning
DESCRIPTION OF ITEMS
Description of work and materials given in the specifications and drawings are not necessarily
repeated in the Bills of Quantities. Trade preambles are not necessarily restricted to specific
Bills but shall be held to apply throughout the Documents.
Any discrepancy between the Contract Documents shall be brought to the notice of the
Engineer in writing for his decision as to which is the correct interpretation before the work is
commenced. Dimensions and sizes shown on Drawings shall generally take preference over
those stated in the Specifications or the execution of the Works.
PRICING GENERALLY
The Contractor shall satisfy himself as to the meaning of every item in the bills of Quantities
and rates inserted shall be deemed to cover all his obligations under the Contract and all items
necessary for the proper construction and maintenance of the Works.
DEWATERING WORKS/SYSTEM
The Lump Sum rate shall include for:
A. Equipment, plant and labour necessary for carrying out the dewatering works.
B. Spare parts, standby pumps, fuel, consumable items and all attendance associated with
the dewatering works
The Lump Sum rate shall include for (cont.):
C. Connection charges, authorities fees and charges, equipment, plants, labour, etc.,
necessary for the disposal of water.
D. Initial, time related and dismantling and demobilization costs associated with the
dewatering system.
E. Provision of method statement, design calculations and shop drawings to the approval
of the Engineer.
SHORING SYSTEM/PLANKING & STRUTTING
The Lump Sum rate shall include for:
F. All material, plant and equipment for upholding the sides of excavations.
G. All necessary labour, consumable items and tools, etc.
H. Mobilization and demobilization of plant; dismantling all temporary shoring works and
removal from site.
I. Any type of shoring system required as approved by the Local Authorities and the
Engineer.
J. Any type of shoring system required as approved by the local authorities and the
engineer.
K. Provision of method statement, design calculations and shop drawing to the approval of
the engineer
L. Cutting of upper portion of shoring system if required to meet the local authorities
requirement.
B.
C.
D.
E.
F.
CONCRETE WORK
CONCRETE
A. In-situ plain and reinforced concrete have been measured nett in square meters stating
the thickness or in cubic meter. Precast units are measured linearly stating the overall
sizes. The volume of concrete displaced by reinforcement and the volume for pockets,
holes, chases, mortices and the like are not deducted. Voids of less than 0.5m2 in area
are also not deducted.
B. Columns and walls below ground have been measured from top of foundation to top of
basement slab or ground slab.
C. Tie beams and strap beams have been measured up to the top of basement slab or
ground slab.
D. Beams have been measured as full depth including the part within slab thickness.
E. Beams have been measured as full including the part within slab thickness.
F. Upstands, parapets, kerbs and the like have been measured fro the top of the slab from
which they project.
Rates for concrete shall include for:
G. The supply of all materials, storage, plant and equipment, tools, admixtures, trial mixes,
mixing, sampling and testing.
H. Hoisting and depositing concrete imposition, vibration and consolidation of concrete
and compaction around reinforcement.
I. Forming construction joints, provision of water stops (where necessary) and forming
edges of beds where lain in bays.
J. Providing tamped or trowelled or floated surfaces as required and for finishing to falls
or slope.
K. Thicknessing under block walls
L. Cutting or forming mortices, apertures, grooves, chases, rebates and chamfers.
M. Grouting, casting in-pipes, pipe sleeves, ducts, dowels, fixing bolts and the like.
CONCRETE (cont.)
Rates for concrete shall include for:
A. Building in ends of lintels, etc.
B. Curing as specified.
C. The preparation of a detailed bar bending schedule and submission for Engineers
approval.
H. Fixing or ironmongery including matching fixing screw, etc. and shall include
removing before painting and then re-fixing.
I. Fitting and hanging
J. Preparing & painting or polishing/varnishing as indicated.
K. Rates for glazed doors shall include glass and beads.
L. Providing holes for door grilles and/or undercutting.
METAL WORK & GLAZING
A. Aluminium curtain walling, doors, windows and the like have been enumerated.
Rates for metal work shall include for:
B. Assembling, cutting and waste, welding and grinding, drilling, counter sinking, bolting
and riveting.
C. Shop coating with rust inhibitive primer, haulage, protection and storage.
D. Aluminium sub-frames if and where required, hoisting and fixing in position, caulking
with mastic, grouting mortices with cement and sand grout.
E. Inspection of metal work at workshop by the Engineer if necessary.
F. Ironmongery as required including matching, fixing screws, etc. and shall include for
fixing, removing before painting and then refixing.
G. Approved design and quality weather and draught seals.
H. Preparation and submission of shop drawings and samples for Engineers approval.
I. Submitting detailed design criteria and calculations allowing for factors such as the size
of panels, wind load, weight of glazing, etc. to substantiate the size, strength and design
of the proposed extruded sections and thickness of glass.
METAL WORK & GLAZING (cont.)
Glazed Units
J. Rates for glazed doors shall include glass, glazing accessories and beads as required.
K. Rates for glazing work shall include for cutting to required sizes and shapes, forming
holes, supplying and fixing all required gaskets, clips, beads, points, metallic putty, etc.
protection of all glass from damage, replacing damaged panels, cleaning throughout
and leaving all work in perfect condition.
L. Rates of galvanized work shall include for the treatment of cut ends, etc as required.
M. Rates for doors/frames shall include for concrete filling at jambs as required.
FLOOR, WALL & CEILING FINISHING
General
A. Floor, wall and ceiling finishes have been measured nett in m2.
B. Rendering and wall tiling have been measured from top of skirting (if any) to soffit of
slab. Where there are suspended ceilings, measurements were taken to the soffit of the
suspended ceiling plus 100mm unless otherwise indicated on drawing. All openings
and other unfinished areas over 0.5m2 have been deducted. Rendering to ceiling has
been measured flat.
Rates shall include for:
C. Waterproofing to kitchen bathrooms and other wet areas and rooms as indicated have
been measured as flat area in m2. Rates for waterproofing to wet areas is deemed to
include for carrying the waterproofing up walls to 100mm above FFL and up to 100m
above the bathtubs.
In-Situ Finishing
Rates for In-Situ Finishing shall include for the:
H. Forming horizontal or vertical guide screeds and for supplying hardwood guide blocks.
I. Preparing surface and providing expanded metal lath at junctions of blockwork and
concrete.
J. Work to curved surfaces.
K. Rates for paint work for timber works shall include for rubbing down with glass paper
before painting. All exposed surfaces of woodwork covered with plywood lining,
veneered, etc. shall receive two coats of approved wood preservative as specified.
PLUMBING AND MECHANICAL ENGINEERING INSTALLATIONS
All works shall be complete as specified, as shown on the drawings and to the approval of the
Engineer.
A. Pipe work lengths measured are mean length as fixed in position. Rates for pipe work
laid underground shall include all excavation, concrete encasement, sand surround,
dewatering, backfilling and disposal of surplus soil.
B. Rates for pipework laid underground shall include for all dewatering required to keep
the excavated trenches clear of water by pumping, bailing or well point dewatering.
C. Rates for pipework shall include joints in the running length, fittings (e.g. Tees,
junctions) made bends, cutting, short lengths and waste. Rates for pipework shall
include for painting.
D. Rates for pipework shall include for pipe clips, holderbars, insulation, and lagging
fixing to any background, hangers, supports, guides, expansion joints, unions, flanges,
dielectric isolators, flexible coupling.
E. Rates for piping shall include for cleaning, flushing and disinfection of all systems as
per specification.
F. Rates for piping shall include for provision of automatic air vents, drain valves of
risers, air chambers and vacuum breaker.
G. Rates shall allow for water hammer and stress analysis of the piping network
H. Rates shall allow for thrust blocks and anchors.
I. Rates for sanitary fixtures shall include for assembling, jointing and fixing in position
complete with all taps, mixers, traps, cisterns, flush pipes and the like. Rates shall also
include for connection to service pipes.
J. Rates for all plumbing work shall include for making out positions and any temporary
removal necessary for decoration.
PLUMBING AND MECHANICAL ENGINEERING INSTALLATIONS (cont.)
K. Builders work in connection with plumbing installation shall include, but not be limited
to cutting or forming holes, chases, channels, recessed pipes enclosure with removable
covers, etc. in block work, concrete, timber and other materials , providing and building
or casting in pipe sleeves, clamps, brackets, hangers, holdfasts and the Line Builders
work in connection shall include for making good on completion all works in
connection shall include for making good completion all works disturbed by the
plumbing installation.
L. Allow for spare fire sprinklers as per specifications.
M. Builders work in connection with mechanical installation shall include but limited to:
N. Rates for air conditioning and ventilation system shall include for forming or cutting
holes, chases, channels, etc. in reinforced concrete structures and block work, providing
steel pipe sleeves, clamps, brackets, hangers, supports, tools, ladders, scaffolding, etc.
painting metal works, making good around any other incidental requirements for the
proper execution of the air conditioning and ventilation system in accordance with the
Drawings.
O. Rates shall include for testing the equipment under the supervision of the Engineers
representative including any modifications, adjustments, or repairs which may be
required during or on completion of the test, all as required and to the satisfaction of the
Engineer.
P. Rates shall include for volume splitter, volume, dampers, fire dampers, gauge test
points in ducts and for system balancing all in compliance with ASHRAE, SMACNA
& NEPA requirements.
Q. Rates for flexible ducts shall include for butterfly volume dampers.
R. Rates shall include for access openings with access doors, inducts as per specification
and to the approval of the Engineer.
S. Except for chilled water pumps, rates for pumping units shall include for the built-in
and/or isolated control panels and all interconnecting control wiring and power supply
from panel to pumps and accessories. (Conduiting is not included)
T. Rates for all pumps shall include for all valves, strainer, flexible connections, gauges at
suction and discharge of each pump.
U. Rates shall include for sound attenuators and linear as per specification to the approval
of the Engineer.
V. Rates shall include for temporary disposable filters on air handlers as per specifications.
drawings as indicated in the specifications and/or in the drawings for the approval of
the Engineer prior to commencement of the Works and of ordering of materials.
Y. Rates for plumbing and HVAC systems shall include for closing ceilings in Technical
Floor shafts with either concrete slab as adjacent slabs or structural steel supported
checquer plates to Engineers approval.
ELECTRICAL INSTALLATIONS
Rates for Electrical Works shall include for:
A. Plugs, drawing wires and cables, sinking ends of cables to exposed conductors and
capping ends of cables, connections to equipment with cable glands, etc.
B. Factory rust inhibiting primer, including storage and protection of all Electrical Works.
C. Supplying and painting all exposed surfaces of electrical metal work with one coat of
rust inhibiting Galvafroid primer or approved equivalent and two coats of approved
chlorinated rubber paint, and painting concealed surfaces of panel board cabinets with
emulsified asphalt.
D. Laying all conduits concealed in reinforced concrete slabs, columns, walls, floors,
blockwork or exposed all as indicated on Drawings.
E. Providing all testing devices, equipment and any electrical power necessary for testing
before putting into operation the completed electrical system under the supervision of
the Engineer, also for carrying out any modification or repairs necessary on completion
of tests to the satisfaction of the Engineer.
F. Testing all installations as specified under the clause: Tests and Certificates.
G. Preparation and furnishing of detailed workshop drawings as indicated in the
specifications, and/or the drawings for the approval of the Engineer prior to
commencement of the works and/or the ordering of materials.
H. Sealing openings, etc., with fire proofing materials, if not included elsewhere.
I. Rates for feeders shall include cables (single core or multi-core armored or unarmored
as applicable) conduits if any, cable cleats at every meter run, cable glands, etc.
L. Rates for cables and wires shall include earthing wires and/or cables.
M. Rates for devices and equipment shall include nameplates and engraving.
N. Rates for ducts and conduit lead-ins and crossings shall include fire-proofing filling
material.
O. Builders work in connection with electrical installation shall include nut not be limited
to forming or cutting holes, chases, channels, etc. in reinforced concrete structures and
block work and also for providing sleeves, clamps, brackets, hangers, holdfasts, screws,
bolts and nuts, excavating and dewatering of trenches, backfilling for underground
cable duct banks and directly buried cables. Builders works shall also include making
good around all trades disturbed by the execution of electrical installation.
P. Civil works in connection with electrical installation shall include for all incidental and
associated works for the proper installation, completion and commissioning of the
Electrical Works.
EXTERNAL WORKS
A. The Preamble clauses for other trades shall equally apply to work measured under this
section.
B. Rates for pavings, kerbs, and the like shall include for the supply and installation of all
materials as shown on the drawing or as directed by the Engineer.
PROVISIONAL SUMS
A. Provisional sums are included for use as directed by the Engineer.
B. Where the Contractor is required to add for Profit a percentage figure shall be
inserted as indicated. This percentage shall include for site office, head office and other
overheads.
C. Where the Contractor is required to add for Attendance and/or Charges a
percentage/lump sum figure shall be as inserted as indicated. This percentage/lump sum
shall include the following where work is to be executed by a sub-contractor.
(a) Use of temporary roads, pavings, paths, standing and special scaffolding,
hoisting/cranage plant, lighting and water, offices, office facilities and sanitary
facilities.
(b) Unloading, distribution, hoisting/lifting and placing in position (if not carried
out by the Sub-Contractor)
PROVISIONAL SUMS (cont.)
(c) Providing secure storage facilities with lighting and power.
(d) Providing power (if required)
(e) Protecting the work on completion.
(f) Necessary supervision, coordination and shop drawings as applicable/required.
The adjustment item shall not be a lump sum but a percentage of the total tendered sum
excluding Provisional Sums or a percentage of the total for the items indicated. The adjustment
item shall be applied to all applicable item rates and sums entered in the Tender Summary
(including any addenda). The Contract shall be signed with the inclusion of the adjusted rates
and sums. The adjusted rates and sums shall be applied measurement and for the valuation of
variations.
GENERALLY ALL TRADES
Should the Contractor wish to use alternative materials to those specified, e.g. to utilize local
stocks or suppliers instead of imports, he shall obtain the approval of the Engineer. Any
alternative materials shall not be of a lesser standard than those stipulated herein.
DAYWORKS
The Engineer may, if in his opinion it is necessary or desirable, issue an instruction that any
varied work shall be executed on a daywork basis. The Contractor shall then be paid for such
varied work under the terms set out in the daywork schedule included in the Contract and at the
rates and prices affixed thereto by him in the Tender.
The Contractor shall furnish to the Engineer such receipts or other vouchers as may be
necessary to prove the amounts paid and, before ordering materials, shall submit to the
Engineer quotations for the same for his approval.
In respect of such of the Works executed on a daywork basis, the Contractor shall, during the
continuance of such work, deliver each day to the Engineer an exact list in duplicate of the
names, occupation and time of all workmen employed on such work and a statement, also in
duplicate, showing the description and quantity of all materials and Contractors Equipment
used thereon or therefore other than Contractors Equipment which is included in the
percentage addition in accordance with such daywork schedule. One copy of each list and
statement will, if correct, or when agreed, be signed by the Engineer and returned to the
Contractor.
At the end of each month the Contractor shall deliver to the Engineer a priced statement of the
labour, materials and Contractors Equipment, except as aforesaid, used and the Contractor
shall not be entitled to any payment unless such lists and statements have been fully and
punctually rendered. Provided always that if the Engineer considers that for any reason the
sending of such lists of statements by the Contractor, in accordance with the foregoing
provisions, was impracticable he shall nevertheless be entitled to authorize payment for such
work, either as daywork, on being satisfied as to the time employed and the labour, materials
and Contractors Equipment used on such work, or at such value therefore as shall, in his
opinion, be fair and reasonable.
SECTION IV
BILL OF QUANTITIES
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
GENERAL SUMMARY
Office No. 1601, Silver Tower, Business Bay, Dubai. P.O. Box 31548. Tel. 04- 2779058. Fax. 04-2779059
E-mail:- cpec@cpecdxb.ae
PAGE No.
Bill No. 1
Preliminaries
1.1 - 1.3
Bill No. 2
Earthwork
2.1 - 2.2
Bill No. 3
Concrete
3.1 - 3.4
Bill No. 4
Masonry
4.1 - 4.2
Bill No. 5
Metal Works
5.1 - 5.1
Bill No. 7
7.1 - 7.2
Bill No. 8
8.1 - 8.3
Bill No. 9
Finishes
9.1 - 9.3
Bill No. 10
Specialties/Provisional Sums
10.1 - 10.1
Mechanical - Plumbing
15.1 - 15.4
Bill No. 16
Electrical works
Telephone System
Bill No. 17
AC.1 - AC.2
Bill No. 18
Day works
18.1 - 18.4
AMOUNT (Dhs)
E.1 - E.2
FA.1 - FA.1
T.1 - T.1
DISCOUNT
TOTAL AMOUNT CARRIED TO FORM TENDER
Bill of Quantities
Description
Unit
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Quantity
Rate
Amount
Dhs
Bill of Quantities
Description
Unit
Item
Item
Item
Item
Item
Item
Item
Item
Item
Quantity
Rate
Amount
Dhs
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
Bill of Quantities
Bill No.1
PRELIMINARIES (Cont.)
No.
AMOUNT
Dhs
Description
Bill No.1 Preliminaries Collection
Page 1/3
Page 2/3
Page 3/3
1.4
Bill of Quantities
No.
Bill No. 2
EXCAVATION & EARTH WORK
Description
Unit
Quantity
Rate
Amount
Dhs
m3
Back fill the areas in layers with required watering & compaction
with the excavated earth or with procured earth from external
source in order to achieve required finished floor level of as
shown in the drawings.
m3
m3
m3
Item
Bill of Quantities
No.
Bill No. 2
EXCAVATION & EARTH WORK
Description
Unit
Quantity
Rate
Amount
Dhs
Bill of Quantities
Bill No.2
EXCAVATION & EARTHWORK (cont.)
No.
AMOUNT
Dhs
Description
Bill No.2 Excavation and Earthwork
Page 1/2
Page 2/2
2.3
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
SUBSTRUCTURE
A
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
LS
Re-inforcement Steel
kg
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
SUBSTRUCTURE (cont.)
A
m2
m2
m2
m2
m2
m2
m2
m2
m2
Sundries
1. Horizontal and vertical construction joints
2. Allow for builders work to DEWA and
other local authority requirements.
3. Water stop to vertical and horizontal
construction joints.
4. Extra for laying slab to falls.
Item
Item
Item
Item
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
SUPERSTRUCTURE
A
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Re-inforcement Steel
a. High Tensile bars of various diameters
kg
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
SUPERSTRUCTURE (cont.)
A
m2
m2
m2
m2
m2
m2
LS
Bill of Quantities
Bill No.3
CONCRETE (cont.)
No.
AMOUNT
Dhs
Description
Bill No. 3 Concrete
Page 1/4
Page 2/4
Page 3/4
Page 4/4
3.5
Bill of Quantities
Description
Unit
Rate
Amount
Dhs
Quantity
m2
m2
m2
m2
m2
Item
m2
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
LM
LM
Item
Item
Item
Bill of Quantities
Bill No.4
MASONRY (cont.)
No.
AMOUNT
Dhs
Description
Bill No. 4 Masonry
Page 1/2
Page 2/2
4.3
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
Supply and fixing stainless steel and glass hand drail to main staircase
Item
Item
Item
Item
Bill of Quantities
Bill No.5
METAL WORK (cont.)
No.
AMOUNT
Dhs
Description
Bill No. 5 Metal Works
Page 1/1
TOTAL Bill No. 5 - Carried to General Summary
5.2
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
SUBSTRUCTURE
Supply, apply and install waterproofing
membrane including primer and protection board
as per drawings, specification and to Engineer's
approval.
A
m2
m2
LM
m2
LM
ROOFING
F
Bill of Quantities
Description
Unit
Wet Areas
(Bitumen paint - Nitoproof)
Cold applied bitumen waterproofing
membrane to wet areas, kitchens, toilets as per
specification and to Engineer's approval
m2
m2
LM
m2
Quantity
Rate
Amount
Dhs
Bill of Quantities
Bill No.7
THERMAL & MOISTURE PROTECTION (cont.)
No.
AMOUNT
Dhs
Description
Bill No. 7 Thermal & Moisture Protection
Page 1/2
Page 2/2
7.3
Bill of Quantities
Description
Unit
Quantity
NO.
NO.
NO.
NO.
NO.
Rate
Amount
Dhs
DOORS
Main Entrance, Stair case
Ground Floor
Aluminum powder coated push type door with reinforced clear glass with
spacing+6mm clear glass aluminum panel insert including the lock set
of union yale make
Iron Mongery to Manufacturer's recommendation and approval of consultant
AD01- 1900 x 2100
Corridor
Ground
Aluminum powder coated push type door with reinforced clear glass with
spacing+6mm clear glass aluminum panel insert including the lock set
of union yale make
Iron Mongery to Manufacturer's recommendation and approval of consultant
AD03 - 1000 x 2100
Bill of Quantities
Description
Unit
Quantity
NO.
11
NO.
NO.
NO.
NO.
Rate
Amount
Dhs
Toilet
Ground
Wooden swing door with louver at bottom and oil paint on both side and lock
set of union or yale make (with door closer)
Iron Mongery to Manufacturer's recommendation and approval of consultant
WD03 900 x 2100
Warehouse
Ground
Steel door, half reinforced clear glass with push bar for fire exit and finished with
one coat of red oxide primer and two coats of jotun pilot II. Inside and outside
paint to engineers aprpoval. To comply with DCD requirement
Iron Mongery to Manufacturer's recommendation and approval of consultant
F.E.D - 1000 x 21000
Loading/Unloading Area
Ground
Sectional overhead door (electrically operated) by Crawford)
Iron Mongery to Manufacturer's recommendation and approval of consultant
OSD 3000 x 5000
10
Bill of Quantities
Description
Unit
Quantity
NO.
11
NO.
NO.
NO.
NO.
Rate
Amount
Dhs
WINDOWS
Warehouse & Office
Ground Floor, Roof
Powder coated aluminum sliding panel double glazed with reflective 12mm
spacing+6mm clear glass
Iron Mongery to Manufacturer's recommendation and approval of consultant
AW01 - 1600 x 1200
Main Entry
Ground
2 side covered curtain wall with powder coated aluminum fixed double glazed
with 6mm THK. Reflective 12mm THK spacing + 6mm clear glass
Iron Mongery to Manufacturer's recommendation and approval of consultant
CW01 - 8700 x 2800
Directors Cabin
Ground
2 side covered curtain wall with powder coated aluminum fixed double glazed
with 6mm THK. Reflective 12mm THK spacing + 6mm clear glass
Iron Mongery to Manufacturer's recommendation and approval of consultant
CW02 - 4150 x 3600
Bill of Quantities
Bill No.8
DOORS & WINDOWS (cont.)
No.
AMOUNT
Dhs
Description
Bill No. 8 Doors & Windows
Page 1/3
Page 2/3
Page 3/3
8.4
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
FINISHES
Supply, apply and install the following finishes
complete as per drawings, specification and
Architect's approval
FLOOR FINISH
1
Main Lobby
900x900 unglazed ceramic tiles (supply) Cost Dhs. 100/m2)
2
Entrance Step
Granite Tiles (Supply) Cost Dhs. 250/m2
Telephone Room
Smooth power floated concrete finish FC 140
Pump Room
Smooth power floated concrete finish FC 140
Toilet
Ceramic tiles 300x 300 unglazed Dhs. 60/m2
10
Display Area
Smooth power floated concrete finish FC 140
11
Warehouse Staircase
Hard Epoxy coat
SKIRTING
1
Main Lobby
900x900 unglazed ceramic tiles (supply) Cost Dhs. 100/m2)
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
Main Lobby
Emulsion paint on smooth C/S plaster
Entrance Step
Telephone Room
Emulsion paint on smooth C/S plaster
Pump Room
Emulsion paint on smooth C/S plaster
Toilet
200 x 300 glazed wall tiles
10
Display Area
Epoxy paint on smooth c/s plaster surface
11
Warehouse Staircase
Emulsion paint on smooth C/S plaster
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
CEILING FINISH
1
Main Lobby
60X60cm moisture resistant gypsum tile suspended false ceiling mounted
on G.I. hidden grid system with necessary shadow angle to avoid
cut tiles with bulkhead to be finished in fenomastic paint
Telephone Room
Hi-Tech plaster paint
Pump Room
Hi-Tech plaster paint
Toilet
60X60cm moisture resistant gypsum tile suspended false ceiling mounted
on G.I. hidden grid system with necessary shadow angle to avoid
cut tiles with bulkhead to be finished in fenomastic paint
Remarks
Office Staircase
Stainless steel and glass handrail to Engg. Approval
Warehouse Staircase
Stainless steel handrail to Engg. Approval
EXTERNAL FINISHES
Roofing System
Roofing & cladding powder coated aluminum sandwiched panel
(0.7mm aluminum profile sheet + 75mm thk insulation + 0.5mm
inside sheeting)
Bill of Quantities
Bill No.9
FINISHES (cont.)
No.
AMOUNT
Dhs
Description
Bill No. 9 Finishes
Page 1/4
Page 2/4
Page 3/4
Page 4/4
9.4
Bill of Quantities
No.
Bill No.10
SPECIALITIES/PROVISIONAL SUMS
Description
Unit
Quantity
Rate
Amount
Dhs
15,000.00
75,000.00
200,000.00
Signage
25,000.00
Landscaping
100,000.00
65,000.00
100,000.00
Bill of Quantities
Bill No.10
SPECIALTIES/PROVISIONAL SUMS
No.
AMOUNT
Dhs
Description
Bill No. 10 SPECIALTIES
Page 1/1
10.2
Corporate Plannners Engineering Consultants
Bill of Quantities
No.
Bill No.15 A
MECHANICAL - PLUMBING & DRAINAGE
Description
Unit
Quantity
Rate
Amount
Dhs
DRAINAGE
Design, supply, installation, balancing, testing, commissioning,
maintenance and warranty of the complete above and under ground
drainage system as per the specification document, drawings and to the
approval of the authorities, Engineer and the Client
Item
Above ground drainage including soil, waste, vent, foul, a/c condensate
pipe work, fittings, access points, expansion couplings, supports,
accessories etc.. complete
Item
2.1
The following including all civil works, cover and frame etc.. complete
2.1.1
Manhole Covers
Item
2.1.2
Gully traps
Item
2.1.3
Grease trap
Item
2.1.4
Clean outs
Item
2.1.5
Item
2.1.6
Item
2.1.7
Rodding eyes
Item
2.1.8
Item
2.1.9
Item
Bill of Quantities
No.
Bill No.15 A
MECHANICAL - PLUMBING and DRAINAGE
Description
Unit
DRAINAGE (CONT.)
2.1.9 Connections to sanitaryware/sinks
Rate
Amount
Dhs
Item
2.1.10
Item
2.1.11
Item
2.1.12
Item
2.1.13
Item
Quantity
Sundry items:
3.1
Item
3.2
Item
3.3
Item
3.4
Item
3.5
Item
3.6
Inspections
Item
3.7
Item
3.8
Item
3.9
Builders works
Item
3.10
Allow for any other item not included above but in the Contractors opinion
to be listed due to considerable monetary value
a)
b)
c)
d)
Bill of Quantities
No.
Bill No.15 A
MECHANICAL - PLUMBING and DRAINAGE
Description
Unit
Quantity
Rate
Amount
Dhs
WATER SUPPLY
Design, supply, installation, balancing, testing, commissioning,
maintenance and warranty of the complete Water supply system as per the
specification document, drawings and to the approval of the Engineer and
the Client
Incoming water supply from DEWA mains, water meters and connections
Item
Nos.
Nos.
Item
Distribution pipe work, accessories and fittings -cold water (PPR pipe work)
Item
Distribution pipe work, accessories and fittings - Hot water (PPR pipe work)
Item
Item
Item
Item
10
All pipe work pertaining to irrigation work upto the isolating valve including
installation of control valves, strainers (supplied by the Irrigation specialist)
Item
Bill of Quantities
No.
Bill No.15 A
MECHANICAL - PLUMBING and FIRE FIGHTING
Description
Unit
Quantity
Rate
Amount
Dhs
Item
15.2
Item
15.3
Item
15.4
Item
15.5
Item
15.6
15.7
Inspections
Item
15.8
Item
15.9
15.10
Builders works
Item
15.11
Allow for any other item not included above but in the Contractors opinion
to be listed due to considerable monetary value
Item
Item
Item
a)
b)
c)
d)
Bill of Quantities
Bill No.15A
MECHANICAL - PLUMBING and FIRE FIGHTING
No.
Description
AMOUNT
Dhs
15.5
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
L.V PANEL with all the internal components, controls and indications, cable
glands, and door sealing / padlocking facilities as per local authoritys
requirements
Item
S.M.D.Bs with all the internal components, controls and indications, cable
glands, and door sealing / padlocking facilities as per local authoritys
requirements
Item
Multiple steps capacitor bank panel with automatic p.f. correction regulator
etc.
Item
Item
Item
6
6.1
Cables:
Armoured cables from MDB panel to final DBs
6.2
Cables from MDB/ DBs to all mechanical equipment including AC units and
pumps.
Item
Isolators:
Supply and installation of isolators for A/C chillers, chilled water pumps and
other pumpsets etc.
Item
Item
Item
9.1
Nos.
9.2
Nos.
9.3
Nos.
Bill of Quantities
Description
Unit
9.4
Nos.
9.5
Nos.
9.6
Nos.
10
10.1
Nos.
10.2
Nos.
10.3
Nos.
10.4
Nos.
10.5
Nos.
10.6
Nos.
10.7
Flex outlets
Nos.
11
Item
12
Light fittings:
Supply and installation of lighting fixtures including all the supports, fixings,
terminations and HRPVC wiring & conduiting etc complete .
12.1
Nos.
12.2
Nos.
12.3
Nos.
13
Conduiting with draw wires for FCUs, thermostats ,sensors of A/C and
water Supply systems.
Item
14
All the required electrical manholes for incoming / outgoing cable routing
15
Cable tranches & cable tray required for all heigh level electrical
connections
16
Quantity
Rate
Amount
Dhs
Bill of Quantities
Bill No.16
ELECTRICAL (CONT.)
No.
Description
AMOUNT
Dhs
E.3
Bill of Quantities
Description
Unit
Quantity
Rate
Amount
Dhs
Earthing system:
Supply and installation of complete earthing system including the earth pits,
copper rods, clamps, copper earth tapes, test clamps and earth terminations
Item
Item
Item
Horizontal pump 2000GPM @12 BAR with complete accessories, valves and
controls & breaching inlet connections and follow as per MEP Drawing
Item
Item
Dry pipe type sprinkler system for the cold storage area and remaining
areas with conventional sprinkle system with complete valves, pipes
support and sprinkler heads as per the MEP drawing.
Item
Item
F
F.1
Sundries:
Allow for working drawings, samples, submittals, inspections, operation and
maintenance manual and As Built drawings
Item
F.2
Item
F.3
Item
F.4
Item
F.5
Allow for any other item not included above but in the Contractors opinion to
be listed due to considerable monetary value
Item
a)
b)
c)
d)
TOTAL carried to summary
FA.1
Bill of Quantities
Description
AMOUNT
Dhs
FA.2
Bill of Quantities
Description
Telephone system:
Supply and installation of all outlet points, telephone cabinets, conduits,
wires, junction boxes and all accessories for the telephone system as per
DU latest requirements
Unit
CATV system:
Supply and installation of all outlet points, conduits, wires, junction boxes
and all accessories for the Cable T.V. system as per service providers
(DU) requirements
Quantity
Rate
Amount
Dhs
Item
Item
Bill of Quantities
Description
AMOUNT
Dhs
T.2
Bill of Quantities
No.
Bill No.17
AIRCONDITIONING & VENTILATION
Description
Unit
Quantity
Rate
Amount
Dhs
Item
Nos.
2a
Item
Nos.
4.1
Nos.
4.2
Nos.
5.1
Supply ductwork
Item
5.2
Item
5.3
Item
5.4
Item
5.5
Item
5.6
Item
5.6.A
Item
5.6.B
Item
Bill of Quantities
No.
Bill No.17
AIRCONDITIONING & VENTILATION (CONT.)
Description
Unit
5.7
Flexible connections
Item
5.8
Item
5.9
Item
Item
Item
Item
Item
10
10.1
Sundry items:
Allow for the following:
Design and preparation of working drawings
Item
10.2
Item
10.3
Item
10.4
Item
10.5
Item
10.6
Item
10.7
Inspections
Item
10.8
Item
10.9
Builders works
Item
10.10
Allow for any other item not included above but in the Contractors opinion
to be listed due to considerable monetary value
Item
Quantity
Rate
Amount
Dhs
a)
b)
c)
Bill of Quantities
Bill No.17
AIRCONDITIONING & VENTILATION (CONT.)
No.
Description
AMOUNT
Dhs
AC.3
Bill of Quantities
Bill No.18
DAYS WORKS
No.
AMOUNT
Dhs
Description
Bill No. 18 Days Works
Page 1/5
Page 2/5
Page 3/5
Page 4/5
Page 4/5
TOTAL Bill No. 18 - Carried to General Summary
18.5
Bill of Quantities
Bill No.18
DAYS WORKS
No.
AMOUNT
Dhs
Description
Bill No. 18 Days Works
Page 1/5
Page 2/5
Page 3/5
Page 4/5
Page 4/5
TOTAL Bill No. 18 - Carried to General Summary
18.5
Bill of Quantities