SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Ame
endmentReccord/Contro lSheet(ACS))
Revv.No
Date
e
Reaso
onForIssue
Preparedby
000
050312
IssuedforrImplementation
KRS
ReviewedByy Approvedb y
JPK
KKS
Detailsof
Amendm
ment/Revision
1. Earlierissued
mentNo
docum
BWAOPROXXXX
OFC0000PX0ST005
mattedand
reform
renumbered.
IssuedBy
KKS
2. Revisedtoinclude
n
O&MaandConstruction
commeents.
001
002
120312
RevisedaandReissuedForr
Implementation
190612
RevisedaandReissuedForr
Implementation
KRS
JPK
KRS
JPK
(Kiran
Suryawanshi))
(Juwadi
Pradeep)
KKS
KKS
KKS
KKS
ni)
(KrishanSainni) (KrishanSain
DocumentTTemplate
Updated
OFCBlowinggpressure
requiremen
ntselaborated.
003
04062
2013
Revised&Reissuedfor
Implementation
KRS
BVN
KKS
KKS
RevisedaspeerNPEGuideline
e
Doc.No.R4G
G20IFNGEN
PR002
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page1of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
INDEX
SCOPE.................................................................................................................. ...............................................................3
3
REFERENCEDOCUMENTSS................................................................................... ...............................................................3
3
1 Codesand
dStandards...................................................................................... ...............................................................3
3
2.1
2.2
2 CompanySpecification
ns.................................................................................. ...............................................................4
4
2.3
3 ConflictandClarificatio
on................................................................................. ...............................................................5
5
ALFIBRECABLLE............................................................. ...............................................................5
5
INSTALLTIONOFOPTICA
1 MaterialTTakeover.......................................................................................... ...............................................................5
5
3.1
3.2
2 DrumHan
ndling................................................................................................ ...............................................................5
5
3.3
3 CableHan
ndling................................................................................................ ...............................................................6
6
3.4
4 FibreInstaallationPlann
ning.............................................................................. ...............................................................7
7
3.5
5 OFCBlow
wing.................................................................................................... ...............................................................8
8
3.6
6 FibreSpliccing................................................................................................... .............................................................10
0
3.7
7 Terminatiion..................................................................................................... .............................................................11
1
3.8
8 Earthing......................
.
2
..................................................................................... .............................................................12
3.9
9 OFCTagging.................................................................................................... .............................................................12
2
3.1
10 AerialInsttallation............................................................................................ .............................................................12
2
INSPECTION
NANDTESTIN
NG................................................................................. .............................................................14
4
1 General............................................................................................................. .............................................................14
4
4.1
4.2
2 PreInstallationTestingg................................................................................... .............................................................14
4
4.3
3 PostInstaallationTestin
ng................................................................................. .............................................................14
4
4.3.1
Visu
ualInspection
n................................................................................... .............................................................14
4
4.3.2
OFC
CTesting........................................................................................... .............................................................15
5
4.3.3
Site
eAcceptanceTest(SAT).................................................................... .............................................................16
6
4.4
4 TestEquip
pment............................................................................................... .............................................................16
6
5
QA/QCREQ
QUIREMENTSS................................................................................... .............................................................17
7
DOCUMENTTATION.............................................................................................. .............................................................17
7
1 General............................................................................................................. .............................................................17
7
6.1
6.2
2 AsbuiltD
Documents......................................................................................... .............................................................17
7
6.3
3 ApprovalofDocumentts.................................................................................. .............................................................18
8
8
HEALTHANDSAFETY.......................................................................................... .............................................................18
9
APPEENDIXA................................................................................................................ .............................................................19
SiteA
AcceptanceTTestingProced
dure............................................................................. .............................................................19
9
APPEENDIXB................................................................................................................ .............................................................22
2
Repo
ortFormats............................................................................................................. .............................................................22
2
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page2of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
SCOPE
oversminimumrequireme
entsforthein
nstallationoffsinglemodeeopticalFibreecables(OFC
Cs)byblowing
g
This documentco
into HDPEducts, jointing(byssplicing),term
minationaten
ndpointsins ideCompanyysfacilitiesaandendtoen
ndtesting(i.e
e.
testin
ngfromterminationtoterrmination).
dinconjunctio
onswithscop
peofwork,reequirementso
e
Thissspecificationshallberead
ofthecontractdocumentandschedule
ofrates.Unlessagreedspecifically,scopeccoveredunde
erthesedocuumentsshall besupplemeentaryandco
omplementary
y
toeaachother.
REFEERENCEEDOCUMENTS
2.1
1
Code
esandSttandardss
Thed
design,materrials,construcction,inspecttionandperfformanceofO
OFCandDucttinstallation materialshalllcomplywith
h
thelaatesteditionoftheITUT,IEC,TIA/EIA,,ISO,ASTMaandISspecificcationsasmeentionedunderrelevantseectionsofthis
speciifications.
Sl. No
o.
1
Title
D
Document N
No.
Splice
es for optical Fibres an
nd cables Part 3: IEEC610733
Sectio
onal specificaation Fusio
on splices foor optical
Fibressandcables
FOTP61MeasurementofFibre
eor
EEIA/TIA45561A
Cable
eAttenuationUsinganOTDR
3
Opticcalfibrecable
esPart11: Genericspeccification
Gen
neral
IEC6079411
1
Opticcalfibrecable
esPart12:G
Genericspeci fication
Basicopticalcable
etestprocedu
ures
IEC6079412
2
50
IEC6079425
IEC61753
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page3of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Sl. No
o.
2.2
2
Title
D
Document N
No.
1
IEC6175531
IEC6175532
2
Comm
munication cables. Comm
mon design rrules and
consttruction. Haalogen free
e flame rretardant
therm
moplasticsheathingcompo
ounds
EEN5029022
27
CompanySpecifications
dditionreferenceisalsomaadetofollow
wingCompanyySpecificationns/DesignBasis.
Inad
Sl.N
No.
Title
DocumentNo.
Specificcation for Op
ptical Fibre Cable (Multi
LooseTTubeDesign)
1007040PPSSPREF001
1
SpecificcationforJoin
ntClosuresfo
orOFC
1007040PPSSPREF002
2
SpecificcationforOptticalFibreCable(Ribbon
FibreCe
entralLooseTTubeDesign)
1007040PPSSPREF003
3
Specificcation for HD
DPE Duct for installation
ofOpticcalFibreCablle
1007040PPSSPREF004
4
1007040PPSSPREF011
1
Specificcation for In
nstallation off Ducts for
OpticalFibreCable(ss)
1007040PPSSPREF013
3
& Fibre
Intracity OFN Architecture
A
Enginee
ering (Duct & Fibre Tyypes, Fibre
Allocatiion,Splicing&
&Termination
nPlan)
R4G20IFN
NGENPR002
2
1007040PPBDPREF00
02
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page4of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
2.3
3
Guidelines To Estab
blish Location
n, Size and
Numbe
erofZeroMan
nholesatFacilities
1007040G
GDGPREF00
04
ConfflictandClarificaation
quirementsoffthisspecificcationandrefferencecodes,standards andCompany
y
Anyconflictsbetweenvariousreq
specificaationsmentio
onedunderse
ection2.1and2.2abovesshallbebrou
ughttotheatttentionofCo
ompany.Until
thereso
olutionisofficciallymadebyytheCompan
nyRepresentaative,themo
orestringentrrequirementshallgovern.
INSTTALLTIO
ONOFO
OPTICALLFIBRECABLE
3.1
1
Mate
erialTakkeover
3.2
2
Th
heContracto
orshall,atits discretion,carryoutdrum
mtestoneacchFibreofO
OpticalFibreC
Cable(OFC)in
n
co
oiled form to verify avverage atten
nuation valu e (optical loss in dB/kkm) or checcking of any
y
defective/disco
ontinuousFib
bresaftertakkingoverthe freeissueop
pticalFibrecaabledrumsfrromCompany
y
attits designattedwarehousse.TheComp
panyshall pr ovideapplicaablefactoryaacceptance teestreportsto
o
th
heContractorrforitsrefere
ence.
ii
In
ncasetheme
easuredatten
nuationvalue
e(orFibrelosss)isfoundtobehighertthan10%oftthatshownin
n
Faactory Accep
ptance Test report or any damage to the Fibrre(s) is observed, the saame shall be
e
im
mmediatelyb
broughttothenoticeofth
heCompany andthedisccrepancy/dam
magereport jointlysigned
d
byyrepresentattivesoftheContractorand
dtheCompanny.
iii
Su
uchOFCdrum
msshallbese
etasideforfurtherinstructtionsfromtheCompany.
iv
Th
heContractortonotethattanydefectn
noticedintheecablebytheeContractorthatisnotreecordedatthe
e
timeoftakingovershallbetoContracto
orsaccount.
hefinalaccep
ptancetestingofOFCafte
erinstallationnhowevershallbebased onresultsgivveninFactory
y
Th
AcceptanceTe
estReportson
nly.
vi
Th
he Contracto
or, after taking over of the
t free issu e OFC drum
ms, shall be rresponsible tto handle the
e
materialcarefu
m
ullyandtranssportthesam
metoitsown storagearea//installationssite.
Drum
mHandliing
i
FiibreOpticCablesshallbe suppliedinw
woodencabl edrumswith
hwoodenbaattensprotecttingthecable
e
frromexternal objects.Inttheeventof battensbein gremovedfo
orinspection
nortestingpurposes,they
y
arretobereplaacedandnotremovedagaainuntilthec ableisbeingpreparedforrinstallation.
ii
Atthetimeofloading/unlo
oading,thedrrumsshallnottberolledon
nto/offthetru
uck,butlifted
dbyasuitably
y
raatedcraneussingslingsand
d/orspreaderrbars.
iii
Th
he following are a set of guidelines th
hat shall be ffollowed by C
Contractor when handlingg optical Fibre
e
drums:
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page5of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
iv
3.3
3
Alwaysccarrydrumso
ontheirflanges.
Nevercaarrydrumson
ntheirside,aasthismaycaausetanglingofthecable.
Alwayslloadorunloadthedrumb
byusingaroddinthedrumcenterforfasteningtheslings.
Neverovverloadaliftingdevice.
Neverussehookstoliftdrums,astthismaycaussedamagetothedrums.
Alwaysllowerdrumsgentlyontothegroundorrtransporttraay.
Neverdrropdrums.A
Avoidimpactsswhichmayddamagethed
drum.
Alwaysp
protectthecaablefromrub
bbingordamaage.Adjustth
heloadoruseeseparators.
Neverle
etdrumflange
escontactcableonadjaceentdrums.
Alwaysrrollthedrumsinthedirectionofthearrrow.Neverrrollintheopp
positedirectio
on,asthiswill
loosenthewind.
moredrumso
onavehicleinnamannerthattheirmovvementwillccausedamage
e
Neverplacetwoorm
toeitherrcable.
Alwayscchecktherum
msagainstrolllingifplaced onuneven//slopingsurfaace.
ws,andspaceemustbelefft
Siinceadrumsmaycontaincableofvaryyinglength,ttheymustbe storedinrow
betweentherows,sothat:
Thedrum
midentificationplateandcablelength canbeeasilyyread.
Anydrum
mcanbeload
dedatanytim
me,andinanyyorder.
Anydrum
mcanbetesttedatanytim
me.
edtothestorreandhavec ableremainin
nginthemsh
hallbestored
dinaseparate
e
Anydrumsthaatarereturne
ning on the d
drum shall be
e
arrea as per instructions off warehouse in charge. TThe length of cable remain
clearlyindicate
edbypaintonthesideofthedrum.
vi
Whendrumsa
W
arestoredforraconsiderabletimeitshhallnotbekeeptonadamp
psurfacetoaavoiddamage
e
to
othewoodbyyrodentsord
decay.
Cable
eHandliing
Cableshallnotbedraggedalongthegrroundasitm
mayresultinaabrasionoftheoutersheeath.Alsothe
e
caablemaygetcaughtond
debrispresenttonthegrouund,whichco
ouldresultin
nkinkingoftthecable.The
e
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page6of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Contractorshaallensureavaailabilityofmanpoweradeequatetolift andholdtheecabletopreventdragging
g
onground.
3.4
4
ii
emeasuresto
opreventstep
ppingoverorrdriveoverth
hecable.
Taakeadequate
iii
Unspoolingsh
hallbedone inamanner topreventooverlappingo
oflayerswhicchmaycauseethecableto
o
becometangle
ed.
iv
Wheneverthe
W
ecableisrequ
uiredtobecu
utintosmalleerlength,botthendsofthecutcableshallbesealed
d
withtemporar
w
ryendcapsto
okeepdirtan
ndmoistureooutandkeep
pthefillingco
ompoundin. Theendcaps
sh
hallbeofrubberorplasticcandshallbe
eheldinplaceewithhosecclamps,oralteernatively,heeatshrinkend
d
caapsmadeofccrosslinkedp
polymermaybeused.
Fibre
eInstallaationPlanning
i
BeforeactualblowingofFibreintoalreaadyinstalled ducts,itisneecessarytocarryoutproperplanningin
n
ordertooptim
mizeuseofFib
brecableandminimizewaastages.FortthistheContrractorshallisssueadetailed
d
OFCinstallatio
O
onplancoveriingthefollow
wingatleast22weekspriorrtostartofO
OFCblowingforreviewand
d
ap
pprovalofthe
eCompany.
a..
Cablelen
ngthcalculatiionforeachrroutebasedooncableschedule
b.
CableDrrumschedule
e/selectionforoptimumuttilizationofcaable
c..
Equipme
ent,materialssandconsum
mablesrequireedforOFCblo
owing,Jointin
ngandTestin
ng.
ii
Procedure for blowing, jointing (including splicing) and post insstallation testting of OFC including fina
al
AcceptanceTe
esting(AT)tobewitnessed
dbytheComppany.
iii
estReportFo
ormatsincludingthosetob
beuseddurinngfinalAccep
ptanceTestingg.
Te
iv
Communicatio
onprocedureandequipme
entrequireddduringFibreb
blowing.
vi
pecificationo
ofallmateriallsincludingco
onsumablesttobesupplie dbytheConttractorinclud
dingproposed
d
Sp
manufacturer,
m
makeandm
modelnumberr.
vii
In
nstallationplaandulyappro
ovedbyComp
panyshallonllybeadopted
dforactualim
mplementatio
on.
viii
Th
he Contracto
or shall familiiarize himselff with specifi cations of caables, ducts, OFC accessories and their
designparame
eterssuchasbendradius,maximumalllowablepullfforce,etc.
ix
nstallation an
nd testing in ggood working
g
Arrange for all equipment of adequate capacity neccessary for in
onditioninclu
uding,butnotlimitedto,b
blowingmachhine,aircom
mpressors,splicingmachinee(suitablefor
co
eiither multi lo
oose tube design OFC use
ed in intercitty routes or R
Ribbon Fibre central loosee tube design
n
tracityroute
OFCusedinin
O
esasperconttract),OTDRaandPowermetersetc.and
dwithsufficieentspares.All
su
uchcritical eq
quipmentshaallbesubjectttoapprovallofCompanyy.TheContraactorshallsu
ubmitdetailed
d
sp
pecifications, catalogues, calibration certificates w
where appliccable, etc. fo
or Companys review and
d
accceptanceofequipment.
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page7of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Arrangeforallrequiredconsumablesin
nsufficientquuantityinclud
dingapproveedqualitylub
bricantforuse
e
duringOFCblo
owing.
3.5
5
OFCBlowingg
i
Only
O
acceptab
ble method of
o OFC installation is by pneumatic b
blowing usingg special blow
wing machine
e
ussingcompresssedairatpre
essuresbetwe
een710barrgbutnotinn
nocaseexceeedingpressurreusedduring
g
Duct Integrity Testing (DITT). Flow capaacity of comppressor shall be suitable for blowing at least 1km
m
le
ength of OFC. Air Temperrature shall not
n be more than 55 Degg C. If required air coolerr of adequate
e
blowing.
caapacityshallb
beInstalled.FFigurebelowshowsassetupforFibreb
ii
iii
ooptimizeblowingoperattions,asago
oodpractice, theOFCshouldbeblown
nfromacentrallocationin
n
To
th
hesegment/spancoverin
nghalfthelen
ngthofspanoordrumineaachdirection.Firsthalfofttotallengtho
of
OFCinadrum
O
mshallbeblo
ownthrough ductinoneddirectionand
dthenbalanccehalfblown
nintoductin
n
ottherdirection
n.
iv
Beforestartinggblowingope
eration,theO
OFCneedsto beunwound
dfromthedrumandlaido
ontheground
d
in
nanorderlym
mannernorm
mallyfigurere
esemblingnum
meral8.Forrthis,theOFCdrumshall beloadedon
n
p
payoff stand and unwound from top
pside of the drum. Pay o
off stand shaall be placed
d on properly
y
preparedsurfaacetoavoidttilting/topplin
ngwhiledispeensingOFC.TThepicturesb
belowshowp
placingOFCon
n
grroundinfigurreresemblinggnumeral8andcorrectaandincorrecttprocessofunwindingand
d
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page8of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
After blowing half length in one direction, the cabl e should be unwounded at the locatiion of pay offf
sttandandstorredinafigure
eof8.Then
ninnerendofftheOFCsho
ouldbeblown
ninoppositedirection.
vi
KinkinOFCdu
uringblowinggandafterbllowingmust beavoided.A
Atblowingpoints,thelasstloopofOFC
C
sh
houldbeman
nuallypulledaaftercableblowingandpl ugtightened.
vii
Communicatio
onbetweencaableinstallatiionteamsdu ringinstallatiionmustbeeensured.
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page9of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
3.6
6
viii
Id
dentificationn
numbermarkkedoneachC
CableDrumshhallberecord
ded.
ix
Manholesand
M
dhandholesprovidedalo
ongtherouteeofductsshallserverepo
ositoryforOFCcablejoint
closures and extra
e
cable lo
oops that can later be ussed for repaiir and mainteenance durin
ng operationss.
Le
engthofloop
pedcableshallbeshallbesufficienttoaallowsplicingginavanparkedclosetotthemanhole
e.
Asaminimum10meterlen
ngthofeachO
OFCcomingi ntomanholeshallbeloop
pedandstoreedinsideman
g
hole/handhole. Loop shall be in the shape of nnumeral 8 tto avoid twisting and kkinking during
sp
plicing/jointin
ng. The extrra cable loop lengths shhall be reco
orded and in
ncorporated in Asbuilt
documentation.
Siimplexcapssshallbeinstalledattheend
dofductsthrroughwhichffibrehasbeenblown.
xi
ums schedule
Th
he Contracto
or shall plan the
t cable blo
owing operattion includingg preparation
n of cable dru
e
su
uchthattoth
heextentposssible,completedrumlenngthofOFCislaidwithou
utcuttinginb
betweenorat
ends. To an extent
e
feasible, extra cablle (less than 50m) shall b
be coiled inside the manhole to avoid
d
cu
utting of the cable. Any cutting
c
of exttra Fibre whiich may beco
ome unservicceable piece as defined in
n
Contractshallbesubjectto
oapprovalofCompany.
xii
OFC
O blowing report shall be made avaailable to Coompany in th
he specified fformat (referr Appendix B,
B
Fo
ormatB:OFC
CBlowingRep
port).
Fibre
eSplicingg
i
Sp
plicing shall be done using a good quality
q
fusionn splicing maachine in air conditioned
d (AC) vehicle
e
(p
picturesbelow
wshowsFibre
eduringandaftersplicinggusingsplice machine).Th
heOFCforinttercityroutes
sh
hallbeofmultiloosetube
edesignwhiletheOFCus edforintraccityroutessh
hallofRibbon
nFibrecentra
al
lo
oosetubedessign.TheCon
ntractorshall mobilizetheesplicingequ
uipmentsuitaableforthetyypeofOFCas
percontract.
ii
hesplicelosssperjointshaallbeminimalandshallnootbemoreth
han0.10dBw
whenmeasuredwithOTDR
R
Th
(B
Bidirectionalttesting).AverrageSplicelossforaminim
mumof3splicesshallnottbemorethaan0.06dBper
sp
plice.Special JointClosure
essuitablefo
orundergrounnd,buriedinstallation,co
onformingto theCompany
y
sp
pecificationsreferredunde
erSection2o
ofthisspecificcation,shallb
beusedateachOFCjoint.
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page10of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
3.7
7
iii
Atleast0.6m to0.8mFib
breshallbesttoredinFibreetrayofjointtclosure.Fib
breshouldbeeneatlycoiled
d
withoutkinks.
w
Minimumbe
endingradiusinaccordanccewiththeFibrespecificattionshallbeeensured.
iv
Jo
oint closure assembly
a
shall be done ass per instructtions of manufacturer. Joint closure sh
hall be sealed
d
properlybeforreitistakeno
outofsplicinggvan.
olewiththeh
helpofplastic
Afterassemblyy,jointclosureshallbetiedtothesu pportsinsideethemanho
caable ties as shown
s
in man
nhole drawin
ngs (i.e. the dome portio n points tow
wards sky and
d cables enter
jo
ointclosurefrrombottom).Allboltsclam
mpsandotheerfixingdeviccesshallbeco
orrosionproo
of.
vi
Airpressurete
estshallbedo
onebeforeclampingthejoointclosureffordurationo
of1hour.Theejointclosure
e
2
sh
hallbefilledw
withairpresssureof1.0kgg/cm (g)and shallbeleftffor1hour.Th
hefallinpresssureshallnot
be more than 0.1 kg/cm2 after
a
1 hour. With the joiint closure prressurized, it can be dipped in a water
eckedforanyyairleakagess.Recordsofaallsuchtestsshallbemaintainedforeachsplicejoint
bucketandche
dulycorrelated
dwithsplicejjointNo.
vii
bendthecableatbenddiaameterlesserthan20D(20xdiameterrofthecable
e)
Careshallbettakennottob
whilefixingthe
w
ejointclosureinsidemanhole.
viii
ix
Fo
ordetailsofSSplicingatvarriouslocation
nsreferdocum
mentno.R4G
G20IFNGEN
NPR002
Term
mination
i
AllOFCattheiirextremeen
ndsshallbetterminatedinntoFibreDisttributionPaneel(FDP)provvidedforFibre
e
te
erminationan
nddistributio
onatCompan
nysfacilities suchasaggrregationNodes(AG1,AG2
2,AG3andso
o
on) or masts or
o eNodeB, in
nline amplifie
ers or ILAs orr ILAs with R
ROADMs or R
Reconfigurablee Optical Add
d
DropMultiplexxers.
ii
Cableshallbebroughtintothebuilding//container/sshelterorcab
binetshousin
ngtheFDPthrroughduct/G
GI
pipebetweenbuildingandmanholenearesttosuchhfacility.
iii
maintenance.
m
iv
OFC
O entry into
o FDP shall be
b done through holes prrovided for th
his purpose aas per instructions of FDP
P
su
upplier.
FiibresofOFCsshallbesplice
edwithpigtaailsconformi ngtoCompa nySpecificationreferred underSection
n
2ofthisspeciffication,andsstoredinthetrayasperdeetailedinstru
uctionoftheFFDPSupplier..
vi
d.
NomixingofFibresinthetrays/mixingofcablesshaallbeallowed
vii
bebroughtup
pbysideand
dwithinspaceeprovidedin
nFDPandshaallbeproperrlyroutedand
d
Pigtailsshallb
upplier. Pigtaails routing sshall be readytoremove type without
sttored as per detailed insttruction of su
disturbinganyotherpigtails.
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page11of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
3.8
8
viii
Fiibresshallbe neatlyarranggedinaFibre
etray.
ix
OFCcablearm
O
mourshallbep
properlyearthedtotheeaarthingsystem
mofthefaciliity.
Fo
ordetailsofTTerminationaatvariouslocaationsreferddocumentno.R4G20IFNGENPR002
Earth
hing
ACopperrodofaround20m
mmdiameterand1mlo
ongshallbe buriedalonggwithgoodq
qualityofChaarcoalandsalt
atam
min.2.5mde
epthfromNG
GLorasrequiiredsothattheresistanceeinnormalso
oilshallbelessthanoreq
qualto2ohm
m.
AGIstripflat50m
mmwideand
d6mmthickaafterboltingandwelding withrodshalllbebroughttothesurfacceforbonding
g
with theopticFib
brearmor.Sp
peciallymadeclamp,made
eofsteelshaallbeusedfo
orbondingth
heGIstripwitththecopper
rodaandwithcablearmorforaavoidingcorro
osionandgalvaniccurrentts.Multipleeearthingrodsmayberequiredinsome
e
ofth
helocationswherethesoilresistivittyishigh.Su
uggestedlocaationwhereccablearmoreearthingshallbedoneisas
follow
ws:
Sr No.
Location
E
Earthing Locatiion
InterrCityRoutes
IntraaCityRoutes
Ateaachmanhole
ebetweentw
woearthinglo
ocations,care
eshallbetakkentoensureethatarmor ismadeconttinuousatthe
e
jointclosure(i.e.aarmorofinco
omingandoutgoingcableshallbejoineedtogetherto
oensureelecctricalcontinu
uity).
3.9
9
OFCTagging
TheO
OFCshallbettaggedforpro
operidentificcation.Taggin
ngshallbedooneatentry/
/exitofeach,Manholean
ndattermina
al
facilitties (while OFC
O routing through Cable
e Tray at max. spacing 500m, entry loccation to FDM
MS Rack and
d inside FDMS
S
Rack). Aluminium
m Tag with OFC
O Number as per COMPANY Equipm
ment/materiaal tagging policy/system p
punched on it
shallbetiedtoOFCwithPlasticcabletie/SSSWire.
3.1
10 AeriaalInstallation
IssueDate:040620013
Page12of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Repo
ortofsuch te
emporaryaerrialinstallatio
onshallbesu
ubmitted attthetimeofh
handingover//Takingover ofcompleted
d
sectio
onintheattaachedformat(ReferAppen
ndixB,Forma
atE:AerialDeeviationRepoort).
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page13of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
INSP
PECTION
NANDTTESTING
G
4.1
1
Gene
eral
4.2
2
4.3
3
Th
hetestsshall beconducte
edinaccordan
ncewiththe recommendaationsofIEC6
610733andEIA/TIA455
61.Thetestprrocedureshalllbesubmitte
edtotheCom
mpanyforapp
provalatleasst30daysprio
ortothestarrt
offthetests.
ii
Th
heContractorshalltestallcoresofthecable,includdingthespareecoresifany..
iii
Th
he Company shall be pro
ovided with a licensed coopy of the PPC based Tesst Data Management and
d
Analysissoftwareasmaybe
erequiredan
ndusedbytheeContractor..
iv
Company rese
erves the righ
ht to witnesss inspection aand testing ccarried out in
n field as speecified herein
n
below.
PreInstallatiionTestiing
i
Th
his test shalll be done att the time off taking overr of the free issue Opticaal Fibre Cable (OFC) from
m
Companysdesignatedwarrehouseatso
olediscretionnoftheConttractor.The C
Contractorsh
hallbefreeto
o
taakeoverOFC
CfromCompaanybasedon
nmanufacturrestestcertifficate,copyo
ofwhichshalllbeprovided
d
to
otheContracctor,athisow
wnriskandco
ost,howeverr,Companyshallnotbereesponsibleforcorrectnesss,
co
ompletenessandaccuracyyoftheresulttsindicatedinnFactoryTesstReports.
ii
Companystron
nglyrecommendstestingofeachFibreecoreinthe((OpticalFibreecable(OFC)incoiledform
m
to
ocheckfordefectsandbreaksinthe cableusingO
OTDRaswellaschecking ofcontinuityyofOFCstee
el
arrmourtape. Anydrumsh
howinganyd
defectiveFibrreorarmourrorattenuatiionmorethaan10%higher
th
hanthatindiccatedintest reportshall bebroughtt othenotice oftheComp
panyandshalllbesetaside
e
fo
orfurtherinsttructionsfrom
mCompany. Resultsshall berecorded inFormatatttached(referrAppendixB
B,
Fo
ormatA:Dru
umTestReporrt).
iii
Allothermate
erialssupplied
dasfreeissu
ueshallbeviisuallyinspecctedbytheC
Contractorforranyphysica
al
damageandiffanydamage
eisfoundthe
esameshall bereportedttotheCompanyandmaterialsshallbe
e
usse/discarded as per instructions of th
he Company. All damage reports musst be signed jjointly by the
e
Contractorasw
wellastheCo
ompany.
PostInstallattionTesting
4.3.1 VisuaalInspection
4.3 .1.1
Terminati
T
ngNodess
Followin
ngshallbevissuallychecked
dattheTerm
minationNodees(e.g.AG1,A
AG2,AG3,ILA
A,eNodeB,ettc.)forquality
y
ofworkm
manship:
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page14of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
CableterminattionatFDPs,routingoftubesandFibrees
ii
ectors
Fiixingofconne
iii
Connectorsare
ecleaned
iv
dasshownin
nDrawings
Cableisrouted
blespecificatiions
Bendingradiiaareinaccordaancewithcab
vi
properlylabe
elled
AllCablesarep
vii
entryisprope
erlysealed(gaastight)
Buildingducte
4.3 .1.2
In
nspection
nofenro
outeFaci lities
Allmanholes//handholesaarecleaned
ii
Occupiedasw
O
wellasunoccu
upiedductsaareproperlyssealed
iii
Cablesandjoin
ntsarelabelle
ed
iv
ointClosuresareproperlyandfirmlyse
ecuredinside manholes
Jo
Jo
ointsandcableloopsarelo
ocatedassho
ownindrawinngs
vi
Bendingradiiaareinaccordaancewithcab
blespecificatiions
vii
Cablesareinsttalledintheccorrectducts
viii
oopsareprop
perlycoiledandsecured.
Lo
ix
Cableentriesintothejointenclosureare
esealedcorreectly
4.3.2 OFCTTesting
i
AfterinstallationofOpticalFibreCable(OFC)intheeductsbyblo
owing,butpriortosplicin
ng,eachFibre
e
sh
hallberetesttedforcontin
nuity/damaggethatmayhhavehappeneedduringcableinstallation
nactivities.
ii
Afterjointing((byfusionsplicing)eachFFibreofOFC, eachfusionsspliceshallbeetestedforccomplianceto
o
th
hefollowingp
parameters:
a..
VisualIn
nspection
Nodefects
b.
TensileSStrength
>2N
c..
SpliceLo
oss
maximum0. 1dB
d.
Returnlo
oss
minimum500dB
iii
plicesnotme
eetingtheab
bovecriteriasshallbebrok en,jointressplicedandreetestedtilltheresultsare
e
Sp
withinaccepta
w
ablelimit.
iv
Th
he Contracto
or shall progrressively test the installedd cable as the jointing wo
ork progressees. Each Fibre
e
sh
hallbetested
dusingOTDR
Rfromendto
oendandspllicelossshalllbemeasureedat1550nm
mand1310nm
m
wavelengthsa
w
ttheoutermostlimitonb
bothsidesof splicedjointss(i.e.endtoendofinstalledFibreafter
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page15of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
eaachjoint).Avveragemeasuredloss(i.e.averageoffoorwardandbaackwardmeaasurements)fforeachsplice
e
sh
hall meet the specified criteria
c
at (iii) above at 1550nm. Value at 1310n
nm shall be reported for
in
nformation.N
Noreflectiono
orghostshalllbepresent.
v
Average splice
e loss over th
he link (minim
mum of 3 sp lices in the link) shall nott exceed 0.06
6 dB for each
h
Fiibre.
vi
Fo
orfuturerefe
erence,bidire
ectionaltestin
ngshallalso becarriedou
utat1310nm
mandreadin
ngrecordedin
n
sp
pecifiedform
mat(referApp
pendixB,Form
matC:OTDR
RTestReportt).(Thetestresultsat1310nmshallbe
e
fo
orreferenceaandtheresulttsat1550nm
mshallonlybeeconsideredforacceptance).
vii
In
naddition,Fib
bresignature
eshallalsobe
erecordedw
withOTDRat 1550nmand
d1310nmwaavelengthand
d
re
ecordsmadeavailabletoC
Companyalon
ngwithfinalrreport.
viii
Afterinstallationofcablefromnodeto node,jointinng,backfillinggandterminaatingwithap
pigtailtoeach
h
end of the cable a final biidirectional test shall be made for eaach Fibre fro
om the nodess between all
nodes/hops. This
T test shall be carried out
o by the C ontractor forr his own asssessment and
d rectification
n
workpriortoi
w
invitingComp
panyforwitnessingtheSitteAcceptancceTesting(SA
AT).Testresultsshallmade
e
avvailabletoth
heCompanyfforinformation.Finalacceeptanceshallbeasperth
heresultsob
btainedduring
g
SA
AT.
4.3.3 SiteA
AcceptancceTest(SSAT)
4.4
4
Th
he Test Proce
edure for Op
ptical Fibre Caable Site Accceptance Testts shall be prrepared by th
he Contractor
an
nd submitted
d to Company at least 30 days prior tto proposed SSAT of a partticular Link // hops (not to
o
exxceed300km
mforintercityworks)basedonthere quirementsaandOFCTesttReportForm
matsprovided
d
underAppendixAandBresspectively.
ii
iii
iv
When
W
all the tests
t
specifie
ed for Site Accceptance Teesting are succcessfully dem
monstrated tto be meeting
g
sp
pecified criterion, such OFC shall be considered
c
accceptable by the Compan
ny and readyy for Handing
g
Over/TakingO
O
Over(HOTO)o
ofinstalledFibrelink.
TestEquipment
i
ii
Th
he Contracto
or shall use only
o
calibrate
ed testing annd/or simulattion equipmeent (such as OTDR, Power
meter,
m
laser source, talk phones
p
etc.) during
d
preinnstallation tessting, postin
nstallation tessting and site
e
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page16of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
iii
iv
abletoperfo
OTDRshallbe
O
ormallthete
estsrequiredasperthissspecification. OTDRshallh
havesufficient
dyynamic range
e to carry out the link test
t
betweenn nodes. OTD
DR reports sshall be subm
mitted to the
e
COMPANYinfformofprinto
outandsoftccopy.
QA//QCREQUIREM
MENTS
nContractDo
ocumentshal lapply.
QA/QCrequirementascoveredin
DOC
CUMENTTATION
N
6.1
1
Gene
eral
6.2
2
Th
he Contracto
or shall provid
de all docum
mentation (e.gg. installation
n and testingg procedures,, test reportss,
an
nd OTDR tracces in hard copy
c
form as well as in eelectronic form on CD. A
All drawing, d
document and
d
Reportformatsshallbesub
bjecttoappro
ovalofCompaany.
ii
AlldocumentsshallbeinEn
nglishonly.
iii
AsbuiltDocu
uments
i
At the end off Site Accepttance Testingg, the Contraactor shall prepare marked up (red llined) asbuilt
in
nformationwithregardto,,asaminimum,thefollow
wing:
Anychan
ngeintheOFFCrouting.
Length//ChainageoftheOFCatsignificantlocaations.
Lengtho
ofeachcablesegmentbetw
weensplices withdrumnumberusediinthatsegmeent.
Jointclosurelocationanditscoord
dinates(LAT//LONG)alonggwithappropriatetagnumber.
ofcablespoolledateachm
manhole/handdhole.
Lengtho
Fibredisstributionwithinacabletu
ube/bufferwiise.
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page17of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
ii
6.3
3
Location
nofelectroniccmarkers.
providedtoup
pdateGISdattabase.Thissshallinclude:
Asbuiltdatashallalsobep
nationClosuree(FTC)/Mod
dularOptical Distribution Frame/Fibre
e
Cableterminationat FibreTermin
DistributtionPanelbycorenumberrandcolorcooding.
Pigtailscconnectionin
nFTCandarraangementinssplicingpanel.
Detailso
ofsplicethrou
ughFibres.M
Measuredcabllelossforeacchcoreofeacchcablesegm
ment.
iii
ortsincludingSATreports. Alltestresulltsshallbesu
ubmittedinellectronicform
m
Allinspectionaandtestrepo
asswellasinprrintedform.
iv
AllmaterialtesstreportsforrthematerialssuppliedbyytheContracttor.
ovalsandperrmissionsfrom
mtheconcerrnedapprovin
ngauthorities
AlldocumentsspertainingtoRoWappro
earea/utility//facilityinorigginal.
havingjurisdictionoverthe
vi
Th
heContractorshallissueaaboveasbuilttdata/recorddstoCompanyforapprovvalandrecord
ds.
ApprrovalofDocume
ents
i
Th
heContractorshallbesole
elyresponsib
bleforsubmisssionofalldo
ocumentsas listedabove andobtaining
g
ap
pprovalofCo
ompany.
ii
iii
Allmanufacturingandtesttingprocedurresshallbessubjecttoapp
provalofCom
mpany.Theseeinclude,but
notlimitedto,thefollowingg:
on,jointing,ttestingandteerminationoffOFC.
Proceduresforhandling,installatio
Proceduresfortestingjointclosurres.
optesting.
Procedureforlink/ho
eptancetestprocedures.
SiteAcce
HEA
ALTHAN
NDSAFEETY
i
HealthandsaffetyofallCon
ntractorperso
onnelandtheepublic,duringtheinstalllation,jointin
ng,testingand
d
te
erminationoffOFC,shallbe
einaccordan
ncewithregu latoryrequirements,ConttractorsHealthandSafety
y
Planandproce
eduresapprovedbyComp
pany.
ii
heContractorshallfollowallprecautio
onstoensurethattheOFC
Cisprotected
d,instrumentssareproperly
y
Th
handledandpersonnelsafe
etypracticesareenforced .
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page18of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
APP
PENDIXA
A
SiteAcceptancceTestingProceduree
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page19of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Thep
procedureforrfinalSiteAcceptanceTesstingofinstalledcablesha llbeasgivenhereinthisA
Appendix.
A.1
Accepta
ance proces
ss
Upon
nsuccessfulccompletiono
ofOFCinstallaationandtesstingfromenndtoendinaalink/hop/seectionandhaavingsatisfied
d
himselfregardinggreadinessofflink/hop/secction(betwee
enanytwonneighboringn
nodes(e.g.beetweenapairofAG2,ora
a
pair of ILAs/ROAD
DM/FOADM or AG3 and ILA/ROADM//FOADM etc. as the case may be) for handover, th
he Contractor
shall sendnotice totheCompaanyforwitne
essingfinalSiteAcceptancceTesting(SA
AT)throughaaAcceptance Noticeasper
attacchedformat((referAppend
dixB,Format F:Invitation forSAT)alonngwithrequiredQCRecorrds/ReportsofInspection
n
andttestingcarriedoutaspartofinstallation.
Upon
n Receipt of such Acceptaance Notice, the Companyy shall confirrm the date o
of Acceptance Testing witthin 2 days of
o
suchAcceptanceN
Notice.
On tthe date of Acceptance Test, the Co
ontractor shaall, in presennce of the C
Company Rep
presentative, perform the
e
AcceptanceTestaasgivenbelow
w:
A.2
For
F inter-city
y OFC
eintheinstalledOpticalFFibreCablesh
hallbetestedforthepoweerlossat155
50nmaswellasat1310nm
m
EachFibre
wavelengthusingthe PowerMeterTestwhere aPowerfeeeder(Laser)shallbeinstalledatoneen
ndandPower
nit PMU) shall
s
be instaalled at the other end o
of Fibre. The test shall be
e
Receiver (Power Measurement Un
considere
ed successful when the Po
ower loss in the Fibre is w
within the Accceptable Criiteria specifieed hereunderr.
Beforecarryingoutpo
owermeterre
eadings,referrencelosseshhavetobemeentionedinth
heLSPMform
mat.
nm wavelenggth indicating
g
The Company shall provide factorry test certifficate for eacch drum testted at 1550n
attenuatio
on values in coiled condittion. For the purpose of acceptance ttesting values indicated in factory test
reportshaallbeconside
ered.
Successfu
ultestshallco
onclusivelyestablishcontin
nuityofFibre inadditiontoestablishinggFibreattenu
uation.
A
A.2.0.2
Acceptance
A
Criteria
hen the averaage attenuation of each Fibre in the OFC link (not
The test shall be conssidered as accceptable wh
shorterth
han80km),att1550nmwaavelength,is lessthanoreequalto0.222dB/km,excclusiveofconnectorlossess,
whenthe suppliedcab
bleattenuatio
on(inacoiled
d4kmDrum) islessthano
orequalto0.1
195dB/km.
In the event OFC supplied by Com
mpany is having attenuatiion in coiled condition m
more that 0.195 dB/km (as
indicated infactoryte
estreport)thentheaccep
ptanceattenuuationvaluefforthelinksshallbeequaltoX+0.025
5
dB/km,w
whereX=attenuationvalue
eincoiledconditionasgivvenintestrep
port.
Resultsatt1310nmwavvelengthshallbeforinform
mationonly.
A
A.2.1
For
F intra-city
y OFC
OpticalFibre Cablelink/ho
op/sectionshallbecheckeedusingOTDR
R
ForIntracityworks,eaachFibreintheinstalledO
inbothdirectionsat15
550nmwavellengthaswellasat1310n mwavelengtth.
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page20of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Inadditio
onFibrelosssshallbedeterminedforeaachFibreusi ngPowerMeeterTestwheereaPowerffeeder(Laserr)
shall be installed at one end and Power Receivver (Power M
Measurementt Unit PMU
U) shall be installed at the
e
otherend
dofFibre.
Successfu
ul test shall conclusively
c
establish
e
conttinuity of Fibbre in additio
on to establisshing Fibre sp
plice loss and
d
attenuatio
on.
A
A.2.1.3
Acceptance
A
Criteria
minimumof3splicesinthe
e
Thetestsshallbeconsiideredasacceptablewhentheaverageesplicelossiinthelink(m
link)doessnotexceed0
0.06dB.
on,theaveraggepowerlosssdetermined
dusingpowe rmeter(ind
dB/km)shallb
bereportedfforeachFibre
e
Inadditio
considerin
ng Fibreattenuationasgiiveninfactorrytestreporttforthedrumwithcableeincoiledin conditionfor
both1550
0nmand131
10nmwavelen
ngths.These resultsshall beforinform
mationonly. Beforecarryingoutpower
meterreaadings,refere
encelosseshaavetobemen
ntionedintheeLSPMformaat.
A
A.2.2
Unsuccessfu
U
ul Test
hetestasabo
oveareunsucccessfulthe causeoffailuureshallbed
determinedreepairsaffecteedadthetest
Incaseth
repeated,,tillsuchtime
etheOFCisssuccessfullyte
estedandacccepted.
A
A.2.3
Test
T
Reports
s
ortsfortheabovetestssh
hallbepresen
ntedinthefoormatattach
hed(referApp
pendixB,ForrmatC:OTDR
R
Testrepo
TestRepo
ortandFormatD:LSPMTTestReport). Incasethettestasaboveeareunsucceessfulthecaauseoffailure
e
shall be determined
d
repairs
r
affectted ad the te
est repeated , till such tim
me the OFC is successfully tested and
d
accepted..Theformatssattachedun
nderAppendixxBaretypicaalformatsforrreferencep
purposeonly. Finalformats
shall be provided
p
by the
t Companyy prior to staart of Site Accceptance Teesting. The same shall bee used by the
e
contracto
orforrecordin
ngalltestdatta.
A.3
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page21of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
APP
PENDIXB
B
Repo
ortFormatts
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page22of23
3
InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable
10070400PSSPREF014 Rev.03
3
Sl.No.
FORMAT
Title
File
OFC
CBLOWINGREEPORT
FORMA
AT A - OFC
Blowing Report.xlsx
DR
RUMTESTREP
PORT
OTTDRTESTREP
PORT
LSPMTESTREP
PORT
FORMA
AT B - Drum
Test R
Report.xlsx
FORMAT
T C - OTDR
Test R
Report.xlsx
FORMA
AT D - LSPM
Test R
Report.xlsx
AERIALDEVIATIONREPORT
FORMA
AT E - Aerial
Deviation
n Report.xlsxx
INV
VITATIONFOR
RSAT
FOR
RMAT F Invitation
n for SAT.xlss
Relian
nceJioInfocom
mmLimited
IssueDate:040620013
Page23of23
3
FORMAT A
OFC BLOWING REPORT
Project Name
Master route
Section Name
Date
Maint. Area:
Contractor:
Report No:
Rev. No.:
Cable type:
SPREAD DETAILS :
(From / To)
Link No.
Chainage
MH / Splice chambers
Numbers
Sr. No.
From
To
From
To
Duct Clearance
Rep. No.
(For cable
blowing )
Drawing No.:
No. of fibers:
G 652D
Cable entry
MH
Duct Entry
Slack (Meters)
Duct Entry
Cable End
Slack (Meters)
Yes / No
Yes / No
Yes / No
Remarks, if any:
CONTRACTOR
NAME
SIGNATURE
DATE
COMPANY
FORMAT B
OFC Drum Test Report
DRUM NO:
Bill No. :
Name of Supplier :
..m
..m
Date :
Identification Colour
Fibre No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Tube / Thread
BLUE
ORANGE
Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
Physical Check
Optical Length
OK/Not OK
(m)
..m
Remarks
@1550nm
FORMAT B
OFC Drum Test Report
DRUM NO:
Bill No. :
Name of Supplier :
..m
..m
Date :
Identification Colour
Fibre No.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Tube / Thread
GREEN
BROWN
SLATE
Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
Physical Check
Optical Length
OK/Not OK
(m)
..m
Remarks
@1550nm
FORMAT B
OFC Drum Test Report
DRUM NO:
Bill No. :
Name of Supplier :
..m
..m
Date :
Identification Colour
Fibre No.
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Tube / Thread
WHITE
RED
BLACK
Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
Physical Check
Optical Length
OK/Not OK
(m)
..m
Remarks
@1550nm
FORMAT B
OFC Drum Test Report
DRUM NO:
Bill No. :
Name of Supplier :
..m
..m
Date :
Identification Colour
Fibre No.
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
Tube / Thread
YELLOW
VIOLET
AQUA
Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
Physical Check
Optical Length
OK/Not OK
(m)
..m
Remarks
@1550nm
FORMAT B
OFC Drum Test Report
DRUM NO:
Bill No. :
Name of Supplier :
..m
..m
Date :
Identification Colour
Fibre No.
133
134
135
136
137
138
139
140
141
142
143
144
Tube / Thread
PINK
Fiber
Physical Check
Optical Length
OK/Not OK
(m)
..m
Remarks
@1550nm
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
NOTE:
The Number of Fibers and Colours shall be as per actual. The Sample is ffor 144 fiber cable. This shall be updated based on actual OFC used.
CONTRACTOR
SIGNATURE
NAME
DATE
COMPANY
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Length
Attenuation
Result Acceptable
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Sr. No.
Model
Comm.Power loss
AV
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Length
Attenuation
Result Acceptable
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Sr. No.
25
Model
Comm.Power loss
AV
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Length
Attenuation
Result Acceptable
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Sr. No.
49
Model
Comm.Power loss
AV
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Length
Attenuation
Result Acceptable
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Sr. No.
73
Model
Comm.Power loss
AV
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Length
Attenuation
Result Acceptable
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
Sr. No.
97
Model
Comm.Power loss
AV
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Length
Attenuation
Result Acceptable
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
Sr. No.
121
Model
Comm.Power loss
AV
FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name
Date
CABLE DETAILS (Strike off whichever is not applicable)
Job Number:
Cable Vendor:
Section:
Report No.:
Cable Type:
From:
TO:
Report Date:
No. of fibers:
RING
Date of Testing:
12/24/48/96F
Fiber Type: Link No.
Km:
Contractor:
No. of Events:
Nos.
Make
Model
Sr. No.
Length
Attenuation
Result Acceptable
Comm.Power loss
1550 / 1310
dB
Kms
dB/km
Y/N
dB
Fiber No.
Event 1
AV
Max.
Min
Avg
Note:
CONTRACTOR
1. The maximum value for average of the Forward and Reverse Event loss at 1550 nm shall less than or equal to 0.1 dB.
NAME
2. The average loss for all the splice events in a span shall not exceed 0.06 dB.
SIGNATURE
3. Attenuation coefficient limits for G652D cable at 1550 nm shall be considered 0.195 dB / Km maximum. For calculations actual value as per factory test report shall
be considered.
DATE
COMPANY
FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :
Cable Type :
No.of Fibers:
Date of Testing:
Section from :
To :
Link No:
Contractor:
Description
Make
Side A
Light Source
Power meter
Test
Model
Side B
Side A
Caliberation Date
Sr. No.
Side B
Side A
No. of Splices
Side B
Fiber Length
dB loss (R)
dB loss (Av)
Results
Remarks
Fiber No.
1550 nm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
1310 nm
1550 nm
1310 nm
1550 nm
1310 nm
FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :
Cable Type :
No.of Fibers:
Date of Testing:
Section from :
To :
Link No:
Contractor:
Description
Make
Side A
Light Source
Power meter
Test
Model
Side B
Side A
Caliberation Date
Sr. No.
Side B
Side A
No. of Splices
Side B
Fiber Length
dB loss (R)
dB loss (Av)
Results
Remarks
Fiber No.
1550 nm
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
1310 nm
1550 nm
1310 nm
1550 nm
1310 nm
FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :
Cable Type :
No.of Fibers:
Date of Testing:
Section from :
To :
Link No:
Contractor:
Description
Make
Side A
Light Source
Power meter
Test
Model
Side B
Side A
Caliberation Date
Sr. No.
Side B
Side A
No. of Splices
Side B
Fiber Length
dB loss (R)
dB loss (Av)
Results
Remarks
Fiber No.
1550 nm
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
1310 nm
1550 nm
1310 nm
1550 nm
1310 nm
FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :
Cable Type :
No.of Fibers:
Date of Testing:
Section from :
To :
Link No:
Contractor:
Description
Make
Side A
Light Source
Power meter
Test
Model
Side B
Side A
Caliberation Date
Sr. No.
Side B
Side A
No. of Splices
Side B
Fiber Length
dB loss (R)
dB loss (Av)
Results
Remarks
Fiber No.
1550 nm
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
1310 nm
1550 nm
1310 nm
1550 nm
1310 nm
FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :
Cable Type :
No.of Fibers:
Date of Testing:
Section from :
To :
Link No:
Contractor:
Sr No
Make
Side A
Light Source
Power meter
Test
Model
Side B
Side A
Caliberation Date
Sr. No.
Side B
Side A
No. of Splices
Side B
Fiber Length
dB loss (R)
dB loss (Av)
Results
Remarks
Fiber No.
1550 nm
1310 nm
1550 nm
1310 nm
1550 nm
1310 nm
137
138
139
140
141
142
143
144
CONTRACTOR
NAME
SIGNATURE
At 1550 nm
dB
At 1310 nm
dB
DATE
COMPANY
FORMAT E
Aerial Deviation Report
Project Name
Master route
Section Name
Date
Section Name : .
From: . To:
Chainage
Sr No
From
Affected length
To
KM
CONTRACTOR
COMPANY
Total
SIGNATURE
NAME
DATE
FORMAT F
INVITATION FOR SITE ACCEPTANCE TESTING
PROJECT NAME :
PHASE :
Master Route :
Section Name :
Company is kindly requested to witness Site Acceptance testing of above section(s) on Date of Testing indicated above.
The Contractor confirms that all works have been completed in accordance with applicable specifications and other
requirements of the Contract and the section(s) is/are ready for final Site Acceptance testing.
Signature:
Name :
Date:
Contractor's QA/QC Report
QC Incharge Name :
Contact NO.:
It is hereby confirmed that the Contractor has performed all inspection and Testing as per approved QA/QC procedures
and in accordance with specifications and other requirements of the Contract. Applicable inspection and test reports are
attached for reference.
Signature :
Name:
Date:
LIST OF REPORTS ATTACHED