SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Ame
endmentReccord/Contro lSheet(ACS))

Revv.No

Date
e

Reaso
onForIssue

Preparedby

000

050312

IssuedforrImplementation

KRS

ReviewedByy Approvedb y

JPK

KKS

Detailsof
Amendm
ment/Revision
1. Earlierissued
mentNo
docum
BWAOPROXXXX
OFC0000PX0ST005
mattedand
reform
renumbered.

IssuedBy

KKS

2. Revisedtoinclude
n
O&MaandConstruction
commeents.
001

002

120312

RevisedaandReissuedForr
Implementation

190612

RevisedaandReissuedForr
Implementation

KRS

JPK

KRS

JPK

(Kiran
Suryawanshi))

(Juwadi
Pradeep)

KKS

KKS

KKS

KKS

ni)
(KrishanSainni) (KrishanSain

DocumentTTemplate
Updated
OFCBlowinggpressure
requiremen
ntselaborated.

003

04062
2013

Revised&Reissuedfor
Implementation

KRS

BVN

KKS

KKS

RevisedaspeerNPEGuideline
e
Doc.No.R4G
G20IFNGEN
PR002

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page1of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

INDEX

SCOPE.................................................................................................................. ...............................................................3
3

REFERENCEDOCUMENTSS................................................................................... ...............................................................3
3
1 Codesand
dStandards...................................................................................... ...............................................................3
3
2.1
2.2
2 CompanySpecification
ns.................................................................................. ...............................................................4
4
2.3
3 ConflictandClarificatio
on................................................................................. ...............................................................5
5

ALFIBRECABLLE............................................................. ...............................................................5
5
INSTALLTIONOFOPTICA
1 MaterialTTakeover.......................................................................................... ...............................................................5
5
3.1
3.2
2 DrumHan
ndling................................................................................................ ...............................................................5
5
3.3
3 CableHan
ndling................................................................................................ ...............................................................6
6
3.4
4 FibreInstaallationPlann
ning.............................................................................. ...............................................................7
7
3.5
5 OFCBlow
wing.................................................................................................... ...............................................................8
8
3.6
6 FibreSpliccing................................................................................................... .............................................................10
0
3.7
7 Terminatiion..................................................................................................... .............................................................11
1
3.8
8 Earthing......................
.
2
..................................................................................... .............................................................12
3.9
9 OFCTagging.................................................................................................... .............................................................12
2
3.1
10 AerialInsttallation............................................................................................ .............................................................12
2

INSPECTION
NANDTESTIN
NG................................................................................. .............................................................14
4
1 General............................................................................................................. .............................................................14
4
4.1
4.2
2 PreInstallationTestingg................................................................................... .............................................................14
4
4.3
3 PostInstaallationTestin
ng................................................................................. .............................................................14
4
4.3.1

Visu
ualInspection
n................................................................................... .............................................................14
4

4.3.2

OFC
CTesting........................................................................................... .............................................................15
5

4.3.3

Site
eAcceptanceTest(SAT).................................................................... .............................................................16
6

4.4
4 TestEquip
pment............................................................................................... .............................................................16
6
5

QA/QCREQ
QUIREMENTSS................................................................................... .............................................................17
7

DOCUMENTTATION.............................................................................................. .............................................................17
7
1 General............................................................................................................. .............................................................17
7
6.1
6.2
2 AsbuiltD
Documents......................................................................................... .............................................................17
7
6.3
3 ApprovalofDocumentts.................................................................................. .............................................................18
8

8
HEALTHANDSAFETY.......................................................................................... .............................................................18

9
APPEENDIXA................................................................................................................ .............................................................19
SiteA
AcceptanceTTestingProced
dure............................................................................. .............................................................19
9
APPEENDIXB................................................................................................................ .............................................................22
2
Repo
ortFormats............................................................................................................. .............................................................22
2
Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page2of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

SCOPE

oversminimumrequireme
entsforthein
nstallationoffsinglemodeeopticalFibreecables(OFC
Cs)byblowing
g
This documentco
into HDPEducts, jointing(byssplicing),term
minationaten
ndpointsins ideCompanyysfacilitiesaandendtoen
ndtesting(i.e
e.
testin
ngfromterminationtoterrmination).

dinconjunctio
onswithscop
peofwork,reequirementso
e
Thissspecificationshallberead
ofthecontractdocumentandschedule
ofrates.Unlessagreedspecifically,scopeccoveredunde
erthesedocuumentsshall besupplemeentaryandco
omplementary
y
toeaachother.

REFEERENCEEDOCUMENTS

2.1
1

Code
esandSttandardss

Thed
design,materrials,construcction,inspecttionandperfformanceofO
OFCandDucttinstallation materialshalllcomplywith
h
thelaatesteditionoftheITUT,IEC,TIA/EIA,,ISO,ASTMaandISspecificcationsasmeentionedunderrelevantseectionsofthis
speciifications.

Sl. No
o.
1

Title

D
Document N
No.

Splice
es for optical Fibres an
nd cables Part 3: IEEC610733
Sectio
onal specificaation Fusio
on splices foor optical
Fibressandcables
FOTP61MeasurementofFibre
eor

EEIA/TIA45561A

Cable
eAttenuationUsinganOTDR
3

Opticcalfibrecable
esPart11: Genericspeccification
Gen
neral

IEC6079411
1

Opticcalfibrecable
esPart12:G
Genericspeci fication
Basicopticalcable
etestprocedu
ures

IEC6079412
2

Opticcal Fibres Part


P
250: Pro
oduct specificcations
sectio
onalspecificationforclassBsinglemoddeFibres

50
IEC6079425

Fibre optic interrconnecting devices and passive


comp
ponentsperfo
ormancestandard

IEC61753

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page3of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Sl. No
o.

2.2
2

Title

D
Document N
No.

ector optical interfaces Part 31:


Fibre optic conne
Opticcal interface, 2,5 mm and
d 1,25 mm ddiameter
cylind
dricalfullzirco
oniaPCferrule,singlemoddefibre

1
IEC6175531

Fibre optic conne


ector optical interfaces Part 32:
d 1,25 mm ddiameter
Opticcal interface, 2,5 mm and
cylind
dricalfullzirco
oniaferrulesfor8degreessangled
PCsin
nglemodeFib
bres

IEC6175532
2

Comm
munication cables. Comm
mon design rrules and
consttruction. Haalogen free
e flame rretardant
therm
moplasticsheathingcompo
ounds

EEN5029022
27

CompanySpecifications

dditionreferenceisalsomaadetofollow
wingCompanyySpecificationns/DesignBasis.
Inad
Sl.N
No.

Title

DocumentNo.

Specificcation for Op
ptical Fibre Cable (Multi
LooseTTubeDesign)

1007040PPSSPREF001
1

SpecificcationforJoin
ntClosuresfo
orOFC

1007040PPSSPREF002
2

SpecificcationforOptticalFibreCable(Ribbon
FibreCe
entralLooseTTubeDesign)

1007040PPSSPREF003
3

Specificcation for HD
DPE Duct for installation
ofOpticcalFibreCablle

1007040PPSSPREF004
4

Specificcation for Acccessories Re


equired for
InstallationofHDPEDuctsandOpticalFibre
Cable

1007040PPSSPREF011
1

Specificcation for In
nstallation off Ducts for
OpticalFibreCable(ss)

1007040PPSSPREF013
3

& Fibre
Intracity OFN Architecture
A
Enginee
ering (Duct & Fibre Tyypes, Fibre
Allocatiion,Splicing&
&Termination
nPlan)

R4G20IFN
NGENPR002
2

Design Basis Maan Hole / Hand


H
Hole
Selectio
on for Intercity and Intrracity OFC
Networrks

1007040PPBDPREF00
02

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page4of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

2.3
3

Guidelines To Estab
blish Location
n, Size and
Numbe
erofZeroMan
nholesatFacilities

1007040G
GDGPREF00
04

ConfflictandClarificaation

quirementsoffthisspecificcationandrefferencecodes,standards andCompany
y
Anyconflictsbetweenvariousreq
specificaationsmentio
onedunderse
ection2.1and2.2abovesshallbebrou
ughttotheatttentionofCo
ompany.Until
thereso
olutionisofficciallymadebyytheCompan
nyRepresentaative,themo
orestringentrrequirementshallgovern.

INSTTALLTIO
ONOFO
OPTICALLFIBRECABLE

3.1
1

Mate
erialTakkeover

3.2
2

Th
heContracto
orshall,atits discretion,carryoutdrum
mtestoneacchFibreofO
OpticalFibreC
Cable(OFC)in
n
co
oiled form to verify avverage atten
nuation valu e (optical loss in dB/kkm) or checcking of any
y
defective/disco
ontinuousFib
bresaftertakkingoverthe freeissueop
pticalFibrecaabledrumsfrromCompany
y
attits designattedwarehousse.TheComp
panyshall pr ovideapplicaablefactoryaacceptance teestreportsto
o
th
heContractorrforitsrefere
ence.

ii

In
ncasetheme
easuredatten
nuationvalue
e(orFibrelosss)isfoundtobehighertthan10%oftthatshownin
n
Faactory Accep
ptance Test report or any damage to the Fibrre(s) is observed, the saame shall be
e
im
mmediatelyb
broughttothenoticeofth
heCompany andthedisccrepancy/dam
magereport jointlysigned
d
byyrepresentattivesoftheContractorand
dtheCompanny.

iii

Su
uchOFCdrum
msshallbese
etasideforfurtherinstructtionsfromtheCompany.

iv

Th
heContractortonotethattanydefectn
noticedintheecablebytheeContractorthatisnotreecordedatthe
e
timeoftakingovershallbetoContracto
orsaccount.

hefinalaccep
ptancetestingofOFCafte
erinstallationnhowevershallbebased onresultsgivveninFactory
y
Th
AcceptanceTe
estReportson
nly.

vi

Th
he Contracto
or, after taking over of the
t free issu e OFC drum
ms, shall be rresponsible tto handle the
e
materialcarefu
m
ullyandtranssportthesam
metoitsown storagearea//installationssite.

Drum
mHandliing
i

FiibreOpticCablesshallbe suppliedinw
woodencabl edrumswith
hwoodenbaattensprotecttingthecable
e
frromexternal objects.Inttheeventof battensbein gremovedfo
orinspection
nortestingpurposes,they
y
arretobereplaacedandnotremovedagaainuntilthec ableisbeingpreparedforrinstallation.

ii

Atthetimeofloading/unlo
oading,thedrrumsshallnottberolledon
nto/offthetru
uck,butlifted
dbyasuitably
y
raatedcraneussingslingsand
d/orspreaderrbars.

iii

Th
he following are a set of guidelines th
hat shall be ffollowed by C
Contractor when handlingg optical Fibre
e
drums:

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page5of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

iv

3.3
3

Alwaysccarrydrumso
ontheirflanges.

Nevercaarrydrumson
ntheirside,aasthismaycaausetanglingofthecable.

Alwayslloadorunloadthedrumb
byusingaroddinthedrumcenterforfasteningtheslings.

Always check the weight


w
marked
d on the druum and ensu
ure the liftingg device has the required
d
capacity.

Neverovverloadaliftingdevice.

Neverussehookstoliftdrums,astthismaycaussedamagetothedrums.

Alwaysllowerdrumsgentlyontothegroundorrtransporttraay.

Neverdrropdrums.A
Avoidimpactsswhichmayddamagethed
drum.

Alwaysp
protectthecaablefromrub
bbingordamaage.Adjustth
heloadoruseeseparators.

Neverle
etdrumflange
escontactcableonadjaceentdrums.

Alwaysrrollthedrumsinthedirectionofthearrrow.Neverrrollintheopp
positedirectio
on,asthiswill
loosenthewind.

nsportation, the drums aare restraineed to restricct movementt.


Always ensure that during tran
neddrumsmaayresultinseeriousinjuryo
orpropertydamage.
Inadequatelyrestrain

moredrumso
onavehicleinnamannerthattheirmovvementwillccausedamage
e
Neverplacetwoorm
toeitherrcable.

Alwayscchecktherum
msagainstrolllingifplaced onuneven//slopingsurfaace.

ws,andspaceemustbelefft
Siinceadrumsmaycontaincableofvaryyinglength,ttheymustbe storedinrow
betweentherows,sothat:

Thedrum
midentificationplateandcablelength canbeeasilyyread.

Anydrum
mcanbeload
dedatanytim
me,andinanyyorder.

Anydrum
mcanbetesttedatanytim
me.

edtothestorreandhavec ableremainin
nginthemsh
hallbestored
dinaseparate
e
Anydrumsthaatarereturne
ning on the d
drum shall be
e
arrea as per instructions off warehouse in charge. TThe length of cable remain
clearlyindicate
edbypaintonthesideofthedrum.

vi

Whendrumsa
W
arestoredforraconsiderabletimeitshhallnotbekeeptonadamp
psurfacetoaavoiddamage
e
to
othewoodbyyrodentsord
decay.

Cable
eHandliing

When handling Fibre optic caable, there arre certain pre


ecautions whhich need to be ensured. The cable itt needs to be
e
hand
dledappropriaatelytoensureitslongterrmlife.
i

Cableshallnotbedraggedalongthegrroundasitm
mayresultinaabrasionoftheoutersheeath.Alsothe
e
caablemaygetcaughtond
debrispresenttonthegrouund,whichco
ouldresultin
nkinkingoftthecable.The
e

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page6of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Contractorshaallensureavaailabilityofmanpoweradeequatetolift andholdtheecabletopreventdragging
g
onground.

3.4
4

ii

emeasuresto
opreventstep
ppingoverorrdriveoverth
hecable.
Taakeadequate

iii

Unspoolingsh
hallbedone inamanner topreventooverlappingo
oflayerswhicchmaycauseethecableto
o
becometangle
ed.

iv

Wheneverthe
W
ecableisrequ
uiredtobecu
utintosmalleerlength,botthendsofthecutcableshallbesealed
d
withtemporar
w
ryendcapsto
okeepdirtan
ndmoistureooutandkeep
pthefillingco
ompoundin. Theendcaps
sh
hallbeofrubberorplasticcandshallbe
eheldinplaceewithhosecclamps,oralteernatively,heeatshrinkend
d
caapsmadeofccrosslinkedp
polymermaybeused.

Fibre
eInstallaationPlanning
i

BeforeactualblowingofFibreintoalreaadyinstalled ducts,itisneecessarytocarryoutproperplanningin
n
ordertooptim
mizeuseofFib
brecableandminimizewaastages.FortthistheContrractorshallisssueadetailed
d
OFCinstallatio
O
onplancoveriingthefollow
wingatleast22weekspriorrtostartofO
OFCblowingforreviewand
d
ap
pprovalofthe
eCompany.
a..

Cablelen
ngthcalculatiionforeachrroutebasedooncableschedule

b.

CableDrrumschedule
e/selectionforoptimumuttilizationofcaable

c..

Equipme
ent,materialssandconsum
mablesrequireedforOFCblo
owing,Jointin
ngandTestin
ng.

ii

Procedure for blowing, jointing (including splicing) and post insstallation testting of OFC including fina
al
AcceptanceTe
esting(AT)tobewitnessed
dbytheComppany.

iii

estReportFo
ormatsincludingthosetob
beuseddurinngfinalAccep
ptanceTestingg.
Te

iv

Procedure to check proper functioningg of installatiion and testiing equipmen


nt including calibration of
o
te
estingequipm
ment,beforeiitsuseincludingbutnotli mitedtoblow
wingmachinee,aircompreessors,splicing
g
machine,OTD
m
RandPowermetersetc.

Communicatio
onprocedureandequipme
entrequireddduringFibreb
blowing.

vi

pecificationo
ofallmateriallsincludingco
onsumablesttobesupplie dbytheConttractorinclud
dingproposed
d
Sp
manufacturer,
m
makeandm
modelnumberr.

vii

In
nstallationplaandulyappro
ovedbyComp
panyshallonllybeadopted
dforactualim
mplementatio
on.

viii

Th
he Contracto
or shall familiiarize himselff with specifi cations of caables, ducts, OFC accessories and their
designparame
eterssuchasbendradius,maximumalllowablepullfforce,etc.

ix

nstallation an
nd testing in ggood working
g
Arrange for all equipment of adequate capacity neccessary for in
onditioninclu
uding,butnotlimitedto,b
blowingmachhine,aircom
mpressors,splicingmachinee(suitablefor
co
eiither multi lo
oose tube design OFC use
ed in intercitty routes or R
Ribbon Fibre central loosee tube design
n
tracityroute
OFCusedinin
O
esasperconttract),OTDRaandPowermetersetc.and
dwithsufficieentspares.All
su
uchcritical eq
quipmentshaallbesubjectttoapprovallofCompanyy.TheContraactorshallsu
ubmitdetailed
d
sp
pecifications, catalogues, calibration certificates w
where appliccable, etc. fo
or Companys review and
d
accceptanceofequipment.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page7of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Arrangeforallrequiredconsumablesin
nsufficientquuantityinclud
dingapproveedqualitylub
bricantforuse
e
duringOFCblo
owing.

3.5
5

OFCBlowingg
i

Only
O
acceptab
ble method of
o OFC installation is by pneumatic b
blowing usingg special blow
wing machine
e
ussingcompresssedairatpre
essuresbetwe
een710barrgbutnotinn
nocaseexceeedingpressurreusedduring
g
Duct Integrity Testing (DITT). Flow capaacity of comppressor shall be suitable for blowing at least 1km
m
le
ength of OFC. Air Temperrature shall not
n be more than 55 Degg C. If required air coolerr of adequate
e
blowing.
caapacityshallb
beInstalled.FFigurebelowshowsassetupforFibreb

ii

nstallation of OFC into du


ucts by pulling is prohibiteed. Companyy reserves the right to reeject any such
h
In
in
nstallationatitssolediscre
etion.HowevverinsomesppecialcasesssuchasHillyaareasinvolvin
ngcontinuous
sh
harpbendsandhairpinbe
ends,Companymayallow
wpullingofcaableinshort stretchesfromMHtoMH
H.
Fo
orallsuchcases,specificaapprovalfrom
mCompanyssConstruction
nIncharge(SStateconstructionHeador
City Constructtion Manager or City Cluster Constru ction Managger) Shall be obtained prrior to pulling
g
uchapprovalsshallbemainntainedandssubmittedasasbuiltdocu
umentation.
operation.Reccordsofallsu

iii

ooptimizeblowingoperattions,asago
oodpractice, theOFCshouldbeblown
nfromacentrallocationin
n
To
th
hesegment/spancoverin
nghalfthelen
ngthofspanoordrumineaachdirection.Firsthalfofttotallengtho
of
OFCinadrum
O
mshallbeblo
ownthrough ductinoneddirectionand
dthenbalanccehalfblown
nintoductin
n
ottherdirection
n.

iv

Beforestartinggblowingope
eration,theO
OFCneedsto beunwound
dfromthedrumandlaido
ontheground
d
in
nanorderlym
mannernorm
mallyfigurere
esemblingnum
meral8.Forrthis,theOFCdrumshall beloadedon
n
p
payoff stand and unwound from top
pside of the drum. Pay o
off stand shaall be placed
d on properly
y
preparedsurfaacetoavoidttilting/topplin
ngwhiledispeensingOFC.TThepicturesb
belowshowp
placingOFCon
n
grroundinfigurreresemblinggnumeral8andcorrectaandincorrecttprocessofunwindingand
d

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page8of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

After blowing half length in one direction, the cabl e should be unwounded at the locatiion of pay offf
sttandandstorredinafigure
eof8.Then
ninnerendofftheOFCsho
ouldbeblown
ninoppositedirection.

vi

KinkinOFCdu
uringblowinggandafterbllowingmust beavoided.A
Atblowingpoints,thelasstloopofOFC
C
sh
houldbeman
nuallypulledaaftercableblowingandpl ugtightened.

vii

Communicatio
onbetweencaableinstallatiionteamsdu ringinstallatiionmustbeeensured.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page9of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

3.6
6

viii

Id
dentificationn
numbermarkkedoneachC
CableDrumshhallberecord
ded.

ix

Manholesand
M
dhandholesprovidedalo
ongtherouteeofductsshallserverepo
ositoryforOFCcablejoint
closures and extra
e
cable lo
oops that can later be ussed for repaiir and mainteenance durin
ng operationss.
Le
engthofloop
pedcableshallbeshallbesufficienttoaallowsplicingginavanparkedclosetotthemanhole
e.
Asaminimum10meterlen
ngthofeachO
OFCcomingi ntomanholeshallbeloop
pedandstoreedinsideman
g
hole/handhole. Loop shall be in the shape of nnumeral 8 tto avoid twisting and kkinking during
sp
plicing/jointin
ng. The extrra cable loop lengths shhall be reco
orded and in
ncorporated in Asbuilt
documentation.

Siimplexcapssshallbeinstalledattheend
dofductsthrroughwhichffibrehasbeenblown.

xi

ums schedule
Th
he Contracto
or shall plan the
t cable blo
owing operattion includingg preparation
n of cable dru
e
su
uchthattoth
heextentposssible,completedrumlenngthofOFCislaidwithou
utcuttinginb
betweenorat
ends. To an extent
e
feasible, extra cablle (less than 50m) shall b
be coiled inside the manhole to avoid
d
cu
utting of the cable. Any cutting
c
of exttra Fibre whiich may beco
ome unservicceable piece as defined in
n
Contractshallbesubjectto
oapprovalofCompany.

xii

OFC
O blowing report shall be made avaailable to Coompany in th
he specified fformat (referr Appendix B,
B
Fo
ormatB:OFC
CBlowingRep
port).

Fibre
eSplicingg
i

Sp
plicing shall be done using a good quality
q
fusionn splicing maachine in air conditioned
d (AC) vehicle
e
(p
picturesbelow
wshowsFibre
eduringandaftersplicinggusingsplice machine).Th
heOFCforinttercityroutes
sh
hallbeofmultiloosetube
edesignwhiletheOFCus edforintraccityroutessh
hallofRibbon
nFibrecentra
al
lo
oosetubedessign.TheCon
ntractorshall mobilizetheesplicingequ
uipmentsuitaableforthetyypeofOFCas
percontract.

OpticalFFibreSplicinggAndFusion SplicingMac hine

ii

hesplicelosssperjointshaallbeminimalandshallnootbemoreth
han0.10dBw
whenmeasuredwithOTDR
R
Th
(B
Bidirectionalttesting).AverrageSplicelossforaminim
mumof3splicesshallnottbemorethaan0.06dBper
sp
plice.Special JointClosure
essuitablefo
orundergrounnd,buriedinstallation,co
onformingto theCompany
y
sp
pecificationsreferredunde
erSection2o
ofthisspecificcation,shallb
beusedateachOFCjoint.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page10of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

3.7
7

iii

Atleast0.6m to0.8mFib
breshallbesttoredinFibreetrayofjointtclosure.Fib
breshouldbeeneatlycoiled
d
withoutkinks.
w
Minimumbe
endingradiusinaccordanccewiththeFibrespecificattionshallbeeensured.

iv

Jo
oint closure assembly
a
shall be done ass per instructtions of manufacturer. Joint closure sh
hall be sealed
d
properlybeforreitistakeno
outofsplicinggvan.

olewiththeh
helpofplastic
Afterassemblyy,jointclosureshallbetiedtothesu pportsinsideethemanho
caable ties as shown
s
in man
nhole drawin
ngs (i.e. the dome portio n points tow
wards sky and
d cables enter
jo
ointclosurefrrombottom).Allboltsclam
mpsandotheerfixingdeviccesshallbeco
orrosionproo
of.

vi

Airpressurete
estshallbedo
onebeforeclampingthejoointclosureffordurationo
of1hour.Theejointclosure
e
2
sh
hallbefilledw
withairpresssureof1.0kgg/cm (g)and shallbeleftffor1hour.Th
hefallinpresssureshallnot
be more than 0.1 kg/cm2 after
a
1 hour. With the joiint closure prressurized, it can be dipped in a water
eckedforanyyairleakagess.Recordsofaallsuchtestsshallbemaintainedforeachsplicejoint
bucketandche
dulycorrelated
dwithsplicejjointNo.

vii

bendthecableatbenddiaameterlesserthan20D(20xdiameterrofthecable
e)
Careshallbettakennottob
whilefixingthe
w
ejointclosureinsidemanhole.

viii

After placing joint closure


e in manho
ole / handhoole, an electtronic markeer (supplied by Company
y
co
onformingtoCompanysp
pecificationre
eferredunderrSection2offthisspecification)shallb
beplacedover
th
hemanholeccover(incase
eofintercityyOFC)orinsiddethemanh
holebeforeco
overingitwitthalid(incase
e
offintracityOFC).Physical concretemaarkersshallallsobeplaced
dasdirected bytheEngin
neerincharge
e
to
olocatemanholevisually..

ix

Fo
ordetailsofSSplicingatvarriouslocation
nsreferdocum
mentno.R4G
G20IFNGEN
NPR002

Term
mination
i

AllOFCattheiirextremeen
ndsshallbetterminatedinntoFibreDisttributionPaneel(FDP)provvidedforFibre
e
te
erminationan
nddistributio
onatCompan
nysfacilities suchasaggrregationNodes(AG1,AG2
2,AG3andso
o
on) or masts or
o eNodeB, in
nline amplifie
ers or ILAs orr ILAs with R
ROADMs or R
Reconfigurablee Optical Add
d
DropMultiplexxers.

ii

Cableshallbebroughtintothebuilding//container/sshelterorcab
binetshousin
ngtheFDPthrroughduct/G
GI
pipebetweenbuildingandmanholenearesttosuchhfacility.

iii

Approximatelyy 10m OFC sh


hall be kept near the Fib re Distributio
on Panel (FDP) when FDP
P is housed in
n
building/contaainer/shelterorinsidethemanholewhhenFDPisho
ousedinacab
binetforfuturerepairsand
d

maintenance.
m

iv

OFC
O entry into
o FDP shall be
b done through holes prrovided for th
his purpose aas per instructions of FDP
P
su
upplier.

FiibresofOFCsshallbesplice
edwithpigtaailsconformi ngtoCompa nySpecificationreferred underSection
n
2ofthisspeciffication,andsstoredinthetrayasperdeetailedinstru
uctionoftheFFDPSupplier..

vi

d.
NomixingofFibresinthetrays/mixingofcablesshaallbeallowed

vii

bebroughtup
pbysideand
dwithinspaceeprovidedin
nFDPandshaallbeproperrlyroutedand
d
Pigtailsshallb
upplier. Pigtaails routing sshall be readytoremove type without
sttored as per detailed insttruction of su
disturbinganyotherpigtails.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page11of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

3.8
8

viii

Fiibresshallbe neatlyarranggedinaFibre
etray.

ix

OFCcablearm
O
mourshallbep
properlyearthedtotheeaarthingsystem
mofthefaciliity.

Fo
ordetailsofTTerminationaatvariouslocaationsreferddocumentno.R4G20IFNGENPR002

Earth
hing

ACopperrodofaround20m
mmdiameterand1mlo
ongshallbe buriedalonggwithgoodq
qualityofChaarcoalandsalt
atam
min.2.5mde
epthfromNG
GLorasrequiiredsothattheresistanceeinnormalso
oilshallbelessthanoreq
qualto2ohm
m.
AGIstripflat50m
mmwideand
d6mmthickaafterboltingandwelding withrodshalllbebroughttothesurfacceforbonding
g
with theopticFib
brearmor.Sp
peciallymadeclamp,made
eofsteelshaallbeusedfo
orbondingth
heGIstripwitththecopper
rodaandwithcablearmorforaavoidingcorro
osionandgalvaniccurrentts.Multipleeearthingrodsmayberequiredinsome
e
ofth
helocationswherethesoilresistivittyishigh.Su
uggestedlocaationwhereccablearmoreearthingshallbedoneisas
follow
ws:

Sr No.

Location

E
Earthing Locatiion

InterrCityRoutes

At the joint pit cclosest to tthe interval of 8 Kms


(Normallyateveryallternatejointt).

IntraaCityRoutes

Atthe endfacilities suchasAG3//AG2/AG1/eNodeBetc.

Ateaachmanhole
ebetweentw
woearthinglo
ocations,care
eshallbetakkentoensureethatarmor ismadeconttinuousatthe
e
jointclosure(i.e.aarmorofinco
omingandoutgoingcableshallbejoineedtogetherto
oensureelecctricalcontinu
uity).

3.9
9

OFCTagging

TheO
OFCshallbettaggedforpro
operidentificcation.Taggin
ngshallbedooneatentry/
/exitofeach,Manholean
ndattermina
al
facilitties (while OFC
O routing through Cable
e Tray at max. spacing 500m, entry loccation to FDM
MS Rack and
d inside FDMS
S
Rack). Aluminium
m Tag with OFC
O Number as per COMPANY Equipm
ment/materiaal tagging policy/system p
punched on it
shallbetiedtoOFCwithPlasticcabletie/SSSWire.

3.1
10 AeriaalInstallation

The OFC shall be


e installed in
nside buried (except at some
s
special crossings likke bridges/culverts) HDPE ducts only
y.
Howeever,justinccaseduetoso
omeunforese
eenreasons,theOFCcoul dnotbeblow
wnthroughth
heductandd
duetopaucity
y
oftim
me,theComp
panyagreesttoatemporarryinstallation
nofsuchaseectionviaaerrialroute,theeContractorm
maycomplete
e
suchsectionwiththecondition
nthatthesecctionshallbe laidundergr oundattheeearliestwitho
outanyextratimeandcost
toth
heCompanyaasperagreed
dschedule.TheContracto
orshallmainttainallsuchaaerialsectiontillthesameeareinstalled
d
undeerground.
Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page12of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Repo
ortofsuch te
emporaryaerrialinstallatio
onshallbesu
ubmitted attthetimeofh
handingover//Takingover ofcompleted
d
sectio
onintheattaachedformat(ReferAppen
ndixB,Forma
atE:AerialDeeviationRepoort).

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page13of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

INSP
PECTION
NANDTTESTING
G

4.1
1

Gene
eral

4.2
2

4.3
3

Th
hetestsshall beconducte
edinaccordan
ncewiththe recommendaationsofIEC6
610733andEIA/TIA455
61.Thetestprrocedureshalllbesubmitte
edtotheCom
mpanyforapp
provalatleasst30daysprio
ortothestarrt
offthetests.

ii

Th
heContractorshalltestallcoresofthecable,includdingthespareecoresifany..

iii

Th
he Company shall be pro
ovided with a licensed coopy of the PPC based Tesst Data Management and
d
Analysissoftwareasmaybe
erequiredan
ndusedbytheeContractor..

iv

Company rese
erves the righ
ht to witnesss inspection aand testing ccarried out in
n field as speecified herein
n
below.

PreInstallatiionTestiing
i

Th
his test shalll be done att the time off taking overr of the free issue Opticaal Fibre Cable (OFC) from
m
Companysdesignatedwarrehouseatso
olediscretionnoftheConttractor.The C
Contractorsh
hallbefreeto
o
taakeoverOFC
CfromCompaanybasedon
nmanufacturrestestcertifficate,copyo
ofwhichshalllbeprovided
d
to
otheContracctor,athisow
wnriskandco
ost,howeverr,Companyshallnotbereesponsibleforcorrectnesss,
co
ompletenessandaccuracyyoftheresulttsindicatedinnFactoryTesstReports.

ii

Companystron
nglyrecommendstestingofeachFibreecoreinthe((OpticalFibreecable(OFC)incoiledform
m
to
ocheckfordefectsandbreaksinthe cableusingO
OTDRaswellaschecking ofcontinuityyofOFCstee
el
arrmourtape. Anydrumsh
howinganyd
defectiveFibrreorarmourrorattenuatiionmorethaan10%higher
th
hanthatindiccatedintest reportshall bebroughtt othenotice oftheComp
panyandshalllbesetaside
e
fo
orfurtherinsttructionsfrom
mCompany. Resultsshall berecorded inFormatatttached(referrAppendixB
B,
Fo
ormatA:Dru
umTestReporrt).

iii

Allothermate
erialssupplied
dasfreeissu
ueshallbeviisuallyinspecctedbytheC
Contractorforranyphysica
al
damageandiffanydamage
eisfoundthe
esameshall bereportedttotheCompanyandmaterialsshallbe
e
usse/discarded as per instructions of th
he Company. All damage reports musst be signed jjointly by the
e
Contractorasw
wellastheCo
ompany.

PostInstallattionTesting

4.3.1 VisuaalInspection
4.3 .1.1

Terminati
T
ngNodess

Followin
ngshallbevissuallychecked
dattheTerm
minationNodees(e.g.AG1,A
AG2,AG3,ILA
A,eNodeB,ettc.)forquality
y
ofworkm
manship:
Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page14of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

CableterminattionatFDPs,routingoftubesandFibrees

ii

ectors
Fiixingofconne

iii

Connectorsare
ecleaned

iv

dasshownin
nDrawings
Cableisrouted

blespecificatiions
Bendingradiiaareinaccordaancewithcab

vi

properlylabe
elled
AllCablesarep

vii

entryisprope
erlysealed(gaastight)
Buildingducte

4.3 .1.2

In
nspection
nofenro
outeFaci lities

Allmanholes//handholesaarecleaned

ii

Occupiedasw
O
wellasunoccu
upiedductsaareproperlyssealed

iii

Cablesandjoin
ntsarelabelle
ed

iv

ointClosuresareproperlyandfirmlyse
ecuredinside manholes
Jo

Jo
ointsandcableloopsarelo
ocatedassho
ownindrawinngs

vi

Bendingradiiaareinaccordaancewithcab
blespecificatiions

vii

Cablesareinsttalledintheccorrectducts

viii

oopsareprop
perlycoiledandsecured.
Lo

ix

Cableentriesintothejointenclosureare
esealedcorreectly

4.3.2 OFCTTesting
i

AfterinstallationofOpticalFibreCable(OFC)intheeductsbyblo
owing,butpriortosplicin
ng,eachFibre
e
sh
hallberetesttedforcontin
nuity/damaggethatmayhhavehappeneedduringcableinstallation
nactivities.

ii

Afterjointing((byfusionsplicing)eachFFibreofOFC, eachfusionsspliceshallbeetestedforccomplianceto
o
th
hefollowingp
parameters:

a..

VisualIn
nspection

Nodefects

b.

TensileSStrength

>2N

c..

SpliceLo
oss

maximum0. 1dB

d.

Returnlo
oss

minimum500dB

iii

plicesnotme
eetingtheab
bovecriteriasshallbebrok en,jointressplicedandreetestedtilltheresultsare
e
Sp
withinaccepta
w
ablelimit.

iv

Th
he Contracto
or shall progrressively test the installedd cable as the jointing wo
ork progressees. Each Fibre
e
sh
hallbetested
dusingOTDR
Rfromendto
oendandspllicelossshalllbemeasureedat1550nm
mand1310nm
m
wavelengthsa
w
ttheoutermostlimitonb
bothsidesof splicedjointss(i.e.endtoendofinstalledFibreafter

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page15of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

eaachjoint).Avveragemeasuredloss(i.e.averageoffoorwardandbaackwardmeaasurements)fforeachsplice
e
sh
hall meet the specified criteria
c
at (iii) above at 1550nm. Value at 1310n
nm shall be reported for
in
nformation.N
Noreflectiono
orghostshalllbepresent.
v

Average splice
e loss over th
he link (minim
mum of 3 sp lices in the link) shall nott exceed 0.06
6 dB for each
h
Fiibre.

vi

Fo
orfuturerefe
erence,bidire
ectionaltestin
ngshallalso becarriedou
utat1310nm
mandreadin
ngrecordedin
n
sp
pecifiedform
mat(referApp
pendixB,Form
matC:OTDR
RTestReportt).(Thetestresultsat1310nmshallbe
e
fo
orreferenceaandtheresulttsat1550nm
mshallonlybeeconsideredforacceptance).

vii

In
naddition,Fib
bresignature
eshallalsobe
erecordedw
withOTDRat 1550nmand
d1310nmwaavelengthand
d
re
ecordsmadeavailabletoC
Companyalon
ngwithfinalrreport.

viii

Afterinstallationofcablefromnodeto node,jointinng,backfillinggandterminaatingwithap
pigtailtoeach
h
end of the cable a final biidirectional test shall be made for eaach Fibre fro
om the nodess between all
nodes/hops. This
T test shall be carried out
o by the C ontractor forr his own asssessment and
d rectification
n
workpriortoi
w
invitingComp
panyforwitnessingtheSitteAcceptancceTesting(SA
AT).Testresultsshallmade
e
avvailabletoth
heCompanyfforinformation.Finalacceeptanceshallbeasperth
heresultsob
btainedduring
g
SA
AT.

4.3.3 SiteA
AcceptancceTest(SSAT)

4.4
4

Th
he Test Proce
edure for Op
ptical Fibre Caable Site Accceptance Testts shall be prrepared by th
he Contractor
an
nd submitted
d to Company at least 30 days prior tto proposed SSAT of a partticular Link // hops (not to
o
exxceed300km
mforintercityworks)basedonthere quirementsaandOFCTesttReportForm
matsprovided
d
underAppendixAandBresspectively.

ii

d without proper Site A


Acceptance TTesting that is duly witnessed by the
e
No OFC shall be accepted
Company.

iii

nce Testing, for any non


ncompliance to the specified criterion
n
Upon complettion of the SSite Acceptan
ootcauseanaalysisshallbeecarriedoutttofindoutreeasonsforthe
e
observedand//ornoteddurringSAT,aro
propriate recctification. Affter rectification the sysstem shall be
e
noncompliancce and to caarry out app
etested to establish com
mpliance. Oncce the Contrractor is satiisfied with regard to full compliance
e,
re
Companyrepresentativesh
hallbeinvited
dagaintowit nessretesting.

iv

When
W
all the tests
t
specifie
ed for Site Accceptance Teesting are succcessfully dem
monstrated tto be meeting
g
sp
pecified criterion, such OFC shall be considered
c
accceptable by the Compan
ny and readyy for Handing
g
Over/TakingO
O
Over(HOTO)o
ofinstalledFibrelink.

TestEquipment
i

All Fibre opticc cable optical performan


nce testing sshall be perfo
ormed by the use of an Optical Time
e
DomainReflecctometer(OTTDR).TheOTD
DRshallbeeqquippedwith
hthecapabilittyofstoring testresultsin
n
electronic file formats for printout and transfer to PPC based maanagement an
nd analysis to
ools. Link loss
sh
hallbemeasu
uredusinglassersourceand
dpowermeteer.

ii

Th
he Contracto
or shall use only
o
calibrate
ed testing annd/or simulattion equipmeent (such as OTDR, Power
meter,
m
laser source, talk phones
p
etc.) during
d
preinnstallation tessting, postin
nstallation tessting and site
e

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page16of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

accceptancetesstingstages. Calibrationcertificatesfo ralltestequipmentshall betraceableetoNational/


in
nternationalttestingandcaalibrationlaboratoryandsshallbereadiilyavailablefforscrutinybyyCompanyas
an
nd when req
quested. The
e contractor shall providee all details of all equipm
ment to be used for site
e
Acceptance Te
esting along with calibration certificattes for Comp
panys/EngineeerinCharges review and
d
pproval priorr to start of Site
S Acceptan
nce Tests. Onnly equipmen
nt approved b
by company // Engineerin
ap
Chargeshallbe
eusedforSiteAcceptance
eTesting.

iii

usion splice machine


m
shall also be duly calibrated and suitable for precise FFibre alignmeent and splice
e
Fu
lo
ossevaluation
n.

iv

abletoperfo
OTDRshallbe
O
ormallthete
estsrequiredasperthissspecification. OTDRshallh
havesufficient
dyynamic range
e to carry out the link test
t
betweenn nodes. OTD
DR reports sshall be subm
mitted to the
e
COMPANYinfformofprinto
outandsoftccopy.

QA//QCREQUIREM
MENTS

nContractDo
ocumentshal lapply.
QA/QCrequirementascoveredin

DOC
CUMENTTATION
N

6.1
1

Gene
eral

6.2
2

Th
he Contracto
or shall provid
de all docum
mentation (e.gg. installation
n and testingg procedures,, test reportss,
an
nd OTDR tracces in hard copy
c
form as well as in eelectronic form on CD. A
All drawing, d
document and
d
Reportformatsshallbesub
bjecttoappro
ovalofCompaany.

ii

AlldocumentsshallbeinEn
nglishonly.

iii

Document numbering shall be as per Companys document aand equipmeent numberin


ng system (as
providedbyCo
ompany).

AsbuiltDocu
uments
i

At the end off Site Accepttance Testingg, the Contraactor shall prepare marked up (red llined) asbuilt
in
nformationwithregardto,,asaminimum,thefollow
wing:

Anychan
ngeintheOFFCrouting.

Length//ChainageoftheOFCatsignificantlocaations.

Lengtho
ofeachcablesegmentbetw
weensplices withdrumnumberusediinthatsegmeent.

Jointclosurelocationanditscoord
dinates(LAT//LONG)alonggwithappropriatetagnumber.

ofcablespoolledateachm
manhole/handdhole.
Lengtho

Fibredisstributionwithinacabletu
ube/bufferwiise.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page17of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

ii

6.3
3

Location
nofelectroniccmarkers.

providedtoup
pdateGISdattabase.Thissshallinclude:
Asbuiltdatashallalsobep

nationClosuree(FTC)/Mod
dularOptical Distribution Frame/Fibre
e
Cableterminationat FibreTermin
DistributtionPanelbycorenumberrandcolorcooding.

Pigtailscconnectionin
nFTCandarraangementinssplicingpanel.

Detailso
ofsplicethrou
ughFibres.M
Measuredcabllelossforeacchcoreofeacchcablesegm
ment.

iii

ortsincludingSATreports. Alltestresulltsshallbesu
ubmittedinellectronicform
m
Allinspectionaandtestrepo
asswellasinprrintedform.

iv

AllmaterialtesstreportsforrthematerialssuppliedbyytheContracttor.

ovalsandperrmissionsfrom
mtheconcerrnedapprovin
ngauthorities
AlldocumentsspertainingtoRoWappro
earea/utility//facilityinorigginal.
havingjurisdictionoverthe

vi

Th
heContractorshallissueaaboveasbuilttdata/recorddstoCompanyforapprovvalandrecord
ds.

ApprrovalofDocume
ents
i

Th
heContractorshallbesole
elyresponsib
bleforsubmisssionofalldo
ocumentsas listedabove andobtaining
g
ap
pprovalofCo
ompany.

ii

Contractor shaall procure materials


m
onlyy after obtainning approvall of proposed
d brand and manufacturer
frrom Compan
ny. Companyy reserves the
t
right to disallow use of any materials off unapproved
d
brand/modelo
ormaterialsssourcedfromunapproved manufactureer.

iii

Allmanufacturingandtesttingprocedurresshallbessubjecttoapp
provalofCom
mpany.Theseeinclude,but
notlimitedto,thefollowingg:

on,jointing,ttestingandteerminationoffOFC.
Proceduresforhandling,installatio

Proceduresfortestingjointclosurres.

optesting.
Procedureforlink/ho

eptancetestprocedures.
SiteAcce

HEA
ALTHAN
NDSAFEETY
i

HealthandsaffetyofallCon
ntractorperso
onnelandtheepublic,duringtheinstalllation,jointin
ng,testingand
d
te
erminationoffOFC,shallbe
einaccordan
ncewithregu latoryrequirements,ConttractorsHealthandSafety
y
Planandproce
eduresapprovedbyComp
pany.

ii

heContractorshallfollowallprecautio
onstoensurethattheOFC
Cisprotected
d,instrumentssareproperly
y
Th
handledandpersonnelsafe
etypracticesareenforced .

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page18of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

APP
PENDIXA
A
SiteAcceptancceTestingProceduree

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page19of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Thep
procedureforrfinalSiteAcceptanceTesstingofinstalledcablesha llbeasgivenhereinthisA
Appendix.
A.1

Accepta
ance proces
ss

Upon
nsuccessfulccompletiono
ofOFCinstallaationandtesstingfromenndtoendinaalink/hop/seectionandhaavingsatisfied
d
himselfregardinggreadinessofflink/hop/secction(betwee
enanytwonneighboringn
nodes(e.g.beetweenapairofAG2,ora
a
pair of ILAs/ROAD
DM/FOADM or AG3 and ILA/ROADM//FOADM etc. as the case may be) for handover, th
he Contractor
shall sendnotice totheCompaanyforwitne
essingfinalSiteAcceptancceTesting(SA
AT)throughaaAcceptance Noticeasper
attacchedformat((referAppend
dixB,Format F:Invitation forSAT)alonngwithrequiredQCRecorrds/ReportsofInspection
n
andttestingcarriedoutaspartofinstallation.
Upon
n Receipt of such Acceptaance Notice, the Companyy shall confirrm the date o
of Acceptance Testing witthin 2 days of
o
suchAcceptanceN
Notice.
On tthe date of Acceptance Test, the Co
ontractor shaall, in presennce of the C
Company Rep
presentative, perform the
e
AcceptanceTestaasgivenbelow
w:
A.2

Test for Attenuation


n and Fibre Continuity
y
A
A.2.0.1

For
F inter-city
y OFC

eintheinstalledOpticalFFibreCablesh
hallbetestedforthepoweerlossat155
50nmaswellasat1310nm
m
EachFibre
wavelengthusingthe PowerMeterTestwhere aPowerfeeeder(Laser)shallbeinstalledatoneen
ndandPower
nit PMU) shall
s
be instaalled at the other end o
of Fibre. The test shall be
e
Receiver (Power Measurement Un
considere
ed successful when the Po
ower loss in the Fibre is w
within the Accceptable Criiteria specifieed hereunderr.
Beforecarryingoutpo
owermeterre
eadings,referrencelosseshhavetobemeentionedinth
heLSPMform
mat.
nm wavelenggth indicating
g
The Company shall provide factorry test certifficate for eacch drum testted at 1550n
attenuatio
on values in coiled condittion. For the purpose of acceptance ttesting values indicated in factory test
reportshaallbeconside
ered.
Successfu
ultestshallco
onclusivelyestablishcontin
nuityofFibre inadditiontoestablishinggFibreattenu
uation.
A
A.2.0.2

Acceptance
A
Criteria

hen the averaage attenuation of each Fibre in the OFC link (not
The test shall be conssidered as accceptable wh
shorterth
han80km),att1550nmwaavelength,is lessthanoreequalto0.222dB/km,excclusiveofconnectorlossess,
whenthe suppliedcab
bleattenuatio
on(inacoiled
d4kmDrum) islessthano
orequalto0.1
195dB/km.
In the event OFC supplied by Com
mpany is having attenuatiion in coiled condition m
more that 0.195 dB/km (as
indicated infactoryte
estreport)thentheaccep
ptanceattenuuationvaluefforthelinksshallbeequaltoX+0.025
5
dB/km,w
whereX=attenuationvalue
eincoiledconditionasgivvenintestrep
port.
Resultsatt1310nmwavvelengthshallbeforinform
mationonly.
A
A.2.1

For
F intra-city
y OFC

OpticalFibre Cablelink/ho
op/sectionshallbecheckeedusingOTDR
R
ForIntracityworks,eaachFibreintheinstalledO
inbothdirectionsat15
550nmwavellengthaswellasat1310n mwavelengtth.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page20of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Inadditio
onFibrelosssshallbedeterminedforeaachFibreusi ngPowerMeeterTestwheereaPowerffeeder(Laserr)
shall be installed at one end and Power Receivver (Power M
Measurementt Unit PMU
U) shall be installed at the
e
otherend
dofFibre.
Successfu
ul test shall conclusively
c
establish
e
conttinuity of Fibbre in additio
on to establisshing Fibre sp
plice loss and
d
attenuatio
on.
A
A.2.1.3

Acceptance
A
Criteria

minimumof3splicesinthe
e
Thetestsshallbeconsiideredasacceptablewhentheaverageesplicelossiinthelink(m
link)doessnotexceed0
0.06dB.

on,theaveraggepowerlosssdetermined
dusingpowe rmeter(ind
dB/km)shallb
bereportedfforeachFibre
e
Inadditio
considerin
ng Fibreattenuationasgiiveninfactorrytestreporttforthedrumwithcableeincoiledin conditionfor
both1550
0nmand131
10nmwavelen
ngths.These resultsshall beforinform
mationonly. Beforecarryingoutpower
meterreaadings,refere
encelosseshaavetobemen
ntionedintheeLSPMformaat.
A
A.2.2

Unsuccessfu
U
ul Test

hetestasabo
oveareunsucccessfulthe causeoffailuureshallbed
determinedreepairsaffecteedadthetest
Incaseth
repeated,,tillsuchtime
etheOFCisssuccessfullyte
estedandacccepted.
A
A.2.3

Test
T
Reports
s

ortsfortheabovetestssh
hallbepresen
ntedinthefoormatattach
hed(referApp
pendixB,ForrmatC:OTDR
R
Testrepo
TestRepo
ortandFormatD:LSPMTTestReport). Incasethettestasaboveeareunsucceessfulthecaauseoffailure
e
shall be determined
d
repairs
r
affectted ad the te
est repeated , till such tim
me the OFC is successfully tested and
d
accepted..Theformatssattachedun
nderAppendixxBaretypicaalformatsforrreferencep
purposeonly. Finalformats
shall be provided
p
by the
t Companyy prior to staart of Site Accceptance Teesting. The same shall bee used by the
e
contracto
orforrecordin
ngalltestdatta.
A.3

Test for Fibre Length

Length off the Fibre blown through


h the duct sh
hall be meassured through the OTDR test. For a reverification
n,
lengthofductplusthe
elengthofFib
brecoiledatttheendscan bereferredto.

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page21of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

APP
PENDIXB
B
Repo
ortFormatts

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page22of23
3

InfrrastructureEngine
eering
SpecificationForInstallationo
ofOpticalFibreCable

10070400PSSPREF014 Rev.03
3

Sl.No.

FORMAT

Title

File

OFC
CBLOWINGREEPORT

FORMA
AT A - OFC
Blowing Report.xlsx

DR
RUMTESTREP
PORT

OTTDRTESTREP
PORT

LSPMTESTREP
PORT

FORMA
AT B - Drum
Test R
Report.xlsx

FORMAT
T C - OTDR
Test R
Report.xlsx

FORMA
AT D - LSPM
Test R
Report.xlsx

AERIALDEVIATIONREPORT

FORMA
AT E - Aerial
Deviation
n Report.xlsxx

INV
VITATIONFOR
RSAT

FOR
RMAT F Invitation
n for SAT.xlss

Relian
nceJioInfocom
mmLimited

IssueDate:040620013

Page23of23
3

FORMAT A
OFC BLOWING REPORT
Project Name
Master route
Section Name
Date
Maint. Area:

Contractor:

Report No:

Rev. No.:

Clarity Fault No. /


Job no. :

Cable type:

SPREAD DETAILS :
(From / To)

Link No.

Armoured / Unarmoured OFC

Chainage

MH / Splice chambers
Numbers

Sr. No.
From

To

From

Actual Duct Length in


Kms (MH to MH)

To

Duct Clearance
Rep. No.
(For cable
blowing )

Drawing No.:
No. of fibers:

G 652D

Uni Tube / Loose tube type OFC:

Cable length on drum in meters


OFC Cable Id
(Identification #)

OFC Cable Drum Id


(Identification #)

Mtr Mark at Start

Mtr Mark at End

OFC Length as per


meter marking

Actual Length of OFC


Consumed in Field
(As per Meter
marking)

OFC meter Marking

Cable entry
MH

Duct Entry
Slack (Meters)
Duct Entry

HH1 Duct Exit


Slack (Meters)
Duct Entry
HH2 Duct Exit
Slack (Meters)
Duct Entry
HH3 Duct Exit
Slack (Meters)
Duct Entry
MH

Cable End
Slack (Meters)

Cable end Plug fixed

Yes / No

MH, HH1, HH2, HH3, MH deployed in field

Yes / No

Manhole / HH covers closed

Yes / No

Remarks, if any:

CONTRACTOR
NAME
SIGNATURE
DATE

COMPANY

FORMAT B
OFC Drum Test Report
DRUM NO:

Bill No. :

Name of Supplier :

Physical Length (OSE) :

..m

Physical Length (OSE) :

Length (OSE - ISE):

..m

Date :

Identification Colour
Fibre No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Tube / Thread

BLUE

ORANGE

Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK

Physical Check

Optical Length

OK/Not OK

(m)

..m

Attenuation (dB / km)


@1310nm

Remarks
@1550nm

FORMAT B
OFC Drum Test Report
DRUM NO:

Bill No. :

Name of Supplier :

Physical Length (OSE) :

..m

Physical Length (OSE) :

Length (OSE - ISE):

..m

Date :

Identification Colour
Fibre No.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Tube / Thread

GREEN

BROWN

SLATE

Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK

Physical Check

Optical Length

OK/Not OK

(m)

..m

Attenuation (dB / km)


@1310nm

Remarks
@1550nm

FORMAT B
OFC Drum Test Report
DRUM NO:

Bill No. :

Name of Supplier :

Physical Length (OSE) :

..m

Physical Length (OSE) :

Length (OSE - ISE):

..m

Date :

Identification Colour
Fibre No.
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

Tube / Thread

WHITE

RED

BLACK

Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK

Physical Check

Optical Length

OK/Not OK

(m)

..m

Attenuation (dB / km)


@1310nm

Remarks
@1550nm

FORMAT B
OFC Drum Test Report
DRUM NO:

Bill No. :

Name of Supplier :

Physical Length (OSE) :

..m

Physical Length (OSE) :

Length (OSE - ISE):

..m

Date :

Identification Colour
Fibre No.
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

Tube / Thread

YELLOW

VIOLET

AQUA

Fiber
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK

Physical Check

Optical Length

OK/Not OK

(m)

..m

Attenuation (dB / km)


@1310nm

Remarks
@1550nm

FORMAT B
OFC Drum Test Report
DRUM NO:

Bill No. :

Name of Supplier :

Physical Length (OSE) :

..m

Physical Length (OSE) :

Length (OSE - ISE):

..m

Date :

Identification Colour
Fibre No.
133
134
135
136
137
138
139
140
141
142
143
144

Tube / Thread

PINK

Fiber

Physical Check

Optical Length

OK/Not OK

(m)

..m

Attenuation (dB / km)


@1310nm

Remarks
@1550nm

BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
AQUA
PINK

NOTE:
The Number of Fibers and Colours shall be as per actual. The Sample is ffor 144 fiber cable. This shall be updated based on actual OFC used.

CONTRACTOR
SIGNATURE
NAME
DATE

COMPANY

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Length

Attenuation

Result Acceptable

Average Event Loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

Event 1

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Sr. No.

Event Dist. From A/B

dB loss With OTDR

Model

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

AV

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Length

Attenuation

Result Acceptable

Average Event Loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

Event 1

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

Sr. No.

Event Dist. From A/B

dB loss With OTDR

25

Model

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

AV

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Length

Attenuation

Result Acceptable

Average Event Loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

Event 1

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Sr. No.

Event Dist. From A/B

dB loss With OTDR

49

Model

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

AV

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Length

Attenuation

Result Acceptable

Average Event Loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

Event 1

74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

Sr. No.

Event Dist. From A/B

dB loss With OTDR

73

Model

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

AV

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Length

Attenuation

Result Acceptable

Average Event Loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

Event 1

98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120

Sr. No.

Event Dist. From A/B

dB loss With OTDR

97

Model

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

AV

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Length

Attenuation

Result Acceptable

Average Event Loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

Event 1

122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144

Sr. No.

Event Dist. From A/B

dB loss With OTDR

121

Model

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

AV

FORMAT C
TEST REPORT - SPLICE LOSS AND ATTENUATION BY OTDR
Project Name
Master route
Section Name

Refractive index at 1550 nm / 1310 nm.

Date
CABLE DETAILS (Strike off whichever is not applicable)

Job Number:

Cable Vendor:

Section:

Report No.:
Cable Type:

From:

TO:

Report Date:
No. of fibers:

RING

Date of Testing:

OTDR Fiber Length

12/24/48/96F
Fiber Type: Link No.

Km:

Contractor:

No. of Events:

Nos.

TEST INSTRUMENT DETAILS


Sr.No.

Name of the Instrument

Make

Model

Sr. No.

Length

Attenuation

Event Dist. From A/B

Result Acceptable

Average Event Loss

Optical Time-domain reflectometer (OTDR)

Comm.Power loss

1550 / 1310

dB

Kms

dB/km

Y/N

dB

Fiber No.

dB loss With OTDR

Event 1

AV

Max.
Min
Avg

Note:

CONTRACTOR

1. The maximum value for average of the Forward and Reverse Event loss at 1550 nm shall less than or equal to 0.1 dB.

NAME

2. The average loss for all the splice events in a span shall not exceed 0.06 dB.

SIGNATURE

3. Attenuation coefficient limits for G652D cable at 1550 nm shall be considered 0.195 dB / Km maximum. For calculations actual value as per factory test report shall
be considered.

DATE

COMPANY

FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :

Cable Type :

No.of Fibers:

Date of Testing:

Section from :

To :

Link No:

Contractor:

Test Instrument Details


Sr No

Description

Make
Side A

Light Source

Power meter

Test

Model
Side B

Side A

Caliberation Date

Sr. No.
Side B

Side A

No. of Splices
Side B

Fiber Length

Output reference power level at 1550nm


dB loss (F)

dB loss (R)

dB loss (Av)

Results
Remarks

Fiber No.

1550 nm
1

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

1310 nm

1550 nm

1310 nm

1550 nm

1310 nm

Acceptable/ Not Acceptable

FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :

Cable Type :

No.of Fibers:

Date of Testing:

Section from :

To :

Link No:

Contractor:

Test Instrument Details


Sr No

Description

Make
Side A

Light Source

Power meter

Test

Model
Side B

Side A

Caliberation Date

Sr. No.
Side B

Side A

No. of Splices
Side B

Fiber Length

Output reference power level at 1550nm


dB loss (F)

dB loss (R)

dB loss (Av)

Results
Remarks

Fiber No.

1550 nm

35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

1310 nm

1550 nm

1310 nm

1550 nm

1310 nm

Acceptable/ Not Acceptable

FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :

Cable Type :

No.of Fibers:

Date of Testing:

Section from :

To :

Link No:

Contractor:

Test Instrument Details


Sr No

Description

Make
Side A

Light Source

Power meter

Test

Model
Side B

Side A

Caliberation Date

Sr. No.
Side B

Side A

No. of Splices
Side B

Fiber Length

Output reference power level at 1550nm


dB loss (F)

dB loss (R)

dB loss (Av)

Results
Remarks

Fiber No.

1550 nm

69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102

1310 nm

1550 nm

1310 nm

1550 nm

1310 nm

Acceptable/ Not Acceptable

FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :

Cable Type :

No.of Fibers:

Date of Testing:

Section from :

To :

Link No:

Contractor:

Test Instrument Details


Sr No

Description

Make
Side A

Light Source

Power meter

Test

Model
Side B

Side A

Caliberation Date

Sr. No.
Side B

Side A

No. of Splices
Side B

Fiber Length

Output reference power level at 1550nm


dB loss (F)

dB loss (R)

dB loss (Av)

Results
Remarks

Fiber No.

1550 nm

103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136

1310 nm

1550 nm

1310 nm

1550 nm

1310 nm

Acceptable/ Not Acceptable

FORMAT D
LSPM TEST REPORT - LINK LOSS MEASUREMENT WITH LIGHT SOURCE AND POWER METER
Project Name
Master route
Section Name
Cable Vendor :

Cable Type :

No.of Fibers:

Date of Testing:

Section from :

To :

Link No:

Contractor:

Test Instrument Details


Description

Sr No

Make
Side A

Light Source

Power meter

Test

Model
Side B

Side A

Caliberation Date

Sr. No.
Side B

Side A

No. of Splices
Side B

Fiber Length

Output reference power level at 1550nm


dB loss (F)

dB loss (R)

dB loss (Av)

Results
Remarks

Fiber No.

1550 nm

1310 nm

1550 nm

1310 nm

1550 nm

1310 nm

Acceptable/ Not Acceptable

137
138
139
140
141
142
143
144

CONTRACTOR
NAME
SIGNATURE
At 1550 nm

dB

At 1310 nm

dB

DATE

COMPANY

FORMAT E
Aerial Deviation Report
Project Name
Master route
Section Name
Date
Section Name : .

From: . To:

Chainage
Sr No

From

Section length: .kms

Affected length
To

KM

Reason for deviation

Target Date / period for


conversion to Underground

CONTRACTOR

COMPANY

Total

SIGNATURE
NAME
DATE

FORMAT F
INVITATION FOR SITE ACCEPTANCE TESTING

PROJECT NAME :
PHASE :

Master Route :

Section Name :

Date of Testing : _____________

Company is kindly requested to witness Site Acceptance testing of above section(s) on Date of Testing indicated above.
The Contractor confirms that all works have been completed in accordance with applicable specifications and other
requirements of the Contract and the section(s) is/are ready for final Site Acceptance testing.

Signature:
Name :
Date:
Contractor's QA/QC Report

QC Incharge Name :

Contact NO.:

It is hereby confirmed that the Contractor has performed all inspection and Testing as per approved QA/QC procedures
and in accordance with specifications and other requirements of the Contract. Applicable inspection and test reports are
attached for reference.

Signature :
Name:
Date:
LIST OF REPORTS ATTACHED

1. OTDR Test Report

2. LSPM Test Report

3. Drum Test Report

4. Fibre Blowing Report