Master Energy Planning


Department / Section:
Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

Battery Limit

Day Bin to Mixer

Energy Use

Silica Feeder
Weighing Hopper
Fludization System for
Carbon Charging

List of Equipment

Screw Motor # 1
Load Cells
Fludization Pads
Solenoid Valves

Electrical AC Motors

Connected
Load KW

1.5

Wearing of Belts
Belt Loosening
Compound stuck up in
auto loader
Roller Jamming
Bearing Jamming

Prev Maint
Prev Maint
Prev Maint

Air Leakage

Audit

Pneumatic Cylinder

Loading Conveyors

Electrical AC Motors

4.5

Weighing Scale

Load cell

Polymer Charging- Loading


Conveyor to Mixer Chamber

Oil Charging- Oil Tank to Mixer


Oil Pump
Chamber

Purging System

Electrical AC Motors

Carbon Purging

Wearing Of Belts
Belt Loosening
Belt Offcentering and
Jamming

Solenoid Valve
( 10 Nos )

7.5

Oil Volume as per recipe


Oil Quality
Oil Temperature

Metering &
Accounting
System

Existing Controls

No Control
Prev Maint
Prev Maint
Moisture Separater
Prev Maint
No Control
Audit

55

STOCK LOADER
CHARGING SYSTEM Transfer
of Polymer,Carbon & Oil

Energy Variables

Moisture in Silica
Screw clearance
Gear box backlash
Moisture in Carbon
Damaged pads
Coil Resistance
PU Tube leakage in SOV

Refer Flow Diagram With Critical


Relevant Operation Controls Controls/Operation Log Book Format
% Of Total
Procedures / Work
Reference/ Performance Calculation
Energy
Instructions
Work Sheet of Energy Centric
Equipment.

No

2.04

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

No

0.056

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Prev Maint
Prev Maint

No

0.17

No Control

No

0.00

No

0.28

No

0.002

Time difference between


the operation of two
Timer is present
valves
No Control
Coil Resistance
Prev Maint
Air leakage from fitting

Dust Collector

Blowing System

Blower

Electrical AC Motors

HOPPER DOOR

Gear Box LUBRICATION


SYSTEM

Hydraulic Cylinder

37

LUBE PUMPS-Electrical
AC Motors

DUST SEAL LUBRICATION


Electrical AC Motors
SYSTEM

Prev Maint
Fan & Impellor Condition
Differential pressure
No Control
Jamming
Prev Maint
Line Damage
Prev Maint
Hydraulic Pressure
Leakages
Oil Contamination
Viscosity
Jamming
Compund Stuckup

Temperature
Water Flow
Oil Pressure
Oil Contamination
Oil Viscosity

2.2

Oil Contamination
Oil Pressure
Leakages

Hydraulic Cylinder

Solenoid Valve

Pr. Regulator
Prev Maint
Prev Maint
Prev Maint
Prev Maint

Heat Exchanger
Flow Switch
Pr. Switch
Prev Maint

Prev Maint

Hydraulic Pressure
Pr Regulator
Oil Leakages from Fitting
Prev Maint
Hose Pipe Leakage

No

Hopper Door to Discharge Door

No

0.00

No

0.15

No

0.08

No

0.00

Prev Maint

No

0.00

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

Hydraulic Power Pack

AC Motor

Mixer Rotor & Gear Box


Assy

Electrical AC Motors

55

MIXER 105

Cooling System for Motor Electrical AC Motors

TSS

2125

Prev Maint

No

2.04

Rotor Speed
Gear Box Clearance
Gear Box wear & tear
Oil Leakage from
Coupling

Batch Specific
Prev Maint

Energy Meter@
BNB5 TR

Coil Resistance

78.8

0.15

Hydraulic Pressure
Coil Resistance
Pr Regulator
Hydraulic Line Leakages Prev Maint
Compound Stuck up

No

0.00

18.5

Water Circulation
Pipeline Insulation
Leakage
Valve Failure

Prev Maint

No

0.69

Pumps & Heaters

10.9

Water Circulation
Pipeline Insulation
Leakage
Cooling Valve Failure
Line Jam

Prev Maint

0.4

Gear Box Lubrication

Electrical AC Motors

0.55

Temperature
Oil Pressure
Oil Contamination

Prev Maint

0.02

R.H.S. Screw

Electrical AC Motors

90

L.H.S Screw

Electrical AC Motors

90

TOP ROLL

Electrical AC Motors

ROLL TCU

Pumps & Heaters

ROLL LUBRICATION

Electrical AC Motors

0.21

ROLL NIP GAP


ADJUSTMENT

Electrical AC Motors

Uncontrolled Loading

ROLL FWD/REV

Electrical AC Motors

BOTTOM ROLL

TAKE AWAY CONVEYOR

DIP TANK

Pump-Electrical AC
Motors

0.75

COOL RACK

Fans-Electrical AC
Motors

7.5

Temp of Compound

WIGWAG

Electrical AC Motors

7.5

Wearing of Conveyor Belt


Rollers Jamming
Prev Maint
Belt Off-Centering
Belt Loose/tight

Discharge DOOR

Hydraulic Cylinder
Solenoid Valve

MIXER TCU

Pumps & Heaters

TSS TCU

No Contractor

Ref No- BNB 105 2/102-103

Operator

Ref No- BNB 105 2/102-103

Operator

Ref No- BNB 105 2/102-103

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/102-103

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/78

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Operator

1.37

RAM & CONTROL


Mixing Chamber

Ref No- BNB 105 2/10- 98R5581001/1025

0.00

Prev Maint
Prev Maint
Prev Maint

No Control
No Control
No Control

Name of The Contractor/Service


Provider if Involved

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref No- BNB 105 2/81


BNB 105 2/83

Operator

3.34

Screw Speed
Screw Clearance
Friction
Oil Leakage

Batch Specific
Prev Maint

75

Roll Speed
Roll idle running

Batch Secific
Roll interlocking with
discharge door
Prev Maint

9.2

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

0.34

0.008

Shear Pads

0.11

Compound Stuck up
No Control
between TSS & Calendar

0.15

Electrical AC Motors

75

Roll Speed
Roll idle running

Electrical AC Motors

2.2

3.34

Mixer TCU To Bottom Roll


Energy Meter @
MDB15 For TSS

Batch Secific
PLC
Prev Maint

2.78

2.78

Wearing of Conveyor Belt

BATCH OFF UNIT

Take Away Conveyor to


Wigwag Conveyor

TOTAL

2695.01

90.00
80.00

Energy Use

List of Equipment

Silica Feeder

Screw Motor # 1

STOCK LOADER
Loading Conveyors
Oil Pump

Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Solenoid Valve
( 10 Nos )
Electrical AC Motors

Carbon Purging
Dust Collector Blower
Gear Box LUBRICATION
SYSTEM

LUBE PUMPS-Electrical AC
Motors

Connected Load KW
70.00

55
1.5
4.5
7.5
5

50.00
40.00

37
4

DUST SEAL LUBRICATION


SYSTEM
Hydraulic Power Pack

AC Motor

Mixer Rotor & Gear Box Assy

Electrical AC Motors

2125

Cooling System for Motor


MIXER TCU
TSS TCU
Gear Box Lubrication
R.H.S. Screw
L.H.S Screw
TOP ROLL
ROLL TCU
ROLL LUBRICATION

Electrical AC Motors
Pumps & Heaters
Pumps & Heaters
Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Pumps & Heaters
Electrical AC Motors

4
18.5
10.9
0.55
90
90
75
9.2
0.21

ROLL NIP GAP ADJUSTMENT

Electrical AC Motors

ROLL FWD/REV
BOTTOM ROLL
TAKE AWAY CONVEYOR
DIP TANK
COOL RACK
WIGWAG

Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Pump-Electrical AC Motors
Fans-Electrical AC Motors
Electrical AC Motors

Electrical AC Motors

60.00

2.2
55

3
4
75
2.2
0.75
7.5
7.5

30.00
20.00
10.00
0.00

Slippage
Bearing Damaged
Roller Jamming
Air Leakage at cylinder

Slurry Contamination

Prev Maint

Tank Cleaning after


regular intervals
Cooling Fans
Cooling Rack speed

Energy Meter For


Misc PCC16.4

0.082

0.028

0.28

0.28

99.82

Logo
LOCATION : _____________

Department / Section:
Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

2
CHARGING SYSTEM Transfer
of Polymer

Dust Collector

Mixing Chamber

MIXER 106

Cooling System

MILLS

BATCH OFF UNIT

Mast

Battery Limit

Energy Use

List of Equipment

Polymer Conveyor

Electrical AC Motors

Chemical Charging
Conveyor

Electrical AC Motors

Weighing Scale

Load cell

Purging System

Carbon Purging

Solenoid Valve
(10 Nos.)

Blowing System

Blower

Electrical AC Motors

Polymer Charging-Polymer
Conveyor to Chemical
Charging Conveyor

Hydraulic Cylinder
HOPPER DOOR

Solenoid Valves

LUBE PUMPS-Electrical
Gear Box
AC Motors
LUBRICATION SYSTEM

DUST SEAL
Electrical AC Motors
LUBRICATION SYSTEM
Hydraulic Cylinder
Hopper Door to Discharge Door

RAM & CONTROL


Solenoid Valve

HYDRAULIC POWER
PACK

Electrical AC Motors

Mixer Rotor & GearBox


Electrical AC Motors
Assembly
Cooling System For
Motor

Electrical AC Motors

Hydraulic Cylinder
DISCHARGE DOOR

Solenoid Valves
TCU

Mixer TCU

Pumps & Heaters

Dump Mill

Electrical AC Motors

Holding Mill

Electrical AC Motors

Sheeting Mill

Electrical AC Motors

Dump Mill to Sheeting Mill

Take Away Conveyor to


Wigwag Conveyor

TAKE AWAY
CONVEYOR

Electrical AC Motors

DIP TANK

Pump-Electrical AC
Motors

COOL RACK

Fans-Electrical AC
Motors

WIGWAG

Electrical AC Motors
TOTAL

Master Energy Planning

Connected
Load
KW

Energy Variables

Metering &
Accounting
System

Existing
Controls

2.5

Wearing Of Belts
Belt Loosening

Prev Maint

No

1.5

Wearing Of Belts
Belt Loosening

Prev Maint

No

37

Time difference between


the operation of two
Timer is present
valves
Prev Maint
Coil Resistance
Fan & Impellor Condition
Differential pressure
Prev Maint

No

Hydraulic Pressure
Leakages
Oil Contamination
Viscosity
Jamming

Pr. Regulator
Prev Maint

No

Coil Resistance

Prev Maint

No

Heat Exchanger
Flow Switch
Pr. Switch
Prev Maint

Temperature
Water Flow
Oil Pressure
Oil Contamination

2.2

Oil Contamination
Oil Pressure

Prev Maint

No

Hydraulic Pressure

Pr Regulator
Prev Maint

No

Coil Resistance

Prev Maint

No

Prev Maint

No

Rotor Speed
Gear Box Clearance
Gear Box wear & tear

Batch Specific
Prev Maint

Energy Meter @
BNB6 TR

Hydraulic Pressure
Leakages
Oil Contamination
Viscosity
Jamming

Pr. Regulator
Prev Maint

Coil Resistance

Prev Maint

13.5

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

No

200

Mill Idle Running Time

No Control

Energy Meter @
MDB21

300

Viscosity of Compound
Gear Box Clearance

Process Specific
Prev Maint

Energy Meter @
MDB21

200

Mill Idle Running Time

No Control

No

55

2125
4

Hydraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

No

Wearing of Conveyor Belt


2.2

Prev Maint
Slippage
Slurry Contamination

Tank Cleaning at
regular intervals

7.5

Temp of Compound

Cooling Fans
Cooling Rack
speed

7.5

Wearing of Conveyor Belt Prev Maint

0.75

2968.65

Energy Meter @
PCC 1

Energy Meter @
PCC 21.2 BNB6
Conveyor Panel

Relevant Operation Controls


% Of Total
Procedures / Work
Energy
Instructions

0.084
0.051

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.202
Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01
1.246

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.135

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.074

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

1.853

71.581

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.135

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.455
6.737
10.106

6.737

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.074

0.025

0.253
0.253

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Ref NoBNB 106 2/57


BNB 106 2/58

Contractor

Ref NoBNB 106 2/57


ATL/106/0167/01

Operator

Ref NoBNB 106 2/4


BNB 106 2/5
BNB 106 2/6

Operator

Ref NoBNB 106 2/4


BNB 106 2/5
BNB 106 2/6

Operator

Ref NoBNB 106 2/4


BNB 106 2/5
BNB 106 2/6

Operator

Ref NoBNB 106 2/4


BNB 106 2/5
BNB 106 2/6

Operator

Ref NoBNB 106 2/4


BNB 106 2/5
BNB 106 2/6

Operator

Ref NoBNB 106 2/17


BNB 106 2/19
BNB 106 2/21
Ref NoBNB 106 2/18
BNB 106 2/20

Operator

Ref NoBNB 106 2/33

Operator

Logo
LOCATION : _____________

Department / Section:
Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

CHARGING SYSTEM Transfer


of Carbon,Polymer & Oil

Dust Collector

Dust Collector

Mixing Chamber

Cooling System

TSS

BATCH OFF UNIT

Mast

Battery Limit

Carbon Charging- DayBin to


Mixer Chamber

Polymer Charging- Loading


Conveyor to Mixer Chamber

Energy Use

Carbon Feeders 1-8


Weighing Hopper

Screw Motor # (8)


Load Cells
Solenoid Valves

Polymer Conveyor

Electrical AC Motors

Transfer Conveyor

Electrical AC Motors

Weighing Scale

Load cell

Oil Injection Pump

Electrical AC
Motors(2)

Oil Weighing Scale

Load cell

Carbon Purging

Solenoid Valve

Oil Charging- Oil Tank to Mixer


Chamber

Purging System

List of Equipment

Blowing System

Blower

Electrical AC Motors

Hydraulic Cylinder
HOPPER DOOR

Solenoid Valves

Gear Box
LUBE PUMPS-Electrical
LUBRICATION SYSTEM AC Motors

DUST SEAL
Electrical AC Motors
LUBRICATION SYSTEM
Hopper Door to Dischage Door
RAM & CONTROL

Hydraulic Cylinder
Solenoid Valves

Hydraulic Power Pack AC Motor

Mixer Rotor-1 & Gear


Box Assly

Electrical AC Motors

Mixer Rotor-2 & Gear


Box Assly

Electrical AC Motors

MOTOR BLOWERS

Electrical AC Motors

Hydraulic Cylinder
DISCHARGE DOOR

Solenoid Valves

All Zones

TCU

Pumps & Heaters

TSS TCU

Pumps & Heaters

Gear Box Lubrication

Electrical AC Motors

R.H.S. Screw

Electrical AC Motors

L.H.S Screw

Electrical AC Motors

TOP ROLL

Electrical AC Motors

ROLL TCU

Pumps & Heaters

ROLL LUBRICATION

Electrical AC Motors

ROLL NIP GAP


ADJUSTMENT

Electrical AC Motors

ROLL FWD/REV

Electrical AC Motors

MIXER TCU To Bottom Roll

Take Away Conveyor to


Wigwag Conveyor

BOTTOM ROLL

Electrical AC Motors

TAKE AWAY
CONVEYOR

Electrical AC Motors

DIP TANK

Pump-Electrical AC
Motors

COOLING CONVEYOR

Electrical AC Motors

WIGWAG

Electrical AC Motors
TOTAL

Master Energy Planning

Connected
Load

Energy Variables

Moisture
Separater
Prev Maint

24

Moisture in Carbon
Screw clearance
Coil Resistance

5.5

Wearing Of Belt

Prev Maint

5.5

Wearing Of Belt

Prev Maint

7.5

Oil Volume as per recipe


Oil Quality
Oil Temperature

Metering &
Accounting
System

Existing
Controls

No

Energy Meter @
PDB21.2.1 I/c
1F4Weighing &
Feeding PLC
Panel

No Control
Energy Meter @
PDB21.2.2 1F1
BNB7 Oil Pump

Time difference between


the operation of two
Timer is present
valves
Prev Maint
Coil Resistance

No

37

Fan & Impellor Condition


Power quality
Prev Maint
Differential pressure

Hydraulic Pressure
Leakages
Oil Contamination
Viscosity
Jamming

Pr. Regulator
Prev Maint

Coil Resistance

Prev Maint

Temperature
Water Flow
Oil Pressure
Oil Contamination

5.5

Oil Contamination
Oil Pressure

Prev Maint

Hydraulic Pressure

Pr Regulator
Prev Maint

Coil Resistance

Prev Maint

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

Prev Maint

75

Heat Exchanger
Flow Switch
Pr. Switch
Prev Maint

Energy Mater @
PCC21.2 3F2
BNB7 MIXER Panel

No

Energy Meter @
BNB7 HT Feeder

2125

2125

No

Rotor Speed
Gear Box Clearance
Gear Box wear & tear

Batch Specific
Prev Maint

Energy Meter @
BNB7 HT Feeder

Hydraulic Pressure
Leakages
Oil Contamination
Viscosity
Jamming

Pr. Regulator
Prev Maint

Coil Resistance

Prev Maint

18.5

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

10.9

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

Energy Meter @
PCC21.2 3F1 TSS
TCU

Temperature
0.55

90

Oil Pressure
Oil Contamination

Prev Maint

Screw Speed
Screw Clearance
Friction

Batch Specific
Prev Maint

75

Roll Speed
Roll idle running

Batch Secific
Prev Maint
Interlocking

9.2

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

90

0.21

Uncontrolled Loading

Shear Pads

Compound Stuck Up
No Control
between TSS & Calendar

Energy Meter For


TSS @ MDB14

75

Roll Speed
Roll idle running

Batch Secific
Prev Maint
Interlocking

Wearing of Conveyor Belt


2.2

Prev Maint
Slippage
Slurry Contamination

Tank Cleaning on
regular basis

5.5

Temp of Compound

Cooling Fans
Cooling Rack
speed

5.5

Wearing of Conveyor Belt Prev Maint

0.75

4812.31

Energy Meter For


Misc @ PCC21.2

% Of Total Relevant Operation Controls


Energy
Procedures / Work Instructions

0.50

0.11

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.11
-

0.16

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01
0.77

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.08

0.11

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01
1.56

44.2

44.2
0.2
Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

0.4

0.2

0.0

1.9
1.9

1.6
Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01
0.2

0.0
0.1

0.1

1.6

0.05

0.02

0.11
0.11

Ref NoLIM/PRN-R/WI/MIX
LIM/PRN-R/MIX/PROCESS01

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Ref NoBNB 107 2/29

Contractor

Ref NoBNB 107 2/29

Operator

Ref NoBNB 107 2/78

Operator

Ref NoBNB 107 2/78

Ref NoBNB 107 2/7


BNB 107 2/8
BNB 107 2/9

Ref NoBNB 107 2/7


BNB 107 2/8
BNB 107 2/9

Ref NoBNB 107 2/7


BNB 107 2/8
BNB 107 2/9

Operator

Operator

Operator

Operator

Ref NoBNB 107 2/7


BNB 107 2/8
BNB 107 2/9

Ref NoBNB 107 TSS 2/51


BNB 107 TSS 2/52
BNB 107 TSS 2/53

Operator

Operator

Ref NoBNB 107 2/27


BNB 107 2/28
BNB 107 2/86

Operator

Logo
LOCATION : ____STOCK-1

Department / Section: PCR/STOCK-1/Extruder


Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

Duplex Extruder

It is Hot Feed Extrusion


Process,in this process
rubber compound is first fed
into Twin Mill/Single Mill and
then through feed mill it is
transferred to Extruder
where compound takes the
shape of die and converted
into Treads & Sidewalls

Master

Battery Limit

Energy Use

List of Equipment

Twin Mill Stock Loader


Conveyor,Cutter

Electrical AC Motors

Twin Mill/Cracker Mill

Electrical AC Motors

Twin Mill Lubrication

Electrical AC Motors

Collecting Mill/Single Mill Electrical AC Motors

Conveyors-From
Collecting to Feed Mill

Electrical AC Motors

Feed Mill

Electrical AC Motors

Cooling Blower For Feed


Electrical AC Motors
Mill

Hot Feed Extruder

Feed Mill Lubrication

Electrical AC Motors

Feed Conveyor

Electrical AC Motors

Hot Feed Extruder

Electrical DC Motors

HFE Lubrication

Electrical AC Motors

Cold Feed Extruder

Cushion Calendar

Feed Conveyor

Electrical AC Motors

Cold Feed Extruder

Electrical DC Motors

CFE BLOWER

Electrical AC Motors

Cushion Extruder Feed


Conveyor

Electrical AC Motors

Cushion Extruder

Electrical DC Motors

Cushion Calendar

Electrical DC Motors

TCU

Electrical AC
Motors,Heaters

Cushion Cal. Feed


Conveyor

Electrical AC Motors

Pull Out Conveyor

Electrical DC Motors

Die Heater

Electrical AC Motors

Shrinkage Conveyor

Electrical AC Motors

Paint Conveyor

Electrical AC Motors

Inclined Conveyor

Electrical AC Motors

Cooling Conveyor 6-9

Electrical AC Motors

Chiller Pump

Electrical AC Motors

Separating Conveyor

Electrical AC Motors

Sidewall Decline
Conveyor

Electrical AC Motors

Sidewall Blowoff
Conveyor

Electrical AC Motors

Winder Overhead
Conveyor

Electrical AC Motors

Winder-1 & Winder-2

Electrical AC Motors

Pull Out Conveyor to Cooling


Line

Decline Conveyor to Booking


Conveyor

SKIVER KNIFE MOTOR

Electrical AC Motors

SKIVER CONV

Electrical AC Motors

SKIVER CARRIAGE

Electrical AC Motors

RING BLOWER

Electrical AC Motors

RING BLOWER

Electrical AC Motors

SEPERATING CONV
BLOWER

Electrical AC Motors

BOOKING W/S

Electrical AC Motors

BOOKING CONV

Electrical AC Motors
TOTAL LOAD

Master Energy Planning

Connected
Load
KW

Energy Variables

Existing
Controls

7.7

Wearing Of Belts
Tearing of Cutter edges
Compound Jamming in
between Coneyors and
roller

Prev Maint

400

Overloading Of
Compound
Nature
of Compound
Gear Box Clearance
Gear Box Wear & Tear
Idle Running
Stock Loader Knife not
working
Lubrication Pressure
drop,Mill Trpping

Best Work
Practices
No Control
Prev Maint

1.55

Temperature
Oil Pressure
Oil Contamination

Prev Maint

Metering &
Accounting
System

Energy Meter @
MDB18

250

Overloading Of
Compound
Gear Box Clearance
Gear Box Wear & Tear

Best Work
Practices
Prev Maint

0.75

Wearing Of Belts
Tearing of Cutter edges

Prev Maint

290

1.65

Overloading Of
Compound
Gear Box Clearance
Gear Box Wear & Tear
Pushout to Sheetout
Activity

Best Work
Practices
Prev Maint

Fan & Impellor Condition


Differential pressure
Prev Maint

Temperature
Oil Pressure
Oil Contamination

Prev Maint

Wearing Of Belts
Loosening of Belts

195

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

1.5

Temperature
Oil Pressure
Oil Contamination

Prev Maint

Prev Maint

Energy Meter @
MDB14

Wearing Of Belts
Loosening of Belts

488

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

7.5

Fan Condition
Differential pressure

Prev Maint

Process Specific
Prev Maint

Prev Maint

Wearing Of Belts
Loosening of Belts

110

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

Calendar Speed

Process Specific
Prev Maint

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

50

144

Wearing Of Belts
Loosening of Belts

Prev Maint

Prev Maint

Energy Meter @
PCC14.1

Wearing Of Belts
Loosening of Belts

Prev Maint

2.2

Wearing Of Belts
Loosening of Belts

Prev Maint

Wearing Of Belts
Loosening of Belts

Prev Maint

5.5

Wearing Of Belts
Loosening of Belts

Prev Maint

22

Wearing Of Belts
Loosening of Belts

Prev Maint

Energy Meter @
MDB 14 For
Entire Extruder
Line

0.55

55

Spray Nozzles
blocked/unblocked
Nozle Crrosion
For Bias Production all
nozzles to be opened

Cleaning of
Nozzles
Nozzles to be
Energy Meter @
replaced
PCC14.1
Opening /Closing
of Valves

2.2

Wearing Of Belts
Loosening of Belts

Prev Maint

2.2

Wearing Of Belts
Loosening of Belts

Prev Maint

1.1

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Winder Motor Idle


Running

Interlocking

Energy Meter @
PCC 14.1

5.5

6.6

Knife Motor Idle Running Interlocking

Wearing Of Belts
Loosening of Belts

Prev Maint

4.4

Idle running

Interlocking

2.2

Fan Condition
Differential pressure

Prev Maint

1.6

Fan Condition
Differential pressure

Prev Maint

1.1

Fan Condition
Differential pressure

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

2.2

Wearing Of Belts
Loosening of Belts

Prev Maint

2082.5

% Of Total Relevant Operation Controls


Energy
Procedures / Work Instructions

0.37

19.21

0.07

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

12.00

0.04

13.93%

0.19%

0.08

0.05

9.36

0.07

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

0.05

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

23.43
Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01
0.36

0.05
Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01
5.28

2.40

6.91

0.05

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

0.24

0.03

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

0.11

0.14

0.26

1.06

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

2.64

0.11

0.11

0.05

0.07

0.07

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

0.26

0.32

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

0.21

0.11

0.08

0.05

0.07

0.11

Ref No.LIM/PRN-R/WI/EXT-D
LIM/PRN-R/EXT-D/PROCESS01

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/11,12,13,14

Operator

Ref No.
DUP EXT 1/15,16

Operator

Ref No.
DUP EXT 1/15,16

Operator

Ref No.
DUP EXT 1/15,16

Operator

Ref No.
DUP EXT 1/15,16

Operator

Operator

Operator
Ref No.
DUP EXT 1/15,16
Operator

Operator
Ref No.
DUP EXT 1/21,19
Operator

Operator

Ref No.
DUP EXT 1/21,19

Operator

Operator

Operator
Ref No.
DUP EXT 1/27,24

Operator
Operator

Operator

Operator

Ref No.
DUP EXT 1/18

Operator

Operator

Operator

Operator

Ref No.
DUP EXT 1/22

Operator

Operator

Operator

Operator

Ref No.
DUP EXT 1/31,32,33

Operator

Operator

Operator

Operator

Ref No.
DUP EXT 1/28,29,30

Operator

Operator

Operator

Logo
LOCATION : ____STOCK-1

Department / Section: PCR/STOCK-1/Extruder


Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

SRRD EXTRUDER

In this process rubber


compound is directly feed
into 150MM CFE & 200 MM
CFE ,compound is extruded
from 150MM and 200MM
screw die so as to take
specified shape.
This is used for making
treads & SideWall
This process starts from
compound going to CFE and
ends after compound leaves
booking area.

SRRD EXTRUDER

specified shape.
This is used for making
treads & SideWall
This process starts from
compound going to CFE and
ends after compound leaves
booking area.

Master

Battery Limit

Energy Use

List of Equipment

200MM EXTRUDER FEED


Electrical AC Motors
CONVEYOR

200 MM Extruder

Electrical DC Motors

200MM MAIN MOTOR


BLOWER

Electrical AC Motors

200MM GEARBOX
LUBRICATION

Electrical AC Motors

200 MM Cold Feed Extruder


150MM EXTRUDER FEED
to 150 MM Cold Feed
Electrical AC Motors
CONVEYOR
Extruder

200 MM Cold Feed Extruder


to 150 MM Cold Feed
Extruder

TCU

Roller Die to Winder1 &


Winder2

150 mm extruder

Electrical DC Motors

150MM MAIN MOTOR


BLOWER

Electrical AC Motors

150MM GEARBOX
LUBRICATION MOTOR

Electrical AC Motors

HEAD HYDRAULIC UNIT

Electrical AC Motors

PUMPS ZONE 1 TO4

Electrical AC Motors

Zone Heating

Heaters

PUMPS ZONE 5 TO 12

Electrical AC Motors

ROLLER DIE MOTOR

Electrical AC Motors

INCLINE CONVEYOR

Electrical AC Motors

BLOWER AT INCLINE
CONVEYOR

Electrical AC Motors

BOOMRANG CONVEYOR

Electrical AC Motors

Cooling Conveyor 1-4

Electrical AC Motors

Roller Die to Winder1 &


Winder2

Pump 1401 & Pump


Electrical AC Motors
1402- One run at a time
DECLINE CONVEYOR

Electrical AC Motors

WATER BLOW OFF


CONVEYOR

Electrical AC Motors

WINDER 1

Electrical AC Motors

WINDER2

Electrical AC Motors

WINDER CHANGE OVER


CONVEYOR

Electrical AC Motors

SKIVER CONVEYOR

Electrical AC Motors

CUTTER CARRIAGE

Electrical AC Motors

SKIVER KNIFE

Electrical AC Motors

RING BLOWER

Electrical AC Motors

SHRINKAGE CONVEYOR 1 Electrical AC Motors


SHRINKAGE CONVEYOR 2
Electrical AC Motors
TO 6
SEPARATING CONVEYOR Electrical AC Motors

Skiver Unit to Scrap


Conveyor

BLOWER AT SEPARATING
Electrical AC Motors
CONVEYOR

Skiver Unit to Scrap


Conveyor

BLOWER AT SEPARATING
Electrical AC Motors
CONVEYOR

BOOKING CONVEYOR 1

Electrical AC Motors

BOOKING CONVEYOR 2

Electrical AC Motors

LINEAR WEIGHING SCALE


Electrical AC Motors
CONVEYOR
BOOKING WEIGHING
SCALE CONVEYOR

Electrical AC Motors

SCRAP CONVEYOR

Electrical AC Motors
TOTAL LOAD

Master Energy Planning

Connected
Load
KW

Energy Variables

2.2

Wearing Of Belts
Loosening of Belts

386

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

5.5

1.1

2.2

Fan Condition
Differential pressure

Temperature
Oil Pressure
Oil Contamination

Wearing Of Belts
Loosening of Belts

Existing
Controls

Prev Maint

Process Specific
Prev Maint

Metering &
Accounting
System

Energy Meter @
PCC 21.1

Prev Maint

Prev Maint

Prev Maint

300

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage
Fan Condition
Differential pressure

Process Specific
Prev Maint

Energy Meter @
MDB21

Prev Maint

1.1

Temperature
Oil Pressure
Oil Contamination

Prev Maint

11

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

Prev Maint

4.4

Water Contamination

No Control

144

Water Circulation

Temperature
controllers for
switching
heaters

17.6

Water Contamination

No Control

22

Roller Speed

2.2

Wearing Of Belts
Loosening of Belts

7.5

Fan Condition
Differential pressure

Process Specific

Prev Maint

Prev Maint

Energy Meter @
PCC 21.1

0.75

Wearing Of Belts
Loosening of Belts

Prev Maint

16

Wearing Of Belts
Loosening of Belts

Prev Maint

Energy Meter @
PCC 21.1

22

Impellar Condition
Nozzle Blockage

Prev Maint
Cleaning

Energy Meter @
PCC 21.1

2.2

Wearing Of Belts
Loosening of Belts

Prev Maint

Energy Meter @
PCC 21.1-For
Misc.

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

Idle running

Interlocking

Idle running

Interlocking

2.2

Wearing Of Belts
Loosening of Belts

Prev Maint

6.7

Wearing Of Belts
Loosening of Belts

Prev Maint

4.3

Idle running

Interlocking

2.2

Idle running

Interlocking

1.6

Fan Condition
Differential pressure

Prev Maint

0.5

Wearing Of Belts
Loosening of Belts

Prev Maint

0.75

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

7.5

Fan Condition
Differential pressure

Prev Maint

1.6

Fan Condition
Differential pressure

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

1.5

Wearing Of Belts
Loosening of Belts

Prev Maint

996.6

% Of Total Relevant Operation Controls


Energy
Procedures / Work Instructions

0.22%

38.73%

0.55%

0.11%

0.22%

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

30.10%

0.30%

0.11%

1.10%

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

0.44%

14.45%

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

1.77%
2.21%

0.22%

0.75%

0.08%
1.61%
Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

2.21%

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

0.22%

0.15%

0.40%
0.40%

0.22%

0.67%
0.43%
0.22%

0.16%

0.05%
0.08%
0.15%

0.75%

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-S
LIM/PRN-R/EXT-S/PROCESS01

0.16%

0.15%
0.15%
0.15%
0.15%
0.15%

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Ref No.
SRRD EXT 1/86-83

Operator

Ref No.
SRRD EXT 1/86-83

Operator

Ref No.
SRRD EXT 1/86-83

Operator

Ref No.
SRRD EXT 1/86-83

Operator

Ref No.
SRRD EXT 1/85

Operator

Ref No.
SRRD EXT 1/85

Operator

Ref No.
SRRD EXT 1/85

Operator

Ref No.
SRRD EXT 1/85

Operator

Ref No.
SRRD EXT 1/85

Operator

Ref No.
SRRD EXT 1/85

Operator

Ref No.
SRRD EXT 1/86-83

Operator

Ref No.
SRRD EXT 1/86-83

Operator

Ref No.
SRRD EXT 1/86-87

Operator

Ref No.
SRRD EXT 1/86-87

Operator

Logo
LOCATION : ____STOCK-1

Department / Section: PCR/STOCK-1/Extruder


Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

KRUPP EXTRUDER

In this process rubber


compound is directly feed
into CFE ,compound is
extruded from screw die so
as to take specified shape.
This is used for making
treads & SideWall
This process starts from
compound going to CFE and
ends after compound leaves
booking area.

KRUPP EXTRUDER

In this process rubber


compound is directly feed
into CFE ,compound is
extruded from screw die so
as to take specified shape.
This is used for making
treads & SideWall
This process starts from
compound going to CFE and
ends after compound leaves
booking area.

Maste

Battery Limit

Energy Use

List of Equipment

UPPER EXTRUDER FEED


Electrical AC Motors
CONVEYOR

UPPER EXTRUDER

Electrical DC Motors

UPPER M/C GEAR BOX


LUBRICATION

Electrical AC Motors

UPPER M/C MAIN MOTOR


Electrical AC Motors
BLOWER

LOWER EXTRUDER FEED


Electrical AC Motors
CONVEYOR

LOWER EXTRUDER

Cold Feed Extruder-Upper


Extruder to Boxer Extruder

Electrical DC Motors

Cold Feed Extruder-Upper


Extruder to Boxer Extruder

LOWER M/C MAIN


MOTOR BLOWER

Electrical AC Motors

LOWER M/C GEAR BOX


LUBRICATION

Electrical AC Motors

BOXER EXTRUDER FEED


Electrical AC Motors
CONVEYOR

BOXER EXTRUDER

Electrical DC Motors

BOXER EXTRUDER GEAR


Electrical AC Motors
BOX LUBRICATION
Electrical AC MotorsPumps
TCU
Heaters(9 Zones)-2 in
Each
HYDRAULIC HEAD

Electrical AC Motors

CUSHION EXTRUDER

Electrical DC Motors

CUSHION EXTRUDER TCU Electrical AC Motors

CUSHION FEED
CONVEYOR

Electrical AC Motors

PULL OUT CONVEYOR

Electrical AC Motors

SHRINKAGE CONVEYOR

Electrical AC Motors

MARKER CONVEYOR

Electrical AC Motors

INCLINED CONVEYOR

Electrical AC Motors

COOLING CONVEYOR

Electrical AC Motors

CHILLER PUMP

Electrical AC Motors

COOLING LINE BLOWER

Electrical AC Motors

DECLINE CONVEYOR
BLOWER

Electrical AC Motors

BLOWER MOTOR FOR


S/W BLOW OFF
CONVEYOR

Electrical AC Motors

SKIVER CONVEYOR

ELECTRICAL AC
SERVO MOTOR

SKIVER KNIFE

Electrical AC SERVO
Motor

CUSHION CALENDAR TO
COOLING LINE

SKIVER CUTTER
CARRIAGE

Electrical AC Motors

SEPARATING CONVEYOR Electrical AC Motors

DECLINE CONVEYOR TO
BOOKING CONVEYOR

BLOWER AT SEPARATING
Electrical AC Motors
CONVEYOR

BOOKING CONVEYOR

Electrical AC Motors

WINDER 1

Electrical AC Motors

WINDER 2

Electrical AC Motors

WINDER CHANGE OVER


CONVEYOR

Electrical AC Motors

LINEAR WEIGHING SCALE


Electrical AC Motors
CONVEYOR
BOOKING WEIGHING
SCALE CONVEYOR

Electrical AC Motors
TOTAL

Master Energy Planning

Connected
Load
KW

Energy Variables

Existing
Controls

2.2

Wearing Of Belts
Tearing of Cutter edges

Prev Maint

316

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

1.1

Oil Pressure
Oil Contamination

Fan Condition
Differential pressure

Metering &
Accounting
System

Pr. Switch
Prev Maint

Prev Maint

1.1

Wearing Of Belts
Tearing of Cutter edges

Prev Maint

205

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

Energy Meter
@PCC 57 &
PCC13.5

0.37

0.75

75

0.37

Fan Condition
Differential pressure

Oil Pressure
Oil Contamination

Prev Maint

Pr. Switch
Prev Maint

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

Oil Pressure
Oil Contamination

Pr. Switch
Prev Maint

Energy Meter
@PCC13.5

8.865
Water Circulation
Pipeline Insulation
Leakage

Energy Meter
@PCC13.5

Prev Maint

162

7.5

40

0.75

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

2.95

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

0.75

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

2.2

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

2.2

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

2.2

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

Prev Maint

Prev Maint

22

Impellor Condition
Nozzle Blockage
Fan Condition
Differential pressure

Fan Condition
Differential pressure

Prev Maint

Fan Condition
Differential pressure
Idle Running

Prev Maint
Interlocking

15

22

7
5.2

Prev Maint
Cleaning
Prev Maint

Wearing Of Belt
Belt Loosening
Rollers Jamming

Prev Maint

Idle running

Interlocking

Energy Meter @
PCC13.5

4.6

Idle running

Interlocking

2.2

Wearing Of Belt
Belt Loosening
Rollers Jamming

Prev Maint

1.6

Fan Condition
Differential pressure
Idle Running

Prev Maint
Interlocking

2.2

Wearing Of Belt
Belt Loosening
Rollers Jamming

Prev Maint

1.5

Idle running

Interlocking

1.5

Idle running

Interlocking

1.5

Wearing Of Belt
Belt Loosening
Rollers Jamming

Prev Maint

2.2

Wearing Of Belt
Belt Loosening
Rollers Jamming

Prev Maint

0.75

Wearing Of Belt
Belt Loosening
Rollers Jamming

Prev Maint

933.555

% Of Total Relevant Operation Controls


Energy
Procedures / Work Instructions

0.24

33.85

0.12

0.32

0.12

21.96

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

0.32

0.04

0.08

8.03

0.04

0.95

17.35

0.80

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01
Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

4.28

0.08

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

0.32

0.08

0.24

0.24

0.24

0.43

1.61
2.36

0.32

2.36

0.75
0.56

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

0.49
0.24

0.17

0.24

0.16
0.16
0.16

0.24

0.08

Ref No.LIM/PRN-R/WI/EXT-K
LIM/PRN-R/EXT-K/PROCESS01

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Ref No.
KRUPP EXT 1/1-2

Operator

Ref No.
KRUPP EXT 1/1-2-4-6

Operator

Ref No.
KRUPP EXT 1/1-2

Operator

Ref No.
KRUPP EXT 1/1-2-6

Operator

Ref No.
KRUPP EXT 1/45-47-51

Operator

Ref No.
KRUPP EXT 1/45-47-51

Operator

Ref No.
KRUPP EXT 1/45-47-51

Operator

Ref No.
KRUPP EXT 1/45-47-51

Operator

Ref No.
KRUPP EXT 1/53-56-76

Operator

Ref No.
KRUPP EXT 1/53-56-76

Operator

Ref No.
KRUPP EXT 1/53-56-76

Operator

Ref No.
KRUPP EXT 1/34

Operator

Ref No.
KRUPP EXT 1/34

Operator

Ref No.
KRUPP EXT 1/34

Operator

Ref No.
KRUPP EXT 1/35-36-37

Operator

Ref No.
KRUPP EXT 1/35-36-37

Operator

Ref No.
KRUPP EXT 1/38-43

Operator

Ref No.
KRUPP EXT 1/80-82

Operator

Logo
LOCATION : _____________

Department / Section:
Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

STEEL TYRE CORD


CALENDAR

In this process,rubber is
calendared on fabric and
Steel wires - Both sides.
This coated fabric and steel
sheets are used to make
Body Plies and Steel Belts
respectively

Mas

Battery Limit

FABRIC
PRE-CALENDARING To
FABRIC CENTERING & EDGE
SPREADING SYSTEM

Energy Use

List of Equipment

Feed Roll Let Off

Electrical DC Motors

Tension Stand-1

Electrical DC Motors

Tension Stand-2

Electrical DC Motors

LET OFF Splice Station


Hydraulic Power Pack

Electrical AC Motors

Fabric Roll Accumulator


Hydraulic Power Pack

Electrical AC Motors

FABRIC
PRE-CALENDARING To
FABRIC CENTERING & EDGE
SPREADING SYSTEM

Oven Main Blower

Electrical AC Motors

Oven Exhaust

Electrical AC Motors

Pre & Post Accumulator


Centering System

Electrical AC Motors

Pre Oven Web Spreading


System

Electrical AC Motors

Pre Calendar Centering


System

Electrical AC Motors

Pre Calendar Spreading


System

Electrical AC Motors

Pre Calendar Edge


Spreading System

Electrical AC Motors

Electrical AC Motors
E-2 Mill (Cracker Mill)
Electrical AC Motors
E2 to E3 Mill Conveyor
Electrical AC Motors
E2 to E4 Mill Conveyor

E-3 Mill (Cracker Mill)

Electrical AC Motors

E-4 Mill (Feed Mill)

Electrical AC Motors

E4 Mill to CalendarUpper Conveyor Belt

Electrical DC Motors

MILLS To 4 Roll Calendar

E4 Mill to Calendar-Lower
Electrical DC Motors
Conveyor Belt

Lower Wig-Wag

Electrical AC Motors

Scrap Conveyor

Electrical DC Motors

ROLL 1-4 (4)

Electrical DC Motors

ROLL 1-4 (4) Blower

Electrical AC Motors

Gap Adj Roll-1(2) Gap


Adj Roll-2(2) Gap Adj
Roll-4(2)

Electrical DC Motors

Roll 1-4 TCU (4)

Electrical AC Motors

Calendar Bearing
Lubrication(2)

Electrical AC Motors

Calendar Gear-Box
Lubrication

Electrical AC Motors

Cross- Axis Roll


& 4)-2

(1

Electrical AC Motors

Pull Unit

Electrical DC Motors

Pull Unit Blower motor

Electrical AC Motors

Brake Pump Pull Unit

Electrical AC Motors

Cooling Drum

Electrical DC Motors

Cooling Drum Blower


motor

Electrical AC Motors

Brake Pump Cooling


Drum

Electrical AC Motors

Dancer Hydraulic

Electrical AC Motors

4 Roll Calendar to Wind Up


Unit

Accumulator Hydraulic

Electrical AC Motors

Centering unit of
Accumulator

Electrical AC Motors

Winder 1

Electrical DC Motors

Winder 2

Electrical DC Motors

Winder-1 Blower & Brake Electrical AC Motors


Winder-2 Blower & Brake Electrical AC Motors
Top Stock Guider D/S
Top Stock Guider W/S
Bottom Stock Guider D/S
Bottom Stock Guider W/S
Cutter Unit near Wind-up
Winder Position drive
(Wagon Translation)

Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
Electrical AC Motors
TOTAL

Master Energy Planning

Connected
Load
KW

Energy Variables

Existing
Controls

5.6

Speed
Clutch Engage/Disengage
Friction

No Control
Prev Maint

7.6

Speed
Roll Jamming

15

Speed
Roll Jamming

Metering &
Accounting
System

Process Specific
Prev Maint
Energy Meter
Process Specific @ PCC15.1 Let
Prev Maint
Off Unit

18.5

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

Prev Maint

18.5

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

Prev Maint

75

18.5

Fan & Impellor Condition


Differential pressure
Bearing Greasing

Fan & Impellor Condition


Differential pressure
Bearing Greasing

0.55

Speed
Roll Jamming

1.1

Speed
Roll Jamming

0.55

Speed
Roll Jamming

1.1

Speed
Roll Jamming

1.1

Speed
Roll Jamming

Prev Maint

Prev Maint

Process Specific
Prev Maint

Energy Meter
@ MDB15
Calendar Line

Process Specific
Prev Maint

Process Specific
Prev Maint

Process Specific
Prev Maint

Process Specific
Prev Maint

250

Overloading Of Compound Best Work


Practices
Gear Box Clearance
No Control
Gear Box Wear & Tear
Prev Maint

0.55

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

1.1

Wearing Of Belts
Tearing of Cutter edges
Belt Loosening

Prev Maint

Energy Meter
@ PCC16.2

250

Overloading Of Compound Best Work


Practices
Gear Box Clearance
No Control
Gear Box Wear & Tear
Prev Maint

Energy Meter
@ PCC16.2

194

Overloading Of Compound Best Work


Practices
Gear Box Clearance
No Control
Gear Box Wear & Tear
Prev Maint

Energy Meter
@ PCC15.1

1.7

Wearing Of Belts
Belt Loosening

Prev Maint

1.7

Wearing Of Belts
Belt Loosening

Prev Maint

0.75

Wearing Of Belts
Belt Loosening

Prev Maint

1.7

Wearing Of Belts
Belt Loosening

Prev Maint

288

Roll Speed
Roll idle running

Process Secific
Prev Maint
Interlocking

4.4

15

22

Fan & Impellor Condition


Differential pressure
Bearing Greasing

Uncontrolled Loading

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

Shear Pads

Prev Maint

Oil Pressure
Oil Contamination

2.2

Oil Pressure
Oil Contamination

Pr. Switch
Prev Maint

Pr. Switch
Prev Maint

0.55

0.12

27.5

0.4

0.12

5.5

Speed
Idle Running
Fan & Impellor Condition
Differential pressure
Bearing Greasing

Interlocking

Prev Maint

Oil Pressure
Oil Contamination

Pr. Switch
Prev Maint

Drum Speed
Chain Loosening
Sprocket teeth damaging

Prev Maint

Fan & Impellor Condition


Differential pressure
Bearing Greasing

Prev Maint

Oil Pressure
Oil Contamination

Pr. Switch
Prev Maint

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming

Prev Maint

7.5

0.37

Hudraulic Pressure
Hose Leakages
Oil Contamination
Viscosity
Friction/Jamming
Speed
Roll Jamming

Prev Maint

Process Specific
Prev Maint

26

Idle Running

Interlocking

26

Idle Running

Interlocking

0.52

Idle Running

Interlocking

0.52

Idle Running

Interlocking

1.1

Idle Running

Interlocking

1.1

Idle Running

Interlocking

1.1

Idle Running

Interlocking

1.1

Idle Running

Interlocking

3.45

Idle Running

Interlocking

1.1

Idle Running

Interlocking

1313.25

% Of Total Relevant Operation Controls


Energy Procedures / Work Instructions

Ref No.LIM/PRN-R/WI/FCAL
0.43%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL
0.58%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL
1.14%
LIM/PRN-R/FCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL
1.41%
LIM/PRN-R/FCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL
1.41%
LIM/PRN-R/FCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL
5.71%
LIM/PRN-R/FCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL
1.41%
LIM/PRN-R/FCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL
0.04%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL
0.08%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL
0.04%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL
0.08%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL
0.08%
LIM/PRN-R/FCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
19.04%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.04%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.08%
LIM/PRN-R/FCAL-SCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL-SCAL
19.04%
LIM/PRN-R/FCAL-SCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL-SCAL
14.77%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.13%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.13%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.06%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.13%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
21.93%
LIM/PRN-R/FCAL-SCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.34%
LIM/PRN-R/FCAL-SCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL-SCAL
1.14%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
1.68%
LIM/PRN-R/FCAL-SCAL/PROCESS01

Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.23%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.17%
LIM/PRN-R/FCAL-SCAL/PROCESS01
Ref No.LIM/PRN-R/WI/FCAL-SCAL
0.23%
LIM/PRN-R/FCAL-SCAL/PROCESS01
0.53%

0.04%

0.01%

2.09%

0.03%

0.01%

0.42%

Ref No.LIM/PRN-R/WI/FCAL-SCAL
LIM/PRN-R/FCAL-SCAL/PROCESS01

0.57%

0.03%
1.98%
1.98%
0.04%
0.04%
0.08%
0.08%
0.08%
0.08%
0.26%
0.08%

Ref No.LIM/PRN-R/WI/FCAL-SCAL
LIM/PRN-R/FCAL-SCAL/PROCESS01

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Operator

Operator
Ref No
Stc 4/31-33-38

Operator

Operator

Operator

Ref No
Stc 4/42-43

Operator
Ref No
Stc 4/42-43

Operator

Operator

Operator

Operator
Ref No
Stc 4/28-29-31
Operator

Operator

Operator

Operator
Ref No
Stc 4/97-99
Operator

Ref No
Stc 4/97-99

Operator

Operator

Operator

Operator

Ref No
Stc 4/17-15

Operator

Operator

Operator

Operator

Operator

Operator

Ref No.
StC 4/95-1-43

Ref No.
StC 4/95-1-43

Operator

Operator

Operator

Operator

Operator

Operator

Operator

Operator

Operator

Operator

Ref No.
StC 4/36 -37-38

Ref No.
StC 4/36 -37-38

Operator

Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator

Logo
LOCATION : _____________

Department / Section:
Department Head:
Source Of Energy:

Division/ Energy
Segment

S.No

Process Brief

Assembly Line

In this process,rubber is
calendared .And this
calendared rubber is used
in making Inner Liner and
Gum-Edge

Ma

Battery Limit

Energy Use

List of Equipment

150MM EXTRUDER

Electrical DC Motors

150 MM TCU

Electrical AC Motors

150MM EXTRUDER Gear


Box Lubrication

Electrical AC Motors

150 mm extruder
Fwd/Rev Movement

Pnumatic Cylinder

Hydraulic System

Electrical AC Motors

Face Roll Calendar -1

Electrical DC Motors

Calendar -1 Knife

Pnumatic Cylinder

Nip-Gap Adjustment

Electrical AC Motors

Trimming Conveyor

Electrical AC Motors

Calendar-1 TCU

Electrical AC Motors

Face Roll Calendar -2

Electrical DC Motors

Calendar -2 Knife

Pneumatic Cylinder

Nip-Gap Adjustment

Electrical AC Motors

Calendar-2 to StandBy
Extruder

Trimming Conveyor

Electrical AC Motors

Calendar-2 TCU

Electrical AC Motors

1st Take Away Conveyor

Electrical AC Motors

90MM Extruder Feed


Conveyor

Electrical AC Motors

90 MM Extruder

Electrical DC Motor

Trimming Conveyor

Electrical AC Motors

Transfer Conveyor from


Extruder to Cal-2

Electrical AC Motors
Pneumatic Cylinder

2nd Take Away Conveyor Electrical AC Motors

Poly Loading Unit To Wind Up


Unit

Poly Loading Unit

Sponge Roller Unit

Pneumatic Cylinder

Chaffer Let-Off 1

Electrical AC Motors

Chaffer Let-Off 2

Electrical AC Motors

Chaffer Application
Conveyor

Electrical AC Motors

Chaffer Passing
Conveyor-1

Electrical AC Motors

Chaffer Passing
Conveyor-2

Electrical AC Motors

Cooling Conveyor 1,2

Electrical AC Motors

Laminating Conveyor

Electrical AC Motors
Electrical AC Motors

Surface Winder-1,2,3

Poly Loading Unit To Wind Up


Unit

Surface Winder-1,2,3
Pneumatic Cylinder

Booking Conveyor-1,2,3

Electrical AC Motors

3rd Conveyor Blower

Electrical AC Motors
Electrical AC Motors

Wind Up Unit
Pneumatic Cylinder
MHE IN-OUT

Pneumatic Cylinder
TOTAL

Master Energy Planning

Connected
Load
Kw

Energy Variables

Existing
Controls

Metering &
% Of Total
Accounting
Energy
System

174

35.27

6.6

1.34

1.1

0.2229654

2.6

0.53

72.5

14.70

1.6

0.32
0

2.25

0.5
0

72.5

14.70

1.6

0.32

0
3.3

0.67
0

2.2

0.4459309

1.1

0.2229654

110

22.3
0

0.61

0
3

0.61

0.61

1.5

0.30

1.5

0.30

1.5

0.30

1.22

6.75

1.37
0

8.5

1.72

1.25

0.25

1.22

493.35

EnPIs
(Performance
Indicators)

Relevant Operation
Controls Procedures /
Work Instructions

Format No.

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Name of The Contractor/Service


Provider if Involved

Logo
LOCATION : _____________

Department / Section:
Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

In this process,rubber is
calendared .And this
3 - ROLL CALENDAR calendared rubber is used
in making Inner Liner and
Gum-Edge

Maste

Battery Limit

Energy Use

List of Equipment

150 MM EXTRUDER FEED


Electrical AC Motors
CONVEYOR

150 MM EXTRUDER

Electrical DC Motors

Electrical AC Motors
Take Away Conveyor
Pneumatic Cylinder

150 MM Cold Feed Extruder


to Calendar

Extruder TCU(10)

Electrical AC Motors

120 MM Extruder

Electrical DC Motors

120 MM EXTRUDER FEED


Electrical AC Motors
CONVEYOR

to Calendar

Electrical AC Motors
Take Away Conveyor
Pneumatic Cylinder

Extruder TCU(10)

Electrical AC Motors

Calendar

Electrical DC Motors

Nip Motor

Electrical AC Motors

Calendar TCU

Electrical AC
Motors(3)

Top Take Away Conveyor Electrical AC Motors


Bottom Take Away
Conveyor

Electrical AC Motors

Cooling Drums

Electrical AC Motors

Sponge Roller Unit

Pneumatic Cylinder

Chaffer Let-off Unit 1&2 Electrical AC Motors

Take Away Conveyor to Wind


Up Unit

Chaffer Passing
Conveyor

Electrical AC Motors

Chaffer Application
Conveyor

Electrical AC Motors

Sponge Roller Unit

Pneumatic Cylinder

Wind Up Unit-1

Electrical AC Motors

Air Blower

Electrical AC Motors

Auto-Centering System

Pneumatic Cylinder

Wind Up Unit-2

ELECTRICAL AC
MOTOR

Auto Centering for


Winder-2

Pneumatic Cylinder

MHE Adjustment

Pneumatic Cylinder
TOTAL

Master Energy Planning

Connected
Load
KW

2.2

114.7

2.2

Energy Variables

Existing
Controls

Metering &
% Of Total
Accounting
Energy
System

Wearing Of Belts
Tearing of Cutter edges

Prev Maint

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

Wearing Of Belts
Belt loosening

Prev Maint

0.64

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

2.17

Screw Speed
Temp of Compound
Temp of Extruder's
Barrel,Head & Screw
Compound Leakage

Process Specific
Prev Maint

Wearing Of Belts
Tearing of Cutter edges

Prev Maint

0.64

33.15

7.5

77.2

22.31

2.2

Wearing Of Belts
Belt loosening

Prev Maint

0.64

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

2.17

7.5

77.2
1.5

Roll Speed
Gear Box Clearance

Batch Secific
Prev Maint

22.31

Uncontrolled Loading

Shear Pads

0.43

Water Circulation
Pipeline Insulation
Leakage

Prev Maint

4.77

2.2

Wearing Of Belts
Belt loosening

Prev Maint

0.64

2.2

Wearing Of Belts
Belt loosening

Prev Maint

0.64

7.5

Drum Speed
Chain Loosening
Prev Maint
Sprocket teeth damaging

2.17

16.5

Speed

1.5

Wearing Of Belts
Belt loosening

Prev Maint

0.43

2.2

Wearing Of Belts
Belt loosening

Prev Maint

0.64

1.5

Idle Running

Interlocking

0.43

18

Fan Condition
Idle Running

Prev Maint
Interlocking

5.20

2.2
346

Idle Running

Interlocking

0.64

Relevant Operation Controls


Procedures / Work Instructions

Refer Flow Diagram With Critical


Controls/Operation Log Book Format
Reference/ Performance Calculation
Work Sheet of Energy Centric
Equipment.

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/63-64

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/63-64

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/63-64

Ref No.
3 ROLL 4/63-64
Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/78

Ref No.
3 ROLL 4/78

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/78

Ref No.
3 ROLL 4/78

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/65
Ref No.
3 ROLL 4/65
Ref No.
3 ROLL 4/65
Ref No.
3 ROLL 4/65
Ref No.
3 ROLL 4/65

Ref No.
3 ROLL 4/65

Ref No.LIM/PRN-R/WI/ILC-2
LIM/PRN-R/ILC-2/PROCESS01

Ref No.
3 ROLL 4/69

Ref No.
3 ROLL 4/69

Format No.

Name of The Contractor/Service


Provider if Involved

Operator

Operator

Operator

Operator

Operator

Operator

Operator

Operator

Operator
Operator

Operator

Operator
Operator

Operator

Operator
Operator
Operator

Operator
Operator

Operator

Logo
LOCATION : _____________

Department / Section:
Department Head:
Source Of Energy:

S.No

Division/ Energy
Segment

Process Brief

POWER DISTRIBUTION-

POWER DISTRIBUTION-

ESS-2

ESS-2

POWER FACTOR CORRECTION


& HARMONICS REDUCTION

Power Distribution To Machines


& LT Panels

Battery Limit

Energy Use

List of Equipment

TR14

TR15

TR16

TR18

TR20

Export Feeder From ESS-1 to


All HT Feeders

TRANSFORMERS

Export Feeder From ESS-1 to


All HT Feeders

TRANSFORMERS

TR21

TR22

BNB107-1

BNB107-2

BNB 106

ESS-3 Export Feeder

CAPACITOR BANKS 1 &


2

REACTORS,CAPACITORS & RVT

HARMONIC FILTERS
14/15/21

Cooling Fans,Reactors,Fixed &


Variable Capacitors

CAPACITOR BANKS TO
HARMONIC FILTERS

MDB 14

Duplex Extruder, BNB 107 TSS,


Assembly Line, Conti-1, Conti-2,
ATL Bead Apexing M/C

MDB 15

BNB5 TSS, Stc Calendar, Tyre


Testing M/c(Schench), MLDB

MDB 16

BNB6 PCC1, Duplex Twin Mill, E2Mill


& E3 Mill(Stc), Bead Winding
M/c(Allwell),Work Office, HR
Conference Room,VAC-4, Change
Room,FCW System

MDB 18

New TTM, Midcap Ext(Bias), HVAC-1


& 2, Fisher Cutter, Body Ply
Cutter,Chillers,Chiller Pumps,
Assembly Line Feed Mill

MDB 20

Duplex Single Mill

MDB 21

SRRD Extruder,3Roll
Calendar,BNB7 CR, BNB6 100"
Mill,BNB6 Dump Mill, 9th/10th Row
A/w,

MDB 22

York Chillers, ADMIN, Training


Centre(AKI),New Bead
Winding,Bead Apexing M/c,
Instrument Air Compressors 1 & 2,
Building/Curing/Final
Finish/Stock/Mould Shop/CFT-C Air
Washers

PCC 22.4

Instrument Air Compressors 1 & 2

PCC 22.1

ADMIN, AKI

SLDB - 5

LIGHTING @ BNB 7 GF,FF,SF & ESS2/Street Lighting

MDB 14 to MDB 22, PCC


22.4,PCC 22.1,SLDB-5, PMCC
16.3, ACDB

ACDB

Auxilliary Control Supply For LT


Panels, EnMS, Material
Gate,Emergency Lighting UPS

PMCC 16.3

VAC-4,Change Room,FCW System,


Cooling Tower Fans

Master Energy Planning

List of Equipment

Connected
Load

2.5 MVA

Power Quality
Quality
Winding Temp

Oil

TR14

2.5 MVA

Power Quality
Quality
Winding Temp

Oil

TR15

Energy Variables

Power Quality
Quality
Winding Temp

Oil

2 MVA

Oil

TR18

2 MVA

Power Quality
Quality
Winding Temp

1.25 MVA

Power Quality
Quality
Winding Temp

Oil

TR20

TR16

2 MVA

Power Quality
Quality
Winding Temp

Oil

TR21

2 MVA

Power Quality
Quality
Winding Temp

Oil

TR22

2.5 MVA

Power Quality
Quality
Winding Temp

Oil

BNB107-1

2.5 MVA

Power Quality
Quality
Winding Temp

Oil

BNB107-2

2.5 MVA

Power Quality
Quality
Winding Temp

Oil

BNB 106

ESS-3 Export Feeder

REACTORS,CAPACITORS & RVT

Cooling Fans,Reactors,Fixed &


Variable Capacitors

Load Variation- Switching


of Inductive & Capacitive
Loads
Load Variation- Switching
of Inductive & Capacitive
Loads

Duplex Extruder, BNB 107 TSS,


Assembly Line, Conti-1, Conti-2,
ATL Bead Apexing M/C

Power Quality

BNB5 TSS, Stc Calendar, Tyre


Testing M/c(Schench), MLDB

Power Quality

NB6 PCC1, Duplex Twin Mill, E2Mill


& E3 Mill(Stc), Bead Winding
M/c(Allwell),Work Office, HR
Conference Room,VAC-4, Change
Room,FCW System

Power Quality

ew TTM, Midcap Ext(Bias), HVAC-1


& 2, Fisher Cutter, Body Ply
Cutter,Chillers,Chiller Pumps,
Assembly Line Feed Mill

Power Quality

Duplex Single Mill

Power Quality

SRRD Extruder,3Roll
Calendar,BNB7 CR, BNB6 100"
Mill,BNB6 Dump Mill, 9th/10th Row
A/w,

Power Quality

York Chillers, ADMIN, Training


Centre(AKI),New Bead
Winding,Bead Apexing M/c,
nstrument Air Compressors 1 & 2,
Building/Curing/Final
Finish/Stock/Mould Shop/CFT-C Air
Washers

Power Quality

nstrument Air Compressors 1 & 2

Power Quality

ADMIN, AKI

Power Quality

IGHTING @ BNB 7 GF,FF,SF & ESS2/Street Lighting

Power Quality

Auxilliary Control Supply For LT


Panels, EnMS, Material
Gate,Emergency Lighting UPS

Power Quality

VAC-4,Change Room,FCW System,


Cooling Tower Fans

Power Quality

Energy Planning

Metering &
Accounting
System

% Of Total
Energy

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

8%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

10.70%

Existing Controls

EnPIs
(Performance
Indicators)

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

17.70%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

8.40%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

17.30%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

14.20%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

6.90%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

6.90%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays /
Fuses Bucholtz Relay

Individual Energy
Meter @ HT Panel

7%

Isolators / Circuit
Breakers
Overcurrent Relays
Differential Relays
Earth Fault Relays

Individual Energy
Meter @ HT Panel

5%

Individual Energy
Meter @ HT Panel
Reactive Power
Individual Energy
Manager/ACB/MCCB/Cont
Meter @
actors
MDB14/15/21

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-14

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-15

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-16

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-18

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-20

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-21

O/C Relays,E/F
Relays,ACB

Energy Meter @
MDB-22

ACB/MCCB
ACB/MCCB
MCCB

Energy Meter @
MDB-22
Energy Meter @
MDB-22
Energy Meter @
SLDB-5

MCCB

Energy Meter @
ACDB

ACB/MCCB

Energy Meter @
PMCC 16.3

Refer Flow Diagram With Critical


Relevant Operation
Controls/Operation Log Book Format
Controls Procedures / Reference/ Performance Calculation
Work Instructions
Work Sheet of Energy Centric
Equipment.

Format No.

Name of The Contractor/Service


Provider if Involved