TK ROYAL ONE Project

Toul Kork, Russian Blvd, Phnom Penh

NON-CONFORMANCE REPORT
Date:

11-Jul-16

Ref. No:

TKR-WP5-NCR-001

To:

Comin Khmere

Attention:

Mr. Vong Sovannchamroeun

Location:

Level 5 (Grid line 4/A;


4/F; 6/A; 6/F)

Contract :

WP5: MEP Work

Attachment : Photos and drawing Attached

1. Details of Non-Conformance :
HDPE pipe for lightning protection is not moved to middle of column (as discussion and approval in the meeting)

2. Possible Cause :

Material
Workmanship

Method
Design/Drwg.

Equipment

3. Problem found At :
Receipt
During Install

Before Install
On Completion

4. Correction By
Contractor
Vendor

Sub-Contractor
Engineer

5. Initiator
Name/Sign :

Yin Ratha

Date : 11-Jul-16

Position: Site Engineer MEP

6. Proposed Correction :
Repair
Rework

Use As Is
Replace

7. Details of Correction :

8. Proposed By:
Name/Sign:

Position :

Date:

Position:

Date:

9. Approval:
Name/Sign :

NCR

1/2

10. Comments:

11. Verification :

12. Sign-Off :
Name/Sign :
Note :

NCR

Position :
Witness Point Required .

2/2

Date: