Name of Work: : LINE- 2: ERECTION, TESTING & COMMISSIONING CHARGES FOR CONSTRUCTION OF 220 KV D/C TRANSMISSION LINE (UG CABLE P
NIT No: CE(Procurement)/WBSETCL/Cable Laying/ Pkg.AE/2015-16/43 DT 26.02.2016
Bidder Name
:
PRICE SCHEDUL
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the rel
Sl.
No.
400.00
1.00
Item Description
2.00
Design & construction of cable trench and backfilling including all related work
such as blasting of rocks and backfilling of trenches, fixing of gradient of trench,
excavation of trial pits wherever required, shoring, dewatering, excavation and
backfilling of any temporary manhole, support of existing fecilities/ plant,
ramming of loose earth, backfilling with carried earth wherever necessary,
disposal of surplus earth/ debris, breaking & making good of footpath,
pavement road, existing installation including street lights, cables etc, clearing
of obstacles,providing all types of markers,warning bricks & tapes as per
specification, suitable structures/ techniques materials for crossings of road, rail,
culvcrt, river, canal etc, for installatian of HDPE pipes if required other
installation materials including construction of cable duct with supply of sand
cement bricks and other construction material complete as per technical
specification and approved drawing including reinstation of exiting cables &
other utility installation wherever required.
3.00
Excavation & construction of joiniting bay (7M X 3M)as per approved drawing
with retaining walls on all sides of brick/ stone masionary duly plastered. Making
cover of jointing bay with sand, RCC preccast protection cover/tiles/bricks
including supply of all necessary materials and back filling.
4.00
5.00
Erection of polymer housed 198 KV 10 KA, heavy duty gapless outdoor type
LA as per technical specification for composite tower.
6.00
7.00
8.00
9.00
Erection of HDPE pipes with easy access to 1 phase 220KV 1200 sq.mm cable
run and erection including all neccessary accessories, structures etc.
10.00
Erection of steel structures for 220 KV cable termiantions at New Town AA IIC
WBSETCL substation end as per requirement.
11.00
Erection of earth link box, SVL, earth strip, Bonding cable, erath rod etc.
wherever required and as per technical specification for bonding earthing of
XLPEcable complete at both end.
12.00
Design and construction of foundation of all steel structures for installation and
connection of XLPE cable at proposed New Town AA-IIC 220KV SS and entire
cable route as per approved electrical layout, specification and as per
requirement.
13.00
14.00
15.00
16.00
Any other works not specifically covered above required for installation of XLPE
and Fibre optic cable.
Total in Figures
D/C TRANSMISSION LINE (UG CABLE PART WITH OFC) FROM RAJARHAT 400 KV S/S OF PGCIL (UNDER CONSTRUCTION) TO PROPOSED NEW TOWN IIC 220 KV
Units
1.8
Kms
1.8
Kms.
Nos
11.25
Kms
No
18
Nos
No
No
1.0
Lot
Lot
Lot
Lot
Km
Nos
Nos
Lot
#VALUE!
ON) TO PROPOSED NEW TOWN IIC 220 KV S/S (RL 1.8 KM).
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00