AN-II Coal Fired Power Plant Project

Task 9 Ash and Slag Handling


Task 9.3 Basic Design of Ash and Slag Handling
DATA SHEET
ETH00 BB001 Ash Silo

Nature of revision

Date

Elaborated by

Designed by

Approved by

Chief engineer

Rev.

Project

AN-II Coal Fired Power Plant Project


Elaborated by

Straka

Approved by

Janda

Project stage

Basic Design

Designed by
Chief engineer
File name
Pk 406 553_rev_A_ Data sheetETH 05 BB 001 Silo

Serial number

Date

Lvika

04/2016

Evidence number

Document number

Rev.

10041 Pk 406 553

Order

Component

Sub-System

Type . Serial

Revision

CAN 2

ETH

999

DSH . 001

AN-II Coal Fired Power Plant Project

Datasheet of ETH00 BB001 Ash Silo


Name:

Task N9
Order

ETH00 BB001 Ash Silo

Ash and Slag


Handling

Component

CAN 2

KKS code
Other marking

ETH00 BB001

KKS location code


Sub-System
Type . Serial

HDA

999

Revision

DSH . 001

Ambient data
Indoor/outdoor

outdoor

Notice:If both ambients apllied the minority of parts in opposite ambient to be specified

Average temperature

[C]

13

Minimum temperature

[C]

-16

Maximum temperature

[C]

41,5

Max.wind velocity

[m/s]

2,1

Seismicity

7.0 7.4

Data of inlet medium - ash


Unit
Name of medium

ash
[ t/m3 ]

0,6 0,8

Temperature

[ C ]

160 - 175

Granularity

[ mm ]

later

[t/h ]

93,24

Density

Mass flow 100 %

Silo
Remark: roof and bottom part of the silo is existing (transported from Voitsberg) and shall be
used for construction of the new ash silo.
Volume
[m3]
1 250
Utilisation volume
[m3]
1 000
Number of inlets
Number of outlets
Diametr

03/2016

[mm]

existing roof
existing bottom
12 000

Task 9.1 Basic Design of Ash and Slag Handling Data sheets ETH00 BB001 Ash Silo
Pk 406 553_rev_0

2/3

AN-II Coal Fired Power Plant Project


Height
With/without ceiling
Height of hopper
Inclination of hopper(from horizontal
plane)
Heat insulation
Lower operation level
Upper operation level
Discharge support device
-fluidisation
air parameters and consumption
-air guns
air parameters and consumption
-rapping device
power input
-vibrators
Manufacturer;type
Silo wall material
Wall thickness
Buckstays profiles
Hopper(bottom) material (if different from
wall material)
Cladding material of hopper inner walls
Supporting/suspension structure
Level measurement Min, Max

[mm]

[]

11 000
with
1 370
15,7

mm
[m]
[m]

100
1, 5
10,000

[bar(g),Nm3/h]
[pcs]
[bar(g),Nm3/h]
[pcs]
[V; kW]
[pcs]

NA
NA
NA
NA
NA
400 V,
NA

[mm]

Carbon steel
8 (to be checked by supplier)

no

Drawings
Drwg.name:
ETH00BB001 Ash Silo

03/2016

Drwg.N:
Pk 208 196

Task 9.1 Basic Design of Ash and Slag Handling Data sheets ETH00 BB001 Ash Silo
Pk 406 553_rev_0

3/3