PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


AT A GLANCE
Advanced inspection technology.

Allow the diagnostic of any solids from a very small object


to any size complex.
Provide real time RBI enabling development of accurate
maintenance procedures towards zero shutdown
programs.
Cost effective technology and enhance Plant performance.
Users are able to measure the real time safety factors
during operation. Planning for repairs and maintenances
is on real JIT as the actual condition and time of
destruction is known.
Phonon Diagnostic Technology is user friendly,
environmental friendly and operational friendly.

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


THE FUNDAMENTAL

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


TECHNOLOGY ADVANTAGES
No plant shutdown or production

interruption.
No modification to the material
during diagnostic.
The operation parameters are
maintained.
No special assembly units.
No dimensional or accessibility
restriction
Wide temperature range (-30 o C to
1500 o C).

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


ENGINEERING ADVANTAGES
Accurate and Real Time data

acquisition
Detail material integrity study
Ease In Maintenance Regime
Just In time Repair Planning
Simplify the preparation of Standards
and Procedures

HSE Friendly
Compact structure which is free from

redundant operations.
Reduce Down Time
Reduce the volume and labor intensity
of monitoring, repair and tests.

PHONON DIAGNOSTIC DIMENSIONS


INSTALLATION OF TRANSDUCERS

REAL TIME PROCESSING

WORK STATION

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM: ANDESCOPE

- CONCRETE THICKNESS IDENTIFICATION


- STRENGTH AND STABILITY
- CONDITION OF THE DEFECTS (EXISTANCE, LOCATION,
CHARACTERISTICS, DEGREE OF FATIQUE, CRACKS, THE
MATERIAL LOSS, IDENTIFY THE POINT OF WEEKNESS)

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM: STRESS DIAGNOSTIC

FEATURES:
1. THIS TECHNOLOGY REPLACES THE
CONVENTIONAL NDT METHOD TO IDENTIFY
STRESSES IN MATERIAL;
2. IDENTIFY THE DEGREE OF THE DANGER
CAUSED BY MECHANICAL STRESS;
3. ABLE TO IDENTIFY THE PHYSICAL
CHANGES OF THE MATERIAL AT WELDMENT
AREA;

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM: DIASTRESS MP

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM: GPR APPLICATION
ROADS AND RAILWAYS
- IDENTIFY THE THICKNESS OF THE

TUNNELS
- IDENTIFY THE CONDITION AND
QUALITYOF THE CONCRETE
STRUCTURE
- ALLOCATE THE METAL PLASTIC
CONNECTIONS

GPR Noggin

- MATERIAL AND LAYERS


- ABLE TO CONDUCT THE SOIL TEST.
- TYPE OF SOIL TYPE.

-MATERIAL LOSS

- INTEGRITY OF THE SOIL.

-EVOLUATE THE FOUNDATION


BRIDGES
- TECHNICAL CONDITION OF THE
STRUCTURE

- WATERPOOLS AND VOIDS BENEETH


THE SOIL
- SOIL BERING TEST
- GEOMETRICAL OF CAPILLARY RISE
PRESENCE

-ALLOCATE THE CORROSIONS AND


METAL LOSS
INSPECT THE FOUNDATION
(TECHNICAL CHARACTERISTICS OF
THE METAL STRUCTURE, SIZES OF
THE METAL USED IN THE FOUNDATION
AND DEPTH;

BUILDING
-DIADNOSE THE QUALITY OF THE
-CONCRETE MATERIAL
-ALLOCATE THE METALL AND PLASTIC
-PIPES WIRELINE
-RELLOCATE THE MATERIAL LOSS.
-EVALUATE THE FOUNDATION

HYDRODAMMS

ANTENNA

250 MHz

1000 MHz

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM: GPR FUNDAMENTAL

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


PHONON SYSTEM: GPR APPLICATION METHOD
LAND TRANSPORT

HELICOPTER

MANUAL

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE TANK REPORT
1. Setting up Phonon Transducers

2. Perform Phonon Calibration

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE TANK REPORT (Contd)
3. Map and Table of Phonon Diagnostics
Result

4. Summary of Defects

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE TANK REPORT (Contd)
5. Conclusion of the Diagnostic Results

6. Recommendations

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE PIPELINE REPORT
1. Setting up Phonon Transducers

2. Perform Phonon Calibration

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE PIPELINE REPORT (Contd)
3. Map of Phonon Diagnostics Result

4. Summary of Defects
No.

Defect
designation

Defect center coordinates


Distance from top
Distance
mark (12 hrs), mm
from section
counterstart, m
clock-wise
clock-wise

Defect dimensions, mm
Length,
L

Width,
W

Depth

Distribution of
phonon energy

Activity
coefficient

Defect type

Level of defect
hazard

6.95

Local
metal
loss

significant

S530002
1.

D02-11

12,23

1710

2953

680

2.22

S530003
2.

3.

4.

5.

D03-32

D03-41

D03-45

D03-56

364,37

450,45

485,91

545,93

750

173

1233

1416

508

354

372

226

167

2.42

2.65

1.49

1484 1017 2.01

7.42

General
metal significant
loss

7.91

General
metal significant
loss

5.12

Local
metal
loss

significant

6.47

Local
metal
loss

significant

8.17

Local
metal
loss

significant

7.42

Local
metal
loss

significant

R530029
6.

7.

D29-81

498,73

D29-104 643,28

917

939

915

198

153

557

2.77

2.43

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE PIPELINE REPORT (Contd)
5. Conclusion of the Diagnostic Results
1. Corrosiveness of soils, progressively less and mild. does
not bear influence on pipelines.

6. Recommendations
1. Provide the necessary level of cathode protection along
all tested pipelines.

2. The level of cathode protection at pipelines is not


assured.

2. When observing formed working parameters and


providing necessary level of cathode protection, the tested
pipelines are suitable for further operation.

3. Insulating coating :satisfactory. 5 defective areas on


pipeline CS530003

3. It is not recommended to expose pipelines to higher


pressures with the purpose of testing.

4. Risk of Soil movements, structural changes,


subsidences: Not Found

4. Sections, requiring immediate repairs and replacements,


were not found in pipelines.

5. Stressed state of pipelines is normal


6. Maximum corrosion wear for the time of operation
amounted to:

pipeline CS530002 and its branches 3,9 %

pipeline CS530003 and its branches 11,8 %

pipeline CR530029 and its branches 20,5 %

7. According to the results of phonon diagnostics 407


defects were found, out of them14 significant.
8. Remaining life of tested pipelines amounts to 3 - 20
years.

5. It is recommended to perform in 3 5 years repeated


phonon diagnostics for sections of pipelines and
branches, which at the moment of current examination
have remaining life of 3 10 years (15 sections, including
6 sections on delivery and return pipelines and 9 sections
on branches).

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE RAILWAY DIAGNOSTICS

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE RAILWAY DIAGNOSTICS (Contd)

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE BRIDGE DIAGNOSTICS

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE BRIDGE DIAGNOSTICS (Cont-d)

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


SAMPLE BRIDGE DIAGNOSTICS (Contd)

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


APPLICATION

BRIDGE

HEAVY LIFT
EQUIPMENT

ROAD TUNNEL

INSPECTION /
RBI / FFS
PIPELINES

RAIL ROAD

OFFSHORE PLATFORM

TANKS
PLANT

PHONON ENERGY DIAGNOSTIC TECHNOLOGY:


AIM AND GOAL
To set a Phonon
International Hub in
Malaysia & transfer of
Technology

To reduce redundant
jobs and provide
holistic and accurate
material integrity
data

PHONON
DIAGNOSTIC
TEHNOLOGY

To provide a new
dimension in
inspection RPI/FFS in
a single run

To enhance facility
performance now
and future meeting
the Facility Safety
Management

THANK YOU
WANT TO
KNOW MORE?
CONTACT
FARIZ NAZRUL CHE NOH
MOHAMAD KHOSIM OTHMAN
MOHD HAZIM HASSAN

: 019 2159122
: 019 9562451
: 016 2220974

Vous aimerez peut-être aussi