Vous êtes sur la page 1sur 3

DOS & NOT DOS for HUMASTAR 300

REMOVE THE INSTRUEMENT COVER

REPLACE THE WASH SOLUTION & THERMOSTAT SOLUTION WITH NEW FRESH
WATER AND PLACE THE LIQUID LEVEL SENSOR FOR CONTROL

EMPTY THE WASTE CONTAINER

CLEAN BOTH THE PROBE WITH ISOPROPYL ALCHOLE

REMOVE ALL THREE COVER PLATE FROM THE REAGENT TREY & SAMPLE TRAY

SWITCH ON THE UPS & WAIT UNTILL THE LED BECOMES STEADY

TURN ON THE INSTRUMENT & WAIT FOR AUTO-CHECK

CLICK ON THE F2-OPERATION. FIRST PAGE IS REAGENT ON-LINE PAGE

PLACE THE REAGENTS FOR THE DAILY RUN ON THE REAGENT TRAY INTO THEIR
ASSIGNED POSITIN ON THE REAGENT ON-LINE PAGE & ACTIVATE THIS REAGENTS
SIMPLY CLICK ITS () CHECK BOX

PLACE BOTH THE REAGENT TRAY COVERS PERFECTLY IN THEIR POSITIONS

WHEN THE GREEN TRIANGLE START IS ON- CLICK START REAGENT VOLUME
CHECK

CLICK OK TO START THE OPERATION

AFTER THE VOLUME CHECK CLICK ON THE CALIBRATION PAGE

TO CHECK OR PROGRAME A STANDARD OR CALIBRATOR CLICK ON () IT (ON THE


RIGHT PAGE). THE VALUE OF THE CALIBRATOR OR STANDARD WILL BE DISPLAYED
TOGETHER WITH ITS mAbS/Factor AND THE DATE OF LAST CALIBRATION. SIMPLY CLICK
() AGAINST THE METHODS TO BE CALIBRATED. A () INSIDE THE CHECK BOX INDICATES
THAT THE METHOD HAS BEEN PROGRAMMED.

TO CHECK OR PROGRAME A QC CONTROL FOR CALIBRATION CLICK THE MOUSE


ON THE DISERED CONTROL TO OPEN THE LEFT SIDE PAGE. AS ABOVE, SIMPLY CLICK ()
THE MOUSE AGAINST THE METHOD TO BE CALIBRATED. A () INSIDE THE CHECK BOX
INDICATES THAT THE METHOD HAS BEEN PROGRAMMED.

PLACE ALL THE STANDARDS, CALIBRATORS & QC CONTROLS IN THERE


APPROPRITE POSITION. THEN PLACE THE COVER PLATE ON THE SAMPLE TRAY.


ONCE ALL THE CONTROLS, CALIBRATORS AND STANDARDS HAVE BEEN
PROGRAMMED-SIMPLY CLICK START. A CONFIRMATION WINDOW WILL OPEN- CLICK OK
TO START CALIBRATION.

AFTER THE CALIBRATION IS DONE AND PRINTED, CHECK CAREFULLY EVERY


VALUE AND MAKE SURE THAT THE RESULTS OBTAINED ARE WITHIN THE LIMITS OF THE
CONTROLS. WHEN IN DOUBT, REPEAT A STANDARD OR CONTROL ACCORDINGLY.

TO REPEAT A CONTROL, STANDARD OR CALIBRATOR, ONE OR MORE OF ITS


METHODS, SIMPLY DEACTIVATE THEIR () CHECKS ON THE RIGHT. CLOSE THE
CALIBRATION PAGE AND THEN REOPEN IT. REPROGRAME (ON THE LEFT PAGE) ONLY
THE DESIRED METHODS TO BE REPEATED AND CLICK START.

DURING CALIBRATION PATIENT ENTRY CAN BE DONE OR IT CAN BE DONE ANY


TIME.

CLICK ON F2 TO OPEN THE BOOK. CLICK ON PAGE 4 (1-10) SAMPLE- THE


PATIENT ENTRY PAGES.

CLICK ON THE FIRST LINE (OR ANY LINE) ON THE RIGHT. THE LEFT PAGE WILL
OPEN. INTRODUCE THE PATIENT DEMOGRAPHICS, STARTING WITH:
Patient ID
Last Name
Comments
Sex & Age
Etc..

CHOOSE THE METHODS BY CLICKING ITS CHECK BOX () AND OR USE THE
PROFILE. MAKE SURE THAT THE PROGRAMMED METHOD HAS THE () INSIDE ITS CHECK
BOX.

CLICK THE LINE ON THE NEXT PATIENT FOR NEW PATIENT ENTRY. THE DATA WILL
BE SAVE AUTOMATICALLY

PLACE ALL THE SAMPLE SERUM ACCORDING TO THE POSITION MENTIONED IN


THE SAMPLE PAGE

PLACE THE COVER PLATE ON THE SAMPLE TRAY PERFECTLY.

CLICK START TO START THE OPERATION. A WINDOW WILL OPEN TO CONFIRM THE
SAMPLES THAT HAVE BEEN PROGRAMMED- CLICK ON OK

SAMPLE RESULTS WILL BE STORE AUTOMATICALLY. IT CAN BE VIEWED IF WE


CLICK ON THE SAME SAMPLE ID (RIGHT SIDELINE)

PATIENT REPORT CAN BE PRINTED ANYTIME. EVEN DURING OPERATION. TO PRINT


PATIENT REPORTS PROCEED AS FOLLOWS:

GO TO FILE AND CLICK PRINT. THEN CLICK THE SAMPLE REPORT.

Vous aimerez peut-être aussi