S1 Recompletion Program

Cont RIH Packer, P/T failed, unset & POH & P/T failed again, POH & RIH w/new
packer P/T OK
Cont RIH packer, P/T, failed, POH Packer
Electrical cables need to be replaced
Auxiliary brake not functioning due to leak on stuffing box
S2 Recompletion Program

Terminate swabbing, R/D swab lubricator, perform feed rate test, unset
packer
Cont POH packer, waiting for CNLC crew, RIH TCP
S3 Casing Evaluation Program

WOC, POH, RIH drilling string, tag & R/U power swivel, Commence drilling
Annular BOP rubber must be changed
RIH drilling BHA, R/U power swivel, commence drilling
Poor Mast light rubber must be changed before moving to new
location
S4 ESP Repair

Reverse circulation, RIH w/ packer, displacing waxy oil


RIH w/circulation due to waxy oil
S5 PCP repair

POH scraper, M/U NTT w/stator, R/D w/floor


RIH sucker rod, tag & perform space out,
S6 Recompletion Program

R/U swab Empty, swabbing Electrical cables need to be replaced


Continue Swabbing
Electrical cables need to be replaced