DESIGN OF CIRCULAR WATER TANK (Rigid joint)

Nameof work:1

Tank capacity

1492

K ltr

Depth of water

19.00

mtr

Free board

0.00

Conrete

cbc

25
8.5

fy

460

1492257 ltr
19000 mm
0

unit weight 25000 N/m3


m 93.33

N/mm2

Tensile stress

115

N/mm2

Effective Cover

60

mm

Steel

Nominal Cover

52

mm

Reinforcement
Vertivcal
Hoops Ring

16

mm

mm c/c

upto 25% height

16

mm

40

mm c/c

upto 50% height

12

mm

50

mm c/c

upto 75% height

12

mm

50

mm c/c

upto 100% height

12

mm

100

mm c/c

mm

200

mm c/c

Floor

(both direction)

740

10000
16 mm Ring
100 mm c/c

mm

740

100%
4.75 m

16 mmBars
0 mm c/c
16 mm Ring
50 mm c/c

75%
4.75 m

19000
16 mm Ring
50 mm c/c

50%
3.10 m

16 mm Bars
0 mm c/c
16 mm Ring
40 mm c/c

6.40 m

8 mm Ring
200 mm c/c
8 mm Ring
200 mm c/c
740
75

pk_nandwana@yahoo.co.in

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:Tank capacity
Depth of water
Free board
Conrete
Steel

0
1492 K ltr
19.00 m
0.00 m
M
fy
cbc

Nominal cover

25
460 N/mm2
8.5 N/mm2
52 mm

1492257 mm
19000 mm
0
mm
Tensile stess

=
m=
Effective cover =

1 Design Constants:- For HYSD Bars

st
cbc
k=

115

N/mm2

8.5
m*c

N/mm2

m*c+st
j=1-k/3
1

R=1/2xc x j x k
0.5

Cocrete M =

m 93.33
x

8.5

8.5

93.33
93.33 x

0.873

8.5

0.709

If D is the inside diameter of tank, we have =

25

wt. of concrete = 25000 N/mm2

2 Dimention of tank:-

from which D

115 N/mm2
93.33
60 mm

1492.3

19.00

0.873

0.709

x 0.873 =

2.631

Effective depth of tank = 19.00 - 0.00 = 19.00


1492256.5105 x 1000
x D2
x 19.00 =
4
1000
x 1000

10.00

Provide a diameter of

115

m
=

10.00

say

10.00

3 Determination of bending moment and hoop tension:= 3H+5 =


3
x 19.00 +
5
H2
= 19.00
x 19.00
=
58
h
= H/3 = 19.00
DT
10.00
x
0.62
The height above base, upto which cantilever action will be there is given by
H/3 or
D
Maximum ring tension at this level, per meter height = w (H-h)
where w
2
10.00
pressure at h/3 = 9800 x ( 19.00 - 6.3333 )x
= 620667
N
2
Maximum prerssure at bottom =
wH
= 9800 x 19.00 = 186200
N
1
6.333
x ### x 6.333 x
maximum cantilever B.M. =
Mf =
2
3
Thickness of wall from empirical formula

62

cm

620

= 6.333

1 m which ever is heigher

9800

N/m2

= 1E+006 N-m/m

4 Design of setion for cantilever action:if d is the effective thickness of tank wall,
Mf
1244781
x
1000
D=
=
= 688.00 mm
1000 R
x
1000
2.63
= 688 +
52 =
740 =
say
740 mm
Total thickness =d +cover
However, provide a minimum thickness equal to the greater of following;
(I) 150mm (II) 30H+ 50 =
740
30
x 19.00 +
50 =
620 Hence provide T=
688 mm
Providing
52 mm cover to the center of reinforcement,
availble d =
Mf
1244781
x 1000
Ast =
Area of steel for cantilever bending is given by=
=
= 22194
st . J .d
115 x 0.709 x
688
3.14xdia2
3.14 x 12 x 12
using 12 mm bars
A
=
=
= 113
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
113 / 22194 =
5
say
=
0 mm
mm
bar,
@
Hence Provided 12
0 mm c/c upto height of
6.40 m from base

Above this height, curtail half bars and continue the other half upto top. Let us test this for devlopment length
pk_nandwana@yahoo.co.in

12
115
x
st
=
431
mm say
0.43
m
4
0.8
=
4. tbd
x
6.40 m height above the base. These vertical bars are to be
Hence half bars may be curtailed at
25 mm
provided inner face . Keep a clear cover of =
Ld

5 Design of section for hoops action;


Maximum hoops tension

area of ring, Ash =


620667
/
115 =

620667 N

at

6.33 m above the base

5397 mm
Let us provide rings atboth faseHence of area of ring in each face=
2698.5 mm2
2
3.14xdia
3.14 x 12 x 12
using 12 mm bars
A
=
=
= 113
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
113 / 2699 =
42
say
= 40 mm
Hence Provided 12 mm bar, @ 40 mm c/c upto height of
6.40 m from base
and above this, the spacing may be increased
1000 x 113
Actual , Ast
=
2
x
=
5652 mm2
40
620667
=
ct
1.105
<
1.2
40 +(
93.33 1 )x
5652 =
1000
x
Hoop tension at
9800 x
9.50 x
10.00 /
2.00 =
465500
9.50 m below top =
2

area of ring, Ash =


465500
/
4048 mm
115 =
Let us provide rings atboth faseHence of area of ring in each face=
2024 mm2
2
3.14xdia
3.14 x 12 x 12
using 12 mm bars
A
=
=
= 113
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
113 / 2024 =
56
say
= 50 mm
Hence Provided 12 mm bar, @ 50 mm c/c upto height of
9.50 m from base
0.3
At the top, minimum Ash
=
x 1000 x 740 = 2220 /
2
= 1110 mm2
100
Spacing of hoop Bars
=
1000 x
113 / 1110 =
102
say
= 100 mm c/c
2

6 Distribution reinforcement:Percentage area of distribution reinforcement is

0.30

0.10

740
450

100
100

0.117

0.117
x
1000 x
740 = 866.9 area of steel in each face = 433
100
However , no additional reinforcement will be provided at inner face since the vertical steel for cantilever action
will serve this purpose. Hence provided Ast= 433.43 mm2 in vertical direction at the outer face.
3.14xdia2
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
50 / 433 =
116
say
= 100 mm
Hence Provided these 8 mm bar, @100 mm c/c

Ash

7 Provision for haunches:It is customary to provide150 mmx150mm haunchesat the junction of wall and base.
A haunches reinforcement of 8 mm @
100 mm c/c may be provided.
8 Design of tank floor.:Since the tank floor is resting on ground throughout , provide a minimum thickness of 150
0.30
Minimum Ast
=
x
150 x 1000
=
450
mm2 in each direction
100
Provide half the reinfocement near each face, Ast
=
225 mm2
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
50
/ 225 =
223
say
= 200 mm
However provide 8 mm bars @ 200 mm c/c in both direction , at top and bottom of floor slab.

The floor slab will rest on


9 Detail of reinforcement :pk_nandwana@yahoo.co.in

75 mm thick layer of lean concrete covered with a layer of tar felt.


The detail shown in drawing.

mm
m

hich ever is heigher

mm
mm2
mm2

m from base

vlopment length

ical bars are to be

ove the base

mm2

N/mm2

mm2

mm2
cantilever action
mm2

all and base.

mm

direction

mm2

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:- 0

740

10000
100%
16 mm Ring
100 mm c/c
16 mmBars
0 mm c/c
16 mm Ring
50 mm c/c

740

4.75 m

75%
4.75 m

50%
16 mm Ring
50 mm c/c

3.10 m

16 mm Bars
0 mm c/c
16 mm Ring
40 mm c/c

19000

6.40 m

8 mm Ring
200 mm c/c
8 mm Ring
200 mm c/c
150
75

pk_nandwana@yahoo.co.in

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

jc

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.89
0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

Perm
M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

M-15
1.6

M-20
1.8

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Shear stress tc
100As
M-20
bd
0.15
0.18
0.16
0.18
0.17
0.18
0.18
0.19
0.19
0.19
0.2
0.19
0.21
0.2
0.22
0.2
0.23
0.2
0.24
0.21
0.25
0.21
0.26
0.21
0.27
0.22
0.28
0.22
0.29
0.22
0.3
0.23
0.31
0.23
0.32
0.24
0.33
0.24
0.34
0.24
0.35
0.25
0.36
0.25
0.37
0.25
0.38
0.26
0.39
0.26
0.4
0.26
0.41
0.27
0.42
0.27
0.43
0.27
0.44
0.28
0.45
0.28
0.46
0.28
0.47
0.29
0.48
0.29
0.49
0.29
0.5
0.30
0.51
0.30
0.52
0.30
0.53
0.30
0.54
0.30
0.55
0.31
0.56
0.31
0.57
0.31
0.58
0.31
0.59
0.31

Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25

0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09

0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4

1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59

0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09

0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49

2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59

0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

M-50
1.4

Development Length in tension


bd

H.Y.S.D. Bars
(N / mm2)
kd = Ld

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

2.0

Modification factore

bd

Plain M.S. Bars


(N / mm2)
kd = Ld

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
3.0
5.0
7.0
8.5
10.0
11.5
13.0
14.5
16.0

Kg/m
300
500
700
850
1000
1150
1300
1450
1600

(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0

Kg/m
250
400
500
600
800
900
1000
1100
1200

(N/mm2)
-0.6
0.8
0.9
1.0
1.1
1.2
1.3
1.4

in kg/m
-60
80
90
100
110
120
130
140

1.4
1.2
0.8
0.4

0.0

0.4
0.8
Percentage of tension reinforcement

1.2

1.6

2.4

2.8

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2)

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

jc

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.89
0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

Perm
M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

Shear stress tc

M-15
1.6

M-20
1.8

Reiforcement %

M-25
1.9

M-30
2.2

M-35
2.3

Permissible
M-40
2.5

Grade of concrete

ct.max

100As
bd
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66

M-20

M-20

0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31
0.31
0.32
0.32
0.32
0.32
0.32
0.33
0.33

0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.46
0.47
0.48
0.49
0.50
0.51

100As
bd
0.15
0.18
0.21
0.24
0.27
0.3
0.32
0.35
0.38
0.41
0.44
0.47
0.5
0.55
0.6
0.65
0.7
0.75
0.82
0.88
0.94
1.00
1.08
1.16
1.25
1.33
1.41
1.50
1.63
1.64
1.75
1.88
2.00
2.13
2.25

0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20

0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41

1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74

0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46

1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51

2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

Development Length in tension


bd

Plain M.S. Bars


(N / mm2)
kd = Ld

H.Y.S.D. Bars
(N / mm2)
kd = Ld

bd

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
3.0
5.0
7.0
8.5
10.0
11.5
13.0
14.5
16.0

Kg/m2
300
500
700
850
1000
1150
1300
1450
1600

(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0

Kg/m2
250
400
500
600
800
900
1000
1100
1200

(N/mm2)
-0.6
0.8
0.9
1.0
1.1
1.2
1.3
1.4

in kg/m2
-60
80
90
100
110
120
130
140

Permissible direct tensile stress in concrete (IS : 456-2000)


Grade of concrete

ct.max

M-10
1.2

M-15
2.0

M-20
2.8

M-25
3.2

M-30
3.6

M-35
4.0

M-40
4.4

M-50