AREA : 8.00 BILL NO. 4.

02 NAKULA POOL

ITEM

DESCRIPTION OF WORK

PREPARATION

1
2
3

Repaired and refinishing as existing towel counter


Change roof and refinished as existing game room
Demolished of ceramic tile (wall & floor) sahadewa pool

QTY.

UNIT

12.00
58.04

M2
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
II

SOIL AND SAND

Adjustment of floor level sahadewa pool


Limestone backfill and compaction in layer as indicate in
drawing and specification to sahadewa pool

217.26
127.80

M3

Ditto to child pool

27.00

M3

Loose stone 10 cm to small bar foundation


Sand bed 5 cm to sahadewa pool
Ditto to child pool
Ditto to small bar

0.14
12.78
2.70
0.10

M3
M3
M3
M3

Sand 15 cm to sand area


Polyethelane sheet 0.6 mm to concrete slab ground floor
sahadewa pool

9.56
255.60

M3
M2

10
11

Ditto to child pool


Ditto to small bar

54.00
4.84

M2
M2

3
4
5
6
7
8

M3

Sub Total
III

CONCRETE WORKS

Limestone foundation to sahadewa pool pool


Ditto to child pool
Ditto to small bar
Sloof 15/30 cm to sahadewa pool
Ditto to child pool
Slab concrete 15 cm thickness 2 layer dia. 8-20 mm to
sahadewa pool

10.80
6.91
0.22
8.62
2.70
39.92

M3
M3
M3
M3
M3
M3

Ditto to child pool


Slab concrete 10 cm thickness 1 layer dia. 8-20 mm to
small bar

8.10
0.48

M3
M3

7
8

Waterproofing to sahadewa pool

255.60
54.00

M2
M2

2
3
4
5

Ditto to child pool

Sub Total
IV

MASONRY

Brick masonry with mortar 1pc:4sands to steping


sahadewa pool

190.95

M2

Ditto to child pool

13.44

M2

GRAHADIKA

8.00 BILL NO. 4.02 - 1

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 8.00 BILL NO. 4.02 NAKULA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

3
4

Ditto to small bar


Palimanan border 30x60x5 cm to sahadewa pool

11.00
58.65

M2
M1

5
6
7
8

Ditto 30x30x5 cm to sahadewa pool


Palimanan 30x30x5 cm to steping sahadewa pool
Ditto to steping child pool
Ditto to small bar floor

123.15
21.20
5.76
4.84

M1
M2
M2
M2

9
10

Palimanan 15x30x5 cm to pathway pool border


Rough palimanan infill as existing 30x30x3 cm to
sahadewa pool deck

111.90
207.08

M1
M2

11
12
13
14
15

Rough palimanan random to child pool deck


Ditto to small bar
Pabble washed white color to pathway pool
Jogja stone to small bar
Paras jogja covered to small bar wall

1.49
9.24

M2
M2
M2
M3
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
V

PLASTER

Plaster 1pc:5sand and cement rendered to toilet pool

M2

Sub Total
VI

TILES

Ceramik tile 8x8 cm Kuda laut Random color to sahadewa


pool

Ditto to child pool

M2

Sub Total
VII

ROOF
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Change roof and refinishing to games room

2
3

New thatch roof include timber structure to small bar


Timber plank 2cm thikness to small bar

16.92

M2
M2

Thatch roof w/ "Ate rope" complete with bamboo rafter dia. 16.92
6 - 30 cm to small bar

M2

Thatch roof ridge as describe in drawing and specification


to small bar

12.80

M2

6
7

Timber profile tugeh 15/15 to small bar


Timber profile pemade 6/12 cm to small bar

0.04
14.00

8
9
10
11

Timber profile apit-apit 2.3/5 cm to small bar


Timber profile inner eaves 6/12 cm to small bar
Timber profile outer eaves 6/12 cm to small bar
Timber profile tatab 3/7 cm to small bar

12.00
13.20
20.25
20.25

M3
M1
M1
M1
M1

12

Timber beam 6/15 cm to small bar

0.08

GRAHADIKA

M2

M1
M3

8.00 BILL NO. 4.02 - 2

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 8.00 BILL NO. 4.02 NAKULA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

0.25

M3

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
VIII
1

WOOD WORKING
Timber profile coulumn 15/15 cm to small bar
Sub Total

IX

FINISHING

Finishing with Lazur DL to timber profile tugeh 15/15 cm


small bar

0.04

M3

2
3
4
5
6
7
8

Ditto to profile pemade 6/12 cm


Ditto to profile apit-apit 2.3/5 cm
Ditto to profile inner eaves 6/12 cm
Ditto to profile outer eaves 6/12 cm
Ditto to profile tatab 3/7 cm
Ditto to beam 6/15 cm
Ditto to profile coulumn 15/15 cm

14.00
12.00
13.20
20.25
20.25
0.08
0.25

M1
M1

Unit

M1
M1
M1
M3
M3

Sub Total
X

HARD SCAPE

1
2

Palimanan artificial waterfall


Ditto to water feature

4.00
3.00

3
4
5
6
7
8
9

Ditto to art work


Ditto to art work at child pool
Sun bath chair
Small pool bar
Sun long chair
Child sun long chair
Chessboard sandi stone 30x30x3 cm and palimanan
30x30x3 cm

1.00
2.00
2.00
1.00
49.00
7.00
1.00

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

Sub Total
XI

LIGHTING

Sub Total
Total
COLLECTION
I
II
GRAHADIKA

PREPARATION
SOIL AND SAND
8.00 BILL NO. 4.02 - 3

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 8.00 BILL NO. 4.02 NAKULA POOL

ITEM

DESCRIPTION OF WORK

QTY.

III
IV

CONCRETE WORKS
MASONRY

V
VI
VII
VIII

PLASTER
TILES
ROOF
WOOD WORKING

IX
X
XI

FINISHING
HARD SCAPE
LIGHTING

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

8.00 BILL NO. 4.02 SAHADEWA POOL ( 1 UNIT ) Rp.


To Final Summary

GRAHADIKA

8.00 BILL NO. 4.02 - 4

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 4.01 NAKULA POOL

ITEM

DESCRIPTION OF WORK

PREPARATION

Site clearence

QTY.

UNIT

840.00

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
II

SOIL AND SAND

1
2
3
4

Excavation to well foundation to toilet pool


Ditto to pool
Ditto to pond pool
Sand backfill and compaction in layer as indicate in
drawing and specification to toilet pool foundation

12.00
307.50
30.24
4.00

M3
M3
M3
M3

5
6
7

Sand infill 5 cm to pond pool


Compacted bed sand 5 cm to toilet pool foundation
Ditto to under floor toilet pool
Ditto to loose stone 15 cm to toilet foundation

1.26
0.38
3.46

M3
M3
M3

0.05
0.30

M3
M2

25.20

M2

8
9
10

Polyethelane sheet 0.6 mm to concrete slab ground floor


toilet pool
Ditto to pond pool
Sub Total

III

CONCRETE WORKS

1
2
3

Tie beam 15/20 to toilet pool

1.22

M3

Coulumn structure 12/12 cm to toilet pool


Ring beam concrete 15/25 cm to toilet pool
Slab concrete 8 cm thickness 1 layer dia. 8 - 20 mm to
toilet pool

0.52
0.63

M3
M3

0.18

M3

Slab concrete 8 cm thickness 1 layer dia. 8 - 20 mm cm to


toilet pool

1.84

M3

6
7

Ditto to pond pool


Slab concrete 10 cm thickness 1 layer dia. 8 - 20 mm cm
to toilet pool

5.26
2.30

M3
M3

Waterproofing to slab concrete 10 cm thickness to toilet


pool

23.04

M2

Ditto to pond pool

25.20

M2

110.16
23.16
326.01
38.60
60.10
32.50
96.80
35.70

M2
M2
M2
M1
M1
M2
M1
M1

Sub Total
IV

MASONRY

1
2
3
4
5
6
7
8

Brick masonry with mortar 1pc:4sands to tilet pool


Ditto to pond pool
Palimanan 20x30x40x3 cm in fill to entrance pool
Palimanan coping 20x30x5 cm to pond pool
Palimanan 30x30x5 cm to border pool
Ditto to steping pool
Ditto to border pool deck
Ditto to pathway border pool

GRAHADIKA

7.00 BILL NO. 4.01 - 5

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 4.01 NAKULA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

9
10

Pebble whased white color to pool deck


Ditto to outdor shower

62.18
2.24

M2
M2

11

Pebble whased white combined green color to pool deck

11.52

M2

12

Paras jogja 15x30x2 cm w/ nut 15 cm thickness to toilet


pool

68.16

M2

13

Paras jogja 40x40x3 cm w/ specie 1 cm thickness to toilet


pool

31.20

M1

14

Paras jogja grill to toilet pool

8.80

M1

97.68

M2

23.04

M2

255.55

M2

111.36
6.12

M2
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
V

PLASTER

Plaster 1pc:5sand and cement rendered to toilet pool


Sub Total

VI

CEILING

Ceiling calciboard 4 mm to toilet pool


Sub Total

VII

TILES

Ceramik tile 8x8 cm Kuda laut Random color to pool


Sub Total

VIII
1
2

MARBLES
Marble 30x30 beige color to toilet pool
Hammerling marble to toilet pool
Sub Total

IX

DOOR AND WINDOW

Bingkirai door as indicate in drawing c/w bingkirai frame,


list profile, hardware, finishing Lazur DL to pool

5.00

Unit

Timber panel to toilet pool

6.00

Unit

12.88
0.11
0.10
12.88

M2
M3
M3

Sub Total
X

WOOD WORKING

1
2
3
4

Timber pergola 4/12, profile to towel counter


Timber column profile 15/15 to towel counter
Timber beam profile 6/12 cm to towel counter
Polycarbonat sheet 10 mm brown color to towel counter

GRAHADIKA

M2

7.00 BILL NO. 4.01 - 6

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 4.01 NAKULA POOL

ITEM
5

DESCRIPTION OF WORK
Timber wall partition for urinal 3 cm

QTY.

UNIT

0.80

M1

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
XI

FINISHING

Finishing painted w/ timber cornice 3/5, profile painted w/


timber frame 4x6, 60x60 cm to ceiling calciboard

23.04

M2

2
3
4

Finishing with Lazur DL to timber pergola 4/12


Ditto to timber column 15/15 cm
Ditto to beam profile 6/12 cm

12.88
0.11
0.10

M2
M3
M3

Sub Total
XII

SANITARY WARE

1
2

Faucet Taps TOTO TX 1 B P traps to toilet pool


Bowl basin Amstad ovalyn 21" C 1224 JA 1 O
TOTO closet monoblock CW 860 N include jet spray to
toilet pool

6.00
6.00

Unit
Unit

3.00

Unit

4
5

Wall Hang urinal TOTO U 57 to toilet pool


Paper holder TOTO S20 to toilet pool

2.00
3.00

Unit
Unit

6
7
8

Hand dryer TOTO RA 230 A toilet pool


Floor drain TOTO TX 1 B P traps to toilet pool
Outdoor shower

4.00
2.00
2.00

Unit
Unit
Unit

Sub Total
XIII
1
2
3

HARD SCAPE
Additional of water fall Art Work
Additional of planter box
Additional of Art Work

Unit
Unit
Unit

Sub Total
XIV

LIGHTING

Eye ball recessed down light halogen eq. Osram 24 W/12


V to toilet pool

11.00

Unit

Standart downlight eq. Osram e/ ecco lumilux 23W 41/827


to toilet pool

2.00

Unit

Eye ball recessed down light halogen eq. Osram 24 W/12


V w/ timber box to towel counter

6.00

Unit

Lumascape star fitting inside paras box w/ halogen eq.


Osram 50W/12 41/827

2.00

Unit

Sub Total
Total
GRAHADIKA

7.00 BILL NO. 4.01 - 7

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 4.01 NAKULA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

COLLECTION
I
II
III

PREPARATION
SOIL AND SAND
CONCRETE WORKS

IV
V
VI
VII
VIII
IX
X
XI
XII
XIII

MASONRY
PLASTER
CEILING
TILES
MARBLES
DOOR AND WINDOW
WOOD WORKING
FINISHING
SANITARY WARE
LIGHTING
5.00 BILL NO. 7 ALT. 1 ( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

7.00 BILL NO. 4.01 - 8

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :6.00 BILL NO. 3 KITCHEN (EX. MERTASARI KITCHEN)

ITEM

DESCRIPTION OF WORK

PREPARATION
Preparation including roof, wall and floor

1
2

Demolished partial kitchen ex Mertasari


Site clearence

QTY.

UNIT

300.00
300.00

M2
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
II

SOIL AND SAND

Excavation to well foundation until the hard soil layer to


kitchen

54.40

M3

Backfill and compaction in layer as indicate in drawing and 240.00


specification

M3

3
4

Compacted bed sand 5 cm


Ditto to loose stone 15 cm

15.00
45.00

M3
M3

Polyethelane sheet 0.6 mm to concrete slab ground floor


kitchen

300.00

M2

Sub Total
III

CONCRETE WORKS

Pour concrete to footplat foundation 80/80 c/with


reinforcement steel bars, form work as indicated in
drawing and specification

43.52

M3

2
3

Tie beam 20/25 to kitchen


Slab concrete 8 cm thickness 1 layer dia. 8 - 20 mm

4.50
24.00

M3
M3

4
5
6
7

Coulumn structure 25/25 cm


Ring beam concrete 20/35 cm
Ditto 10/67 cm
Slab concrete 10 cm thickness 1 layer dia. 8 - 20 mm cm

8.50
10.99
4.93
23.20

M3
M3
M3
M3

Waterproofing to slab concrete

232.00

M2

Sub Total
IV

ROOF
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

New thatch roof including timber trussed Pryda System

132.75

M2

2
3

Timber plank 2.5 cm thickness


32.00
Thatch roof w/ "Ate rope" complete with bamboo rafter dia. 132.75
6 - 30 cm

M1
M2

Thatch roof ridge as describe in drawing and specification


to main restaurant

M1

GRAHADIKA

32.00

6.00 BILL NO. 3 - 9

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :6.00 BILL NO. 3 KITCHEN (EX. MERTASARI KITCHEN)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

5
6

Timber beam 8/15 cm


Profile bingkirai timber inner eaves 8/15 as described in
drawing and specification

1.20
33.70

M3
M1

Ditto outer eaves 6/12 as described in drawing and


specification

51.40

M1

Profile bingkirai timber tatab 3/7 as described in drawing


and specification

51.40

M1

Profile bingkirai timber apit-apit 3/5 as described in


drawing and specification

32.00

M1

10

Flushing Bjls 0.6 mm w/ timber covered 2 cm thickeness

32.00

M1

11

Anti termite to roof equal to Lentrex 400 EC

132.75

M2

290.80

M2

290.80

M2

VII

TILES

Ceramic tile 30x30 cm, heavy duty, non slip, white color to 437.20
kitchen

M2

Ditto to toilet staff

60.00

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
V

MASONRY

Brick masonry to with mortar 1pc:4sands


Sub Total

VI

PLASTER

Plaster 1pc:5sand and cement rendered


Sub Total

Sub Total
VIII

DOOR AND WINDOW

Bingkirai door as indicate in drawing c/w bingkirai frame,


list profile, hardware, finishing Lazur DL to toilet staff

2.00

Unit

Ditto to kitchen

1.00

Unit

57.60

M2

Sub Total
IX

WOOD WORKING

Timber grill 4/4 cm w/ timber frame 6/12


Sub Total

GRAHADIKA

FINISHING

6.00 BILL NO. 3 - 10

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :6.00 BILL NO. 3 KITCHEN (EX. MERTASARI KITCHEN)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

1
2

Painthed and finishing wall to kitchen


Finishing painted w/ timber cornice 3/5, profile painted w/
timber frame 4x6, 60x60 cm to ceiling calciboard

290.80
163.24

M2
M2

3
4

Ditto to timber inner eaves 8/15 cm


Ditto to timber outer eaves 6/12 cm

33.70
51.40

M1
M1

5
6
7

Ditto to timber tatab 3/7 cm


Ditto to timber apit-apit 3/5 cm
Ditto to timber grill 4/4 cm w/ timber frame 6/12 cm

51.40
32.00
57.60

M1
M1
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
XI

SANITARY WARE

TOTO closet monoblock CW 860 N include jet spray to


toilet staff

2.00

Unit

Paper holder TOTO S20 to toilet staff

4.00

Unit

Floor drain TOTO TX 1 B P traps toilet staff

2.00

Unit

Sub Total
Total
COLLECTION
I
II
III

PREPARATION
SOIL AND SAND
CONCRETE WORKS

IV
V

ROOF
MASONRY

VI

PLASTER
TILES
DOOR AND WINDOW
WOOD WORKING
FINISHING
SANITARY WARE

VII
VIII
IX
X
XI

6.00 BILL NO. 3 KITCHEN ( 1 UNIT ) Rp.


To Final Summary

GRAHADIKA

6.00 BILL NO. 3 - 11

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 12.00 BILL NO.3 MAIN RESTAURANT, MAIN KITCHEN, STAGE AND SWIMMING POOL (ALT. 2)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

MAIN RESTAURANT
1
2
3

Restaurant & Bar


Buffets
Bar

455.28
81.92
40.96

M2
M2
M1

4
5
6
7
8
9
10
11
12
13
14

Open dinning ( 4 unit)


Guest Toilet ( Male & Female)
Stage
Changing room
Court yard at Open dining
Stair
Hardscape (around stage area)
Pathway under covered
Pathway and stepping
Flower pot
Fixed art work

20.25
33.44
57.76
10.24
113.80
115.20
107.24
46.80
50.00
42.00
5.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
Unit
Unit

(Cost Estimated Include Standard MEP)


Sub Total
MAIN KITCHEN
1

Kitchen

327.68

M2

2
3
4

ME yard for gas tube, out door A/C, etc


ME room
Circulation out door

5.76
5.76
60.46

M2
M2
M2

210.00
284.40
40.00
3.00
1.00

M2
M2
Unit
Unit
Ls

1.00

Unit

(Cost Estimated Exclude Kitchen Equipment)


Sub Total
SWIMMING POOL

1.a
1.b
1.c
1.d
1.e

SWIMMING POOL
Adjustment of floor level
Change of ceramic tile (wall & floor)
Additional of sunbath chair in the pool
Additional of water feature
Change of circulation water system become whirl pool

1.f

Additional of balancing tank


Sub Total

Adjustment level of pool deck with palimanan covered


combined pebble washed

244.80

M2

3
4
5
6
7
8
9
10

Tower Counter
Guest Toilet
Out door shower
A new gate entrance
A new fence wall
Adjustment palimanan as existing
Fixed art work
Out door lighting

12.80
12.80
2.00
1.00
27.00
119.00
4.00
10.00

M2
M2
Unit
Unit
M1
M2
Unit
Unit

Sub Total
GRAHADIKA

5.00 BILL NO. 8 - 12

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 12.00 BILL NO.3 MAIN RESTAURANT, MAIN KITCHEN, STAGE AND SWIMMING POOL (ALT. 2)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
COLLECTION
I
II

MAIN RESTAURANT
MAIN KITCHEN

III

SWIMMING POOL
5.00 BILL NO. 8 ALT. 2 ( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

5.00 BILL NO. 8 - 13

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :5.00 BILL NO. 2 MAIN RESTAURANT, STAGE AND CHANGING ROOM

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

PREPARATION
Preparation including roof, wall and floor

1
2

Demolish existing cottage room 138 - 139


Ditto to Villa 1 room 146

60.50
46.20

M2
M2

3
4
5

Ditto to Gate and Fence


Ditto to partial restaurant
Site clearence

75.60
252.00
796.00

M1
M2
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
II

SOIL AND SAND

Excavation to well foundation until the hard soil layer


tostage

10.24

M3

Ditto to stone strip foundation on level 1.27m to main


restaurant

101.70

M3

Limestone backfill and compaction in layer to main


restaurantas indicate in drawing and specification

401.41

M3

Ditto to stage and changing room

813.28

M3

5
6
7

Compacted bed sand 5 cm to main restaurant


Ditto to stage and changing room
Polyethelane sheet 0.6 mm to concrete slab ground floor
main restaurant

25.82
9.43
501.76

M3
M3
M2

Ditto to stage and changing room

16.14

M2

Sub Total
III

CONCRETE WORKS

Pour concrete to footplat foundation 80/80 c/with


reinforcement steel bars, form work as indicated in
drawing and specification to stage

20.48

M3

Foundation limestone (top 30/30, bottom 80/80, deep 80)


to main restaurant

18.69

M3

Loose stone 15 cm under lime stone foundation to main


restaurantas indicated in drawing and specification

2.21

M3

Limestone strap foundation to main restaurant as indicated 169.88


in drawing and specification

M3

5
6
7
8

Concrete beam 15/25 to main restaurant


Ditto 20/25 to stage
Ditto 15/50 to stage
Ditto 15/20 to changing room
Slab concrete 8 cm thickness 1 layer dia. 8 - 20 mm to
main restaurant

14.80
1.57
1.92
1.07

M3
M3
M3
M3

41.32

M3

10

Slab concrete 8 cm thickness 1 layer dia. 8 - 20 mm to


stage and changing room

15.60

M3

11
12
13

Coulumn structure 25/25cm to main restaurant


Ditto to stage
Coulumn practice 15/15 to changing room

5.75
1.13
1.35

M3
M3
M3

GRAHADIKA

5.00 BILL NO. 2 - 14

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :5.00 BILL NO. 2 MAIN RESTAURANT, STAGE AND CHANGING ROOM

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

14
15

Ring beam concrete 20/35 to kitchen


Ditto 15/25 to stage

10.99
1.70

M3
M3

16
17
18

Ditto 15/68 to stage


Ditto 10/67 to stage
Slab concrete 10 cm thickness 1 layer dia. 8 - 20 mm to
stage and changing room

3.32
3.87
16.14

M3
M3
M3

19

Waterproofing to slab concrete stage and changing room

161.40

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
IV

ROOF
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

New thatch roof include timber structure 8/15 cm to main


restaurant

478.95

M2

2
3

Ditto to stage
Timber plank 2.5 cm thikness to main restaurant

54.50
168.20

M2
M1

4
5

Ditto stage
24.00
Thatch roof w/ "Ate rope" complete with bamboo rafter dia. 478.95
6 - 30 cm to main restaurant

M1
M2

6
7

Ditto to stage
Thatch roof ridge as describe in drawing and specification
to main restaurant

54.50
168.20

M2
M1

8
9

Ditto to stage
Timber beam 8/15 cm to main restaurant
Ditto to stage

24.00
9.66
0.77

M1
M3
M3

10
11

Timber profil Tugeh 15/15 cm to stage


Profile bingkirai timber inner eaves 8/15 as described in
drawing and specification to main restaurant

0.23
157.80

M3
M1

12
13

Ditto to stage
Ditto outer eaves 6/12 as described in drawing and
specification to main restaurant

12.30
163.20

M1
M1

14

Ditto to stage
Profile bingkirai timber tatab 3/7 as described in drawing
and specification to main restaurant

17.20

M1

163.20

M1

17.20
242.40

M1
M1

Ditto to stage
26.40
Flushing Bjls 0.6 mm w/ timber covered 2 cm thickeness to 168.20
main restaurant

M1
M1

19
20

Ditto to stage
Anti termite to roof equal to Lentrex 400 EC to main
restaurant

24.00
478.95

M1
M2

21

Ditto to stage

54.50

M2

15
16
17

18

Ditto to stage
Profile bingkirai timber apit-apit 3/5 as described in
drawing and specification to main restaurant

Sub Total

GRAHADIKA

5.00 BILL NO. 2 - 15

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :5.00 BILL NO. 2 MAIN RESTAURANT, STAGE AND CHANGING ROOM

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MASONRY

Brick masonry to with mortar 1pc:4sands to wall at


changing room

210.00

M2

2
3

Paras Jogja facing w/ gap Horiz. 0.5 cm to restaurant


Paras Jogja 15x30x2 cm with horizontal nut 1cm to stage
and changing room

81.20
107.57

M2
M2

Ditto 40x40 cm with speci 1 cm thickness stage and


changing room

13.84

M2

Paras jogja grill to changing room

6.50

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
VI

PLASTER

Plaster 1pc:5sand and cement rendered to changing room 210.00


wall

M2

Sub Total
VII

CEILING

Ceiling calciboard 4 mm to stage and changing room

163.24

M2

Sub Total
VIII

TILES

Ceramic tile 30x30 cm, beige color to stage and changing


room

34.62

M2

2
3
4
5
6

Ditto to toilet
Ditto to storage
Ditto to control room
Jogja stone border 40x40x5 cm to main restaurant
Ditto 45x45x3 cm to main restaurant

57.24
11.48
4.80
145.40
94.60

M2
M2
M2
M1
M1

346.43

M2

Sub Total
IX

MARBLE

Marble 40x40 cm, beige color to stage


Sub Total

IX

DOOR AND WINDOW

Bingkirai door as indicate in drawing c/w bingkirai frame,


list profile, hardware, finishing Lazur DL to changing room

2.00

Unit

2
3
4

Ditto to storage
Ditto to control room
Ditto to toilet

1.00
1.00
2.00

Unit
Unit
Unit

GRAHADIKA

5.00 BILL NO. 2 - 16

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :5.00 BILL NO. 2 MAIN RESTAURANT, STAGE AND CHANGING ROOM

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

58.38
100.10
4.32

M2
M1
M3

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
X

WOOD WORKING

1
2
3

Timber slate W=12.5 cm to stage


Timber railing to restaurant
Timber column 15/15 cm to main restaurant

Sub Total
XI

FINISHING

1
2

Painthed and finishing wall to changing room


Finishing painted w/ timber cornice 3/5, profile painted w/
timber frame 4x6, 60x60 cm to ceiling calciboard

210.00
163.24

M2
M2

Finishing of all timber use Lazur DL, complited wood


stainto railing for main restaurant

100.10

M1

4
5
6
7

Ditto to inner eaves 8/15 cm main restaurant


Ditto to stage
Ditto to outer eaves 6/12 cm main restaurant
Ditto to stage

157.80
12.30
163.20
17.20

M1
M1
M1
M1

8
9
10

Ditto to tatab 3/7 cm main restaurant


Ditto to stage
Ditto apit-apit 3/5 cm main restaurant

163.20
17.20
242.40

M1
M1
M1

Sub Total
XII

SANITARY WARE

TOTO closet monoblock CW 860 N include jet spray to


changing room

2.00

Unit

Paper holder TOTO S20 to changing room

4.00

Unit

3
4
5

Floor drain TOTO TX 1 B P traps toilet staff


Floor drain TOTO TX 1 B P traps changing room
Toilet bowl basin include faucet taps, hand dryer soup
dispenser and tissue box to changing room as indicate in
drawing and specification

2.00
2.00
4.00

Unit
Unit
Unit

Sub Total
XIII

HARD SCAPE

1
2

Pathway
Garbage

78.00
5.94

M2
M2

3
4

Stepping
Alternatif gate C

3.00
1.00

M2
Unit

Sub Total
Total
GRAHADIKA

5.00 BILL NO. 2 - 17

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :5.00 BILL NO. 2 MAIN RESTAURANT, STAGE AND CHANGING ROOM

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

COLLECTION
I
II
III

PREPARATION
SOIL AND SAND
CONCRETE WORKS

IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV

ROOF
MASONRY
PLASTER
CEILING
TILES
MARBLE
DOOR AND WINDOW
WOOD WORKING
FINISHING
SANITARY WARE
HARD SCAPE
5.00 BILL NO. 2 MAIN RESTAURANT, STAGE AND
CHANGING ROOM (1 UNIT) Rp.
To Final Summary

GRAHADIKA

5.00 BILL NO. 2 - 18

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 11 SPA AND FITNES CENTER

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

BUILDING

1.a
1.b

GENERAL
Roof
Repainted & maintenance of timber structure

150.00
1.00

M2
Ls

1.c
1.d
1.e

Adj. & A New Door & Window


Repainted of out door Wall Ex
Add. Paras Tenganan

13.00
94.36
26.88

Unit
M2
M2

20.25
8.16
16.72

M2
M2
M2

210.00
284.40
19.28
4.00
1.00

Unit
M2
M2
Unit
Unit

122.90

M2

Sub Total
2
3
4

Add. Open Jacuzzy (exclude equipment)


Add. Open Jamu Bar
Flower Sunken Bath Tub
Sub Total
Total
HARDSCAPE

1.a
1.b
1.c
1.d
1.e

A new gate
Pathway
Pond
Fixed Art Work
Out door lighting
(16 paras box, 9 balinesse lamp)
Sub Total

Softscape
Sub Total
Total
COLLECTION

I
II
III

BUILDING
HARDSCAPE
Softscape

NO. 7 5.00 BILL NO. 11 SPA AND FITNES CENTER( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

5.00 BILL NO. 11 - 19

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 10 BEACH SIDE MEDITERRANEAN - BEACH BAR & KITCHEN

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

76.83
17.64
11.13
17.64

M2
M2
M2
M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

KUKUS KITCHEN
1
2
3
4

Show kitchen area & Food finishing area


Pot wash area
Pastry section
Cold kitchen room

5
6

Guest toilet ( 2 Unit)


Terrace

8.82
18.54

M2
M2

(Cost Estimated Exclude Kitchen Equipment)


Sub Total

DINING BALE
Dining bale 2 unit

81.92

M2

Sub Total
BEACH BAR
1

Beach bar 1 unit

40.96

M2

Sub Total
DINING UMBRELLA
1

Dining Umbrella

20.00

Unit

Sub Total
COLLECTION
I
II

KUKUS KITCHEN
DINING BALE

III
IV

BEACH BAR
DINING UMBRELLA
5.00 BILL NO. 10 ( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

5.00 BILL NO. 10 - 20

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 2.02 GUEST ROOM GARDEN 2

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

129.66

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
I

Preparation Roof
1 Demolished roof existing

II

Roof
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Replace & maintained timber existing structure include


change damage of timber structure

129.66

M2

Profile bingkirai timber eaves bord 3/20 as described in


drawing and specification

45.80

M1

Profile bingkirai timber tatab 3/7 as described in drawing


and specification

59.84

M1

Profile bingkirai timber apit-apit 3/5 as described in


drawing and specification

72.60

M1

Thatch roof w/ "Ate rope" complete with bamboo rafter dia. 129.66
6 - 30 cm

M2

Thatch roof ridge as describe in drawing and specification

32.00

M1

Anti termite to roof equal to Lentrex 400 EC

129.66

M2

III

Finishing Roof
Timber finisher with of "Lazur DL" c/w wood stain, etc.

1
2

To bingkirai timber bord 6/15


To bingkirai timber tatab 3/7

45.80
59.84

M1
M1

To bingkirai timber apit-apit 3/5

72.60

M1

Sub Total
WALL AND PILLAR
1

Covered Paras Tenganan combined plastered painted at


partial wall

95.04

M2

2
3
4

Repainted of all existing out door wall


Additional brick wall
Additional covered paras Tenganan at center wall in
entrance / stair area

90.88
18.43
10.00

M2
M3
M2

Covered Palimanan at pillar

37.80

M2

31.00

M1

Sub Total
RAILING
1

Refinish of existing timber railing


Sub Total
LANDSCAPING WORKS

GRAHADIKA

7.00 BILL NO. 2.02 - 21

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 2.02 GUEST ROOM GARDEN 2

ITEM
1
2

DESCRIPTION OF WORK

QTY.

UNIT

10.00
1.00

Unit
Ls

To Final Summary 24.00

Unit

Special effect of exterior lighting


Private garden of area guest room

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
COLLECTION
I
II
III
IV

ROOF
WALL AND PILLAR
RAILING
LANDSCAPING WORKS
7.00 BILL NO. 2.02 GARDEN 2 ( 1 UNIT ) Rp.

GRAHADIKA

7.00 BILL NO. 2.02 - 22

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 6.00 BILL NO. 2.01 GUEST ROOM GARDEN 1

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

367.34

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
I

Preparation Roof
1 Demolished roof existing

II

Roof
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Replace & maintained timber existing structure include


change damage of timber structure

367.34

M2

2
3

Timber beam 8/12 cm


Profile bingkirai timber eaves bord 6/15 as described in
drawing and specification

0.16
60.80

M3
M1

Profile bingkirai timber eaves bord (inner) 6/15 as


described in drawing and specification

56.80

M1

Profile bingkirai timber tatab 3/7 as described in drawing


and specification

71.40

M1

Profile bingkirai timber apit-apit 3/5 as described in


drawing and specification

25.60

M1

Bingkirai timber 6/12 for grill frame

37.60

M1

8
9

Bingkirai timber grill 4/4


10.08
Thatch roof w/ "Ate rope" complete with bamboo rafter dia. 367.34
6 - 30 cm

M2
M2

10

Flushing Bjls 0.6 mm w/ timber covered 3 cm thickeness

39.20

M1

11
12

Timber plank 3 mm thickness


Anti termite to roof equal to Lentrex 400 EC

4.40
367.34

M1
M2

III

Finishing Roof
Timber finisher with of "Lazur DL" c/w wood stain, etc.

1
2
3
4
5
6

To bingkirai timber eaves bord 6/15


To bingkirai timber eaves bord (inner) 6/15
To bingkirai timber tatab 3/7
To bingkirai timber apit-apit 3/5
To bingkirai timber 6/12 for grill frame
To bingkirai timber grill 4/4

60.80
56.80
71.40
25.60
37.60
10.08

M1
M1
M1
M1
M1

109.20

M2

M1

Sub Total

WALL AND PILLAR


Covered Paras Tenganan combined plastered painted at
partial wall

Replacement Palimanan at Paras frame of existing


window

15.00

M2

3
4
5

Additional Palimanan frame shaft door


Additional brick wall at partial wall
Additional brick coulumn at pilar

2.00
18.43
10.37

M2
M3
M3

GRAHADIKA

6.00 BILL NO. 2.01 - 23

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 6.00 BILL NO. 2.01 GUEST ROOM GARDEN 1

ITEM

QTY.

UNIT

2.00
74.40
33.60

Unit
M2
M2

4.00
8.00
42.80

Unit
Unit
M1

LANDSCAPING WORKS
Special effect of exterior lighting

10.00

Unit

Private garden of area guest room

1.00

Ls

6.00

Unit

6
7
8

DESCRIPTION OF WORK
Art work of shaft door at entrance area
Repainted of all existing out door wall
Covered Palimanan at pillar

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
RAILING
1
2
3

Refinish of existing timber railing


Additional timber railing at terace 1st floor and balcony
Replacement timber railing at railing stair
Sub Total

Sub Total
COLLECTION
I
II

ROOF
WALL AND PILLAR

III
IV

RAILING
LANDSCAPING WORKS
6.00 BILL NO. 2.01 GARDEN 1 ( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

6.00 BILL NO. 2.01 - 24

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 3.02 SAHADEWA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

240.89
336.71
16.00
4.00

M2
M2
M2
Unit

1.00
3.00
0.00

Ls
Unit
Unit

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

SWIMMING POOL
1.a
1.b
1.c
1.d

Adjustment of floor level


Change of ceramic tile (wall & floor)
Additional stairs
Additional of water fall Art Work

1.e
1.f
1.g

Additional of planter box


Additional of Art Work
Special lighting effect
Sub Total 1
CHILD POOL

2.a
2.b

Adjustment of floor level


Change of ceramic tile (wall & floor)

56.40
90.99

M2
M2

2.c
2.d
2.e

Additional stairs
Additional of water fall Art Work
Additional of planter box

9.60
4.00
4.00

M2
Unit
Ls

2.f
2.g

Additional of Art Work


Special lighting effect

2.00
0.00

Unit
Unit

Pool Deck
Child pool deck

354.38
69.70

M2
M2

Bar Pool decking


Out door shower include Art work
Open bar
Counter

51.98
2.00
10.40
1.00

M2
Unit
M2
Unit

54.00
0.00

M2
M2

8.80
1.00

M2
Unit

Sub Total 2
3
4
5
6
7
7.a

Sub Total 3

8.a
8.b

GAME ROOM
Refinish wall & floor
Change a new thatch roof w/ timber structure Ex.
Sub Total 4

9
9.a

Towel Counter
Counter
Sub Total 5

10

Sand Area

140.00

M2

11
12
13

(Exclude Tennis Table & Chess board)


Planter Box Deck Area
Fixed Art Work
Lighting

73.00
4.00
0.00

M2
Unit
Unit

14
15
16

Panel & Pump Room


Guest Toilet
Pathway Entrance

6.00
12.71
16.00

M2
M2
M2

Sub Total 6
Sub Total ( 1+2+3+4+5+6 )
MEP & Special Lighting Installation Estimate 6% from
Building Cost Estimation (By GRA)
GRAHADIKA

6.00 %

5.00 BILL NO. 9 - 25

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 7.00 BILL NO. 3.02 SAHADEWA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

5.00 BILL NO. 9 SAHADEWA POOL ( 1 UNIT ) Rp.


To Final Summary

GRAHADIKA

5.00 BILL NO. 9 - 26

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 11.00 BILL NO. 2.06 GUEST ROOM COTTAGE

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

128.00

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
I

Preparation Roof
1 Demolished roof existing

II

Roof
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Replace & maintained timber existing structure include


change damage of timber structure

128.00

M2

Profile bingkirai timber eaves bord 6/15 as described in


drawing and specification

43.20

M1

Profile bingkirai timber tatab 3/7 as described in drawing


and specification

43.20

M1

Profile bingkirai timber apit-apit 3/5 as described in


drawing and specification

71.20

M1

Bingkirai timber 6/12 for grill frame

37.60

M1

6
7

Bingkirai timber grill 4/4


10.08
Thatch roof w/ "Ate rope" complete with bamboo rafter dia. 128.00
6 - 30 cm

M2
M2

Thatch roof ridge as describe in drawing and specification

25.00

M1

Flushing Bjls 0.6 mm w/ timber covered 3 cm thickeness

39.20

M1

10

Anti termite to roof equal to Lentrex 400 EC

128.00

M2

III

Finishing Roof
Timber finisher with of "Lazur DL" c/w wood stain, etc.

1
2
3
4
5

To bingkirai timber eaves bord 6/15


To bingkirai timber tatab 3/7
To bingkirai timber apit-apit 3/5
To bingkirai timber 6/12 for grill frame
To bingkirai timber grill 4/4

43.20
43.20
71.20
37.60
10.08

M1
M1
M1
M1

73.25
7.14

M2
M2

M2

Sub Total
WALL AND PILLAR
1
2

Repainted of all existing out door wall


Replacement Palimanan at Paras frame of existing
window
Sub Total
LANDSCAPING WORKS

Special effect of exterior lighting

0.00

Unit

Private garden of area guest room

1.00

Ls

GRAHADIKA

11.00 BILL NO. 2.06 - 27

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 11.00 BILL NO. 2.06 GUEST ROOM COTTAGE

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

7.00

Unit

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
COLLECTION
I
II
III

ROOF
WALL AND PILLAR
LANDSCAPING WORKS

11.00 BILL NO. 2.06 GUEST ROOM COTTAGE ( 1 UNIT ) Rp.


To Final Summary

GRAHADIKA

11.00 BILL NO. 2.06 - 28

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :10.00 BILL NO. 2.05 GUEST ROOM CORNER SUITE VILLA

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

419.78

M2

419.78

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
I

Preparation Roof
1 Demolished roof existing

II

Roof
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Replace & maintained timber existing structure include


change damage of timber structure

2
3

Timber beam 8/12 cm


Profile bingkirai timber eaves bord 6/15 as described in
drawing and specification

1.77

M3

87.80

M1

Profile bingkirai timber tatab 3/7 as described in drawing


and specification

20.60

M1

Profile bingkirai timber apit-apit 3/5 as described in


drawing and specification

81.20

M1

6
7

0.09
Timber covered 2.5/20 "Sopi-sopi"
Thatch roof w/ "Ate rope" complete with bamboo rafter dia.
419.72
6 - 30 cm

M3

Thatch roof ridge as describe in drawing and specification

Flushing Bjls 0.6 mm w/ timber covered 3 cm thickeness

M2

20.30

M1

35.20

M1

10
11
12

20.30
Timber plank 2 cm thickness
419.72
Anti termite to roof equal to Lentrex 400 EC
Calcibord 4 mm w/ timber cornice 3/5 include timber frame
132.40
4/6

M1
M2

III

Finishing Roof
Finishing of all timber use Lazur, complited wood stain,
etc.

1
2

To bingkirai timber eaves bord 6/15


To bingkirai timber tatab 3/7

87.80
20.60

M1
M1

3
4
5

To bingkirai timber apit-apit 3/5


To timber covered 2.5/20 "Sopi-sopi"
Finishing painted for ceiling

81.20
0.09
132.40

M1
M3
M2

256.55
54.00

M2
Unit

M2

Sub Total

1
2

WALL AND PILLAR


Repainted of all existing out door wall
Refinished door & window
Sub Total
RAILING

GRAHADIKA

10.00 BILL NO. 2.05 - 29

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA :10.00 BILL NO. 2.05 GUEST ROOM CORNER SUITE VILLA

ITEM

DESCRIPTION OF WORK

Replacement timber railing at railing

QTY.

UNIT

1.00

Ls

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total
LANDSCAPING WORKS
1
2

Special effect of exterior lighting


Private garden of area guest room

0.00
1.00

Unit
Ls

Pantry Of Corner Suite Villa

55.64

M2

1.00

Unit

Sub Total
COLLECTION
I
II
III

ROOF
WALL AND PILLAR
RAILING

IV

LANDSCAPING WORKS
10.00 BILL NO. 2.05 CORNER SUITE VILLA( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

10.00 BILL NO. 2.05 - 30

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 9.00 BILL NO. 2.04 GUEST ROOM SUITE VILLA

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

182.42

M2

182.42

M2

92.70

M3

84.60

M1

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
I

Preparation Roof
1 Demolished roof existing

II

Roof
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Replace & maintained timber existing structure include


change damage of timber structure

2
3

Timber beam 8/12 cm


Profile bingkirai timber eaves bord 6/15 as described in
drawing and specification

Profile bingkirai timber apit-apit 3/5 as described in


drawing and specification

41.20

M1

5
6

0.07
Timber covered 2.5/20 "Sopi-sopi"
Thatch roof w/ "Ate rope" complete with bamboo rafter dia.
182.42
6 - 30 cm

M3

Thatch roof ridge as describe in drawing and specification

Flushing Bjls 0.6 mm w/ timber covered 3 cm thickeness

Timber plank 2 cm thickness

10
11

M2

10.20

M1

30.60

M1

10.20
182.42
Anti termite to roof equal to Lentrex 400 EC
Calcibord 4 mm w/ timber cornice 3/5 include timber frame
50.40
4/6

M1
M2

III

Finishing Roof
Timber finisher with of "Lazur DL" c/w wood stain, etc.

1
2
3
4
5

To bingkirai timber eaves bord 6/15


To bingkirai timber apit-apit 3/5
To timber covered 2.5/20 "Sopi-sopi"
Pergola roof and polycarbonat refinish
Finishing painted for ceiling

84.60
41.20
0.07

M2

18.92
50.40

M1
M1
M3
M2
M2

147.20
6.00

M2
Unit

1.00

Ls

Sub Total

1
2

WALL AND PILLAR


Repainted of all existing out door wall
Refinished door & window
Sub Total
RAILING

Replacement timber railing at railing balconi


Sub Total

GRAHADIKA

9.00 BILL NO. 2.04 - 31

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 9.00 BILL NO. 2.04 GUEST ROOM SUITE VILLA

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

0.00
1.00

Unit
Ls

2.00

Unit

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

LANDSCAPING WORKS
1
2

Special effect of exterior lighting


Private garden of area guest room
Sub Total
COLLECTION

I
II

ROOF
WALL AND PILLAR

III
IV

RAILING
LANDSCAPING WORKS
9.00 BILL NO. 2.04 SUITE VILLA ( 1 UNIT ) Rp.
To Final Summary

GRAHADIKA

9.00 BILL NO. 2.04 - 32

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 8.00 BILL NO. 2.03 GUEST ROOM LOMBOK

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

381.79

M2

381.79

M2

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
I

Preparation Roof
1 Demolished roof existing

II

Roof
Bingkirai wood or equivalent including all labours, cutting
to any profile, nothcing, drilling, bolts & nuts & washer,
delivery to site, hoisting and erection complete in position.

Replace and maintained timber existing structure include


change damage of timber structure

2
3

Timber beam 8/12 cm


Profile bingkirai timber bord 6/15 cm as described in
drawing and specification

1.11

M3

21.00

M1

Profile bingkirai timber apit-apit 3/5 cm as described in


drawing and specification

180.00

M1

Thatch roof w/ "Ate rope" complete with bamboo rafter dia.


381.79
6 - 30 cm

M2

Thatch roof ridge as describe in drawing and specification

Timber covered 2.5/20 cm "Sopi-sopi"

8
9

Timber plank 2 cm thickness


Flacing BJLS 0.6 mm c/w timber covered 2 cm thickenes

10

Anti termite to roof equal to Lentrex 400 EC

III

Finishing Roof
Timber finisher with of "Lazur DL" c/w wood stain, etc.

1
2
3

To bingkirai timber bord 6/15


To bingkirai timber apit-apit 3/5
To timber covered 2.5/20 cm "Sopi-sopi"

10.50

M1

0.46
10.50

M3
M1

10.20

M1

381.79

M2

21.00
180.00
0.46

M2
M1
M3

248.50

M2

46.00

M1

Sub Total
WALL AND PILLAR
1

Repainted of all existing out door wall


Sub Total
RAILING

Replacement timber railing at railing stair


Sub Total
COLLECTION

I
II

ROOF
WALL AND PILLAR

III

RAILING

GRAHADIKA

8.00 BILL NO. 2.03 - 33

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 8.00 BILL NO. 2.03 GUEST ROOM LOMBOK

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

7.00

Unit

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

8.00 BILL NO. 2.03 GUEST ROOM LOMBOK ( 1 UNIT ) Rp.


To Final Summary

GRAHADIKA

8.00 BILL NO. 2.03 - 34

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

FINAL SUMMARY BILL OF QUANTITY

ITEM

RATE

SUMMARY

UNIT

COST PLANT
AMOUNT

5.00 BILL NO. 1 GUEST ROOM GARDEN 1 Rp.

6.00

132,047,705.95

792,286,235.71

II

5.00 BILL NO. 2 GUEST ROOM GARDEN 2 Rp.

24.00

86,952,929.85

2,086,870,316.48

GRAHADIKA

TOTAL SUMMARY Rp.

2,879,156,552.19

PPN 10 %

287,915,655.22

TOTAL SUMMARY Rp.

3,167,072,207.41

ROUNDED Rp.

3,167,072,000.00

FINAL SUMMARY - 35

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 4.00 BILL NO. 1 PRELIMINARY

DESCRIPTION

COST PLAN
AMOUNT

4.1.0 CONDITIONS OF TENDERING


4.1.1 Preparation and Submission of Tenders
4.1.2 Surat Ijin Usaha Jasa Konstruksi
4.1.3 Tenders to visit Site
4.1.4 Area for the Works
4.1.5 Use of the Site
4.1.6 Alterations to text
4.1.7 Tendered Amount
4.1.8 Tenders
4.2.0 PRELIMINARY PARTICULARS
4.2.1 Definitions
4.2.2 Description of the Works
4.2.3 Site of the Works
4.2.4 Possession of the Site
4.2.5 Contract Period
4.3.0 CONTRACT PARTICULARS
4.3.1 The Contract Documents
4.3.2 Conditions of Contract
4.3.3 Appendix to Conditions of Contract
4.3.4 Completion of the Contract Works
4.3.5 Practical Completion
4.3.6 Liquidated and Ascertained Damages for Non completion
4.3.7 Programmed of Work
4.3.8 Approval of Programmed
4.3.9 Method of Measurement
4.3.10 Contractors claims for extras and extensions of time
4.3.11 Taxes and Customs Duties
4.3.12 Specification
4.3.13 Discrepancies
4.3.14 The Contract Sum
4.3.15 Fixed Price Contracts

GRAHADIKA

4.00 BILL NO. 1 - 36

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 4.00 BILL NO. 1 PRELIMINARY

DESCRIPTION
4.3.16 Variations
4.3.17 Pricing of Preliminaries
4.3.18 Contingency Sum
4.3.19 Tender Drawings
4.3.20 Surety Bond
4.3.21 Contractors address
4.3.22 Payments to the Contractor
4.3.23 Assignment or Sub-Letting
4.3.24 Insurance of the Works and Public Liability Insurance
4.3.25 Insurance of the Works
4.3.26 Public Liability Insurance
4.3.27 Employer not Liable for Workmen Compensation
4.3.28 Contractor to Insure Workmen
4.3.29 Remedy of Failure to Insure
4.3.30 Contractor to give Notice of Injury
4.3.31 Fluctuations in Exchange Rates

COST PLAN
AMOUNT

15,000,000.00

10,000,000.00

5,000,000.00

4.4.0 GENERAL MATTERS


4.4.1 Site Management and Establishment Costs
4.4.2 Plant, Tools, Materials, Labor etc
4.4.3 Labor on Costs
4.4.4 Working Hours, Rates of Wages etc
4.4.5 Overtime
4.4.6 Contractors Employees
4.4.7 Workmen Living on Site
4.4.8 Safety, Health and Welfare of Workpeople
4.4.9 Report to Supervisor
4.4.10 Contractors Weekly Site Meetings
4.4.11 Site Instructions
4.4.12 Visitors
4.4.13 Permits and Fees
4.4.14 Drawings
4.4.15 Setting out the Works
4.4.16 Dimensions
4.4.17 Samples and Prototypes
4.4.18 Testing of Materials
4.4.19 Safeguarding the Works

GRAHADIKA

4.00 BILL NO. 1 - 37

50,000,000.00

1,000,000.00
1,000,000.00
5,000,000.00

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 4.00 BILL NO. 1 PRELIMINARY

DESCRIPTION
4.4.20 Maintenance and Protection of existing roads, footpaths, fences,
etc
4.4.21 Protection of private and Public Services
4.4.22 Protection of adjoining Property
4.4.23 Progress Photographs
4.4.24 Safety Helmets and Protective Clothing
4.4.25 Restricted use of the Site
4.4.26 Advertisements
4.4.27 Telephones
4.4.28 Water
4.4.29 Lighting and Power
4.4.30 Fire Protection
4.4.31 Defects Liability Period
4.4.32 Making Good Defects

COST PLAN
AMOUNT
2,500,000.00

500,000.00
5,000,000.00

5,000,000.00
5,000,000.00
10,000,000.00

4.4.33 Cartage of Materials to the Site and Removal of Spoil and


Surplus materials
4.4.34 Limiting Disturbances
4.4.35 Settlements for Nuisance
4.5.0 TEMPORARY WORKS
4.5.1 Temporary Access
4.5.2 Temporary Buildings
4.5.3 Sitting of Temporary Structures
4.5.4 Contractors Storage Sheds
4.5.5 Contractors Site Office
4.5.6 Removal of Temporary Structures Plant and equipment
4.5.7 Temporary Screens and Safety Netting
4.5.8 General Scaffolding and Staging
4.5.9 Shoring, Propping and Strutting
4.5.10 Protection of the Work
4.5.11 Removal of Rubbish

5,000,000.00

5,000,000.00

4.6.0 PREAMBLES FOR ALL TRADES


4.6.1 Notes
4.6.2 Abbreviation
4.6.3 Definitions

GRAHADIKA

4.00 BILL NO. 1 - 38

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 4.00 BILL NO. 1 PRELIMINARY


COST PLAN
AMOUNT

DESCRIPTION
4.6.4 Generally
4.6.5 Method of Measurement
4.6.6 Working Space
4.6.7 Rates to Include

4.00 BILL NO. 1 PRELIMINARY

125,000,000.00

To Final Summary

GRAHADIKA

4.00 BILL NO. 1 - 39

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 1 GUEST ROOM GARDEN 1

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00

539,989.80
21,489,390.00
8,907,995.00

M2

1,320.00

8,500.00

9,820.00

3,607,278.80

86.40

M1

16,500.00

8,500.00

25,000.00

2,160,000.00

Bingkirai timber tatab 3/7 as described in drawing and


specification

86.40

M1

5,500.00

8,500.00

14,000.00

1,209,600.00

Bingkirai timber grill 4/4 & frame 6/12 as described in


drawing and specification

10.08

M2

150,000.00

9,000.00

159,000.00

1,602,720.00

Repainted & maintance of timber structure

1.00

Ls

829,440.00

200,000.00

1,029,440.00

1,029,440.00

1
2
3

Disclosure roof existing


New thatch roof (exclude timber structure)
Bamboo rafter for thatched roof c/w rope as described in
drawing and specification

367.34
367.34
367.34

M2
M2
M2

Thatch roof ties by "Ate rope" as described in drawing and 367.34


specification

Bingkirai timber "Kolong" 3/15 with list 2/3 as described in


drawing and specification

Sub Total

WALL AND PILLAR


Covered Paras Tenganan combined plastered painted at
partial wall

40,546,413.60

109.20

M2

179,404.50

6,000.00

185,404.50

20,246,171.40

1,275.00

1,275.00

19,125.00

128,940.00
573,533.04
573,533.04
1,000,000.00
17,498.50
185,404.50

257,880.00
10,571,360.99
5,946,390.56
2,000,000.00
1,301,888.40
6,229,591.20

Replacement Palimanan at Paras frame of existing


window

15.00

M2

3
4
5
6

Additional Palimanan frame shaft door


Additional brick wall at partial wall
Additional brick coulumn at pilar
Art work of shaft door at entrance area

2.00
18.43
10.37
2.00

M2
M3
M3
Unit

75,900.00
413,933.04
413,933.04
1,000,000.00

53,040.00
159,600.00
159,600.00

7
8

Repainted of all existing out door wall


Covered Palimanan at pillar

74.40
33.60

M2
M2

11,632.50
179,404.50

5,866.00
6,000.00

Sub Total

46,572,407.55

RAILING
1
2
3

Refinish of existing timber railing


Additional timber railing at terace 1st floor and balcony
Replacement timber railing at railing stair

4.00
8.00
42.80

Unit
Unit
M1

103,356.00
149,232.60

19,800.00
168,300.00
50,000.00

123,156.00
317,532.60
50,000.00

Sub Total

1
2

LANDSCAPING WORKS
Special effect of exterior lighting
Private garden of area guest room

492,624.00
2,540,260.80
2,140,000.00
5,172,884.80

10.00
107.52

Unit
M2

750,000.00
300,000.00

7,500,000.00
32,256,000.00

Sub Total

39,756,000.00

ROOF
WALL AND PILLAR
RAILING
LANDSCAPING WORKS

40,546,413.60
46,572,407.55
5,172,884.80
39,756,000.00

COLLECTION
I
II
III
IV

GRAHADIKA

5.00 BILL NO. 1 - 40

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 1 GUEST ROOM GARDEN 1

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

5.00 BILL NO. 1 GARDEN 1 ( 1 UNIT ) Rp.

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)
132,047,705.95

To Final Summary

GRAHADIKA

5.00 BILL NO. 1 - 41

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 2 GUEST ROOM GARDEN 2

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00

190,600.20
7,585,110.00
3,144,255.00

M2

1,320.00

8,500.00

9,820.00

1,273,261.20

62.92

M1

5,500.00

8,500.00

14,000.00

880,880.00

1.00

Ls

664,320.00

190,000.00

854,320.00

854,320.00

1
2
3

Disclosure roof existing


New thatch roof (exclude timber structure)
Bamboo rafter for thatched roof c/w rope as described in
drawing and specification

129.66
129.66
129.66

M2
M2
M2

Thatch roof ties by "Ate rope" as described in drawing and 129.66


specification

Bingkirai timber tatab 3/7 as described in drawing and


specification

Repainted & maintance of timber structure


Sub Total

1
2
3
4
5

WALL AND PILLAR


Covered Paras Tenganan combined plastered painted at
partial wall

13,928,426.40

95.04

M2

179,404.50

6,000.00

185,404.50

17,620,843.68

Repainted of all existing out door wall


Additional brick wall
Additional covered paras Tenganan at center wall in
entrance / stair area

90.88
18.43

M2
M3

11,632.50
159,600.00

5,866.00
413,933.04

10.00

M2

179,404.50

6,000.00

17,498.50
573,533.04
185,404.50

1,590,263.68
10,571,360.99
1,854,045.00

Covered Palimanan at pillar

37.80

M2

179,404.50

6,000.00

185,404.50

7,008,290.10

Sub Total

38,644,803.45

RAILING
1

Refinish of existing timber railing

31.00

M1

55,990.00

6,710.00

62,700.00

Sub Total

1,943,700.00
1,943,700.00

LANDSCAPING WORKS
1

Special effect of exterior lighting

10.00

Unit

Private garden of area guest room

83.12

M2

750,000.00
300,000.00

7,500,000.00
24,936,000.00

Sub Total

32,436,000.00

I
II
III

ROOF
WALL AND PILLAR
RAILING

13,928,426.40
38,644,803.45
1,943,700.00

IV

LANDSCAPING WORKS

32,436,000.00

5.00 BILL NO. 1 GARDEN 2 ( 1 UNIT ) Rp.

86,952,929.85

COLLECTION

To Final Summary

GRAHADIKA

5.00 BILL NO. 2 - 42

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 3 GUEST ROOM LOMBOK

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00

544,429.20
21,666,060.00
8,981,230.00

M2

1,320.00

8,500.00

9,820.00

3,636,935.20

M1

5,500.00

8,500.00

14,000.00

Ls
M2

664,320.00
664,320.00

190,000.00
190,000.00

854,320.00
854,320.00

1
2
3

Disclosure roof existing


New thatch roof (exclude timber structure)
Bamboo rafter for thatched roof c/w rope as described in
drawing and specification

370.36
370.36
370.36

M2
M2
M2

Thatch roof ties by "Ate rope" as described in drawing and 370.36


specification

Bingkirai timber tatab 3/7 as described in drawing and


specification

6
7

Repainted & maintance of timber structure


Change "Timber Sopi-sopi"

1.00
51.00
Sub Total

854,320.00
43,570,320.00
79,253,294.40

WALL AND PILLAR


1
2

Repainted of all existing out door wall


Replacement Palimanan at Paras frame of existing
window

233.50
31.40

M2
M2

179,404.50

6,000.00
1,275.00

185,404.50
1,275.00

Sub Total

RAILING
Replacement timber railing at railing stair

43,291,950.75
40,035.00

43,331,985.75

46.00

M1

0.00

50,000.00

50,000.00

Sub Total

2,300,000.00
2,300,000.00

LANDSCAPING WORKS
1

Special effect of exterior lighting

0.00

Unit

Private garden of area guest room

54.00

M2

750,000.00
300,000.00

16,200,000.00

Sub Total

16,200,000.00

I
II

ROOF
WALL AND PILLAR

79,253,294.40
43,331,985.75

III
IV

RAILING
LANDSCAPING WORKS

2,300,000.00
16,200,000.00

5.00 BILL NO. 3 GUEST ROOM LOMBOK ( 1 UNIT ) Rp.

141,085,280.15

COLLECTION

To Final Summary

GRAHADIKA

5.00 BILL NO. 3 - 43

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 4 GUEST ROOM (COTTAGE)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00

169,344.00
21,666,060.00
2,793,600.00

M2

1,320.00

8,500.00

9,820.00

1,131,264.00

M1

5,500.00

8,500.00

14,000.00

Ls

664,320.00

190,000.00

854,320.00

1
2
3

Disclosure roof existing


New thatch roof (exclude timber structure)
Bamboo rafter for thatched roof c/w rope as described in
drawing and specification

115.20
370.36
115.20

M2
M2
M2

Thatch roof ties by "Ate rope" as described in drawing and 115.20


specification

Bingkirai timber tatab 3/7 as described in drawing and


specification

Repainted & maintance of timber structure

1.00
Sub Total

1
2

WALL AND PILLAR


Repainted of all existing out door wall
Replacement Palimanan at Paras frame of existing
window

854,320.00
26,614,588.00

89.44
9.20

M2
M2

116,325.50

5,866.00
1,275.00

122,191.50
1,275.00

Sub Total

10,928,807.76
11,730.00

10,940,537.76

LANDSCAPING WORKS
1
2

Special effect of exterior lighting


Private garden of area guest room

0.00
35.00

Unit
M2

750,000.00
300,000.00

10,500,000.00

Sub Total

10,500,000.00

ROOF
WALL AND PILLAR
LANDSCAPING WORKS

26,614,588.00
10,940,537.76
10,500,000.00

5.00 BILL NO. 4 GUEST ROOM COTTAGE ( 1 UNIT ) Rp.

48,055,125.76

COLLECTION
I
II
IV

To Final Summary

GRAHADIKA

5.00 BILL NO. 4 - 44

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 5 GUEST ROOM SUITE VILLA

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00

328,986.00
13,092,300.00
5,427,150.00

M2

1,320.00

8,500.00

9,820.00

2,197,716.00

M1

5,500.00

8,500.00

14,000.00

Ls

664,320.00

190,000.00

854,320.00

1
2
3

Disclosure roof existing


New thatch roof (exclude timber structure)
Bamboo rafter for thatched roof c/w rope as described in
drawing and specification

223.80
223.80
223.80

M2
M2
M2

Thatch roof ties by "Ate rope" as described in drawing and 223.80


specification

Bingkirai timber tatab 3/7 as described in drawing and


specification

Repainted & maintance of timber structure

1.00
Sub Total

1
2

WALL AND PILLAR


Repainted of all existing out door wall
Refinished door & window

141.00
6.00

RAILING
Replacement timber railing at railing stair & Timber pergola

854,320.00
21,900,472.00

M2
Unit

11,632.50
18,321.19

5,866.00
9,238.95

17,498.50
27,560.14

Sub Total

2,467,288.50
165,360.83
2,632,649.33

1.00

Ls

55,990.00

6,710.00

62,700.00

Sub Total

62,700.00

62,700.00

LANDSCAPING WORKS
1
2

Special effect of exterior lighting


Private garden of area guest room

0.00
159.00

Unit
M2

750,000.00
300,000.00

47,700,000.00

Sub Total

47,700,000.00

I
II
III

ROOF
WALL AND PILLAR
RAILING

21,900,472.00
2,632,649.33
62,700.00

IV

LANDSCAPING WORKS

47,700,000.00

5.00 BILL NO. 5 SUITE VILLA ( 1 UNIT ) Rp.

72,295,821.33

COLLECTION

To Final Summary

GRAHADIKA

5.00 BILL NO. 5 - 45

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 6 GUEST ROOM CORNER SUITE VILLA

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

ROOF
50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00

527,730.00
21,001,500.00
8,705,750.00

M2

1,320.00

8,500.00

9,820.00

3,525,380.00

M1

5,500.00

8,500.00

14,000.00

Ls

664,320.00

190,000.00

854,320.00

1
2
3

Disclosure roof existing


New thatch roof (exclude timber structure)
Bamboo rafter for thatched roof c/w rope as described in
drawing and specification

359.00
359.00
359.00

M2
M2
M2

Thatch roof ties by "Ate rope" as described in drawing and 359.00


specification

Bingkirai timber tatab 3/7 as described in drawing and


specification

Repainted & maintance of timber structure

1.00
Sub Total

1
2

WALL AND PILLAR


Repainted of all existing out door wall
Refinished door & window

230.00
54.00

RAILING
Replacement timber railing at railing stair & Timber pergola

854,320.00
34,614,680.00

M2
Unit

179,404.50
11,632.50

6,000.00
5,866.00

185,404.50
17,498.50

Sub Total

42,643,035.00
944,919.00
43,587,954.00

1.00

Ls

55,990.00

6,710.00

62,700.00
Sub Total

62,700.00
62,700.00

LANDSCAPING WORKS
1
2

Special effect of exterior lighting


Private garden of area guest room

0.00
417.00

Unit
M2

Pantry Of Corner Suite Villa

34.50

M2

750,000.00
300,000.00
300,000.00

125,100,000.00
10,350,000.00

Sub Total

135,450,000.00

I
II

ROOF
WALL AND PILLAR

34,614,680.00
43,587,954.00

III
IV

RAILING
LANDSCAPING WORKS

62,700.00
135,450,000.00

5.00 BILL NO. 6 CORNER SUITE VILLA( 1 UNIT ) Rp.

213,715,334.00

COLLECTION

To Final Summary

GRAHADIKA

5.00 BILL NO. 6 - 46

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 7 MAIN RESTAURANT, MAIN KITCHEN, STAGE AND SWIMMING POOL (ALT. 1)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

MAIN RESTAURANT
1
2
3

Restaurant & Bar


Counter Bar & Botkle Display
Buffets

537.60
1.00
80.64

M2
Unit
M2

50,000.00
15,750.00

1,470.00
8,500.00
8,500.00

4
5
6
7
8
9
10

Buffets Table
Guest Toilet ( Male & Female)
Stage under covered
Changing room
Hardscape (around stage area)
Flower pot
Fixed art work

33.60
30.72
57.76
30.73
248.64
25.00
10.00

M1
M2
M2
M2
M2
Unit
Unit

1,320.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00

8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00

1,470.00
58,500.00
24,250.00
9,820.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00

790,272.00
58,500.00
1,955,520.00
329,952.00
430,080.00
808,640.00
430,220.00
3,480,960.00
350,000.00
140,000.00

(Cost Estimated Include Standard MEP)


Sub Total

8,774,144.00

MAIN KITCHEN
1

Kitchen

501.76

M2

179,404.50

6,000.00

2
3
4

ME yard for gas tube, out door A/C, etc


ME room
Circulation out door

5.76
5.76
60.64

M2
M2
M2

179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50

93,028,561.92
1,067,929.92
1,067,929.92
11,242,928.88

(Cost Estimated Exclude Kitchen Equipment)


Sub Total

106,407,350.64

SWIMMING POOL
SWIMMING POOL
210.00
284.40

M2
M2

179,404.50
179,404.50

6,000.00
6,000.00

Additional of sunbath chair in the pool


Additional of water feature
Change of circulation water system become whirl pool

6.00
4.00
1.00

Unit
Unit
Ls

179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50
185,404.50

Additional of balancing tank

1.00

Unit

179,404.50

6,000.00

185,404.50

1.a
1.b

Adjustment of floor level


Change of ceramic tile (wall & floor)

1.c
1.d
1.e
1.f

Sub Total

38,934,945.00
52,729,039.80
1,112,427.00
741,618.00
185,404.50
185,404.50
93,888,838.80

Additional of pool deck, palimanan covered (Include


Maintenance Pool deck Ex)

213.00

M2

179,404.50

6,000.00

185,404.50

39,491,158.50

3
4
5
6

Toilet and changing room


Antiqe Out door shower
Tower Counter
Additional of work and out door lighting

12.80
4.00
12.80
15.00

M2
Unit
M2
Unit

179,404.50
179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50

2,373,177.60
741,618.00
2,373,177.60
2,781,067.50

Sub Total

235,537,876.80

Total

329,426,715.60

MAIN RESTAURANT
MAIN KITCHEN
SWIMMING POOL

8,774,144.00
106,407,350.64
329,426,715.60

COLLECTION
I
II
III
GRAHADIKA

5.00 BILL NO. 7 - 47

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 7 MAIN RESTAURANT, MAIN KITCHEN, STAGE AND SWIMMING POOL (ALT. 1)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

5.00 BILL NO. 7 ALT. 1 ( 1 UNIT ) Rp.

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

444,608,210.24

To Final Summary

GRAHADIKA

5.00 BILL NO. 7 - 48

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 8 MAIN RESTAURANT, MAIN KITCHEN, STAGE AND SWIMMING POOL (ALT. 2)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

MAIN RESTAURANT
1
2
3

Restaurant & Bar


Buffets
Bar

455.28
81.92
40.96

M2
M2
M1

15,750.00
1,320.00

1,470.00
8,500.00
8,500.00

4
5
6
7
8
9
10
11
12
13
14

Open dinning ( 4 unit)


Guest Toilet ( Male & Female)
Stage
Changing room
Court yard at Open dining
Stair
Hardscape (around stage area)
Pathway under covered
Pathway and stepping
Flower pot
Fixed art work

20.25
33.44
57.76
10.24
113.80
115.20
107.24
46.80
50.00
42.00
5.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
Unit
Unit

5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00
5,500.00

8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00
8,500.00

1,470.00
24,250.00
9,820.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00

669,261.60
1,986,560.00
402,227.20
283,500.00
468,160.00
808,640.00
143,360.00
1,593,200.00
1,612,800.00
1,501,360.00
655,200.00
700,000.00
588,000.00
70,000.00

(Cost Estimated Include Standard MEP)


Sub Total

11,482,268.80

MAIN KITCHEN
1

Kitchen

327.68

M2

179,404.50

6,000.00

2
3
4

ME yard for gas tube, out door A/C, etc


ME room
Circulation out door

5.76
5.76
60.46

M2
M2
M2

179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50

60,753,346.56
1,067,929.92
1,067,929.92
11,209,556.07

(Cost Estimated Exclude Kitchen Equipment)


Sub Total

74,098,762.47

SWIMMING POOL

1.a
1.b
1.c
1.d
1.e

SWIMMING POOL
Adjustment of floor level
Change of ceramic tile (wall & floor)
Additional of sunbath chair in the pool
Additional of water feature
Change of circulation water system become whirl pool

1.f

Additional of balancing tank

210.00
284.40
40.00
3.00
1.00

M2
M2
Unit
Unit
Ls

179,404.50
179,404.50
179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50
185,404.50

1.00

Unit

179,404.50

6,000.00

185,404.50

Sub Total

38,934,945.00
52,729,039.80
7,416,180.00
556,213.50
185,404.50
185,404.50
173,920,545.27

Adjustment level of pool deck with palimanan covered


combined pebble washed

244.80

M2

179,404.50

6,000.00

185,404.50

45,387,021.60

3
4
5
6
7
8
9
10

Tower Counter
Guest Toilet
Out door shower
A new gate entrance
A new fence wall
Adjustment palimanan as existing
Fixed art work
Out door lighting

12.80
12.80
2.00
1.00
27.00
119.00
4.00
10.00

M2
M2
Unit
Unit
M1
M2
Unit
Unit

179,404.50
179,404.50
179,404.50
179,404.50
179,404.50
179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50
185,404.50
185,404.50
185,404.50
185,404.50

2,373,177.60
2,373,177.60
370,809.00
185,404.50
5,005,921.50
22,063,135.50
741,618.00
1,854,045.00

Sub Total
GRAHADIKA

80,354,310.30
5.00 BILL NO. 8 - 49

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 8 MAIN RESTAURANT, MAIN KITCHEN, STAGE AND SWIMMING POOL (ALT. 2)

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

Sub Total

254,274,855.57

I
II

MAIN RESTAURANT
MAIN KITCHEN

11,482,268.80
74,098,762.47

III

SWIMMING POOL

254,274,855.57

5.00 BILL NO. 8 ALT. 2 ( 1 UNIT ) Rp.

339,855,886.84

COLLECTION

To Final Summary

GRAHADIKA

5.00 BILL NO. 8 - 50

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 9 SAHADEWA POOL

ITEM

DESCRIPTION OF WORK

RATE (RP)
LABOUR

QTY.

UNIT

242.00
347.00
16.00
4.00

M2
M2
M2
Unit

15,750.00
1,320.00
5,500.00

1,470.00
8,500.00
8,500.00
8,500.00

1.00
3.00
0.00

Ls
Unit
Unit

5,500.00
5,500.00
5,500.00

8,500.00
8,500.00
8,500.00

MATERIAL

TOTAL

AMOUNT(RP)

SWIMMING POOL
1.a
1.b
1.c
1.d

Adjustment of floor level


Change of ceramic tile (wall & floor)
Additional stairs
Additional of water fall Art Work

1.e
1.f
1.g

Additional of planter box


Additional of Art Work
Special lighting effect

1,470.00
24,250.00
9,820.00
14,000.00
14,000.00
14,000.00
14,000.00

Sub Total 1

355,740.00
8,414,750.00
157,120.00
56,000.00
14,000.00
42,000.00
9,039,610.00

CHILD POOL
2.a
2.b

Adjustment of floor level


Change of ceramic tile (wall & floor)

59.50
94.60

M2
M2

15,750.00

1,470.00
8,500.00

2.c
2.d
2.e

Additional stairs
Additional of water fall Art Work
Additional of planter box

9.60
4.00
4.00

M2
Unit
Ls

1,320.00
5,500.00
5,500.00

8,500.00
8,500.00
8,500.00

2.f
2.g

Additional of Art Work


Special lighting effect

2.00
0.00

Unit
Unit

5,500.00
5,500.00

8,500.00
8,500.00

1,470.00
24,250.00
9,820.00
14,000.00
14,000.00
14,000.00
14,000.00

Sub Total 2
3
4
5
6
7
7.a

2,615,787.00

Pool Deck
Child pool deck

468.00
69.70

M2
M2

1,470.00
1,470.00

Bar Pool decking


Out door shower include Art work
Open bar
Counter

105.30
2.00
10.24
1.00

M2
Unit
M2
Unit

1,470.00
1,470.00
1,470.00
1,470.00

1,470.00
1,470.00
1,470.00
1,470.00
1,470.00
1,470.00

Sub Total 3

8.a
8.b

GAME ROOM
Refinish wall & floor
Change a new thatch roof w/ timber structure Ex.

Owel Counter
Counter

687,960.00
102,459.00
154,791.00
2,940.00
15,052.80
1,470.00
964,672.80

54.00
0.00

M2
M2

15,750.00

1,470.00
8,500.00

1,470.00
24,250.00

Sub Total 4
9
9.a

87,465.00
2,294,050.00
94,272.00
56,000.00
56,000.00
28,000.00
-

79,380.00
79,380.00

10.24
1.00

M2
Unit

1,470.00
1,470.00

1,470.00
1,470.00

Sub Total 5

15,052.80
1,470.00
15,052.80

10

Sand Area

140.00

M2

1,470.00

1,470.00

205,800.00

11
12
13

(Exclude Tennis Table & Chess board)


Planter Box Deck Area
Fixed Art Work
Lighting

73.00
4.00
0.00

M2
Unit
Unit

1,470.00
1,470.00
1,470.00

14
15
16

Panel & Pump Room


Guest Toilet
Pathway Entrance

6.00
25.60
16.00

M2
M2
M2

1,470.00
1,470.00
1,470.00

1,470.00
1,470.00
1,470.00
1,470.00
1,470.00
1,470.00

107,310.00
5,880.00
8,820.00
37,632.00
23,520.00

Sub Total 6

388,962.00

Sub Total ( 1+2+3+4+5+6 )

10,487,677.60

MEP & Special Lighting Installation Estimate 6% from


Building Cost Estimation (By GRA)
GRAHADIKA

6.00 %

5.00 BILL NO. 9 - 51

10,487,677.60

629,260.66

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 9 SAHADEWA POOL

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

5.00 BILL NO. 9 SAHADEWA POOL ( 1 UNIT ) Rp.

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

11,116,938.26

To Final Summary

GRAHADIKA

5.00 BILL NO. 9 - 52

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 10 BEACH SIDE MEDITERRANEAN - BEACH BAR & KITCHEN

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

KUKUS KITCHEN
1
2
3
4

Show kitchen area & Food finishing area


Pot wash area
Pastry section
Cold kitchen room

59.40
17.64
11.13
17.43

M2
M2
M2
M2

50,000.00
15,750.00
1,320.00

1,470.00
8,500.00
8,500.00
8,500.00

5
6

Guest toilet ( 2 Unit)


Terrace

7.20
31.69

M2
M2

5,500.00
664,320.00

8,500.00
190,000.00

1,470.00
58,500.00
24,250.00
9,820.00
14,000.00
854,320.00

87,318.00
1,031,940.00
269,902.50
171,162.60
100,800.00
27,073,400.80

(Cost Estimated Exclude Kitchen Equipment)


Sub Total

DINING BALE
Dining bale 2 unit

28,734,523.90

81.92

M2

179,404.50

6,000.00

185,404.50

Sub Total

15,188,336.64
15,188,336.64

BEACH BAR
1

Beach bar 1 unit

40.96

M2

55,990.00

6,710.00

62,700.00

Sub Total

2,568,192.00
2,568,192.00

DINING UMBRELLA
1

Dining Umbrella

20.00

Unit

750,000.00

15,000,000.00

Sub Total

15,000,000.00

I
II

KUKUS KITCHEN
DINING BALE

28,734,523.90
15,188,336.64

III
IV

BEACH BAR
DINING UMBRELLA

2,568,192.00
15,000,000.00

5.00 BILL NO. 10 ( 1 UNIT ) Rp.

61,491,052.54

COLLECTION

To Final Summary

GRAHADIKA

5.00 BILL NO. 10 - 53

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING

AREA : 5.00 BILL NO. 11 SPA AND FITNES CENTER

ITEM

DESCRIPTION OF WORK

QTY.

UNIT

MATERIAL

RATE (RP)
LABOUR

TOTAL

AMOUNT(RP)

BUILDING

1.a
1.b

GENERAL
Roof
Repainted & maintenance of timber structure

188.86
1.00

M2
Ls

179,404.50
179,404.50

6,000.00
6,000.00

1.c
1.d
1.e

Adj. & A New Door & Window


Repainted of out door Wall Ex
Add. Paras Tenganan

13.00
67.20
38.50

Unit
M2
M2

179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50
185,404.50

Sub Total
2
3
4

Add. Open Jacuzzy (exclude equipment)


Add. Open Jamu Bar
Flower Sunken Bath Tub

35,015,493.87
185,404.50
2,410,258.50
12,459,182.40
7,138,073.25
57,208,412.52

12.25
6.00
6.28

M2
M2
M2

179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50

2,271,205.13
1,112,427.00
1,164,340.26

Sub Total

118,964,797.43

Total

176,173,209.95

HARDSCAPE
1.a
1.b
1.c
1.d
1.e

A new gate
Pathway
Pond
Fixed Art Work
Out door lighting

210.00
284.40
6.00
4.00
1.00

Unit
M2
M2
Unit
Unit

179,404.50
179,404.50
179,404.50
179,404.50
179,404.50

6,000.00
6,000.00
6,000.00
6,000.00
6,000.00

185,404.50
185,404.50
185,404.50
185,404.50
185,404.50

38,934,945.00
52,729,039.80
1,112,427.00
741,618.00
185,404.50

(16 paras box, 9 balinesse lamp)


Sub Total
2

Softscape

93,703,434.30
122.90

M2

179,404.50

6,000.00

185,404.50

22,786,213.05

Sub Total

22,786,213.05

Total

116,489,647.35

BUILDING
HARDSCAPE
Softscape

176,173,209.95
93,703,434.30
22,786,213.05

NO. 7 5.00 BILL NO. 11 SPA AND FITNES CENTER( 1 UNIT ) Rp.

292,662,857.30

COLLECTION
I
II
III

To Final Summary

GRAHADIKA

5.00 BILL NO. 11 - 54

RADDIN HOTEL SANUR - BALI


RENOVATION AND RE-BRANDING