CENTRAL JAVA 2X1000 MW CFPP PROJECT
Doe No : RFI-SSP/MES-CIP/16/08-044
Date: August 01,2016
REQUEST FOR INSPECTION
MES Mr. K Tanaka
Central Java Project
|centlement,
We would like to have your presence on commencement work according to the following schedules
Data & Time Place / Area Work item, Remark
| canguras
1 Lowland Power block Visual Check Prior Backfill
(05) (layer 2nd)
(follow drawing attached )
Result JAccepted [Jrejectea
eispecton eaued [ie [re
[Comments :
PT. SSP. MES/ SUMITOMO
int Name Evtan 1 AGRA |CENTRAL JAVA 2x1000 MW CFPP PROJECT
1-60.03 | seu
Doc. No, Page
Jrissowcscrnneoes
‘Subject : VISUAL CHECK PRIOR BACKFILL
Project Central Java Location
Client MES Reference Drawing
ITEM TO CHECK
RESULT
Project No. : 1607-SD
peer Groce dy _C ancl tose)
DATE & SIGN REMARKS
Yes ___NA
[Cutting Grass, accepted
we
ahs d
[Quality of cleaning before backfil, accepted
wt
Quality of backfill material, accepted
Print Name
SignaturefF Ele Hen oon sence + aT fo tate le
sme BowneCENTRAL JAVA 2x1000 MW
@. a FIELD INSPECTION REPORT
‘SSP
WSPECTIONTYPET acwal eLavATION Pe, 0S Laven t
cpp1or gpceru Later 20>)
REF. DWG.Nox
ance / Griteria
lancainspecreo: Dr D&C ARYA Ute nee /Criteria = ;
Taal
1086 HAA ELEVATION
ri ee - a Deviation REMARI
‘ACTUAL | _ DESIGN ®
6b09. 08 |__|
Ys 937177 999
x- 367998 994_
Te 9237109. 529
Prepared & checked by [check & Confirmed by JWanessed by RewraarcA by -
PT. SSP, lpr.ssP PT.Mes
ane] SUN mek ea
frame: SUAVE TOR
TE 9237196 344
launo: _egrnn _!¥/n/ Pb
postin: LC. Cro -