O1-Agust-16
1
Towland Power block
(A)
CENTRAL JAVA 2X1000 MW CFPP PROJECT
Doe No : RF-SSP/MES-CIP/16/08-041
Date
REQUEST FOR INSPECTION
Jattention to»: MES Mr. K Tanaka
Project Title =: Central Java Project.
IGentiement,
Data & Time Place / Area Work Item
(layer 2nd)
We would like to have your presence on commencement work according to the following schedules
Visual Check Prior Backfill
(follow drawing attached )
Result
Reinspection Required
amram Vat layer near Sem chore shall be fill seon after
Water removed. ()
Pr. SSP
‘MES/ SUMITOMO
Print Name Tea
Erie
SignatureCENTRAL JAVA 2x1000 MW CFPP PROJECT | [Boc.No. Page
Jrissmcs.concoson 2
‘Subject : VISUAL CHECK PRIOR BACKFILL Project No. : 1607-SD
Project Central Java Location ener eters (0) ~7 nel Cover
Client Mes Reference Drawing
No. ITEM TO CHECK RESULT DATE &SIGN | REMARKS
Yes___NWA
= PY.
2 before backfll, accepted ‘ Ore
3 [Quality of backfil material, accepted >
Yu
Ye
Remarks
PT. SSP MES
Print Name feveain IR
signaturea“ “poe oe of + fo+ +
BUA-C-WS-0075
<4@. 7 FIELD INSPECTION REPORT CENTRAL JAVA 2x1000 MW
‘SSP
INSPECTION TYPE 4 ees = =
Cpe Geri Lape rd ) bate us 014
REF. DWG.No.
“Aeceptance//Criteria =
Jancarnspecres: A
Reto
Deviation
p230_| 4 230 ce
4 gee | 4 2340 | | Ei
poe [4 SE
2 ee | 2340 | i
¢ day | + 2-240 | aq
433g | + 234
tee
oupual
sketch
xe Mpgoree J
Ye GB 709-30,
20
In
TTB - 92 z 367809. 794
237 07: 128 TONS:
[Prepared & checked by [cheek & Confirmed BRO by Atwowk
Presse peck Come lores)
| /aeatege aa lane: for toms "Yn 2a |
fcctan SUPVE TOR, fost: [postion A2c -FIELD INSPECTION REPORT
CENTRAL JAVA 2x1000 MW
INSPECTION TPE
rewar €lv- Lane §
Craton” béckHee yer 20d )
REF. DWG. No.
‘Acceptance Criteria =
Jarcamseccren: A
(Ref to, 1
ae ROSS HAA ELEVATION
a Deviation
BACK FORE ACTUAL | _DESIGN
be
es 4 2340 +38
Prepared & checked by eves & Corn jineaaea BY
pT. ssP lprissP 5 SN PT.MES-JO
ane: ae i Ine ( lume: Horton Wt /orl
sora: SURVEY OR feson frotion: Be =