O1-Agust-16 1 Towland Power block (A) CENTRAL JAVA 2X1000 MW CFPP PROJECT Doe No : RF-SSP/MES-CIP/16/08-041 Date REQUEST FOR INSPECTION Jattention to»: MES Mr. K Tanaka Project Title =: Central Java Project. IGentiement, Data & Time Place / Area Work Item (layer 2nd) We would like to have your presence on commencement work according to the following schedules Visual Check Prior Backfill (follow drawing attached ) Result Reinspection Required amram Vat layer near Sem chore shall be fill seon after Water removed. () Pr. SSP ‘MES/ SUMITOMO Print Name Tea Erie Signature CENTRAL JAVA 2x1000 MW CFPP PROJECT | [Boc.No. Page Jrissmcs.concoson 2 ‘Subject : VISUAL CHECK PRIOR BACKFILL Project No. : 1607-SD Project Central Java Location ener eters (0) ~7 nel Cover Client Mes Reference Drawing No. ITEM TO CHECK RESULT DATE &SIGN | REMARKS Yes___NWA = PY. 2 before backfll, accepted ‘ Ore 3 [Quality of backfil material, accepted > Yu Ye Remarks PT. SSP MES Print Name feveain IR signature a“ “poe oe of + fo+ + BUA-C-WS-0075 <4 @. 7 FIELD INSPECTION REPORT CENTRAL JAVA 2x1000 MW ‘SSP INSPECTION TYPE 4 ees = = Cpe Geri Lape rd ) bate us 014 REF. DWG.No. “Aeceptance//Criteria = Jancarnspecres: A Reto Deviation p230_| 4 230 ce 4 gee | 4 2340 | | Ei poe [4 SE 2 ee | 2340 | i ¢ day | + 2-240 | aq 433g | + 234 tee oupual sketch xe Mpgoree J Ye GB 709-30, 20 In TTB - 92 z 367809. 794 237 07: 128 TONS: [Prepared & checked by [cheek & Confirmed BRO by Atwowk Presse peck Come lores) | /aeatege aa lane: for toms "Yn 2a | fcctan SUPVE TOR, fost: [postion A2c - FIELD INSPECTION REPORT CENTRAL JAVA 2x1000 MW INSPECTION TPE rewar €lv- Lane § Craton” béckHee yer 20d ) REF. DWG. No. ‘Acceptance Criteria = Jarcamseccren: A (Ref to, 1 ae ROSS HAA ELEVATION a Deviation BACK FORE ACTUAL | _DESIGN be es 4 2340 +38 Prepared & checked by eves & Corn jineaaea BY pT. ssP lprissP 5 SN PT.MES-JO ane: ae i Ine ( lume: Horton Wt /orl sora: SURVEY OR feson frotion: Be =

Vous aimerez peut-être aussi