CENTRAL JAVA 2X1000 MW CFPP PROJECT
Doc No : RFI-SSP/MES-CIP/16/07-035
Date: July 26,2016
REQUEST FOR INSPECTION
MES Mr. K Tanaka
Central Java Project
IGentlement,
We would like to have your presence on commencement work according to the following schedules
Data & Time Place / Area Work Iter Remark
27-Jul-16
Lowland Power Block Visual Check Prior Backfill
: ‘area (b2, d6, 45) (layer 2nd)
(follow drawing attached )
Result
Reinspection Required
\& [comments =
Not abe 40 lspeckon becaure of rain
MES] SUMITOMO.
Print Name , DUEL
Signature Ait:CENTRAL JAVA 2x1000 MW CFPP PROJECT
Date
Ql - C.0.03
Doe. No. Page
Jrssrmce censors of
‘Subject : VISUAL CHECK PRIOR BACKFILL
Project No. : 1607-SD
Project Central Java Location
Client MES
Reference Drawing
er ORE Che ae aT
svat eheccpnbr Goce Carel Lager
No. ITEM TO CHECK RESULT DATE & SIGN
YES__ NA
1 |Cutting Grass, accepted v
2 [Quality of cleaning before backfill, accepted uv
3 [Quality of backfil material, accepted
Remarks
PT. SSP MES
PrintName | KURaiA -H Fer
sealre Qn
- Herctont-
[pate 28 /%6/ lo t/a] >u &Frose
FIELD INSPECTION REPORT
(CENTRAL JAVA 21000 MW
INSPECTION TYPE
keavat
ELEVATION B2 LAYER! |sreet
LC Prick GACKEteL _cAYER, nd) __Joate
Report No =85P-5VY
ap jul ie |
REF. DWG. No.
Feanvares EA
‘Accepiance/ Criteria +
[Reto
ie GROSS HAAR ELEVATION
= — HE ‘Deviation
BACK FORE ACTUAL _|__ DESIGN
|_| 9.900 4395 | toss et
|_| + ope | do}
1 | | 4 2940 | 2 |
= 4 *qyo | 6 |
4 4.2940 | 16
s 4 2740 | “fo | |
6 +
Sere |_ +
joie da ae 3
4 | £
pe ee =
Ey i
au +
[| Z + hAG0
7 iA
a ESAT
[Sketch
= 367587. (6
‘Y= 9236932 7H
xe 37592. 1
Ye D368 be2
Prepared & checked by
PT. SSP
E
nan Oe
Feast, SURV E TOR@. . FIELD INSPECTION REPORT CENTRAL JAVA 2x1000 MW.
‘'ssP
INSPECTION TYPE:
[Report No. = S9SV¥
eevarion 62 Laem L. — |sneet
CiRiok RAckricl AYE 2ad ) Date ‘A uli te
REF. DWG. No:
Recepiance/ Criteria *
Icamerccreo: 62 AREA - ae Zz
CROSS HAAIR: ELEVATION ss
Deviation | REMARKS
BACK FORE
Pear a joer
6 \mo |
| te | | lee
[al “1095 _|
| @ ae an “1030 |
9 1030,
finessed by
PT.MES-JO
luna: Afen tong “04 [rer
Festi: Gr ere
estan: SUPE HORF. . FIELD INSPECTION REPORT CENTRAL JAVA 2x1000 MW
‘ssP
REPECHONPET pcuAL CLeATION De,05 Laven t [fem poy
Crete packer LATER 209) Date oy jai ‘oie
REF. DW/G. No
Iamcawsrecten: DG, DC ARYA Feceptance/Criteria.
(Reto. )
No. {GROSS HAIR ELEVATION
Bs apoes | +2068
jt +4 W300
2 + tae
| 3 + (400 z
a + \3900
_$ + 190
| 36 | + 1300 |
3 + 308
ie +300
3 _+ 1300
is +. 1300 +6
41300 4B eee
x= 367998 904_
Ye omy7109, $29
[Winessed bY Pewowea by
PrT.ME:
Prepared & checked by
PT. SSP.
none SUN ART
leita: SURVEVOR
lane: Leper _!¥/a/ 1b
postion: GLC. Crvf -