Vous êtes sur la page 1sur 3

JEFFERSON M.

FIDEL

POSITION APPLIED: Pipe Fitter / Fabricator

WORK EXPERIENCE
Company
Address
132494
Position
Inclusive Date

:
:

Younchang Engineering Co. LTD


Sabiya,Musaffah Comercial Area, P.O Box

Abu Dhabi U.A.E


Pipe Fitter / Structural Fabricator
:
May 20, 2012 To September 27, 2012

JOB DESCRIPTION

Fabrication of structural steel plat forms for Braka Nuclear Power


Plant. (Hyundai,Samsung C & T, Kepco)
Cutting and Fit-up of stainless steel pipe in fabrication shop.

Company
Address

:
:

Position
Inclusive Date

MJL Industrial Engineering Services


No.15 Peking St.Bf Homes International South,
Las Pias City, Metro Manila, Philippines
Pipe Fitter / Fabricator
:
April 11, 2011 to October 28, 2011

JOB DESCRIPTION

Assigns at fabrication to fabricate of water tank and fabricates suction


and discharge line
Preparation lay-out and install including cutting and grinding.
Fit-up and alignment of pipe and fittings from small bore to big bore pipes.
Site installation of pipes and fitting such as tee 90 deg. elbow, 45 deg.
elbow and other
related piping components.

Company
Address
Position
Inclusive Date
2010

:
:
:

Denholm Yam Steel Factory L.L.C


Abu Dhabi, United Arab Emirates
Pipe Fitter/Fabricator
:
September 17, 2007 to September 15,

JOB DESCRIPTION
ARCHIRODON Construction (overseas) C.O SA/GASCO
Fabrication of structural steel flat forms for Ruwais 3 rd NGL train in Ruwais
plant (GASCO).
Fitting of carbon pipes for fire water line spool for GASCO in RUWAIS Plant
(ALDERLY FZE)
Fabrication of pipe spools at KHURAIS Central Processing Facility (KHURAIS
DE OILING UNIT) for SNAMPROGETTI/ARAMCO.

DEEP PANUKE PROJECT -Fabrication of steel structural living quarter.


Structural Steel Works (Sales) Gas Metering Station /Liquid Ropane
Metering 7 Proving Skid for Tecnimont - Sahara Petrochemical.
BECHTEL Fabrication of piping spools for OGD III Project (GASCO).
Fabrication of columns-OGD III Project (GASCO).
GASCO Installation of additional PSV at 13-C-102Relief system in Bab
Plant.
(GPC) Gulf Piping Company Fabrication of piping spools for C-1335 TDS
200 Rig 01 (SBM).
JRMMEI/ARAMCO Fabrication of slops tank, Aramco 16 deck Project
(D5744).
Fabrication of tanks (NACE) for Saudi Aramco LTA MPOT Project.
Fabrication of pipe spools for ASAB full field development project
(PETROFAC ) (ADCO)
Job No. 10581: Dolphin Energy / Stroytransgas Fabrication & Installation
of
process piping system, structural steel works & equipment installation for
Taweelah to Fujairah Gas Pipeline Project.
Company
Address
Position
Inclusive Date

:
:

MidEast Constructors (MECON)


P.O Box 3325 Doha Qatar
General Fitter/Hole Watch
:
April 14 to May 17, 2004

JOB DESCRIPTION

Attended safety for fire fighting and fire drill at the site.
Dismantle old and damage pipes line and fabricate new pipes.
Repacking of leakage by plugging and re-tubing.
Blinding and de-blinding of lines for repair in high vacuum unit.

Company
Address
Pililla, Rizal
Position
Inclusive Date

:
:

La Vista Machine Shop


Pilipinas Shell Petroleum Corporation Malaya,

Pipe Fitter/Mechanical Fitter


:
November 3, 1999 to April 10, 2004

JOB DESCRIPTION

Fit-up all types of spools according to size, schedule and pipe fitting
materials such as elbow to pipe, elbow to flange and flange to pipe.
Fabricating of structural and pipe support.
Cutting, bending and joining sheet metal for storage tanks and hand
drillings, ladder and platforms.
Pipe fit-up for firewater line 8 diameter and 10 diameter spiral pipe
(cement inside).
Blinding/De binding of all tanks nozzle, open to man ways and full out tank
mixer and suction heater.
Equipment full out and installation from the field to maintenance repair
shop and vice versa.

EDUCATIONAL BACKGROUND
1994 1998
:
Malaya National High School
Malaya, Pililla, Rizal.

1988 1994

PERSONAL DATA
Date of Birth
Place of birth
Civil Status
Citizenship
Religion
Height
Weight
Sex
SSS no.
Tin no.
Passport no.
Drivers License no.

Malaya Elementary School


Malaya, Pililla, Rizal.

October 14, 1981


:
Malaya,
Married
Filipino
Catholic
:
57
:
170 lbs.
Male
:
33-6459585-0
:
213-357-030
EB3751976
D16-03-005025

:
:
:

:
:

CHARACTER REFERENCES
La Vista Machine Shop, Sampalok Rd. Lubigan St. Tanay, Rizal
Theodora G. Gervacio / Owner Manager
Crisanto A. Materiano / General Supervisor
(MECON) MidEast Constructors Doha, State of Qatar
Magdy K. Geirrs / Administration Manager
Denholm Yam Steel Factory L.L.C , ABU DHABI, United Arab Emirates
Ferras Muaqattas / Managing Partner
MJL Industrial Engineering Services , Las pias City, Metro Manila,
Philippines
Mario M. Privado / Piping Supervisor
Younchang Engineering Co.,LTD ABU DHABI United Arab Emirates
Jhong Ho Lee / Administration Manager.

Jefferson M. Fidel
Applicant

Vous aimerez peut-être aussi