TENDER NO 6261-HPCL/DHT/EPCM/EPCC/26
CIVIL & STRUCTURAL WORKS FOR SS-75, DG
SHED,IA/PA SHED, WAREHOUSE, CONTROL ROOM ,
MISC ITEMS & CRWS/OWS PITS DHT PROJECT
TOYO
ENGINEERING
INDIA LIMITED
Page 1 of 2
Description of Equipment
Min.
Required
Nos.
As Required
2
3
As Required
As Required
5
6
7
8
9
10
11
12
13
Welding Generator
Gas Cutting Set
Electrical electrode baking
Oven
Potable Oven
Grinding M/c -AG7
Grinding M/c -GQ4
De watering Pump
Air Compressor
Diesel Generator
Pressure gauges
Safety valves
Hydrotest Pumps Manual
14
As Required
15
As Required
16
As Required
17
Trailers hydraulic
As Required
18
As Required
19
Dial Indicators
As Required
20
Torque Tensioners/Wrenches
As Required
21
Water tanker
As Required
22
Hydra 10MT/12MT/8MT
As Required
23
Pipe trailer
Chain pulley blocks1/2/3/5/10tons
Slings/Ropes/Sleepers
Total Station
Pickup/Jeep
Shuttering Materials
Pneumatic tighting wrenches
As Required
As Required
As Required
24
25
26
27
28
29
30
31
32
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
Capacity
& Make
Source
Location
Date of
Availability
ISSUED :
14/12/2010
TENDER NO 6261-HPCL/DHT/EPCM/EPCC/26
CIVIL & STRUCTURAL WORKS FOR SS-75, DG
SHED,IA/PA SHED, WAREHOUSE, CONTROL ROOM ,
MISC ITEMS & CRWS/OWS PITS DHT PROJECT
Sr
No
Description of
Equipment
33
34
35
36
Rolling Machine
Grooving machine
Vice
Flat cutting Machine
Potable electric
drills
Stand drills
Riveting Machine
Small tools for
insulations
Dispensing Machine
Piling Machineries
Dumpy Level
JCB
Poclain
Dumper
Earth Compactor
Tower Crane
Boom Placers
Concrete Pumps
Vibro Rollers
Batching Plant
Transit Mixer
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Min.
Required
Nos.
As Required
As Required
As Required
As Required
Capacity
& Make
Source
Location
TOYO
ENGINEERING
INDIA LIMITED
Page 2 of 2
Date of
Availability
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
NOTES :
1) The details of minimum tools, tackles & equipments in good working condition, required to be
mobilized at peak by contractor to complete the work within schedule is given above. The
contractor is required to augment the above list with additional numbers/categories/types of
equipments, tools & tackles as required &/or directed by Engineer-in-charge to complete the
work within the completion time schedule & quoted price.
2) The Contractor to confirm that these equipments available with them for exclusive deployment
on this project site. Alternatively, the contractor may hire the equipments from agency owning
such equipments.
3) Owner/Engineer-in-charge reserves the right to physically check & verify the availability of
these equipments prior to award of work.
4) The contractor shall replace any defective/damaged equipment promptly to complete the work
without any time & cost implication to the Owner/Engineer-in-charge.