Académique Documents
Professionnel Documents
Culture Documents
Unit
Qty
Rate
Item
Lft
360.00
Item
Sqft
23
185.00
Sqft
46
70.00
46
52.00
2.3) painting
Sqft
Rate for Item
2 Construction of 4 1/2" thick brick wall, supply and fix Al framed glazed door near lift under staircase at gro
Data for Item
Excavation for foundation
Rubble foundation
41/2" thick brick wall
Stiffner column 6" x 4 1/2"
Plastering
Painting
Al door 3' 0" x 7' 0"
ft3
10
ft3
13
ft2
18
Lft
4.25
ft2
36
ft2
36
nr
1
Rate for Item
30.00
230.00
223.00
397.00
70.00
52.00
27,300.00
3 Additional Cost for Supply and lay interlock paving tiles at vehical poach. (Area 53' 0" x 20' 0" = 1060ft2)
4" thick G20 concrete with 6mm dia ms reinforcement
No
1
Item Description
Interlock paving block - Data for 1 Sqr
Material Cost
Interlock paving block
Quarry dust
Add: Wastage 5%
Labour Cost for laying
.
Unit
Qty
Rate
nrs
Cube
375.00
0.17
55.00
8,000.00
Sqr
1
Total for 1 Sqr
Total for 25% OH & Profit
Rate for 1 Sqr
Amount for 10.60 Sqr
Sqr
Cube
Kg
Total
10.60
3.50
200.00
4,500.00
1,200.00
56,000.00
165.00
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditor
for University of Colombo.
Cost Breakdowns for Extra and Additional works
Cost Variation of Item
4 Construction of additional r/f concrete link slab between new builing and existing building with floor tiling,
plastering & painting.
No
1
1.1
1.2
1.3
1.4
Item Description
Data for link slab size - 6' 8" x 3' 3" = 21.68 Sqft
Slab concreting
Supplying & laying G25 concrete
Form work
Reinforcement
Chemical anchoring 10mm dia rebars with Hilti RE
2
2.1
2.2
2.2
Finishes
Soffit plastering
Soffit painting
Floor tiing
Unit
Qty
Rate
Cube
Sqr
Kg
nrs
0.07
0.22
20
20
57,800.00
19,600.00
165.00
450.00
Sqr
Sqr
Sqr
0.22
0.22
0.22
8,687.00
5,200.00
47,193.00
6 Demolishing 6" thick block wall & 9" thick brick work at service panel room and reconstructing according t
revised sizes at 3rd floor.
Data for Item
No
Item Description
Unit
Qty
1 Demolishing block & brick work carting away debris - Data per Item
1.1 Unskilled labour
days
2
Removing debris away from site
Unskilled labour
days
4
Tansporteing & dumping charges
Total for Item
Total for 25% OH & Profit
2 Reconstructing wall service duct
Stiffner column 6" x 4 1/2"
Lft
11.17
41/2" thick brick wall
ft2
44.68
Plastering
ft2
90.36
Painting
ft2
90.36
Rate for Item
9 Additional cost for window type W10a at stairway due to change of size.
Origingal size - 19' 0" x 3' 0" = 57.00 ft2
Revised size / area = 88.64 ft2
Increaed area = 31.64 ft2
Rate
1,300.00
1,300.00
397.00
223.00
70.00
52.00
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditor
for University of Colombo.
Cost Breakdowns for Extra and Additional works
10 Additional cost for Changing Al fixed glass panel to Al louver panel on top of windows to avoid heat trap.
Type of window
1st Floor
W5
W6
W7
nrs
louver size
Total Area(Sqft)
2
4
2
48.00
84.18
71.37
203.55
2nd floor
W5
W6
W7
2
4
2
48.00
84.18
71.37
203.55
3rd floor
W5'
W6'
W6''
W7'
2
2
2
2
6"
1/2"
6"
4"
48.00
64.17
34.50
129.87
276.54
1,500.00
140.00
1,360.00
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditor
for University of Colombo.
Cost Breakdowns for Extra and Additional works
12 Additional cost for increased sliding window sashes according to the architectural view as on the third flo
window sashes change into casement.
Data for 1 sash
No
Item Description
1 AL bar for additional sash
2601
2701
rubber beading
Wastage for glasses
2 Labour cost
3 Allow tools and others
Unit
Qty
Rate
4
4
8
Lft
Lft
Lft
635.00
579.50
10.00
Sqft
13
30.00
17 Changing of control room location for centrel control system at 5th floor.
Data for Item
No
Item Description
1 Construction of revised control room
6" thick block work
floor concrete
Concrete
F/W
R/F
Semirough plastering
Painting
Glazed partition
2
Unit
Qty
Sqr
2.21
19,248.00
Cube
Sqr
Kg
Sqr
Sqr
Sqr
0.18
0.56
42.5
4.42
4.42
0.76
57,800.00
15,000.00
165.00
7,600.00
5,628.00
75,000.00
2.42
19,248.00
0.43
1.3
85
4.84
4.84
57,800.00
15,000.00
165.00
7,600.00
5,628.00
Rate
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditor
for University of Colombo.
Cost Breakdowns for Extra and Additional works
COST SAVINGS
2 Cost saving due to omitted Partition wall at grid B/2 - 4 at 3rd floor
6" thick block work
Sqr
Internal plastering
Sqr
Internal painting
Sqr
Al Door type D1 size 4' 0" x 7' 0"
nr
0.71
0.9103
1.00
3.50
7.00
7.00
1.00
90,000.00
90,000.00
25,200.00
18,500.00
7,000.00
5,200.00
33,600.00
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditor
for University of Colombo.
Cost Breakdowns for Extra and Additional works
3 Cost saving due to omitted 4 windows, type W4 size 9' 0" x 5' 6" at Auditorium.
Fixing of Window type W4
Less: Brick walling
9" thick brick wall
Internal & external plastering
Internal & external painting
Sqr
1.98
120,000.00
Sqr
Sqr
Sqr
1.98
3.96
3.96
33,100.00
7,600.00
5,628.00
0.80
2.50
150.00
0.30
57,800.00
15,000.00
165.00
33,100.00
Cube
Sqr
Kg
Sqr
Sqr
7.72
90,000.00
7.72
30,000.00
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditor
for University of Colombo.
Cost Breakdowns for Extra and Additional works
Saving Amount
tipurpose Auditorium
Amount
4,000.00
1,800.00
2,500.00
4,255.00
3,220.00
2,392.00
18,167.00
18,167.00
300.00
2,990.00
4,014.00
1,687.25
2,520.00
1,872.00
27,300.00
40,683.25
Amount
20,625.00
1,360.00
1,099.25
4,500.00
27,584.25
34,480.31
34,480.31
365,491.31
12,720.00
196,000.00
33,000.00
241,720.00
(241,720.00)
tipurpose Auditorium
123,771.31
123,771.31
Amount
4,046.00
4,312.00
3,300.00
9,000.00
Area
1,911.14
1,144.00
10,382.46
34,095.60
Area
74.11
less tiling
52x472/flr rendering 52x90/-
1,572.68
1,573.00
ucting according to
Amount
2,600.00
5,200.00
2,000.00
9,800.00
12,250.00
4,434.49
9,963.64
6,325.20
4,698.72
21.68
12,250.00
25,422.05
37,672.05
37,672.05
tipurpose Auditorium
tal Area(Sqft)
per Sqft
per Sqft
tipurpose Auditorium
Amount
635.00
579.50
10.00
150.00
390.00
50.00
1,814.50
2,268.13
2,270.00
2,270.00
4,540.00
Amount
42,538.08
10,404.00
8,400.00
7,012.50
33,592.00
24,875.76
57,000.00
(46,580.16)
(24,854.00)
(19,500.00)
(14,025.00)
(36,784.00)
(27,239.52)
14,839.66
tipurpose Auditorium
63,787.50
81,927.00
25,200.00
170,914.50
170,914.50
64,750.00
49,000.00
36,400.00
33,600.00
183,750.00
183,750.00
tipurpose Auditorium
237,600.00
(65,538.00)
(30,096.00)
(22,286.88)
119,679.12
46,240.00
37,500.00
24,750.00
9,930.00
118,420.00
694,800.00
231,600.00
119,679.12
118,420.00
592,763.62
tipurpose Auditorium
463,200.00
116,550.96
(24,544.00)
4,680.00
96,686.96
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditorium
for University of Colombo.
Extra & Additional Works
Item No.
1)
2)
3)
4)
4.1)
4.2)
4.3)
4.4)
Description
Unit
Qty
Rate (Rs.)
Amount (Rs.)
Item
18,167.00
Item
40,683.25
Item
123,771.31
Sqft
Sqft
Sqft
Sqft
21.68
21.68
74.00
74.00
1,573.00
1,604.46
1,636.55
1,669.28
34,102.64
34,784.69
121,104.64
123,526.73
Supply and fix Stainless steel hand rail comprising with 2"
dia & 1" dia S/s pipes at lobby and lecture hall at first floor.
Lft
37.41
2,000.00
74,820.00
Item
5)
6)
37,672.05
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditorium
for University of Colombo.
Extra & Additional Works
Item No.
7)
7.1)
7.2)
7.3)
7.4)
7.5)
7.6)
Description
Unit
Qty
Sqft
Sqft
Sqft
Sqft
Sqft
Sqft
20.17
20.17
20.17
20.17
20.17
20.17
Sqft
nrs
Lft
260.00
5.00
80.00
Sqft
Sqft
Sqft
Sqft
Sqft
Sqft
Supply and fix 1' 0" wide granite strip (Verde Lonkn 2'0"x 1'0") at lift door openings.
ground floor
first floor
Second floor
Third floor
Fourth floor
Fifth floor
Rate (Rs.)
Amount (Rs.)
4,000.00
4,080.00
4,161.60
4,244.83
4,329.73
4,416.32
80,680.00
82,293.60
83,939.47
85,618.26
87,330.63
89,077.24
275.00
12,000.00
375.00
71,500.00
60,000.00
30,000.00
31.64
31.64
31.64
1,200.00
1,200.00
1,200.00
37,968.00
37,968.00
37,968.00
203.55
203.55
276.54
1,360.00
1,360.00
1,360.00
276,828.00
276,828.00
376,094.40
8)
Construction of Zn/Al coated color bonded profiled
sheet roof covering on linked area between two buildings.
8.1)
8.2)
8.3)
9)
9.1)
9.2)
9.3)
10)
10.1)
10.2)
10.3)
C/F
2,322,725.92
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditorium
for University of Colombo.
Extra & Additional Works
Item No.
Description
Unit
Qty
Rate (Rs.)
B/F
11)
11.1)
11.2)
11.3)
12)
Amount (Rs.)
2,322,725.92
Sqft
Sqft
Sqft
128.00
184.00
156.00
130.00
130.00
130.00
16,640.00
23,920.00
20,280.00
12.1)
nr
4.00
2,270.00
9,080.00
12.2)
nr
8.00
2,270.00
18,160.00
12.3)
nr
4.00
4,540.00
18,160.00
13)
14)
Item
nr
15)
16)
Supply and fix suspended mineral fiber ceiling of 2' 0" x 2'
0" penels with aluminium grid at 4th floor lobby.
Changing of control room location for centrel control system
at 5th floor.
17)
1,500,000.00
83
4,000.00
Item
Sqr
332,000.00
30,000.00
7.55
35,000.00
264,250.00
Item
4,555,215.92
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditorium
for University of Colombo.
Extra & Additional Works
Item No.
Description
Unit
Qty
Rate (Rs.)
B/F
18)
19)
Amount (Rs.)
4,555,215.92
Sqr
6.40
22,000.00
Item
1.00
75,000.00
20)
Item
1.00
100,000.00
100,000.00
21)
nr
6.00
32,800.00
196,800.00
22)
Sqr
3.50
15,000.00
52,500.00
140,800.00
free
5,045,315.92
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditorium
for University of Colombo.
Extra & Additional Works
Item No.
Description
Unit
Qty
Rate (Rs.)
Amount (Rs.)
Unit
Qty
Rate (Rs.)
Amount (Rs.)
3)
4)
5)
Item
2,245,925.00
Sqr
Sqr
nr
0.71
0.91
1.00
90,000.00
90,000.00
25,200.00
63,787.50
81,927.00
25,200.00
Sqr
Sqr
Sqr
nr
3.50
7.00
7.00
1.00
18,500.00
7,000.00
5,200.00
33,600.00
64,750.00
49,000.00
36,400.00
33,600.00
Sqr
1.98
120,000.00
237,600.00
Sqr
Sqr
Sqr
1.98
3.96
3.96
33,100.00
7,600.00
5,628.00
(65,538.00)
(30,096.00)
(22,286.88)
0.80
2.50
150.00
0.30
57,800.00
15,000.00
165.00
33,100.00
46,240.00
37,500.00
24,750.00
9,930.00
Cube
Sqr
Kg
Sqr
Design and Construction of "Proposed new building for Lecture halls, Reading rooms and Multipurpose Auditorium
for University of Colombo.
Extra & Additional Works
Item No.
Description
Unit
Qty
Rate (Rs.)
Amount (Rs.)
Total of Savings
Net Value of Extra & Additional works Excluding VAT 11%
2,838,688.62
=
4,971,725.92 - 2,838,688.62
Rs2,206,627.30
Justification
Justification
Justification
Justification
32,800.00
Justification
Justification
5,045,315.92
2,838,688.62
2,206,627.30