PRODUCTIVITY RATES

NO

Activity
Description

Manpower

Equipment

Unit

Output

Day
Day
Day
M2/Day

1
50
70

Hand Tools
Hand Tools
Shovel
Shovel
JCB
J.C.B

M3/Day
M3/Day
M3/Hr
M3/Hr
M3/Hr
M3/Hr

3
1
40
25
20
10

Shovel
Roller Compr
Shovel
Roller Compr.

M3/Hr
M2/Day
M3/Hr
M2/Day

30
100
100
200

Roller compr.

M2/Day
M2/Day
M2/Day
M2/Day

200
200
60
150

1H
1M+2H
1M+1H
1M+1H

R.M/Day
R.M/Day
R.M/Day
R.M/Hr

10
35
15
20

1M+2H
1M+2H
2M+4H
2M+4H
3M+8H
1M+6H
2M+6H
3M+5H
3M+5H
3M+5H

M2/Day
M2/Day
M2/Day
M3/Day
M3/Day
M3/Day
M3/Day
M3/Day
M3/Day
M3/Day

30
40
250
40
120
20
50
30
45
60

MANPOWER
01-GENERAL REQUIREMENT
TEMPORARY FACILITIES
a
b
c
d

Watchman & Curing


Site Cleaning
Fencing
Fixing of Light Weight Scaffolding

(Duration x 2H)
(dhs.contract value
1C+2H+1P
1C+1H

02-EARTH WORK
EXCAVATION
a
b
c
d
e
f

Soft Soil(Hand Tools)


Hard Soil(Hand Tools)
Soft Soil
Hard Soil
Soft Soil
Hard Soil

1H
1H

BACKFILLING
a
b
c
d

Filling in foundation,plinth
Level,Compaction
Spreading 200 mm layer(Subkha,Road base)
Compaction 200 mm layer(Subkha,Road Base)

1H
1H

PAVING & SURFACING


a
b
c
d

Compaction/Levelling
Spreading Sand and Brushing
Laying Tiles
Filling,Compaction

2H
2H
1M+2H
1H

Plate Compr.

PRECAST KERB STONE


a
b
c
d

Excavation&Blinding for Curbstone


Laying Kerbs
Kerb stone on curved lines
Hunching

03-CONCRETE
CONCRETE CASTING
a
c
d
e
f
g
h
i
j
k

Cast.Blinding 5 cm
Cast.Blinding 10 cm
Cast.Blinding 5 cm,10 cm
Cast.of Footing
Cast of Footing (Pump)
Cast of Strap/Tie Beam
Cast of Tie Beam (Pump)
Cast of Ground Floor Slab 10 cm
Cast of Ground Floor Slab ,15 cm
Cast of Ground Floor Slab 20 cmn

Pump
Pump
Pump

NO
m
n
o
p
q
r
s
t
u
v

Activity
Description
Cast of Column
Cast of Beam of Slab
Cast of Roof Slab
Cast of Lintel
Cast of Copying Beam 20x20 cm (upto 2.5m)
Cast of Copying beam 20x20 cm(above 2.5m)
Cast of Parapet
Cast of Arch Lintel
Casting of Neck Column
Casting of Staircase

Manpower

Unit

Output

M3/Day
M3/Day
M2/Day
Nos/Hour
RM/Day
RM/Day
M3/Day
M3/Day
M3/Day
M3/Day

4
12
50
4
150
60
10
5
4
12

1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
1C+1H
20 % of shuttering w

M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
L.M/Day
M2/Day
M2/Day

35
15
20
5
12
20
14
10
10
12
10
6
6
12
6
70
8
12

1SF+2H

M2/Day

1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H
1SF+1H

KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day
KG/Day

1M+4H
1M+4H
2M+2C+5H
1M+2H
1C+5H
1C+5H
1M+1C+4H
1M+3H
1M+3H
1C+1H

Equipment

Pump

Pump

CONCRETE FORMWORK
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q
r
s

Shuttering of Blinding
Shuttering of Footing ( Plywood)
Shuttering of Footing(Plates)
Shuttering of Stub Column
Shuttering of Strap/Tie Beam(Plywood)
Shuttering of Strap/Tie Beam(Plates)
Shuttering of Wall
Shuttering of Column 20x20
Shuttering of Column 20x40
Shuttering of Beam with support
Shuttering of Roof Slab
Shuttering of Lintel
Shuttering of Copying beamn 20x20cm
Shuttering of Parapet
Shuttering of Arch Lintel
Expansion Joints/Ground Slab
Shuttering of beam&Column for 8 m to 12 m height
Shuttering of Staircase
Deshuttering works

MESH REINFORCEMENT
a

Mesh Reinforcement

CONCRETE REINFORCEMENT
a
b
c
d
e
f
g
h
i
j
k
l
m

Reinforcement of Fooring
Reinf.of Stub column
Reinf.of Strap Beam
Reinf.of Tie Beam
Reinf.of Wall
Reinf.of Column
Reinf.of Beam
Reinf.of Solid Slab
Reinf.of Lintel
Reinf.Coping Beam 20 cmx20 cm
Reinf.of parapet
Reinf.of Arch lintel
Reinf.of Staircase

400
250
300
350
400
300
300
300
150
200
300
150
250

NO

Activity
Description

Manpower

Equipment

Unit

Output

1M+1H
1M+2H
1M+1H
1M+1H
1M+2H
1M+2H
1M+1H

Nos./Day
Nos./Day
Nos./Day
Nos./Day
Nos./Day
Nos./Day
Nos./Day

150
140
150
180
140
100
120

1M+2H

Nos./Day

140

1M+1H
1M+1H

M2/Day
M2/Day

10
8

1P+1H
1P+1H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
3E+3H
1E+3H
1E+3H
1E+3H
1E+3H
1E+3H

M2/Day/Coat
M2/Day/Coat
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
Rm/Day
No
No
No/Day

50
40
250
175
350
150
250
100
250
150
80
1
8
6
70

1C+1H
1C+1H
1H

M2/Day
M2/Day
Rm/Day

200
1000
200

1H
2H

M2/Day/coat
M2/Day/coat

100
60

1C+1H

M2/Day

30

1C+1H
1H

Rm/Hr
Rm/Hr

18
7

MASONRY
HOLLOW BLOCK
a
b
c
d
e
f
g

200 mm hollow block upto 2.5 mm height


100 mm Hollow Block -2.5m to 6 m Height
150 mm Hollow Block -upto 2.5 m height
200 mm Hollow Block -upto 2.5m Height
200 mm Hollow Block-2.5 to 6 m Height
200 mm Block Work above 6m Height
200 mm block work including pointing

SOLID BLOCK
a

200 mm Solid Block upto 2.5 m Height

CLAUSTRA BLOCK
a
b

Claustra Block 200x200


Claustra Block 150x150

05 METALS
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o

Painting of Steel Structure Column


Painting of Steel Structure Rafter
Erection of Steel Structure main frame(Eave Heig
Erection of steel structrue main frame
Fixing of Single skin sheet(Roof)
Fixing of Single Skin Sheet(Walls)
Single skin with Fibre Glass Insulation(Roof)
Single Skin with Fibre Glass Insulation(wall)
Sandwitch Panels(roof)
Sandwitch Panels(Wall)
Single Skin with Fibre Glass Insulation(Roof)
Single Skin with Fibre Glass Insulation(Roof)
Single Skin with Fibre Glass Insulation(Roof)
Single Skin with Fibre Glass Insulation(Roof)
Gutter/Down Sprout

07 MOISTURE THERMAL CONTROL


POLYTHENE SHEETS
a
b
c

Polythene under footings


Polythene under slab
Polythene under tie beam

BITUMIN PAINT
a
b

Cold Bituminous Painting


Hot Bituminous Painting

BITUMINOUS MEMBRANE
a

Bituminous Membrane+Protection Board

SEALERS
a
b

Flexel Board
Sealant

NO

Activity
Description

Manpower

Equipment

Unit

Output

1M+1H
1M+1H
1M+2H
1M+2H
1C+1H
1M+1H

M2/Day
M2/Day
M2/Day
M2/Day
Rm/Day
Rm

10
20
17
15
90
30

1M+1H
1M+2H
1M+2H

M2/Day
M2/Day
M2/Day

20
18
15

1M+1H
1M+1H
1M+1H
1Pol+1H

M2/Day
R.M/Day
R.M/Day
M2/Day

15
40
14
100

1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H
1M+1H

M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
M2/Day
R.M/Day

10
30
8
12
15
20
40
30

1M+1H
1M+1H

M2/Day
Lm/Day

35
40

1M+1H
1M+1H
1M+1H
1M+1H

M2/Day
M2/Day
R.M/Day
R.M/Day

6
15
30
10

1C+1H

R.M/Day

100

1M+1H
1M+1H

M2/Day
R.M/Day

50
25

1M

R.M/Day

10

1C+1H

M2/Day

25

09 FINISHES
INTERNAL PLASTER
a
b
c
d
e
f

Ceiling Plaster
Wall plaster upto 3 m Height
Wall plaster 3m to 6m Height
Wall plaster above 6m Height
Fixing of Plaster Mesh
Fixing of Corner Beed

EXTERNAL PLASTER
a
b
c

Wall plaster upto 3 m height


Wall plaster 3m to 6m Height
Wall plaster above 6m Height

TILES
MOSAIC
a
b
c
d

Floor Mosaic Tiles


Mosaic Skirting
Mosaic Steps(Riser&Tread)
Mosaic Polishing

CERAMIC
a
b
c
d
e
f
g
h

Fixing of Ceramic Wall Tiles(Glue type)


Grouting of Ceramic Wall Tiles
Fixing of Ceramic Wall Tiles(Cement Mortar Type)
Fixing of Ceramic Floor Tiles 20x20 cm
Fixing of Ceramic Floor Tiles 30x30 cm
Fixing of Ceramic Floor Tiles 50x50 cm
Grouting Ceramic Floor Tiles
Ceramic Skirting

PVC FLOOR
a
b

PVC Tiles
PVC Skirting

MARBLE
a
b
c
d

Marble Wall
Marble Floor
Marble Skirting
Marble Steps(Tread&Riser)

WOODEN SKIRTING
Timber

FLOOR SCREED(50 MM)


Floor Screed(50 mm)
Cement Skirting

THRESHOLD
Threshold

FALSE CEILING
False Ceiling-Suspended Type

NO

Activity
Description

Manpower

Equipment

Unit

Output

1C+1H

M2/Day

20

1M+1H
1M+1H

M2/Day/Coat
M2/Day/Coat

100
100

1P
1P
1P
1P

M2/Day/Coat
M2/Day/Coat
M2/Day/Coat
M2/Day/Coat

200
80
100
60

1P+1H

M2/Day/Coat

50

1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H

R.M/Day
R.M/Day
R.M/Day
R.M/Day

12
20
75
60

1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum+1H
1Plum
1M+1H

Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day
Nos/Day

2
2
3
2
2
2
2
1
2

1Plum+1H

Nos/Day

1Electrician+1H
1Electrician+1H

R.M/Day
R.M/Day

50
50

Laying Cables

1Electrician+2H

R.M/Day

150

Wiring

1Electrician+1H

R.M/Day

300

1Electrician+1H
1Electrician+1H

Nos/Day
Nos/Day

2
1

DRY WALL PARTITION


Dry Wall Partition

PAINTING AND WALL COVERING


TYROLENE(CULLAMIX)
a
b

Tyrolene over plastered surface


Tyrolene over block wall

NORMAL PAINT(EMULSION/OIL)
a
b
c
d

Primer
Stucco(Putty)
Emulsion Paint
Oil Paint

EPOXY PAINTING
a

Epoxy Painting

MECHANICAL
PIPE&FITTINGS
a
b
c
d

1/2 to 1 inch copper pipe


1/2 to 11/2 inch PVC pipe
2 inch to 3 inch PVC pipe
4 inch to 6 inch PVC pipe

PLUMBING FIXTURES
a
b
c
d
e
f
g
h
i

Showel Tray
Kitchen Sink
Urinals+Partition
Wash Basin
W/C Asian
W/C Western
Bidet
Booster Pump
Manhole 60 cm to 90 cm

PLUMBING APPLIANCES
a

Water Heater

ELECTRICAL
RACE WAYS
a
b

Conduits
Trunking

CONDUITS&GROUNDING
a

WIRING
a

BOARDS
a
b

D.Bs
M.D.B.s