LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

22 Aug 2016

DATE:

KSA

GROUP:

PROBLEM:

EXCESSIVE TIME TO N/U DIVERTER

RESOLUTION:

HAVE TO BE FASTER

COMMENTS

NONE

KSA

GROUP:

PROBLEM:

EXCESSIVE TIME TO P/U 22' BHA

RESOLUTION:

NOT SURE WHAT TO WRITE.

COMMENTS

NONE

GROUP:

26 Sep 2016

TUBULARS

ENTERED BY:

JAMES GENTRY

ENTERED BY:

JAMES GENTRY

ENTERED BY:

JUDE CRAWFORD

PROBLEM:

EXCESS TIME P/U BHA

RESOLUTION:

BETTER PRE PLANNING OF BHA ASSEMBLY

COMMENTS

ALSO ONE HOUR IN TIGHTENING TOP DRIVE TRACK BOLTS

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 1 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

22 Aug 2016

DATE:

GROUP:

PROBLEM:

EXCESS TIME TO P/U 22' BHA

RESOLUTION:

GOOD PLANNING

COMMENTS

AS PER ARAMCO COMPANY MAN

HERMAN METCALF

ENTERED BY:

JAMES GENTRY

25 Aug 2016

DATE:

KSA

GROUP:

PROBLEM:

ENCODER FOR RIG WATCH DEPTH NOT WORKING PROPERLY

RESOLUTION:

TRY TO CALIBRATE WITH HELP FROM IT ON PHONE. NO SUCCESS

COMMENTS

HAVE EPOCH PERSON COME TO RIG TO CALIBRATE.

KSA

GROUP:

PROBLEM:

DEPTH NOT TRACING PROPERLY

RESOLUTION:

CALIBRATE W/EPOCH TECH.

COMMENTS

NONE

DATE:

26 Sep 2016

ENTERED BY:

ENTERED BY:

JAMES GENTRY

26 Aug 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 2 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

26 Aug 2016

DATE:

KSA

GROUP:

PROBLEM:

BLOCK POSITON NOT TRACKING

RESOLUTION:

CALIBRATE WITH EPOCH AND IT HELP FROM HOUSTON.

COMMENTS

NONE

KSA

GROUP:

PROBLEM:

STAND PIPE SEAL BLEW.

RESOLUTION:

POOH WHILE REPLACING SEAL

COMMENTS

NONE

ENTERED BY:

JAMES.GENTRY

ENTERED BY:

TOOLPUSHER

27 Aug 2016

DATE:

982

GROUP:

PROBLEM:

PIPE BECAME HUNG UP DURING CONNECTION, WORK PIPE FREE

RESOLUTION:

PLAN AHEAD TO PREVENT REOCCURENCE

COMMENTS

GOOD PLANNING

DATE:

26 Sep 2016

JAMES GENTRY

ENTERED BY:

03 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 3 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

03 Sep 2016

DATE:

982

GROUP:

TOOL PUSHER

PROBLEM:

PROBLEMS WITH COFLEX HOSES AND FOUND LEAKS ON KOOMY LINES

RESOLUTION:

FIX LEAKS

COMMENTS

N/A

04 Sep 2016

DATE:

982

GROUP:

ENTERED BY:

TOOL PUSHER

PROBLEM:

PROBLEMS WITH COFLEX HOSES AND FOUND LEAKS ON KOOMY LINES

RESOLUTION:

FIX LEAKS

COMMENTS

N/A

982

GROUP:

ENTERED BY:

TOOL PUSHER

PROBLEM:

MULTIPLE LEAKS ON DRAWORKS - KOOMY BOP HOISTING SISTEM AND DAMAGE KOOMY LINES CO
MAN SHUT DOWN TO FIX ALL LEAKS ON GOING

RESOLUTION:

FIX LEAKS AND PROBLEMS

COMMENTS

N/A

DATE:

26 Sep 2016

ENTERED BY:

05 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 4 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

05 Sep 2016

DATE:

GROUP:

ENTERED BY:

PROBLEM:

RIG WAS SHORT 4X FLOORHANDS FOR CREW CHANGE

RESOLUTION:

NEED HANDS AND PLAN AHEAD

COMMENTS

NEED HANDS AND PLAN AHEAD

GROUP:

DAY TOUR

ENTERED BY:

MARIO SALINAS

MARIO SALINAS

PROBLEM:

EXCESS TIME TO TEST BOP TO P/U DP FIRST BUT DV IS TOO CLOSE TO SURFACE

RESOLUTION:

GOOD PLANNING

COMMENTS

GOOD PLANNING

GROUP:

26 Sep 2016

NIGHT TOUR

DAY TOUR

ENTERED BY:

TOOLPUSHER

PROBLEM:

EXCESS TIME OF P/UP BHA TO RIH. DV TOOL IS TOO CLOSE TO SURFACE

RESOLUTION:

GOOD PLANNING BEFORE JOB

COMMENTS

GOOD PLANNING BEFORE JOB

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 5 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

05 Sep 2016

DATE:

982

GROUP:

TOOL PUSHER

PROBLEM:

AIR/HYDRAULIC PUMP FOR GRABBER STOPPED WORKING DRABBER DID NOT OPEN AND CLOSE

RESOLUTION:

MECHANIC TROUBLE SHOOTING TDS AND MEITENANCE SUP. WAS CALLED TO HELP OUT

COMMENTS

ON GOING

06 Sep 2016

DATE:

GROUP:

NIGHT TOUR

ENTERED BY:

MARIO SALINAS

PROBLEM:

UNABLE TO FUNCTION TDS GRABBER FOR MAKING CONNECTIONS, UNABLE TO DRILL

RESOLUTION:

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

COMMENTS

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

GROUP:

26 Sep 2016

ENTERED BY:

NIGHT TOUR

ENTERED BY:

MARIO SALINAS

PROBLEM:

UNABLE TO FUNCTION TDS GRABBER FOR MAKING CONNECTIONS UNABLE TO DRILL

RESOLUTION:

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

COMMENTS

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 6 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

06 Sep 2016

DATE:

NIGHT TOUR

GROUP:

MARIO SALINAS

PROBLEM:

UNABLE TO FUNCTION TDS GRABBER FOR MAKING CONNECTIONS UNABLE TO DRILL

RESOLUTION:

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

COMMENTS

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

NIGHT TOUR

GROUP:

ENTERED BY:

TOOL PUSHER

PROBLEM:

UNABLE TO FUNCTION TDS GRABBER FOR MAKING CONECTIONS, UNABLE TO DRILL

RESOLUTION:

EMS TECHNICIANS ON LOCATION FOR TROUBLE SHOOTING

COMMENTS

EMS TECHNICIANS ON LOCATION FOR TROUBLE SHOOTING

982

GROUP:

26 Sep 2016

ENTERED BY:

ENTERED BY:

PROBLEM:

EMS MECHASNICS TROUBLE SHOOTING TDS

RESOLUTION:

ON GOING

COMMENTS

N/A

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

TOOL PUSHER

LL_odbc.rpt v.2009.12.10.001

Page 7 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

06 Sep 2016

DATE:

982

GROUP:

PROBLEM:

TROBBLE SHOOTING TDS GRABBER

RESOLUTION:

EMS MECHANICS WERE CALLED

COMMENTS

N/A

NIGHT TOUR

GROUP:

TOOL PUSHER

ENTERED BY:

MARIO SALINAS

PROBLEM:

UNABLE TO FUNCTION TDS GRABBER FOR MAKING CONNECTIONS UNABLE TO DRILL

RESOLUTION:

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

COMMENTS

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

982

GROUP:

26 Sep 2016

ENTERED BY:

ENTERED BY:

TOOL PUSHER

PROBLEM:

AIR/HYDRAULIC PUMP FOR GRABBER STOPPED WORKING DRABBER DID NOT OPEN AND CLOSE

RESOLUTION:

MECHANIC CHANGE OUT PUMP AND CALL MAINTANENCE SUP. FOR HELP

COMMENTS

N/A

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 8 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

06 Sep 2016

DATE:

NIGHT TOUR

GROUP:

MARIO SALINAS

PROBLEM:

UNABLE TO FUNCTION TDS GRABBER FOR MAKING CONNECTIONSUNABLE TO DRILL

RESOLUTION:

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

COMMENTS

EMS TECHNICIAN TO TROUBLESHOOT TDS GRABBER

07 Sep 2016

DATE:

982

GROUP:

ENTERED BY:

PROBLEM:

CLEANING IN SIDE MUD TANKS TO MUCH SOLIDS

RESOLUTION:

CLEAN TANKS

COMMENTS

N/A

982

GROUP:

26 Sep 2016

ENTERED BY:

ENTERED BY:

PROBLEM:

CLEANING MUD TANKS TO MUCH SOLIDS

RESOLUTION:

CLEAN TANKS

COMMENTS

N/A

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

TOOL PUSHER

TOOL PUSHER

LL_odbc.rpt v.2009.12.10.001

Page 9 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

07 Sep 2016

DATE:

982

GROUP:

PROBLEM:

TROUBLE SHOOTING TDS GRABBER

RESOLUTION:

EMS WORKING ON PROBLEM

COMMENTS

N/A

TOOL PUSHER

ENTERED BY:

CHRIS BISHOP

08 Sep 2016

DATE:

GROUP:

NORTHERN DIVISION

PROBLEM:

P.O.O.H TO CHECK TALLY

RESOLUTION:

EVERYTHING WAS OK WITH TALLY. WAS TOLD THE TRIP WAS FOR MWD AND HE PUT TH DT AGAINST
THE RIG

COMMENTS

THIS CO. MAN HAD BEEN SHUTTING DOWN THE RIG FOR PETTY THINGS

GROUP:

26 Sep 2016

ENTERED BY:

DAY TOUR

MARIO SALINAS

ENTERED BY:

PROBLEM:

RIG MUD PITS & PUMP SUCTION LINES FULL OF BARITE F/ RIG MOVE

RESOLUTION:

GOOD PLANNING

COMMENTS

GOOD PLANNING

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 10 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

08 Sep 2016

DATE:

GROUP:

ENTERED BY:

PROBLEM:

REVERT BACK TO ALL D.T. FOR THE DAY

RESOLUTION:

REVERT BACK TO ALL D.T. FOR THE DAY

COMMENTS

REVERT BACK TO ALL D.T. FOR THE DAY

GROUP:

NORTHERN AREA

ENTERED BY:

CHRIS BISHOP

CHRIS BISHOP

PROBLEM:

C/O MAN CLAIMED PIPE TALLY WAS OFF AND WANTED TO TRIP TO CHECK.

RESOLUTION:

STRAP OUT OF HOLE

COMMENTS

NOTHING WAS WRONG WITH PIE TALLY. WE KNEW WHERE WE WERE AND THIS CO. MAN JUST WANTS
TO MAKE THINGS BAD WITH THE RIG

GROUP:

26 Sep 2016

NORTHEN OIL DIVISION

NORTHERN DIVISION

ENTERED BY:

CHRIS BISHOP

PROBLEM:

CO. MAN SAID WE WERE TRIPING FOR MWD TO C/O AND WANTED TO STRAP OUT OF HOLE TO CHECK
TALLY.

RESOLUTION:

P.O.O.H AND STRAP L/D MWD

COMMENTS

SHOULDN'T HAVE BEEN D.T. AGAINST THE RIG WE KNEW WHERE WE WERE AND THE TALLY WAS
RIGHT.

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 11 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

08 Sep 2016

DATE:

GROUP:

CHRIS BISHOP

ENTERED BY:

PROBLEM:

FOUND 3 WAY VALVE ON KOOMEY LEAKING AND ELECTRIC PUMP PACKING LEAKING

RESOLUTION:

REAPIR ALL PROBLEMS WITH KOOMEY

COMMENTS

THE KOOMEY DID HAVE SOME MINOR PROBLEMS, BUT KOOMEY WASN'T BLEEDING DOWN OR
LOOSING ANY PRESSURE

GROUP:

NORTHERN OIL DEVISION

CHRIS BISHOP

ENTERED BY:

PROBLEM:

P/U BHA AFTER PROBLEM WITH KOOMEY AND C/O MAN SAYING TALLY WAS WRONG.

RESOLUTION:

P/U BHA

COMMENTS

NONE OF THIS DOWNTIME SHOULD HAVE BEEN AGAINST NABORS. IF HE WANTED TO REPAIR KOOMEY
WE STILL HAVEN'T DRILLED THE SHOE AND COULD'VE DONE IT WHILE IN HOLE

GROUP:

26 Sep 2016

NORTHERN DIVISION OIL

DAY TOUR

MARIO SALINAS

ENTERED BY:

PROBLEM:

RIG MUD PITS & PUMP SUCTION LINES FULL OF BARITE R/ RIG MOVE

RESOLUTION:

GOOD PLANNING

COMMENTS

GOOD PLANNING

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 12 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

08 Sep 2016

DATE:

GROUP:

CHRIS BISHOP

ENTERED BY:

PROBLEM:

P.O.O.H BECAUSE THE CO. MAN CLAIM THE PIPE TALLY WAS WRONG.

RESOLUTION:

P.O.O.H WHILE STRAPPING

COMMENTS

THE TALLY WAS RIGHT AND WAS TOLD TO HIM MANY TIMES

GROUP:

NORTHERN DIVISION OIL

DHRIS BISHOP

ENTERED BY:

PROBLEM:

P.O.O.H BECAUSE THE CO. MAN WANTED TO THINK THE TALLY WAS WRONG.

RESOLUTION:

P.O.O.H

COMMENTS

THE TALLY WAS CORRECT AND WAS TOLD TO HIM MANY TIMES.

GROUP:

26 Sep 2016

NORTHERN DIVISION OIL

DAY TOUR

MARIO SALINAS

ENTERED BY:

PROBLEM:

RIG MUD PITS & PUMP SUCTION LINES FULL OF BARITE F/RIG MOVE

RESOLUTION:

NEED GOOD PLANNING

COMMENTS

NEED GOOD PLANNING

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 13 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

08 Sep 2016

DATE:

982

GROUP:

TOOL PUSHER

PROBLEM:

FOWND LEAKS ON KOOMY BOTLES AND AIR PUMPS

RESOLUTION:

DE PRESSURE KOMMY AND TIGHT ALL BOTLES AND CHANGE OUT AIR PUMPS

COMMENTS

N/A

NORTHERN OIL DIVISION

GROUP:

ENTERED BY:

PROBLEM:

CO. MAN JUST WANTING TO GIVE RIG DOWNTIME

RESOLUTION:

SHALLOW TEST MWD

COMMENTS

REVERT BACK TO ALL PREVIOUS DOWNTIME FOR THE DAY

NORTHERN OIL DIVISION

GROUP:

ENTERED BY:

PROBLEM:

PROBLEM WITH ALL THE DOWNTIME WAS WITH THE CO. MAN

RESOLUTION:

REPORTED TO MY SUPT. AND MANAGER THE ISSUES

COMMENTS

EVERYTHING IS UNDER INVESTIGATION

DATE:

CHRIS BISHOP

09 Sep 2016

DATE:

26 Sep 2016

ENTERED BY:

CHRIS BISHOP

11 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 14 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

11 Sep 2016

DATE:

982

GROUP:

PROBLEM:

FLOW LINE SENSOR STOPEED WORKING FLAPPER BROKE OFF

RESOLUTION:

ELEC. CHANGE OUT TO NEW ONE

COMMENTS

N/A

NIGHT TOUR

GROUP:

ENTERED BY:

PROBLEM:

LINK TILT CYLINDER STOPED WORKING

RESOLUTION:

REPLACED THE CYLINDER FOR LINK TILT SYSTEM

COMMENTS

REPLACED THE CYLINDER FOR LINK TILT SYSTEM.

NIGHT TOUR

GROUP:

ENTERED BY:

PROBLEM:

FLOWLINE SENSOR ON EDS STOPPED WORKING

RESOLUTION:

REPAIRED SENSOR

COMMENTS

SENSOR WORKING FINE

DATE:

26 Sep 2016

ENTERED BY:

TOOL PUSHER

TO0L PUSHER

TOOL PUSHER

12 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 15 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

12 Sep 2016

DATE:

982

GROUP:

PROBLEM:

LINK TILT CYLINDER DID NOT WORK TO RACK BACK DP

RESOLUTION:

CHANGE OUT TO NEW ONE

COMMENTS

N/A

15 Sep 2016

DATE:

982

GROUP:

TOOL PUSHER

ENTERED BY:

PROBLEM:

INSTALLING I-BOPS LOWER AND UPPER WELL CONTROL VALVES

RESOLUTION:

INSTALL RE BUILT I-BOP

COMMENTS

N/A

GROUP:

26 Sep 2016

TOOL PUSHER

ENTERED BY:

NAODD

CHRIS BISHOP

ENTERED BY:

PROBLEM:

ACTUATOR VALVE LEAKING WITHOUT SPARE ON LOCATION

RESOLUTION:

HOTSHOT REBUILD FOR ACTUATOR VALVE FROM BASE AND REBUILD

COMMENTS

BEING THIS IS THE ONLY NATIONAL TDS IN COUNTRY IT'S HARD TO GET PARTS. HAVE THEM FINDING
SPARES IN THE YARD.

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 16 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

15 Sep 2016

DATE:

982

GROUP:

TOOL PUSHER

PROBLEM:

HEAT UP CONNECTIONS TO BREACK OUT I-BOP CHANGE OUT UPPER AND LOWER WELL CONTROL
VALVES IBOP

RESOLUTION:

MECHANIC WORKING ON RE BUILING VALVES

COMMENTS

N/A

16 Sep 2016

DATE:

982

GROUP:

ENTERED BY:

TOOL PUSHER

PROBLEM:

INSTALL UPPER AND LOWER WELL CONTROL VALVES IBOP AND PSI TEST

RESOLUTION:

INSTALL AND TEST

COMMENTS

N/A

982

GROUP:

ENTERED BY:

TOOL PUSHER

PROBLEM:

INSTALL UPPER AND LOWER WELL CONTROL VALVES IBOP AND PSI TEST

RESOLUTION:

N/A

COMMENTS

N/A

DATE:

26 Sep 2016

ENTERED BY:

17 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 17 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

17 Sep 2016

DATE:

982

GROUP:

PROBLEM:

ACCUMULATOR NOT PRESSURING UP PROPORLY ON TIME

RESOLUTION:

MECHANICS TROUBLE SHOOTING

COMMENTS

N/A

982

GROUP:

ENTERED BY:

PROBLEM:

KOMMY NOT PRESSURING UP ON TIME

RESOLUTION:

MECHANIC TROUBLE SOOTING

COMMENTS

N/A

982

GROUP:

ENTERED BY:

PROBLEM:

PROBLEMS WITH AIR PUMPS ON COMMY

RESOLUTION:

MECHANICS TROUBLE SOOT

COMMENTS

N/A

DATE:

26 Sep 2016

ENTERED BY:

TOOL PUSHER

TOOL PUSHER

TOOL PUSHER

19 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 18 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132

FIELD: KURSANIYA

CONTRACTOR: NABORS DRILLING INTERNATIONAL

AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

19 Sep 2016

DATE:

982

GROUP:

TOOL PUSHER

PROBLEM:

WHILE P/U DRILL PIPE FROM RACKS WITH HOIST AND RUNING IN HOLE WITH TDS AT SAME TIME BRAKE
INGAGE ON DRAWWORKS DO TO AIR NOT BEEING SUFISIENT TO OPERATE DRAWWORKS

RESOLUTION:

TROUBLE SHOOT AIR COMP. AND PLUMING ON THE RIG

COMMENTS

N/A

21 Sep 2016

DATE:

982

GROUP:

ENTERED BY:

PROBLEM:

TROUBLE SHOOT ELECTRICAL PROBLEM ON MUD SISTEM

RESOLUTION:

ELECTRICIAN CHANGE OUT PLUG

COMMENTS

N/A

982

GROUP:

ENTERED BY:

PROBLEM:

TROUBLE SHOOT ELECTRICAL SHOT DOWN ON MUD SISTEM

RESOLUTION:

ELECTRCIANS WORK ON BAD PLUG

COMMENTS

N/A

DATE:

26 Sep 2016

ENTERED BY:

TOOL PUSHER

TOOL PUSHER

25 Sep 2016

Copyright(c) 2016 Canrig Drilling Technology, Ltd. All Rights Reserved.

LL_odbc.rpt v.2009.12.10.001

Page 19 of 20

LESSONS LEARNED

FROM: 05

Aug 2016

TO: 26

Sep 2016

OPERATOR: SAUDI ARAMCO OIL COMPANY

WELL NAME: KRSN-132


CONTRACTOR: NABORS DRILLING INTERNATIONAL

FIELD: KURSANIYA
AREA: MIDDLE EAST

PROJECTED DEPTH: 16332

COUNTRY: SAUDI ARABIA

SPUD DATE: 8/18/2016


RIG NUMBER: 982
DIVISION:

MIDDLE EAST
SAUDI ARABIA

DISTRICT:

982

RIG:

25 Sep 2016

DATE:

982

GROUP:

26 Sep 2016

ENTERED BY:

TOOL PUSHER

PROBLEM:

ON #1 MUD PUMP EXPANTION JNT DAMAGE WHILE REPLACEING IT #3 MUD PUMP SWAB WASHED OUT

RESOLUTION:

REPLACE SWAB AND EXPANTION JNT.

COMMENTS

N/A