Académique Documents
Professionnel Documents
Culture Documents
CHAPTER I
DUTIES OF PERMANENT WAY OFFICIALS/MEN
PART 'A'
Duties of Assistant Engineer/Assistant Divisional Engineer
General 101. Essential duties of Assistant Engineer 102. Knowledge of rules and regulations
103. Coordination with officials of other departments 104. Inspection by higher officials 105.
Inspection by Assistant Engineer 106. Inspection of Permanent Way 107. Execution of Works
108. Measurement of Ballast 109. Action in case of emergencies 110. Accompanying Track
Recording/Oscillograph Cars 111. Control over Expenditure 112. Training of probationers
113. Witnessing payments to staff 114. Inspection of office and stores of Inspectors 115.
Staff matters 116. Relinquishment of charge 117.
PART 'B'
Duties of Permanent Way Inspectors / Section Engineer (P Way)
Duties of Permanent Way Inspectors (in overall charge)
General responsibility 118. Knowledge of rules and regulations 119. Co-ordination with
works, bridge and staff of other departments 120. Keeping of materials 121. Accompanying
on inspections of higher officials 122 Testing of running qualities of track 123. Routine
inspection of track 124. Revised Schedule of Inspection of track 124A. Safety of track 125.
Check on Patrolling 126. Execution of works affecting Track 127. Action in case of
emergency 128. Inspection and maintenance of LWR/CWR Track 129. Measurement of
Ballast 130. Station Yards 131. Witnessing payment to staff 132. Other Establishment
matters 133. Correspondence and records 134, Relinquishment of charge 135.
Duties of Permanent Way Inspectors (not in overall charge)
General responsibilities 136. Knowledge of rules and regulations 137. Co- ordination with
Works, Bridge and Staff of other departments 138. Routine Inspection of Track 139. Revised
Schedule of Inspection of track 139A. Annual maintenance works 140. Check on patrolling
141. Execution of works affecting Track 142. Action in case of emergency 143. Maintenance
of LWR/CWR Track 144. Witnessing payments to staff 145.
PART 'C'
Duties of Permanent Way Mistries
General responsibilities 146. Knowledge of rules and signals 147. Permanent Way Mistry incharge of gangs 148.
PART 'D'
Duties of Mates, Keymen and Gangmen
General
Knowledge of rules and signals 149. Safety of the line 150. Equipment at site of work 151.
Musters and Gang Charts/Diary books 152. Observance of sleeper packing during passage
of train 153 Precautions when view is obstructed. 154. Tidiness of section 155. Safe custody
of tools 156. Action when line is unsafe or in the event of accident 157. Patrolling during
abnormal rainfall 158. Commencing work affecting safety of trains 159. Weekly inspection of
gang length by mate 160. Preventing trespass and theft of Permanent way fittings 161.
Relief arrangement in emergencies 162. Assistance to Posts and Telegraph staff 163.
Assistance in protection of trains 164. Assistance in placing fog signals 165. Responsibilities
of the Mate in LWR track 166.
Duties of Keyman
Selection and training of Keyman 167. Keyman's daily inspection 168(1). Roster duty hours
of Keyman 168(2). Equipment of Keyman 169. Duties of Keyman 170. Keyman's book 171.
CHAPTER II
PART 'A'
Welding of rails
General 501. Alumino Thermit Welding of rails 502. Tolerances allowed in the case of Flash
butt welds 503. Short pre-heat welding process 504.
PART 'B'
Short welded rails
Definitions 505. Track structure for SWR 506. Conditions of laying 507. Laying of short
welded rails 508. Maintenance of short welded rails 509. Gap survey and adjustment of gap
510. Conversion of SWR into LWR 511.
PART 'C'
Long welded rails/Continous welded rails
Reference to LWR/CWR Manual 512.
CHAPTER VI
TRACK RECORDING, ANALYSIS AND MONITORING
Introduction 601. Track recording by Mechanical/Electronic equipment 602. Track recording
Cars 603. Mechanical Track recording Car 604. Electronic Track recording Car 605.
Frequency of Track recording 606. Track categories for various parameters 607. Analysis of
track recording Car charts 608. Arrangements for running TRC 609. Actual running of TRC
610. Action to be taken on TRC charts 611. Brief explanation of recordings 612. Monitoring
of riding quality of track 613. Hallade track recorder 614. Oscillograph Car 615. Analysis of
Oscillograms and interpretation of results 616. Use of oscillograph car recordings 617.
Portable accelerometers 618.
CHAPTER VII
ACTION DURING ACCIDENTS INCLUDING BREACHES AND PRE-MONSOON
PRECAUTIONARY MEASURES
PART 'A'
Action during accidents including breaches
Observance of Rules 701. Report of accident to Station Master/Railway servant-in-charge of
Block hut 702. Accidents impairing through traffic 703. Action at site 704. Report to the
Chief Engineer 705. Attendance of Police at site 706. Examination of site and preparation of
sketches 707. Recording particulars at site of accident 708. Use of recorded data 709.
Repairs to damaged track 710. Procurement and arrangement of labour 711. Diversion 712.
Transhipment 713. Funds required during Emergencies 714. Obstructions found on track
715. Flooded Causeways/Dips 716. Special precautions when track is submerged 717.
Driver's report on defects in track 718. Abnormal occurrences attributable to locomotives
and other rolling stock 719. Accidents not affecting through traffic 720. Records of accidents
721. Accident statements to the Railway Board 722.
PART 'B'
Pre-monsoon precautionary measures
General precautions to be taken before monsoon 723. Materials for emergencies 724.
Service spans and Rail clusters 725. Railway affecting works (including Railway affecting
tanks) 726. Vigilance over Railway affecting tanks during heavy rains 727. Weather
warnings and action to be taken 728.
CHAPTER VIII
ENGINEERING RESTRICTIONS AND INDICATORS AND USE OF DETONATING AND
FLARE SIGNALS
Work involving danger to train or traffic 801. Carrying out of works, in case of emergency
802. Responsibility of the Railway servant in-charge of the work 803. Precautions before
commencing operations which would obstruct the line 804. Categories of Engineering works
805. Works of short duration 806. Works of long duration 807. Temporary Engineering Fixed
SignalsLocation and details 808. Procedure for passing trains at stop-dead restrictions
809. Procedure for Blocking line for Engineering purposes 810. Work at time of poor
visibility 811. Temporary signals in emergency 812. Periodical Notice of Engineering
restrictions 813. Permanent speed restriction indicators 814. Indicators (General) 815.
Detonating signals 816. Care and custody 817. Stock with Engineering staff 818. Use of
detonators 819. Testing 820. Life of detonators 821. Disposal of time-barred detonators
822. Safety range 823. Flare signalsDescription 824. Use of flare signals 825. Safeworking
of Contractors 826.
CHAPTER IX
LEVEL CROSSING AND GATEMAN
General location 901. Classification of Level Crossings 902. Categories of Roads 903.
Standards for different classes of level crossings 904. Gates and locking arrangements 905.
Skew level crossings 906. Normal position of gates 907. Gate lamps and blinders 908.
Traffic and Engineering gates 909. Equipment at level crossings 910. Siting of gate-lodges
911. Appointment of Gatemen, rosters and medical fitness certificates 912. Duties of
Gatemen 913. Maintenance of level crossing, examination of gate- equipment and Gateman
in rules 914. Level crossing registers 915. Level crossing indicators 916. Visibility
requirements for unmanned level crossings 917. Provision of speed breakers on the
approaches of unmanned level crossings 918. Census of traffic at level crossings,
unmanned/manned 919. Unmanned ' C ' class level crossings 920. Track structure in level
crossings 921. Manning of the unmanned level crossings through Member of Parliament
Local Area Development Scheme (MPLADS) 922. Level Crossings on National Highways/
State Highways and other important roads 923. Provision of new level
Crossings/Manning/Demanning/Elimination 924. Criteria for Replacement of existing level
crossings (other than those provided on 'Deposit Terms') with road Over/Under Bridges on
cost sharing basis 925.
CHAPTER X
PATROLLING OF THE RAILWAY LINE
Types of Patrolling 1001. Protection of line in case of Emergency 1002. Commencement and
termination 1003. Preparation of Patrol Charts 1004. Distribution of Patrol Charts 1005.
Patrol Books and Systematic Patrolling 1006. Equipment of patrolman 1007. Selection of
Patrolman 1008. Certificate to be submitted by P.W.I. 1009. Duties of Patrolmen 1010.
Action when damage is observed 1011. Responsibility of Engineering Officials in the matter
of Patrolling 1012. Action by A.E.N. and P.W.1. on receipt of information regarding Damage
to the Line 1013. Vulnerable locations (Points) 1014.
CHAPTER XI
THE WORKING OF TROLLIES, MOTOR TROLLIES AND LORRIES
General Instructions 1101. Distinction between Trolly, Motor Trolly and Lorry 1102.
Certificate of competency 1103. Officials permitted to use Trollies, Motor Trollies and Lorries
1104. Responsibility for safe working 1105. Efficient brakes 1106. Attachment to Trains
Prohibited 1107. Working on track circuited Sections and section provided with treadls 1108.
Numbering of trollies /Motor Trolies/ Lories 1109. conveyance of non-railway officials 1112.
Trolly-permits for private sidings 1113. Military officers using trollies in Ordnance depots
1114. Trolly refuges and observation posts 1115. Equipment for Trolly/Motor Trolly/Lorry
1116. Signals for Trolly/Motor Trolly/Lorry 1117. Working of Trollies 1118. Working of Motor
Trollies 1119. Working of Lorries 1120. Working of Cycle Trollies and Moped Trollies 1121.
Working of Rail Dolleys 1122.
CHAPTER XII
WORKING OF MATERIAL TRAINS AND TRACK MACHINES
Rules for working 1201. Material Train 1202. Economical working 1203. Restrictions in
running 1204. Brake-vans and Shelter wagons 1205. Ordering of Material trains 1206. Issue
of' Fit-to-run ' certificate 1207. Official-in-charge of Material train 1208. Equipment 1209.
Testing of brake power 1210. Working in Block Section 1211. Pushing of Material trains
1212. Procedure to be followed while pushing back 1213. Running on Ghat Section and
descending grade 1214. Passage over points 1215. Speed of material trains 1216. Stabling
of a material train 1217. Reporting deficiencies and damages 1218. Warning to workers on
material trains 1219. Engine Crew's hours of duty 1220. Loading at Ballast depots 1221.
Working trip 1222. Operation of Hoppers 1223. Training out materials and daily reports of
working 1224. Charges for material train working 1225. Register of Engineering vehicles
1226. Working of Track maintenance machines 1227.
CHAPTER XIII
PROCEDURE FOR OBTAINING SANCTION AND CARRYING OUT WORKS AFFECTING
SAFETY OF THE RUNNING LINE AND FOR OPENING NEW WORKS
Reference to rules 1301. Works requiring sanction of C.R.S. and notice there for 1302.
Application for sanction of works 1303. Documents to accompany application 1304.
Submission of Safety Certificate 1305. Deviations from plans approved by C.R.S. 1306.
Applications for running of new types of locomotives and/or rolling stock and for increase in
speed 1307. Notification to Railway officials when opening works 1308. Works arising out of
accidents including breaches 1309. Opening of new lines 1310.
CHAPTER XIV
LAYING AND MAINTENANCE OF CONCRETE SLEEPERS
Types of concrete sleepers 1401. Identification of sleepers at Site 1402. Fittings to be used
1403. Locations
where concrete sleepers are used 1404. Laying of concrete sleepers 1405. Operations
connected with relaying 1406. Procedure for manual laying 1407. Maintenance of concrete
sleeper Track 1408. Casual renewal of concrete sleepers 1409. Corrosion of Steel in
concrete sleepers 1410. Maintenance of concrete sleeper fastenings 1411. Action in case of
derailment 1412. Laying of fanshaped turnout sleepers 1413.
CHAPTER XV
TRAINING FOR PERMANENT WAY STAFF
Types of Training Courses 1501. Initial/Induction Courses 1502. Promotional courses 1503.
Refresher Courses 1504. Special Courses 1505.
CHAPTER XVI
BOOKS OF REFERENCE
Books of reference 1601. Circulation of Technical papers 1602.
LIST OF ANNEXURES
Annexure No.
Particulars of sketch/Performa
2/1
2/2
2/3
2/4
Track diagram
2/5
2/6
2/7
2/8
Para ref
2/9
2/10
2/11
2/12
2/13
2/14
2/15
2/16
2/17
2/18
252(d
3/1
3/2
Pro forma for loss of weight of released scrap (P. Way components) ..
32
3/3
32
4/1
4/2
4/3
4/4
4/5
5/1
5/2
6/1
6/2
6/3
6/4
6/5
6/6
7/1
7/2
8/1
8/2
8/3
8/3A
80
807
8/4
807
8/5
Competency Certificate
9/1
9/2
9/3
9/4
9/5
9/6
9/7
Warning Signs
10/1
10/2
10/3
11/1
11/2
11/3
Trolly/Lorry notice
11/4
11/5
12/1
13/1 to 13/3
1118
13/4
13/5
13/6
14/1
16/1
M/1
(D
M/2
(D
M/3
(D
M/4 & M5
(D
M/6