PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

01
rev.01

MONEY CURRENCY:

002
004
006
010
012
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054
056
058
060
062
064
066
068
070
072
074
076
130
132
078
080
082
084
086
088
090
092
094
096
098
100
102
104
106
108
110
112
114
116
118
120
122
124
002
004
006
008
010
012
014
016
018
020
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054
056
058
060
062
064
066

C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
2_SW

20.00
2.00
3.00
4.00
20.00
24.00
28.00
30.00
14.00
16.00
18.00
20.00
24.00
26.00
10.00
12.00
14.00
16.00
18.00
20.00
24.00
30.00
8.00
0.50
0.75
1.00
1.50
10.00
12.00
14.00
16.00
18.00
2.00
20.00
24.00
28.00
3.00
4.00
6.00
8.00
12.00
14.00
6.00
0.75
1.00
10.00
12.00
14.00
2.00
3.00
4.00
6.00
8.00
14.00
0.50
0.75
1.00
1.50
2.00

3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW

16.00
2.00
3.00
4.00
8.00
10.00
14.00
8.00
20.00
24.00
30.00
14.00
16.00
2.00
20.00
30.00
0.50
0.75
1.00
1.50
10.00
16.00
18.00
2.00
20.00
3.00
30.00
4.00
8.00
0.50
0.75
1.00
1.50

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

SUB-SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005

Material

SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

ITEM

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

WELDING
CARBON STEEL
20", Sch 120
2", Sch 160
3", Sch 160
4", Sch 160
20", 17.5 MM THK.
24", 17.5 MM THK.
28", 17.5 MM THK.
30", 17.5 MM THK.
14", Sch 20
16", Sch 20
18", Sch 20
20", Sch 20
24", Sch 20
26", Sch 20
10", Sch 30
12", Sch 30
14", Sch 30
16", Sch 30
18", Sch 30
20", Sch 30
24", Sch 30
30", Sch 30
8", Sch 30
0,5", Sch 40
0,75", Sch 40
1", Sch 40
1,5", Sch 40
10", Sch 40
12", Sch 40
14", Sch 40
16", Sch 40
18", Sch 40
2", Sch 40
20", Sch 40
24", Sch 40
28", Sch 40
3", Sch 40
4", Sch 40
6", Sch 40
8", Sch 40
12", Sch 60
14", Sch 60
6", Sch 60
0,75", Sch 80
1", Sch 80
10", Sch 80
12", Sch 80
14", Sch 80
2", Sch 80
3", Sch 80
4", Sch 80
6", Sch 80
8", Sch 80
14", Sch XS
0,5", Sch XXS
0,75", Sch XXS
1", Sch XXS
1,5", Sch XXS
2", Sch XXS
STAILESS STEEL
16", Sch 10S
2", Sch 10S
3", Sch 10S
4", Sch 10S
8", Sch 10S
10", Sch 20
14", Sch 20
8", Sch 20
20", 30.2 MM THK.
24", 30.2 MM THK.
30", 30.2 MM THK.
14", Sch 30
16", Sch 30
2", Sch 30
20", Sch 30
30", Sch 30
0,5", Sch 40
0,75", Sch 40
1", Sch 40
1,5", Sch 40
10", Sch 40
16", Sch 40
18", Sch 40
2", Sch 40
20", Sch 40
3", Sch 40
30", Sch 40
4", Sch 40
8", Sch 40
0,5", 40S
0,75", 40S
1", 40S
1,5", 40S
1 of 36

Measure
Unit

Quantity
(a)

dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch

20
248
66
16
20
24
364
60
252
3600
54
1200
528
0
1220
84
28
672
54
4660
1104
0
528
12
1464
695
84
2500
1788
1442
6256
90
196
3000
192
56
897
1500
1536
2912
48
1750
6
23
127
60
48
112
1014
747
2884
1122
32
0
13
488
152
36
32

dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch

96
312
303
8
496
760
140
224
40
24
150
56
704
8
2060
180
12
596
73
48
120
192
18
100
420
15
60
16
192
12
221
6
9

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / OWTS N 2

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

01
rev.01

MONEY CURRENCY:

002
004
006
008
010
012
014
016
018
020
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054
056
058
060
062
064
066
068
070
072
074
076
078
080

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

0.5
0.75
1
1.5
2
3
4
6
8
0.5
0.75
1
1.5
2
3
4
6
8
0.75
1
2
4
10
12
14
16
18
20
24
10
12
14
16
18
20
28
30
16
20
20

002
004
006
008
010
012
014
016
018
020
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054
056
058
060
062
064
066
068
070
072

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T

Kilogram Range

2.00
3.00
4.00
6.00
8.00
16.00
20.00
24.00
30.00
0.75
1.00
2.00
14.00
18.00
20.00
30.00

Insulation Type

2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
3_BW

Rating

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

Isorack

Diam_P /Diam_S

068
070
072
074
076
078
080
082
084
086
088
090
092
094
096
098

Sch_P / Sch S

Union

000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

Material

005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

ITEM

SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005

SUB-SECTION

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

2", 40S
3", 40S
4", 40S
6", 40S
8", 40S
16", Sch 60
20", Sch 60
24", Sch 60
30", Sch 60
0,75", 80S
1", 80S
2", 80S
14", Sch STD
18", Sch STD
20", Sch STD
30", Sch STD
BOLTED ERECTION
0,5", 150#
0,75", 150#
1", 150#
1,5", 150#
2", 150#
3", 150#
4", 150#
6", 150#
8", 150#
0,5", 300#
0,75", 300#
1", 300#
1,5", 300#
2", 300#
3", 300#
4", 300#
6", 300#
8", 300#
0,75", 600#
1", 600#
2", 600#
4", 600#
10", 150#
12", 150#
14", 150#
16", 150#
18", 150#
20", 150#
24", 150#
10", 300#
12", 300#
14", 300#
16", 300#
18", 300#
20", 300#
28", 300#
30", 300#
16", 600#
20", 600#
20", 900#
ERECTION
PLANT / TRACK INSTALLATION
6", Sch 40
0,75", Sch 80
0,75", Sch 40S
0,75", Sch 80S
0,75", Sch XXS
1", Sch 80
1", Sch 40S
1", Sch XXS
1,5", Sch 40S
2", Sch 80
2", Sch 10S
2", Sch 80S
3", Sch 40
3", Sch 80
3", Sch 10S
4", Sch 40
4", Sch 80
4", Sch 40S
6", Sch 40
6", Sch 80
8", Sch 20
8", Sch 30
8", Sch 40
8", Sch 10S
10", Sch 20
10", Sch 30
10", Sch 40
12", Sch 30
12", Sch 40
14", Sch 20
14", Sch 40
14", Sch 60
14", Sch XS
16", Sch 20
16", Sch 30
16", Sch 40

Measure
Unit

dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch
dia-inch

2 of 36

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

52
12
108
42
72
368
1480
24
90
35
3
20
84
180
20
60

JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT

6
29
19
12
82
36
110
31
98
10
69
1
14
111
26
5
20
16
4
1
10
7
63
7
12
59
3
48
9
18
25
81
35
2
37
4
1
17
20
1

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

10
15
379
72
288
28
45
460
6
572
212
8
238
654
70
331
450
33
89
518
10
144
233
45
71
94
248
1
23
5
24
95
1
60
38
392
342596453.xls / OWTS N 2

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

01
rev.01

MONEY CURRENCY:

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

002
004
006
008
010
012
014

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

000
005
010
015
020
022

2_SW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW

E
E
E
E
E
E
E
I,R,T
I,R,T
I,R,T
I,R,T
I,R,T

C,X,S

I,R,T

Kilogram Range

002
004
006
008
010
012
014
016
018
020
022
024
026
028
028
028
028

Insulation Type

I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T

Isorack

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

Rating

Sch_P / Sch S

Diam_P /Diam_S

074
076
078
080
082
084
086
088
090
092
094
096

Union

SUB-SECTION
000
000
000
000
000
000
000
000
000
000
000
000
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
010
010
010
010
010
010
010
010
000
000
000
000
000
000
001
002

Material

SECTION
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
020
020
020
020
020
020
025
022

ITEM

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

16", Sch 60
18", Sch 30
18", Sch 40
20", Sch 20
20", Sch 30
20", Sch 40
20", Sch 60
24", Sch 30
26", Sch 20
28", 17.5 MM THK.
30", Sch 30
30", 30.2 MM THK.
RACK INSTALLATION
0,75", Sch 40S
0,75", Sch 80S
1", Sch 80S
2", Sch 80
2", Sch 10S
3", Sch 10S
4", Sch 80
6", Sch 40
6", Sch 80
8", Sch 40
10", Sch 30
12", Sch 40
16", Sch 20
16", Sch 40
20", Sch 30
24", Sch 20
30", Sch 30
UNDERGROUND INSTALLATION
2", Sch 80
3", Sch 40
3", Sch 80
4", Sch 80
6", Sch 40
10", Sch 40
16", Sch 40
SUPPORTS
< 10 Kg.
10 up to 25 Kg.
> 25 Kg. Up to 50 Kg.
> 50 Kg. Up to 100 Kg.
> 100 Kg.
PAINTING
Piping painting

Measure
Unit

Quantity
(a)

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

30
1
3
12
432
314
40
85
2
4
5
4

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

580
90
24
282
16
210
2471
290
2
301
235
510
600
464
536
50
24

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

60
64
179
130
60
43
115

Kg.
Kg.
Kg.
Kg.
Kg.

6847
6981
10207
8088
0

m2

8207

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL

3 of 36

TOTAL
PRICE
(a)x(d)

0.00

342596453.xls / OWTS N 2

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

002
004
006
008
010
012
014
016
018

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

006
010
012
016
020
022
024
026

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T

002
010
012

C,X,S
C,X,S
C,X,S

E
E
E

022

C,X,S

I,R,T

000
005
010
015
020

CPF

2.00
6.00
8.00
0.75
1.50
2.00
4.00
6.00
20.00

I,R,T
I,R,T
I,R,T
I,R,T
I,R,T

Kilogram Range

20.00
20.00
2.00
20.00
8.00
0.75
14.00
2.00
20.00
4.00
6.00
8.00
4.00
6.00
2.00
4.00
6.00
0.75
1.50
2.00

Insulation Type

3_BW
3_BW
2_SW
3_BW
3_BW
2_SW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
2_SW
2_SW
2_SW

Rating

C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X

Isorack

Diam_P /Diam_S

002
004
006
010
012
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050

Sch_P / Sch S

Union

000
000
000
000
000
000
000
000
000
010
000
010
010
001
002
000
000
000
000
000
000

Material

000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

ITEM

SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
003
003
003
003
003
003
003
003
003
003
005
005
005
005
005
005
005
005
005
005
005
005
005
005
010
010
020
020
020
020
020
020

SUB-SECTION

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

WELDING
CARBON STEEL
20", 11.1 MM THK.
20", 11.9 MM THK.
2", Sch 160
20", Sch 20
8", Sch 30
0,75", Sch 40
14", Sch 40
2", Sch 40
20", Sch 40
4", Sch 40
6", Sch 40
8", Sch 40
4", Sch 60
6", Sch 60
2", Sch 80
4", Sch 80
6", Sch 80
0,75", Sch XXS
1,5", Sch XXS
2", Sch XXS
BOLTED ERECTION
2", 150#
6", 150#
8", 150#
0,75", 300#
1,5", 300#
2", 300#
4", 300#
6", 300#
20", 300#
ERECTION
PLANT / TRACK INSTALLATION
0,75", Sch XXS
2", Sch 80
4", Sch 40
4", Sch 80
6", Sch 40
6", Sch 80
8", Sch 30
20", 11.1 MM THK.
UNDERGROUND INSTALLATION
2", Sch 80
20", 11.1 MM THK.
20", 11.9 MM THK.
PAINTING
Piping painting
SUPPORTS
< 10 Kg.
10 up to 25 Kg.
> 25 Kg. Up to 50 Kg.
> 50 Kg. Up to 100 Kg.
> 100 Kg.

Measure
Unit

Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

13860
400
30
280
0
60
14
34
120
116
222
104
20
42
52
28
36
19
3
2

JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT

3
16
7
7
1
20
18
10
19

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

7
9
5
1
13
14
13
7550

l.m.
l.m.
l.m.

2
320
125

m2

12068

Kg.
Kg.
Kg.
Kg.
Kg.

12
123
77
0
0

TOTAL

4 of 36

TOTAL
PRICE
(a)x(d)

0.00

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

5 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

6 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

7 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

8 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

9 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

10 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

11 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

12 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

13 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

14 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

15 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

16 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

17 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

18 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

19 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

20 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

21 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

22 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

23 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

24 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

25 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

26 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

27 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

28 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

29 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

30 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

31 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

02
rev.01

MONEY CURRENCY:

Kilogram Range

Insulation Type

Rating

Isorack

Sch_P / Sch S

Diam_P /Diam_S

Union

Material

ITEM

SUB-SECTION

SECTION

DISCIPLINE

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

32 of 36

Measure
Unit

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / CPF

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

03
rev.01

MONEY CURRENCY:

002
004
006
008
010
012
014
016
018
020
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054

C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
C, X
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

Kilogram Range

8.00
10.00
12.00
16.00
2.00
3.00
4.00
6.00
8.00
0.75
1.00
1.50
2.00
3.00
4.00
6.00
14.00
8.00
24.00
30.00
12.00
16.00
20.00
8.00
0.50
0.75
1.00

Insulation Type

3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW

Rating

1.00
1.50
2.00
12.00
14.00
16.00
20.00
24.00
6.00
8.00
2.00
2.00
0.50
0.75
1.00
1.50
10.00
12.00
14.00
18.00
2.00
3.00
6.00
8.00
30.00
2.00
4.00
14.00
4.00
10.00
14.00
8.00
6.00
0.50
0.75
1.00
1.50
10.00
12.00
14.00
2.00
20.00
3.00
30.00
4.00
6.00
8.00
0.75
1.00
10.00
2.00
4.00
6.00
8.00
10.00
14.00
10.00
12.00
2.00
3.00
4.00
6.00
8.00
0.50
0.75
1.00
1.50
10.00
14.00
2.00
3.00
4.00
6.00
8.00

Isorack

2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW

Sch_P / Sch S

Diam_P /Diam_S

002
004
006
010
012
014
016
018
020
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054
056
058
060
062
064
066
068
070
072
074
076
078
080
082
084
086
088
090
092
094
096
098
100
102
104
106
108
110
112
114
116
118
120
122
124
126
128
130
132
134
136
138
140
142
144
146
148
150

Union

SUB-SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

Material

SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

ITEM

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

WELDING
CARBON STEEL
1", 12.7 MM THK.
1,5", 12.7 MM THK.
2", 12.7 MM THK.
12", Sch 120
14", Sch 120
16", Sch 120
20", Sch 120
24", Sch 120
6", Sch 120
8", Sch 120
2", 14.27 MM THK.
2", 14.3 MM THK.
0,5", Sch 160
0,75", Sch 160
1", Sch 160
1,5", Sch 160
10", Sch 160
12", Sch 160
14", Sch 160
18", Sch 160
2", Sch 160
3", Sch 160
6", Sch 160
8", Sch 160
30", 17.5 MM THK.
2", 2 MM THK.
4", 2 MM THK.
14", Sch 20
4", 22.2 MM THK.
10", Sch 30
14", Sch 30
8", Sch 30
6", 31 MM THK.
0,5", Sch 40
0,75", Sch 40
1", Sch 40
1,5", Sch 40
10", Sch 40
12", Sch 40
14", Sch 40
2", Sch 40
20", Sch 40
3", Sch 40
30", Sch 40
4", Sch 40
6", Sch 40
8", Sch 40
0,75", 45.7 MM THK.
1", 45.7 MM THK.
10", 45.7 MM THK.
2", 45.7 MM THK.
4", 45.7 MM THK.
6", 45.7 MM THK.
8", 45.7 MM THK.
10", 56.2 MM THK.
14", 56.2 MM THK.
10", Sch 80
12", Sch 80
2", Sch 80
3", Sch 80
4", Sch 80
6", Sch 80
8", Sch 80
0,5", Sch XXS
0,75", Sch XXS
1", Sch XXS
1,5", Sch XXS
10", Sch XXS
14", Sch XXS
2", Sch XXS
3", Sch XXS
4", Sch XXS
6", Sch XXS
8", Sch XXS
STAINLESS STEEL
8", Sch 100
10", Sch 10S
12", Sch 10S
16", Sch 10S
2", Sch 10S
3", Sch 10S
4", Sch 10S
6", Sch 10S
8", Sch 10S
0,75", Sch 160
1", Sch 160
1,5", Sch 160
2", Sch 160
3", Sch 160
4", Sch 160
6", Sch 160
14", Sch 20
8", Sch 20
24", 30.2 MM THK.
30", 30.2 MM THK.
12", Sch 30
16", Sch 30
20", Sch 30
8", Sch 30
0,5", Sch 40
0,75", Sch 40
1", Sch 40
33 of 36

Measure
Unit

Quantity
(a)

Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch

1
8
8
24
560
32
500
48
18
72
28
0
1
47
9
12
90
1116
70
36
182
3
6
8
150
8
16
56
0
50
14
144
60
6
220
156
26
100
24
70
142
100
192
60
340
132
32
8
18
1460
12
140
18
8
10
84
90
408
252
117
148
60
32
3
112
34
32
80
28
162
3
484
18
24

Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch

32
60
24
480
258
450
148
696
24
13
21
33
46
30
20
6
28
16
24
30
168
16
20
16
1
391
65

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / COMPRESSION WORKS

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

03
rev.01

MONEY CURRENCY:

002
004
006
008
010
012
014
016
018
020
022
024
026
028
030
032
034
036
038
040
042
044
046
048
050
052
054
056
058
060
062
064
066
068
070
072
074
076
078
080
082
084
086
088
090
092
094
096
098
100
102
104
106
108
110
112
114
116
118
120
122

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

0.50
0.75
1.00
1.50
2.00
3.00
4.00
6.00
8.00
0.75
1.00
1.50
2.00
3.00
4.00
6.00
0.75
1.00
1.50
2.00
3.00
4.00
6.00
8.00
0.50
0.75
1.50
2.00
6.00
0.50
0.75
1.00
1.50
2.00
3.00
4.00
8.00
0.75
1.00
1.50
2.00
3.00
4.00
6.00
8.00
10.00
14.00
16.00
14.00
18.00
20.00
24.00
30.00
10.00
12.00
16.00
20.00
12.00
14.00
20.00
24.00

Kilogram Range

1.50
10.00
16.00
2.00
3.00
30.00
4.00
6.00
8.00
0.50
0.75
1.00
1.50
10.00
2.00
3.00
4.00
6.00
10.00
16.00
20.00
24.00
30.00
8.00
0.75
1.00
1.50
2.00
3.00
6.00
12.00
14.00
16.00
18.00
2.00
20.00
18.00
24.00
1.00
1.50
2.00
4.00

Insulation Type

2_SW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
2_SW
3_BW
3_BW
3_BW
3_BW
3_BW
3_BW
2_SW
3_BW
3_BW
3_BW
2_SW
2_SW
2_SW
3_BW

Rating

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

Isorack

Diam_P /Diam_S

056
058
060
062
064
066
068
070
072
074
076
078
080
082
084
086
088
090
092
094
096
098
100
102
104
106
108
110
112
114
116
118
120
122
124
126
128
130
132
134
136
138

Sch_P / Sch S

Union

SUB-SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

Material

SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003

ITEM

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

1,5", Sch 40
10", Sch 40
16", Sch 40
2", Sch 40
3", Sch 40
30", Sch 40
4", Sch 40
6", Sch 40
8", Sch 40
0,5", Sch 40S
0,75", Sch 40S
1", Sch 40S
1,5", Sch 40S
10", Sch 40S
2", Sch 40S
3", Sch 40S
4", Sch 40S
6", Sch 40S
10", Sch 60
16", Sch 60
20", Sch 60
24", Sch 60
30", Sch 60
8", Sch 60
0,75", Sch 80S
1", Sch 80S
1,5", Sch 80S
2", Sch 80S
3", Sch 80S
6", Sch 80S
12", Sch STD
14", Sch STD
16", Sch STD
18", Sch STD
2", Sch STD
20", Sch STD
18", Sch XS
24", Sch XS
1", Sch XXS
1,5", Sch XXS
2", Sch XXS
4", Sch XXS
BOLTED ERECTION
0,5", 150#
0,75", 150#
1", 150#
1,5", 150#
2", 150#
3", 150#
4", 150#
6", 150#
8", 150#
0,75", 300#
1", 300#
1,5", 300#
2", 300#
3", 300#
4", 300#
6", 300#
0,75", 600#
1", 600#
1,5", 600#
2", 600#
3", 600#
4", 600#
6", 600#
8", 600#
0,5", 900#
0,75", 900#
1,5", 900#
2", 900#
6", 900#
0,5", 1500#
0,75", 1500#
1", 1500#
1,5", 1500#
2", 1500#
3", 1500#
4", 1500#
8", 1500#
0,75", 2500#
1", 2500#
1,5", 2500#
2", 2500#
3", 2500#
4", 2500#
6", 2500#
8", 2500#
10", 150#
14", 150#
16", 150#
14", 300#
18", 300#
20", 300#
24", 300#
30", 300#
10", 600#
12", 600#
16", 600#
20", 600#
12", 900#
14", 900#
20", 900#
24", 900#
34 of 36

Measure
Unit

Quantity
(a)

Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch
Dia-Inch

129
20
32
186
36
30
104
90
16
1
89
15
23
240
34
51
148
36
540
112
120
24
30
32
47
7
32
228
12
12
24
28
16
576
12
20
18
72
7
9
12
52

JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT
JOINT

1
24
18
9
36
24
5
22
6
12
4
4
53
14
6
4
11
7
11
45
6
48
1
4
2
32
11
40
3
2
27
9
15
32
3
61
5
5
21
8
14
1
53
1
3
1
3
4
2
5
2
2
2
10
2
3
3
1
2
9
2

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

TOTAL
PRICE
(a)x(d)

342596453.xls / COMPRESSION WORKS

PIPING PREFABRICATION AND ERECTION

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

PIPING UNIT RATES

03
rev.01

MONEY CURRENCY:

I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T
I,T

030
032
034
036
038
038
038
038

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

R
R
R
R
R
R
R
R

022

C,X,S

000
005
010
015
020

I,R,T
0.00
0.00
0.00
0.00
0.00
0.00

I,R,T
I,R,T
I,R,T
I,R,T
I,R,T

Kilogram Range

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

10.00
12.00
14.00
18.00
10.00
14.00

Insulation Type

002
006
010
012
016
020
022
024
028
030
084
088
090
092
094
116
118
120
124
126
128
130
132
134
136
138
140
142
144
146
148
150
152
154
156
158
160
162
164
166
168
170
172
174
176
178
180
182
184
186
188
190
192
194
196
198
200
202
204
206

000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
005
005
005
005
005
005
005
005
005
001
002
000
000
000
000
000
000

Isorack

C,X,S
C,X,S
C,X,S
C,X,S
C,X,S
C,X,S

Sch_P / Sch S

124
126
128
130
132
134

Rating

Diam_P /Diam_S

Material

000
000
000
000
000
000

Union

ITEM

SECTION
003
003
003
003
003
003
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
005
010
010
020
020
020
020
020
020

SUB-SECTION

DISCIPLINE
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP
PIP

USD

Complete Scope of Work described in STD-CO-NM-PIP-00 (PIPING WORKS UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

10", 1500#
12", 1500#
14", 1500#
18", 1500#
10", 2500#
14", 2500#
ERECTION
PLANT / TRACK INSTALLATION
2", Sch 80S
0,75", Sch 40S
0,75", Sch 80S
0,75", Sch XXS
1", Sch 160
1", Sch 40S
1", Sch XXS
1,5", Sch 160
1,5", 12.7 MM THK.
1,5", Sch 40S
1,5", Sch 80S
1,5", Sch XXS
2", Sch 80
2", Sch 160
2", Sch 10S
2", 14.3 MM THK.
2", Sch 80S
2", Sch XXS
3", Sch 40
3", Sch 80
3", Sch 160
3", Sch 10S
3", Sch 40S
4", Sch 40
4", Sch 80
4", Sch 10S
4", 22.2 MM THK.
4", Sch 40S
4", Sch XXS
6", Sch 40
6", Sch 10S
6", 31 MM THK.
6", Sch 80S
8", Sch 30
8", Sch 60
8", Sch 80
8", Sch 120
8", Sch 10S
10", Sch 30
10", Sch 60
10", Sch 80
10", Sch 160
10", Sch 10S
10", 45.7 MM THK.
12", Sch 30
12", Sch 80
12", Sch 160
14", Sch 20
14", Sch 120
14", Sch 160
16", Sch 60
16", Sch 10S
18", Sch 160
18", Sch STD
20", Sch 40
20", Sch 60
20", Sch 120
24", Sch 120
24", Sch XS
30", 30.2 MM THK.
RACK INSTALLATION
1", Sch 80S
1,5", Sch 160
6", Sch 40S
10", 45.7 MM THK.
14", 56.2 MM THK.
16", Sch 10S
20", Sch 40
30", 17.5 MM THK.
PAINTING
Piping painting
SUPPORTS
< 10 Kg.
10 up to 25 Kg.
> 25 Kg. Up to 50 Kg.
> 50 Kg. Up to 100 Kg.
> 100 Kg.

Measure
Unit

Direct
Manhours
per
Measure
Unit

Quantity
(a)

JOINT
JOINT
JOINT
JOINT
JOINT
JOINT

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

3
5
2
2
9
2

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

15
24
31
51
11
55
132
3
3
61
5
8
145
33
103
10
42
10
69
49
7
160
8
37
8
45
16
6
23
21
79
10
1
39
2
3
4
10
3
81
5
5
4
125
11
74
186
9
47
2
3
7
0
37
8
10
29
1
7
5

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

15
33
33
1
51
25
1
42

m2

25

Kg.
Kg.
Kg.
Kg.
Kg.

590
364
125
1329
0

TOTAL

35 of 36

TOTAL
PRICE
(a)x(d)

0.00

342596453.xls / COMPRESSION WORKS

AREA:
DRAWING:
ISSUE

Document Code:
Project/Proposal (O.T.) N: OT 28.859
INCREASE WATER HANDLING
Project Name:
SONATRACH
Client:
8/8/2011
Date:
Issue:

INSULATION UNIT RATES

01, 03
rev.01

MONEY CURRENCY:

Kilogram Range

Union
0,75
1,00
1,50
2,00
3,00
4
6
8
10
12
14
18
20

Insulation Type

Material
100
100
100
100
100
100
100
100
100
100
100
100
100

Rating

ITEM
010
015
025
030
040
045
050
055
060
065
070
075
080

Isorack

SUB-SECTION
030
030
030
030
030
030
030
030
030
030
030
030
030

Sch_P / Sch S

SECTION
000
000
000
000
000
000
000
000
000
000
000
000
000

Diam_P /Diam_S

DISCIPLINE
AIS
AIS
AIS
AIS
AIS
AIS
AIS
AIS
AIS
AIS
AIS
AIS
AIS

USD

Complete Scope of Work described in STD-CO-NM-AIS-00 (INSULATION UNIT RATES


DESCRIPTION & METHODS OF MEASUREMENTS)

General Note:

DESCRIPTION

Item
Description &
Methods of
Measurement
for Piping

INSULATION MATERIAL: MINERAL WOOL


PREFORMED - THICKNESS: 100 MM
3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
12"
14"
18"
20"

Measure
Unit

l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.

Quantity
(a)

Direct
Manhours
per
Measure
Unit

UNIT PRICE

Material
Supply
(b)

ERECTION
(c)

TOTAL
(d)=(b)+(c)

33
28
2
278
32
64
33
13
416
122
9
25
27

TOTAL

36 of 36

TOTAL
PRICE
(a)x(d)

0.00

342596453.xls / INSULATION

Vous aimerez peut-être aussi