Vous êtes sur la page 1sur 3

Name of Project: VIRGINIA POULTRY BREEDER FARM PROJECT

Name of Proponent: DR. AND DRA. JESUS AGNES


Location of Project: Barangay Kisolon, Sumilao Bukidnon
Date of Monitoring: April 30, 2010

ECC # 10(13)02 07-04 2090-12211 Date Issued:


July 4, 2002
COMPLIAN
CE
CONDITIONS REMARKS
YE N N/
S O A
A. GENERAL PROVISIONS:
1. That this Certification is valid only for / Total bird population was
The poultry breeder farm project having 48,000.
a
maximum capacity of Sixty Thousand
(60,000) birds. This Certificate shall
supersede the ECC previously issued to
the project and all farm operations shall
now be subject to the conditions
stipulated in this Certificate;

2. That all poultry activities shall be


confined within the Fifty Nine Thousand /
Six Hundred Thirty Nine (59,639) square
meters lot area covered with TCT No. T-
24066 located at Barangay Kisolon,
Sumilao, Bukidnon. Any expansion in
terms of project capacity and/or area
coverage shall undergo the EIS System
requirement;
3. That Transfer of Ownership of this
project carries the same conditions in /
this ECC for which written notification
shall be submitted to DENR-10 by the
herein grantee within fifteen (15) days
from such transfer;
4. That the proponent shall designate a No designate PCO to handle
Pollution Control Officer (PCO) to handle / environmental-related aspects of
environment-related aspects of the the farm.
project. The bio-data and appointment
of the PCO shall be submitted to DENR-
10 within fifteen (15) days upon receipt
of said appointment;
5. That Locational Clearance from the Presented DTI permit which
Housing and Land Use Regulatory / entitled its operation from 2009-
Board (HLURB) and all other necessary 2014. Business permit is valid
permits from other government agencies until Feb 2011.
shall be secured prior to continuance of
project implementation wherein copies of
which shall be submitted to this Office
within fifteen (15) days upon receipt
thereof, otherwise, this ECC shall be
considered null and void ab initio;
6. That any misrepresentation or
material falsehood in the submitted /
documents shall be sufficient cause for
the cancellation or suspension of this
ECC;
B. CONSTRUCTION AND
OPERATION PHASE
7. That the proponent shall secure an / Secure regular discharge permit .
Authority to Construct (AC) and Permit to Submit SMR to MMT.
Operate (PO) from this Office, subject to
P.D. 984 compliance;
8. That the proponent shall institute Improve cleanliness of the
adequate measures to mitigate odor and / surroundings of the project.
other forms of nuisance. Good Practice waste management.
housekeeping and sanitation inside the There should be a separate
farm compound shall be maintained at disposal pit for bio-degradable
all times. All solid wastes generated and non-bio-degradable waste
during project operation shall be materials and it should be
disposed of properly and never to be fenced. Empty bottles should not
dumped into any bodies of water; be burned. Collection of chicken
dungs was on the 5th month
before laying and on culling
period.
9. That adequate drainage system Presence of water run-off along
surrounding the poultry houses shall be / each building. Plant additional
provided and the periphery of the buffer agents to control odor and
compound shall be planted with fast flies.
growing trees to serve as buffer against
nuisance;
10. That no operations such as
commercial butchering and/or dressing /
of chicken shall be undertaken;
11. That the local community shall be / The project have 44 workers,6 of
given priority for employment; them were regular and the rest
were on contractual basis. The
workers hailed from
Kalabugaw,Sancanan,Mabuhay
and San Luis Malitbog.
12. That the proponent shall be held Any incidence that need medical
liable for any damage to life and/or / attention was shouldered by the
property resulting from project proponent.
implementation and shall pay just and
reasonable compensation to aggrieved
parties;
13. That all other mitigating measures Present IEE during the
cited in the submitted Initial / monitoring. Furnish IEE copies
Environmental Examination (IEE) Report to the MMT.
shall be implemented;
C. MONITORING MECHANISMS
14. That the DENR-10 and/or Multi-
partite Monitoring Team (MMT) can /
initiate an on-the-spot monitoring and
inspection anytime without prior notice;
and
15. That the proponent shall initiate to EMF receipt was presented.
put up an Environmental Monitoring /
Fund (EMF) for the use of the Multi-
Partite Monitoring Team for monitoring
purposes within thirty (30) days from the
receipt of this ECC.

Non-compliance with any of the said stipulations will be sufficient ground for the cancellation or
suspension of this Certification and/or a fine of not more than Fifty Thousand Pesos (50,000) for
every violation thereof, at the discretion of this Office, pursuant to Section 9 of P.D. 1586 and
Section 6(b), Article IX of DENR Administrative Order No. 96-37.

In case there is a need for additional conditions in this ECC after monitoring/inspection, the
same shall be imposed by DENR-EMB,Region X.

FINDINGS AND OTHER OBSERVATIONS RECOMMENDATIONS