MATERIAL
FECHA:
12/17/2015
TAMAO
UNI
KG/UNI
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
24.92
37.39
49.85
62.31
74.77
99.70
124.62
149.54
174.47
199.39
224.31
249.24
261.70
274.16
299.09
324.01
348.93
373.86
398.78
598.17
797.56
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
37.39
49.85
62.31
74.77
99.70
124.62
149.54
174.47
199.39
224.31
249.24
261.70
274.16
299.09
GENERO: RF
AR EAS
area1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,905.11
2,967.04
10,483.98
6,004.96
2,334.50
197.62
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,905.11
2,967.04
10,483.98
6,004.96
2,334.50
197.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
157.95
59.52
168.26
80.31
26.76
1.98
0.00
0.00
0.00
0.00
0.00
MATERIAL
PLACA A-50 1 5/8" (41.3 MM)
PLACA A-50 1 3/4" (44.5 MM)
PLACA A-50 1 7/8" (47.6 MM)
PLACA A-572 G50 2" (50.8 MM)
PLACA A-50 3" (76.2 MM)
PLACA A-50 4" (101.6 MM)
PLACA A-572 G50 2 1/2" (64 MM)
SOLERA A-36 2" x 1/8"
SOLERA A-36 2" x 3/16"
SOLERA A-36 2" x 1/4"
FECHA:
TAMAO
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6 x 20
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
324.01
348.93
373.86
398.78
598.17
797.56
498.48
1.27
1.90
2.53
1.97
2.85
3.80
3.77
5.06
6.33
7.60
10.13
7.60
9.50
11.39
15.19
18.99
22.79
10.13
12.26
15.28
20.26
25.33
30.39
GENERO: RF
AR EAS
0.00
3,602.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
3,602.17
20.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
SOLERA A-36 10" x 1/4"
SOLERA A-36 10" x 5/16"
SOLERA A-36 10" x 3/8"
SOLERA A-36 10" x 1/2"
SOLERA A-36 10" x 5/8"
SOLERA A-36 10" x 3/4"
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
3' x 10'
3' x 10'
3' x 10'
3.00
4.00
4.00
4.00
5.00
5.00
5.00
6.00
6.00
6.00
8.00
8.00
8.00
10.00
10.00
10.00
10.00
10.00
12.00
12.00
12.00
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
12.62
15.74
19.02
25.25
31.64
38.03
43.27
56.03
15.70
2.66
3.50
4.57
5.78
3.80
5.11
6.47
4.53
6.17
7.84
5.67
7.88
10.17
6.36
6.42
6.82
9.59
12.37
8.00
11.01
14.40
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
POLIN 3" CAL 14 NEGRO
POLIN 4" CAL 14 NEGRO
POLIN 4" CAL 12 NEGRO
POLIN 4" CAL 10 NEGRO
POLIN 5" CAL 14 NEGRO
POLIN 5" CAL 12 NEGRO
POLIN 5" CAL 10 NEGRO
POLIN 6" CAL 14 NEGRO
POLIN 6" CAL 12 NEGRO
POLIN 6" CAL 10 NEGRO
POLIN 8" CAL 16 NEGRO
POLIN 8" CAL 14 NEGRO
POLIN 8" CAL 12 NEGRO
POLIN 8" CAL 10 NEGRO
POLIN 10" x 2 3/4" CAL 14 NEGRO
POLIN 10" x 3" CAL 14 NEGRO
POLIN 10" x 3 1/2" CAL 14 NEGRO
POLIN 10" CAL 12 NEGRO
POLIN 10" CAL 10 NEGRO
POLIN 12" CAL 14 NEGRO
POLIN 12" CAL 12 NEGRO
POLIN 12" CAL 10 NEGRO
FECHA:
TAMAO
3.00
4.00
4.00
4.00
5.00
5.00
5.00
6.00
6.00
6.00
8.00
8.00
8.00
8.00
10.00
10.00
10.00
10.00
10.00
12.00
12.00
12.00
4.00
4.00
4.00
5.00
5.00
5.00
6.00
6.00
6.00
8.00
8.00
8.00
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
2.66
3.50
4.57
5.78
3.80
5.11
6.47
4.53
6.17
7.84
4.50
5.67
7.88
10.17
6.36
6.42
6.82
9.59
12.37
8.00
11.01
14.40
3.50
4.57
5.78
3.80
5.11
6.47
4.53
6.17
7.84
4.50
5.46
7.88
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
POLIN 8" CAL 10 A.R.
POLIN 10" CAL 14 A.R. GALVANIZADO
POLIN 10" CAL 12 A.R.
POLIN 10" CAL 10 A.R.
POLIN 12" CAL 14 A.R.
POLIN 12" CAL 12 A.R.
POLIN 12" CAL 10 A.R.
FECHA:
TAMAO
8.00
10.00
10.00
10.00
12.00
12.00
12.00
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
10.17
6.82
9.59
12.37
8.00
11.01
14.40
0.88
1.19
1.50
1.83
2.46
1.73
2.20
2.68
3.63
4.61
5.52
6.55
2.22
2.86
3.48
4.75
6.10
7.29
8.63
9.82
4.26
5.83
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
ANGULO 5/16" x 2 1/2"
ANGULO 5/16" x 3"
ANGULO 5/16" x 3 1/2"
ANGULO 5/16" x 4"
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
12.20
12.20
12.20
12.20
12.20
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
7.44
9.08
10.71
12.20
10.72
15.19
4.99
6.99
8.78
10.72
12.65
14.58
18.61
22.17
12.65
18.31
13.99
16.52
19.05
29.17
17.11
23.36
36.01
27.53
42.71
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
ANGULO 7/8" x 6"
FECHA:
TAMAO
12.20
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
49.26
0.88
1.19
1.50
1.83
2.46
1.73
2.20
2.68
3.63
4.61
5.52
6.55
2.22
2.86
3.48
4.75
6.10
7.29
8.63
9.82
4.26
5.83
7.44
9.08
10.71
12.20
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
12.20
12.20
12.20
12.20
12.20
12.20
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
10.72
15.19
4.99
6.99
8.78
10.72
12.65
14.58
22.17
12.65
18.31
13.99
16.52
19.05
29.17
17.11
23.36
36.01
27.53
42.71
49.26
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
FECHA:
MATERIAL
IR 6" x 13.6 KG/ML (9 LB/FT) A-50
IR 6" x 18.0 KG/ML (12 LB/FT) A-50
IR 6" x 22.4 KG/ML (15 LB/FT) A-50
IR 6" x 24.0 KG/ML (16 LB/FT) A-50
TAMAO
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
13.60
18.00
22.40
24.00
15.00
19.40
22.50
26.60
31.20
71.40
86.60
31.20
22.30
25.30
28.50
32.90
38.50
44.80
49.20
58.20
131.20
131.20
67.40
21.10
23.90
28.20
32.80
38.70
44.50
52.20
59.80
66.90
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
IR 12" x 74.4 KG/ML (50 LB/FT) A-50
IR 12" x 96.7 KG/ML (65 LB/FT) A-50
FECHA:
TAMAO
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
74.40
96.70
32.90
38.90
44.80
50.60
56.70
63.80
71.40
79.00
134.20
147.40
56.70
38.90
46.20
53.70
59.80
67.40
74.40
85.10
99.80
52.20
59.80
68.40
74.50
82.00
89.10
96.70
105.30
68.40
128.10
82.00
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,338.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,171.95
0.00
0.00
92,166.69
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,338.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,171.95
0.00
0.00
92,166.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.46
0.00
0.00
2,333.39
FECHA:
MATERIAL
IR 18" x 157.7 KG/ML (106 LB/FT) A-50
IR 18" x 177.8 KG/ML (119 LB/FT) A-50
TAMAO
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
157.70
177.80
65.80
74.40
84.60
92.70
150.90
165.60
181.80
196.50
218.80
82.00
92.20
101.60
113.40
125.10
140.30
217.80
241.60
125.60
140.30
151.90
169.70
133.90
147.40
238.00
37.30
42.40
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
0.48
0.37
0.72
0.55
1.45
1.17
0.95
0.72
1.87
1.52
1.22
0.93
3.08
2.23
1.81
1.46
1.11
2.60
2.10
4.09
2.96
2.39
1.93
4.92
3.60
2.92
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PINTURA
MATERIAL
PERFIL ZR 200 CAL 18 (2" x 1") GALV.
PERFIL ZR 400 CAL 16 (4" x 1 1/2")
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.00
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
1.47
3.15
1.62
2.10
2.95
3.29
4.02
2.95
4.00
4.54
5.45
6.43
5.84
6.47
8.32
7.12
8.72
10.20
13.11
15.74
8.39
10.20
12.10
15.64
6.03
12.03
14.02
2.22
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
PTR 3" x 2" (3.0 MM) BCO
PTR 3" x 2" (3.8 MM) VDE
PTR 3" x 2" (4.6 MM) ROJO
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
12.20
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
12.20
12.20
12.20
12.20
12.20
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
5.84
7.13
8.37
7.12
8.72
10.28
8.39
10.28
12.16
15.92
17.90
23.20
92.95
14.02
18.17
22.07
25.70
32.19
18.00
13.11
15.92
21.62
28.30
34.73
40.89
52.44
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
FECHA:
TAMAO
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
12.20
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
25.42
33.36
29.21
38.42
47.38
56.10
72.70
88.28
48.56
60.00
71.28
92.95
113.60
58.68
72.71
86.46
56.10
72.70
88.28
85.36
101.66
133.46
98.00
116.85
153.73
2.50
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
FECHA:
TAMAO
12.20
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
113.20
3.39
4.05
5.41
5.44
7.48
8.63
11.41
11.29
15.27
13.57
18.64
16.08
22.32
21.77
30.97
19.10
28.26
42.56
67.57
33.32
36.82
42.55
64.64
90.40
100.93
41.77
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
TUBO 10" (273 x 7.80 MM) CED-30
TUBO 10" (273 x 9.27 MM) CED-40 E A-50
TUBO 10" (273 x 12.70 MM) CED-60 XE
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
51.03
60.31
81.56
49.73
65.21
73.88
79.73
97.47
132.09
54.69
67.91
81.33
94.55
107.40
62.65
77.83
93.27
123.31
70.57
87.72
122.38
139.16
155.81
205.75
78.56
117.15
155.13
183.43
247.84
94.53
141.12
187.07
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
TUBO 24" (610 x 14.27 MM) CED-30
TUBO 24" (610 x 17.48 MM) CED-40
TUBO 36" (914 x 22.23 MM) -TUBO 24" (610 x 24.61 MM) CED-60
CANAL 3" x 6.10 KG/ML
TUBO 36" (914 x 19.05 MM) -CANAL 4" x 8.04 KG/ML
CANAL 4" x 10.79 KG/ML
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
12.20
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
12/17/2015
KG/UNI
209.65
255.42
488.89
354.82
6.10
420.45
8.04
10.79
12.20
15.63
19.35
17.11
20.46
27.90
31.62
22.76
29.76
37.20
44.64
30.80
37.20
44.64
0.25
0.56
0.76
0.99
1.26
1.55
2.24
3.05
3.97
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MATERIAL
VARILLA LISA 1 1/16" A-36
VARILLA LISA 1 1/8" A-36
VARILLA LISA 1 1/4" A-36
VARILLA LISA 1 3/8" A-36
VARILLA LISA 1 1/2" A-36
TORNILLERIA
FECHA:
TAMAO
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
6.10
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
UNI
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
UNID
12/17/2015
KG/UNI
4.48
5.02
6.21
7.51
9.00
0.25
0.56
0.76
0.99
1.26
1.55
2.24
1.55
3.97
4.48
5.02
6.21
7.51
9.00
9.00
0.56
1.00
1.56
2.25
3.98
6.23
7.50
8.94
GENERO: RF
AR EAS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133,172.79
CANT
TOTAL
PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133,172.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,031.96
0.0046
COTIZACION AL:
-
MATERIAL
TOR. A325 1 1/2" x 6" TC
TOR. A325 1 1/2" x 5 3/4" TC
TOR. A325 1 1/2" x 5 1/2" TC
TOR. A325 1 1/2" x 5 1/4" TC
TOR. A325 1 1/2" x 5" TC
TOR. A325 1 1/2" x 4 3/4" TC
TOR. A325 1 1/2" x 4 1/2" TC
TOR. A325 1 1/2" x 4 1/4" TC
TOR. A325 1 1/2" x 4" TC
TOR. A325 1 1/4" x 5 1/2" TC
TOR. A325 1 1/4" x 5 1/4" TC
TOR. A325 1 1/4" x 5" TC
TOR. A325 1 1/4" x 4 3/4" TC
TOR. A325 1 1/4" x 4 1/2" TC
TOR. A325 1 1/4" x 4 1/4" TC
TOR. A325 1 1/4" x 4" TC
TOR. A325 1 1/4" x 3 3/4" TC
TOR. A325 1 1/4" x 3 1/2" TC
TOR. A325 1 1/4" x 3 1/4" TC
TOR. A325 1 1/4" x 3" TC
TOR. A325 1 1/8" x 5 1/2" TC
TOR. A325 1 1/8" x 5 1/4" TC
TOR. A325 1 1/8" x 5" TC
TOR. A325 1 1/8" x 4 3/4" TC
TOR. A325 1 1/8" x 4 1/2" TC
TOR. A325 1 1/8" x 4 1/4" TC
TOR. A325 1 1/8" x 4" TC
TOR. A325 1 1/8" x 3 3/4" TC
TOR. A325 1 1/8" x 3 1/2" TC
TOR. A325 1 1/8" x 3 1/4" TC
TOR. A325 1 1/8" x 3" TC
TOR. A325 1" x 5" TC
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
Err:504
TOTAL
Err:504
PINTURA
-
MATERIAL
TOR. A325 1" x 4 3/4" TC
TOR. A325 1" x 4 1/2" TC
TOR. A325 1" x 4 1/4" TC
TOR. A325 1" x 4" TC
TOR. A325 1" x 3 3/4" TC
TOR. A325 1" x 3 1/2" TC
TOR. A325 1" x 3 1/4" TC
TOR. A325 1" x 3" TC
TOR. A325 1" x 2 3/4" TC
TOR. A325 1" x 2 1/2" TC
TOR. A325 1" x 2 1/4" TC
TOR. A325 1" x 2" TC
TOR. A325 7/8" x 4" TC
TOR. A325 7/8" x 3 3/4" TC
TOR. A325 7/8" x 3 1/2" TC
TOR. A325 7/8" x 3 1/4" TC
TOR. A325 7/8" x 3" TC
TOR. A325 7/8" x 2 3/4" TC
TOR. A325 7/8" x 2 1/2" TC
TOR. A325 7/8" x 2 1/4" TC
TOR. A325 7/8" x 2" TC
TOR. A325 3/4" x 3 1/2" TC
TOR. A325 3/4" x 3 1/4" TC
TOR. A325 3/4" x 3" TC
TOR. A325 3/4" x 2 3/4" TC
TOR. A325 3/4" x 2 1/2" TC
TOR. A325 3/4" x 2 1/4" TC
TOR. A325 3/4" x 2" TC
TOR. A325 3/4" x 1 3/4" TC
TOR. A325 5/8" x 3" TC
TOR. A325 5/8" x 2 3/4" TC
TOR. A325 5/8" x 2 1/2" TC
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TOR. A325 5/8" x 2 1/4" TC
TOR. A325 5/8" x 2" TC
TOR. A325 5/8" x 1 3/4" TC
TOR. A325 5/8" x 1 1/2" TC
TOR. A325 1 1/2" x 6"
TOR. A325 1 1/2" x 5 3/4"
TOR. A325 1 1/2" x 5 1/2"
TOR. A325 1 1/2" x 5 1/4"
TOR. A325 1 1/2" x 5"
TOR. A325 1 1/2" x 4 3/4"
TOR. A325 1 1/2" x 4 1/2"
TOR. A325 1 1/2" x 4 1/4"
TOR. A325 1 1/2" x 4"
TOR. A325 1 1/4" x 5 1/2"
TOR. A325 1 1/4" x 5 1/4"
TOR. A325 1 1/4" x 5"
TOR. A325 1 1/4" x 4 3/4"
TOR. A325 5/8" x 2 1/4" TC
TOR. A325 1 1/4" x 4 1/4"
TOR. A325 1 1/4" x 4"
TOR. A325 1 1/4" x 3 3/4"
TOR. A325 1 1/4" x 3 1/2"
TOR. A325 1 1/4" x 3 1/4"
TOR. A325 1 1/4" x 3"
TOR. A325 1 1/8" x 5 1/2"
TOR. A325 1 1/8" x 5 1/4"
TOR. A325 1 1/8" x 5"
TOR. A325 1 1/8" x 4 3/4"
TOR. A325 1 1/8" x 4 1/2"
TOR. A325 1 1/8" x 4 1/4"
TOR. A325 1 1/8" x 4"
TOR. A325 1 1/8" x 3 3/4"
TOR. A325 1 1/8" x 3 1/2"
TOR. A325 1 1/8" x 3 1/4"
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TOR. A325 1 1/8" x 3"
TOR. A325 1" x 5"
TOR. A325 1" x 4 3/4"
TOR. A325 1" x 4 1/2"
TOR. A325 1" x 4 1/4"
TOR. A325 1" x 4"
TOR. A325 1" x 3 3/4"
TOR. A325 1" x 3 1/2"
TOR. A325 1" x 3 1/4"
TOR. A325 1" x 3"
TOR. A325 1" x 2 3/4"
TOR. A325 1" x 2 1/2"
TOR. A325 1" x 2 1/4"
TOR. A325 1" x 2"
TOR. A325 7/8" x 4"
TOR. A325 7/8" x 3 3/4"
TOR. A325 7/8" x 3 1/2"
TOR. A325 7/8" x 3 1/4"
TOR. A325 7/8" x 3"
TOR. A325 7/8" x 2 3/4"
TOR. A325 7/8" x 2 1/2"
TOR. A325 7/8" x 2 1/4"
TOR. A325 7/8" x 2"
TOR. A325 3/4" x 3 1/2"
TOR. A325 3/4" x 3 1/4"
TOR. A325 3/4" x 3"
TOR. A325 3/4" x 2 3/4"
TOR. A325 3/4" x 2 1/2"
TOR. A325 3/4" x 2 1/4"
TOR. A325 3/4" x 2"
TOR. A325 3/4" x 1 3/4"
TOR. A325 5/8" x 3"
TOR. A325 5/8" x 2 3/4"
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TOR. A325 5/8" x 2 1/2"
TOR. A325 5/8" x 2 1/4"
TOR. A325 5/8" x 2"
TOR. A325 5/8" x 1 3/4"
TOR. A325 5/8" x 1 1/2"
TOR. A325 1/2" x 2 1/2"
TOR. A325 1/2" x 2 1/4"
TOR. A325 1/2" x 2"
TOR. A325 1/2" x 1 3/4"
TOR. A325 1/2" x 1 1/2"
TOR. A490 1 1/2" x 6"
TOR. A490 1 1/2" x 5 3/4"
TOR. A490 1 1/2" x 5 1/2"
TOR. A490 1 1/2" x 5 1/4"
TOR. A490 1 1/2" x 5"
TOR. A490 1 1/2" x 4 3/4"
TOR. A490 1 1/2" x 4 1/2"
TOR. A490 1 1/2" x 4 1/4"
TOR. A490 1 1/2" x 4"
TOR. A490 1 1/4" x 5 1/2"
TOR. A490 1 1/4" x 5 1/4"
TOR. A490 1 1/4" x 5"
TOR. A490 1 1/4" x 4 3/4"
TOR. A490 1 1/4" x 4 1/2"
TOR. A490 1 1/4" x 4 1/4"
TOR. A490 1 1/4" x 4"
TOR. A490 1 1/4" x 3 3/4"
TOR. A490 1 1/4" x 3 1/2"
TOR. A490 1 1/4" x 3 1/4"
TOR. A490 1 1/4" x 3"
TOR. A490 1 1/8" x 5 1/2"
TOR. A490 1 1/8" x 5 1/4"
TOR. A490 1 1/8" x 5"
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TOR. A490 1 1/8" x 4 3/4"
TOR. A490 1 1/8" x 4 1/2"
TOR. A490 1 1/8" x 4 1/4"
TOR. A490 1 1/8" x 4"
TOR. A490 1 1/8" x 3 3/4"
TOR. A490 1 1/8" x 3 1/2"
TOR. A490 1 1/8" x 3 1/4"
TOR. A490 1 1/8" x 3"
TOR. A490 1" x 5"
TOR. A490 1" x 4 3/4"
TOR. A490 1" x 4 1/2"
TOR. A490 1" x 4 1/4"
TOR. A490 1" x 4"
TOR. A490 1" x 3 3/4"
TOR. A490 1" x 3 1/2"
TOR. A490 1" x 3 1/4"
TOR. A490 1" x 3"
TOR. A490 1" x 2 3/4"
TOR. A490 1" x 2 1/2"
TOR. A490 1" x 2 1/4"
TOR. A490 1" x 2"
TOR. A490 7/8" x 4"
TOR. A490 7/8" x 3 3/4"
TOR. A490 7/8" x 3 1/2"
TOR. A490 7/8" x 3 1/4"
TOR. A490 7/8" x 3"
TOR. A490 7/8" x 2 3/4"
TOR. A490 7/8" x 2 1/2"
TOR. A490 7/8" x 2 1/4"
TOR. A490 7/8" x 2"
TOR. A490 3/4" x 3 1/2"
TOR. A490 3/4" x 3 1/4"
TOR. A490 3/4" x 3"
TOR. A490 3/4" x 2 3/4"
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TOR. A490 3/4" x 2 1/2"
TOR. A490 3/4" x 2 1/4"
TOR. A490 3/4" x 2"
TOR. A490 3/4" x 1 3/4"
TOR. A490 5/8" x 3"
TOR. A490 5/8" x 2 3/4"
TOR. A490 5/8" x 2 1/2"
TOR. A490 5/8" x 2 1/4"
TOR. A490 5/8" x 2"
TOR. A490 5/8" x 1 3/4"
TOR. A490 5/8" x 1 1/2"
TOR. A490 1/2" x 2 1/2"
TOR. A490 1/2" x 2 1/4"
TOR. A490 1/2" x 2"
TOR. A490 1/2" x 1 3/4"
TOR. A490 1/2" x 1 1/2"
TOR. G-5 5/8" x 2"
TOR. G-5 5/8" x 1 3/4"
TOR. G-5 5/8" x 1 1/2"
TOR. G-5 1/2" x 2"
TOR. G-5 1/2" x 1 3/4"
TOR. G-5 1/2" x 1 1/2"
TOR. G-5 1/2" x 1 1/4"
TOR. G-5 3/8" x 1 1/2"
TOR. G-5 3/8" x 1 1/4"
TUERCA 2H DE 1 1/2"
TUERCA 2H DE 1 3/8"
TUERCA 2H DE 1 1/4"
TUERCA 2H DE 1 1/8"
TUERCA 2H DE 1"
TUERCA 2H DE 7/8"
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
TUERCA 2H DE 3/4"
TUERCA 2H DE 5/8"
TUERCA 2H DE 1/2"
TUERCA 2H DE 3/8"
MATERIAL
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
ROLD. PLANA NEGRA 1 3/8"
ROLD. PLANA NEGRA 1 1/4"
ROLD. PLANA NEGRA 1 1/8"
ROLD. PLANA NEGRA 1"
ROLD. PLANA NEGRA 7/8"
ROLD. PLANA NEGRA 3/4"
ROLD. PLANA NEGRA 5/8"
ROLD. PLANA NEGRA 1/2"
ROLD. PLANA NEGRA 3/8"
ROLDANA DE PRESION 1 1/2"
ROLDANA DE PRESION 1 3/8"
ROLDANA DE PRESION 1 1/4"
ROLDANA DE PRESION 1"
ROLDANA DE PRESION 7/8"
ROLDANA DE PRESION 3/4"
ROLDANA DE PRESION 5/8"
ROLDANA DE PRESION 1/2"
ROLD. PLANA GALV. 1 1/2"
ROLD. PLANA GALV. 1 3/8"
ROLD. PLANA GALV. 1 1/4"
ROLD. PLANA GALV. 1 1/8"
ROLD. PLANA GALV. 1"
ROLD. PLANA GALV. 7/8"
ROLD. PLANA GALV. 3/4"
ROLD. PLANA GALV. 5/8"
ROLD. PLANA GALV. 1/2"
ROLD. PLANA GALV. 3/8"
TUERCA A307 DE 1 1/2" GALV.
TUERCA A307 DE 1 3/8" GALV.
TUERCA A307 DE 1 1/4" GALV.
TUERCA A307 DE 1 1/8" GALV.
TUERCA A307 DE 1" GALV.
TUERCA A307 DE 7/8" GALV.
TUERCA A307 DE 3/4" GALV.
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TUERCA A307 DE 5/8" GALV.
TUERCA A307 DE 1/2" GALV.
TUERCA A307 DE 3/8" GALV.
TOR. A307 3/4" x 3" GALV.
TOR. A307 3/4" x 2 3/4" GALV.
TOR. A307 3/4" x 2 1/2" GALV.
TOR. A307 3/4" x 2 1/4" GALV.
TOR. A307 3/4" x 2" GALV.
ROLD. PLANA GALV. 1/2"
ROLD. PLANA GALV. 3/8"
TOR. A307 5/8" x 3" GALV.
TOR. A307 5/8" x 2 3/4" GALV.
TOR. A307 5/8" x 2 1/2" GALV.
TOR. A307 5/8" x 2 1/4" GALV.
TOR. A307 5/8" x 2" GALV.
TOR. A307 5/8" x 1 3/4" GALV.
TOR. A307 5/8" x 1 1/2" GALV.
TOR. A307 1/2" x 2 1/2" GALV.
TUERCA A307 DE 3/8" GALV.
TOR. A307 1/2" x 2" GALV.
TOR. A307 1/2" x 1 3/4" GALV.
TOR. A307 1/2" x 1 1/2" GALV.
TOR. A307 1/2" x 1 1/4" GALV.
TOR. A307 3/8" x 2" GALV.
TOR. A307 3/8" x 1 3/4" GALV.
TOR. A307 3/8" x 1 1/2" GALV.
TOR. A307 3/8" x 1 1/4" GALV.
TUERCA A307 DE 5/8" NEGRA
TUERCA A307 DE 1/2" NEGRA
TUERCA A307 DE 3/8" NEGRA
TOR. A307 5/8" x 4" NEGRO
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TOR. A307 5/8" x 3 1/2" NEGRO
TOR. A307 5/8" x 3" NEGRO
TOR. A307 5/8" x 2 3/4" NEGRO
TOR. A307 5/8" x 2 1/2" NEGRO
TOR. A307 5/8" x 2 1/4" NEGRO
TOR. A307 5/8" x 2" NEGRO
TOR. A307 5/8" x 1 3/4" NEGRO
TOR. A307 5/8" x 1 1/2" NEGRO
TOR. A307 1/2" x 1" GALV.
TOR. A307 1/2" x 4" NEGRO
TOR. A307 1/2" x 3 1/2" NEGRO
TOR. A307 1/2" x 3" NEGRO
TOR. A307 1/2" x 2 3/4" NEGRO
TOR. A307 1/2" x 2 1/2" NEGRO
TOR. A307 3/8" x 1" GALV.
TOR. A307 1/2" x 2" NEGRO
TOR. A307 1/2" x 1 3/4" NEGRO
TUERCA A307 DE 1/2" NEGRA
TOR. A307 1/2" x 1 1/4" NEGRO
TOR. A307 3/8" x 2" NEGRO
TOR. A307 3/8" x 1 3/4" NEGRO
TOR. A307 3/8" x 1 1/2" NEGRO
TOR. A307 3/8" x 1 1/4" NEGRO
VAR-ROSCADA A-307 1" x 1.00 MT GALV
VAR-ROSCADA A-307 3/4" x 1.00 MT GALV
VAR-ROSCADA A-307 5/8" x 1.00 MT GALV
VAR-ROSCADA A-307 1/2" x 1.00 MT GALV
VAR-ROSCADA A-307 3/8" x 1.00 MT GALV
VAR-ROSCADA GRADO B-7 5/8" x 3.00 MT
VAR-ROSCADA GRADO B-7 1/2" x 3.00 MT
TAQ. ANCLA ARPON 5/8" x 6"
TAQ. ANCLA ARPON 5/8" x 5 1/2"
TAQ. ANCLA ARPON 5/8" x 5"
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
TOTAL
PINTURA
MATERIAL
TAQ. ANCLA ARPON 1/2" x 4 1/2"
TAQ. ANCLA ARPON 1/2" x 4"
TAQ. ANCLA ARPON 1/2" x 3 3/4"
TAQ. ANCLA ARPON 3/8" x 4"
TAQ. ANCLA ARPON 3/8" x 3 3/4"
TAQ. HILTI HVA 3/4" x 6 5/8"
TAQ. HILTI HVA 1/2" x 3 1/2"
TAQ. HILTI HVA 5/8" x 7 5/8"
TAQ. HILTI KB-III 5/8" x 4 3/4"
TAQ. HILTI KB-III 1/2" x 4 3/4"
TAQ. HILTI KB-III 1/2" x 5 1/2"
VAR-ROSCADA A-307 1/2" x 1.00 MT GALV
VAR-ROSCADA A-307 3/8" x 1.00 MT GALV
NEOPRENO DE 3/8" x 1.00 MT x 1.00 MT
PERNO NELSON 3/4" x 4" C/CABEZA
FECHA:
TAMAO
UNI
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
12/17/2015
KG/UNI
GENERO: RF
AR EAS
Err:504
TOTAL
PINTURA
P.U.
10.80
10.10
10.80
10.80
10.10
10.20
11.80
DESP.
M.O.
3%
11.12
10.40
11.12
11.12
10.40
10.51
12.15
-
FYM
$2.50
$3.50
$3.50
$3.00
$3.00
$3.00
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$62.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$2,500.00
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
P.U. C/ INDIRECTO
C/FLETE
$2.91
$16.22
$15.42
$15.72
$15.72
$14.92
$2.91
$14.54
$2.91
$16.36
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
20%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,167.99
8,626.12
30,480.22
17,458.30
6,787.11
574.53
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20,601.58
10,351.34
36,576.26
20,949.95
8,144.54
689.44
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
0
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#VALUE!
#VALUE!
#VALUE!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
12.00
12.36
-
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
0.00
10,472.62
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$1.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$16.59
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
12,567.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
M.O.
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#VALUE!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
TOTAL
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
16.80
11.65
11.65
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
TOTAL
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
$2.50
$1.85
0.2823
$0.13
$22.06
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$3.50
$3.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.28
$1.28
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$17.19
$17.19
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.30
12.00
12.00
-
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
12.10
DESP.
M.O.
12.46
-
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$3.00
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$17.20
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#VALUE!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
M.O.
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
M.O.
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,706.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
17,943.78
0.00
0.00
267,957.34
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11,648.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21,532.54
0.00
0.00
321,548.81
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
M.O.
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#VALUE!
#VALUE!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
16.80
DESP.
M.O.
17.30
-
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$3.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$23.06
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
12.20
11.30
11.30
12.90
12.57
11.64
11.64
13.29
-
M.O.
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$3.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$3.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$16.82
$2.91
$2.91
$2.91
$15.79
$15.79
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$17.61
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
12.20
11.30
12.90
12.90
DESP.
M.O.
12.57
11.64
-
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.34
$1.24
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$16.82
$15.79
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.29
-
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$1.42
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$17.61
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$1.42
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$17.61
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.29
-
SUBTOTAL
P.U. C/ INDIRECTO
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
13.50
DESP.
M.O.
13.91
-
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$18.30
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
-
M.O.
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
TOTAL
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10.75
DESP.
M.O.
11.07
-
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$5.00
$2.50
$2.50
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
SUBTOTAL
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$17.66
$2.91
$2.91
P.U. C/ INDIRECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
DESP.
-
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
0.2823
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$0.13
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
$2.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$2.50
$0.00
0.2823
$0.13
$2.91
0.00
0.00
387,174.87
464,609.85
83.63
LT/KG
0.00
INDIRECTO
P.U.
TOTAL
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
$2.50
10%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
DESP.
M.O.
SUBTOTAL
P.U. C/ INDIRECTO
SUBTOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL
15,073.00
SUBTOTAL I + II $ 479,682.85
$/KG
3.60
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
ESWTRUCTURA METALICA
MATERIAL
TRAMO
0
0
368
28
28
28
26
27
T174
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
PAG. 94 DE 452
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T174
AP4
AP5
CAL2
CAL3
368
28
28
26
26
T176
T176
AP5
CAL3
T178
T178
AP5
AP13
CAL3
CAL10
0
368
28
28
26
26
T182
T182
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
PAG. 95 DE 452
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP4
CAL2
CC6
28
26
27
T183
T183
AP12
AP13
CAL10
368
28
28
26
T186
T186
AP12
AP13
CAL10
CP28
368
28
28
26
30
T189
T189
AP14
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
PAG. 96 DE 452
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP15
AT62
AT63
CAL13
CAL14
PA10
PA11
PA12
PA14
28
26
26
27
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
G50
5/8"
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
0
T191
T191
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
368
28
28
26
26
27
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA12
PA13
28
28
T194
T194
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T197
T197
AP15
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
PAG. 98 DE 452
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
28
26
26
27
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
G50
5/8"
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
0
T199
T197
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
368
28
28
26
26
27
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA12
PA13
28
28
T201
T201
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T205
T205
AP5
AP10
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP11
CAL3
CAL11
CC6
28
26
26
27
T212
T212
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
G50
G50
G50
G50
5/8"
3/8"
3/8"
1/2"
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
0
368
28
28
26
26
27
27
28
28
28
28
T214
T214
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
28
28
26
26
27
27
28
28
28
28
T215
T215
AP5
AP16
AT62
CAL13
CAL12
PA10
PA13
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
5/8"
5/8"
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(15.9 MM)
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
368
28
28
26
26
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T219
T219
AP15
AT63
CAL13
CAL23
PA11
PA12
0
368
28
26
27
26
28
28
T226
T226
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
0
368
28
28
26
26
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T228
T228
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
0
368
28
28
26
26
27
28
28
T236
T236
AP14
AP19
CAL17
CAL18
0
368
28
28
27
27
T237
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T237
AP19
CAL17
T240
T240
AP19
CAL17
CAL23
0
368
28
27
26
T241
T241
AP20
AP21
AP22
AP23
AT62
CAL16
CAL22
0
368
28
28
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
PA10
PA18
28
28
0
368
28
28
28
26
27
T174
T174
AP4
AP5
CAL2
CAL3
0
368
28
28
26
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T176
T176
AP5
CAL3
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
26 PLACA A-572 G50 3/8" (9.5 MM)
T178
T178
AP5
AP13
CAL3
CAL10
0
368
28
28
26
26
T182
T182
AP4
CAL2
CC6
0
368
28
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T183
T183
AP12
AP13
CAL10
0
368
28
28
26
T186
T186
AP12
AP13
CAL10
CP28
368
28
28
26
30
T189
T189
AP14
AP15
AT62
AT63
CAL13
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL14
PA10
PA11
PA12
PA14
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T191
T191
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T194
T194
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T197
T197
AP15
AP16
AT62
AT63
CAL12
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL13
PA10
PA11
PA12
PA13
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T199
T197
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T201
T201
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T212
T212
AP15
AP16
AT62
AT63
CAL12
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL13
PA10
PA11
PA12
PA13
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T214
T214
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T215
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T215
AP5
AP16
AT62
CAL13
CAL12
PA10
PA13
368
28
28
26
26
27
28
28
T219
T219
AP15
AT63
CAL13
CAL23
PA11
PA12
0
368
28
26
27
26
28
28
T226
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T226
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
368
28
28
26
26
27
28
28
T228
T228
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
0
368
28
28
26
26
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T236
T236
AP14
AP19
CAL17
CAL18
0
368
28
28
27
27
T237
T237
AP19
CAL17
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
27 PLACA A-572 G50 1/2" (12.7 MM)
T240
T240
AP19
CAL17
CAL23
0
368
28
27
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T243
T243
AP5
AP10
AP11
CAL3
CAL11
CAL25
CC6
0
368
28
28
28
26
26
26
27
T247
T247
AP16
AT62
CAL12
PA10
PA13
0
368
28
26
27
28
28
T256
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T256
AP5
CAL3
T259
T259
AP22
AP23
AP27
AP28
AT62
CAL16
CAL26
CC25
PA10
PA23
0
368
28
28
28
28
26
26
27
27
28
28
T260
T260
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
AP20
AP26
AP27
AP28
AT62
CAL25
CAL26
CAL27
CC6
CC25
PA10
PA23
28
28
28
28
26
26
27
26
27
27
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
5/8"
5/8"
5/8"
5/8"
3/8"
3/8"
1/2"
3/8"
1/2"
1/2"
5/8"
5/8"
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
28 PLACA A-572 G50 5/8" (15.9 MM)
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP11
CAL11
CC6
28
26
27
T174
T174
AP4
AP5
CAL2
CAL3
0
368
28
28
26
26
T182
T182
AP4
CAL2
CC6
0
368
28
26
27
T183
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T183
AP12
AP13
CAL10
368
28
28
26
T186
T186
AP12
AP13
CAL10
CP28
0
368
28
28
26
30
T189
T189
AP14
AP15
AT62
AT63
CAL13
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL14
PA10
PA11
PA12
PA14
27
28
28
28
28
T191
T191
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T194
T194
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T197
T197
AP15
AP16
AT62
AT63
CAL12
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL13
PA10
PA11
PA12
PA13
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T199
T197
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T201
T201
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T205
T205
AP5
AP10
AP11
CAL3
CAL11
0
368
28
28
28
26
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CC6
27
T212
T212
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T214
T214
AP15
AP16
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
26
26
27
27
28
28
28
28
T215
T215
AP5
AP16
AT62
CAL13
CAL12
PA10
PA13
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
368
28
28
26
26
27
28
28
T219
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T219
AP15
AT63
CAL13
CAL23
PA11
PA12
368
28
26
27
26
28
28
T236
T236
AP14
AP19
CAL17
CAL18
368
28
28
27
27
T237
T237
AP19
CAL17
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
0
0
0
T240
T240
AP19
CAL17
CAL23
368
28
27
26
T263
T263
PA25
AP5
CAL3
AT62
AP19
PA24
CAL29
AT67
0
368
28
28
26
26
28
28
27
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
T272
T272
PA25
AP5
CAL3
AT62
AP19
PA24
CAL29
AT67
0
368
28
28
26
26
28
28
27
26
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T80
T80
CC7
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
26 PLACA A-572 G50 3/8" (9.5 MM)
T81
T81
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
T88
T88
CC7
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
26 PLACA A-572 G50 3/8" (9.5 MM)
T89
T89
CC7
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
26 PLACA A-572 G50 3/8" (9.5 MM)
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
T93
T93
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
AP4
28
CAL2
26
CC26
27
T26
T26
CC8
27
TP25
38
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T31
T31
AP1
31
CC26
27
T49
T49
AP1
31
CC26
27
T151
T151
AP1
31
CC27
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T152
T152
AT40
27
AT41
27
CAL6
27
CC6
27
CP23
38
CP24
38
PA5
38
PA6
38
T179
T179
AP13
28
CAL10
26
T181
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T181
AP13
28
CAL10
26
T184
T184
AP13
28
CAL10
26
T187
T187
AP13
28
CAL10
26
CP29
30
T192
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T192
AP16
28
AT62
26
CAL12
27
CP26
30
CP27
30
PA10
28
PA13
28
T195
T195
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T198
T198
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T200
T200
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T202
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T202
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T204
T204
AP13
28
CAL10
26
T208
T208
AP16
28
AT62
26
CAL12
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA10
28
PA13
28
T210
T210
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T213
T213
AP16
28
AT62
26
CAL12
27
CAL34
26
PA10
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA13
28
T216
T216
AP1
31
CC6
27
CC29
27
CC30
27
T220
T220
AP14
28
CAL18
27
T221
T221
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP14
28
CAL18
27
T222
T222
AP14
28
CAL18
27
T245
T245
AP14
30
T277
T277
AP13
28
CAL10
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
29
29
29
29
PM39
PM39
PM40
PM40
PM41
PM41
PM42
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PM42
29
29
29
29
29
PM43
PM43
PM44
PM44
PM45
PM45
PM46
PM46
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PM47
PM47
29
29
29
29
29
PM48
PM48
PM49
PM49
PM50
PM50
PM51
PM51
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PM52
PM52
29
29
29
29
29
PM53
PM53
PM54
PM54
PM55
PM55
PM56
PM56
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
PM57
PM57
29
29
29
PM58
PM58
PM59
PM59
VIGAS DE GUITARRA
0
TG1
PT13
28
TG1
26
CC26
27
AT70
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
0
0
TG2
PT13
28
TG2
26
CC26
27
AT70
27
CAL39
26
TG3
TG3
26
PT78
28
PT17
28
CC26
27
PA31
28
AT70
27
PA29
28
AL78
26
AT69
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
TG4
TG4
26
PT78
28
PT17
28
CC26
27
PA31
28
AT70
27
PA29
28
AL78
26
CAL38
26
AT69
26
TG5
TG5
26
PT79
28
PT14
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CC26
27
AT70
27
PA32
28
PA30
28
PA29
28
AT69
26
AL80
26
AL79
26
TG7
TG7
26
PT18
28
PT77
28
CC26
27
PA33
28
AT70
27
PA29
28
AL77
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL36
26
AT69
26
TG8
TG8
26
PT18
28
PT77
28
CC26
27
PA33
28
AT70
27
CAL31
26
PA29
28
AL77
26
CAL36
26
AT69
26
TG9
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PT15
28
TG9
26
CC26
27
CC31
27
AT70
27
CAL33
26
CAL35
26
TG10
PT16
28
TG10
26
CC26
27
CC28
27
AT70
27
AT71
27
CAL32
26
CAL37
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
0
0
368
28
28
28
26
27
T174
T174
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP4
AP5
CAL2
CAL3
28
28
26
26
T176
T176
AP5
CAL3
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
G50
G50
G50
G50
5/8"
5/8"
3/8"
3/8"
(15.9 MM)
(15.9 MM)
(9.5 MM)
(9.5 MM)
0
T178
T178
AP5
AP13
CAL3
CAL10
0
368
28
28
26
26
T182
T182
AP4
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL2
CC6
26
27
T183
T183
AP12
AP13
CAL10
368
28
28
26
T186
T186
AP12
AP13
CAL10
CP28
368
28
28
26
30
T189
T189
AP14
AP15
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AT62
AT63
CAL13
CAL14
PA10
PA11
PA12
PA14
26
26
27
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
0
T191
T191
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
368
28
28
26
26
27
27
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA13
28
T194
T194
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T197
T197
AP15
AP16
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
26
26
27
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
0
T199
T197
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
368
28
28
26
26
27
27
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA13
28
T201
T201
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T205
T205
AP5
AP10
AP11
368
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL3
CAL11
CC6
26
26
27
T212
T212
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T214
T214
AP15
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
28
26
26
27
27
28
28
28
28
T215
T215
AP5
AP16
AT62
CAL13
CAL12
PA10
PA13
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
G50
5/8"
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
368
28
28
26
26
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T219
T219
AP15
AT63
CAL13
CAL23
PA11
PA12
0
368
28
26
27
26
28
28
T226
T226
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
0
368
28
28
26
26
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T228
T228
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
0
368
28
28
26
26
27
28
28
T236
T236
AP14
AP19
CAL17
CAL18
0
368
28
28
27
27
T237
T237
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP19
CAL17
28
27
T240
T240
AP19
CAL17
CAL23
0
368
28
27
26
T241
T241
AP20
AP21
AP22
AP23
AT62
CAL16
CAL22
PA10
0
368
28
28
28
28
26
26
27
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
PA18
28
0
368
28
28
28
26
27
T174
T174
AP4
AP5
CAL2
CAL3
0
368
28
28
26
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T176
T176
AP5
CAL3
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
26 PLACA A-572 G50 3/8" (9.5 MM)
T178
T178
AP5
AP13
CAL3
CAL10
0
368
28
28
26
26
T182
T182
AP4
CAL2
CC6
0
368
28
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T183
T183
AP12
AP13
CAL10
0
368
28
28
26
T186
T186
AP12
AP13
CAL10
CP28
368
28
28
26
30
T189
T189
AP14
AP15
AT62
AT63
CAL13
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL14
PA10
PA11
PA12
PA14
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T191
T191
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T194
T194
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T197
T197
AP15
AP16
AT62
AT63
CAL12
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL13
PA10
PA11
PA12
PA13
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T199
T197
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T201
T201
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T212
T212
AP15
AP16
AT62
AT63
CAL12
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL13
PA10
PA11
PA12
PA13
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T214
T214
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
T215
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T215
AP5
AP16
AT62
CAL13
CAL12
PA10
PA13
368
28
28
26
26
27
28
28
T219
T219
AP15
AT63
CAL13
CAL23
PA11
PA12
0
368
28
26
27
26
28
28
T226
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T226
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
368
28
28
26
26
27
28
28
T228
T228
AP5
AP16
AT62
CAL3
CAL12
PA10
PA13
0
368
28
28
26
26
27
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T236
T236
AP14
AP19
CAL17
CAL18
0
368
28
28
27
27
T237
T237
AP19
CAL17
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
27 PLACA A-572 G50 1/2" (12.7 MM)
T240
T240
AP19
CAL17
CAL23
0
368
28
27
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T243
T243
AP5
AP10
AP11
CAL3
CAL11
CAL25
CC6
0
368
28
28
28
26
26
26
27
T247
T247
AP16
AT62
CAL12
PA10
PA13
0
368
28
26
27
28
28
T256
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T256
AP5
CAL3
T259
T259
AP22
AP23
AP27
AP28
AT62
CAL16
CAL26
CC25
PA10
PA23
0
368
28
28
28
28
26
26
27
27
28
28
T260
T260
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
AP20
AP26
AP27
AP28
AT62
CAL25
CAL26
CAL27
CC6
CC25
PA10
PA23
28
28
28
28
26
26
27
26
27
27
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
G50
5/8"
5/8"
5/8"
5/8"
3/8"
3/8"
1/2"
3/8"
1/2"
1/2"
5/8"
5/8"
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(9.5 MM)
(9.5 MM)
(12.7 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
0
368 IR 18" x 82.0 KG/ML (55 LB/FT) A-50
28 PLACA A-572 G50 5/8" (15.9 MM)
28 PLACA A-572 G50 5/8" (15.9 MM)
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP11
CAL11
CC6
28
26
27
T174
T174
AP4
AP5
CAL2
CAL3
0
368
28
28
26
26
T182
T182
AP4
CAL2
CC6
0
368
28
26
27
T183
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T183
AP12
AP13
CAL10
368
28
28
26
T186
T186
AP12
AP13
CAL10
CP28
0
368
28
28
26
30
T189
T189
AP14
AP15
AT62
AT63
CAL13
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL14
PA10
PA11
PA12
PA14
27
28
28
28
28
T191
T191
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T194
T194
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T197
T197
AP15
AP16
AT62
AT63
CAL12
0
368
28
28
26
26
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL13
PA10
PA11
PA12
PA13
27
28
28
28
28
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
1/2"
5/8"
5/8"
5/8"
5/8"
(12.7
(15.9
(15.9
(15.9
(15.9
MM)
MM)
MM)
MM)
MM)
0
0
T199
T197
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
368
28
28
26
26
27
27
28
28
28
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T201
T201
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T205
T205
AP5
AP10
AP11
CAL3
CAL11
0
368
28
28
28
26
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CC6
27
T212
T212
AP15
AP16
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
0
368
28
28
26
26
27
27
28
28
28
28
T214
T214
AP15
AP16
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AT62
AT63
CAL12
CAL13
PA10
PA11
PA12
PA13
26
26
27
27
28
28
28
28
T215
T215
AP5
AP16
AT62
CAL13
CAL12
PA10
PA13
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
PLACA
A-572
A-572
A-572
A-572
A-572
A-572
A-572
A-572
G50
G50
G50
G50
G50
G50
G50
G50
3/8"
3/8"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
(9.5 MM)
(9.5 MM)
(12.7 MM)
(12.7 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
(15.9 MM)
0
368
28
28
26
26
27
28
28
T219
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T219
AP15
AT63
CAL13
CAL23
PA11
PA12
368
28
26
27
26
28
28
T236
T236
AP14
AP19
CAL17
CAL18
368
28
28
27
27
T237
T237
AP19
CAL17
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
0
0
0
T240
T240
AP19
CAL17
CAL23
368
28
27
26
T263
T263
PA25
AP5
CAL3
AT62
AP19
PA24
CAL29
AT67
0
368
28
28
26
26
28
28
27
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
T272
T272
PA25
AP5
CAL3
AT62
AP19
PA24
CAL29
AT67
0
368
28
28
26
26
28
28
27
26
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T80
T80
CC7
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
26 PLACA A-572 G50 3/8" (9.5 MM)
T81
T81
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
T88
T88
CC7
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
26 PLACA A-572 G50 3/8" (9.5 MM)
T89
T89
CC7
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
26 PLACA A-572 G50 3/8" (9.5 MM)
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
T93
T93
0
340 IR 14" x 56.7 KG/ML (38 LB/FT) A-50
AP4
28
CAL2
26
CC26
27
T26
T26
CC8
27
TP25
38
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T31
T31
AP1
31
CC26
27
T49
T49
AP1
31
CC26
27
T151
T151
AP1
31
CC27
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T152
T152
AT40
27
AT41
27
CAL6
27
CC6
27
CP23
38
CP24
38
PA5
38
PA6
38
T179
T179
AP13
28
CAL10
26
T181
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T181
AP13
28
CAL10
26
T184
T184
AP13
28
CAL10
26
T187
T187
AP13
28
CAL10
26
CP29
30
T192
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T192
AP16
28
AT62
26
CAL12
27
CP26
30
CP27
30
PA10
28
PA13
28
T195
T195
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T198
T198
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T200
T200
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T202
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
T202
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T204
T204
AP13
28
CAL10
26
T208
T208
AP16
28
AT62
26
CAL12
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA10
28
PA13
28
T210
T210
AP16
28
AT62
26
CAL12
27
PA10
28
PA13
28
T213
T213
AP16
28
AT62
26
CAL12
27
CAL34
26
PA10
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PA13
28
T216
T216
AP1
31
CC6
27
CC29
27
CC30
27
T220
T220
AP14
28
CAL18
27
T221
T221
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
AP14
28
CAL18
27
T222
T222
AP14
28
CAL18
27
T245
T245
AP14
30
T277
T277
AP13
28
CAL10
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
29
29
29
29
PM39
PM39
PM40
PM40
PM41
PM41
PM42
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PM42
29
29
29
29
29
PM43
PM43
PM44
PM44
PM45
PM45
PM46
PM46
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PM47
PM47
29
29
29
29
29
PM48
PM48
PM49
PM49
PM50
PM50
PM51
PM51
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PM52
PM52
29
29
29
29
29
PM53
PM53
PM54
PM54
PM55
PM55
PM56
PM56
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CONCEPTO
CLAVE
EJE
MATERIAL
TRAMO
PM57
PM57
29
29
29
PM58
PM58
PM59
PM59
VIGAS DE GUITARRA
0
TG1
PT13
28
TG1
26
CC26
27
AT70
27
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
0
0
TG2
PT13
28
TG2
26
CC26
27
AT70
27
CAL39
26
TG3
TG3
26
PT78
28
PT17
28
CC26
27
PA31
28
AT70
27
PA29
28
AL78
26
AT69
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
TG4
TG4
26
PT78
28
PT17
28
CC26
27
PA31
28
AT70
27
PA29
28
AL78
26
CAL38
26
AT69
26
TG5
TG5
26
PT79
28
PT14
28
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CC26
27
AT70
27
PA32
28
PA30
28
PA29
28
AT69
26
AL80
26
AL79
26
TG7
TG7
26
PT18
28
PT77
28
CC26
27
PA33
28
AT70
27
PA29
28
AL77
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
CAL36
26
AT69
26
TG8
TG8
26
PT18
28
PT77
28
CC26
27
PA33
28
AT70
27
CAL31
26
PA29
28
AL77
26
CAL36
26
AT69
26
TG9
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
MATERIAL
TRAMO
PT15
28
TG9
26
CC26
27
CC31
27
AT70
27
CAL33
26
CAL35
26
TG10
PT16
28
TG10
26
CC26
27
CC28
27
AT70
27
AT71
27
CAL32
26
CAL37
26
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
CONTRATO:
CONTRATISTA: NIDELVIA DEL SOCORRO AVILA CHAN.
CLAVE
CONCEPTO
EJE
TRAMO
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
MATERIAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
ANCHO
ALTO
1.000
1.000
1.000
0.00
0.00
0.00
3.236
0.054
0.054
0.054
0.300
0.250
1.000
1.000
0.350
0.339
0.400
0.400
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
74.77
99.70
0.00
265.35
9.42
4.56
5.38
8.97
17.45
0.00
265.35
9.42
4.56
5.38
8.97
17.45
1
4
2
2
1
2
KGS
PIEZAS
SUBTOTALDE
KGS
LARGO
0
KG
KG
KG
KG
KG
KG
KG/M2 O ML
CANTIDAD X
PIEZA
UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
TOTAL
311.14
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 211 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
7.436
0.054
0.054
0.300
0.300
1.000
0.425
0.348
0.425
0.348
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
74.77
CANTIDAD X
PIEZA
1
4
4
1
1
KGS
609.75
11.44
9.37
9.53
7.81
PIEZAS
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
609.75
11.44
9.37
9.53
7.81
647.90
0
KG
KG
KG
7.632
0.054
0.300
1.000
1.000
0.348
0.348
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
1
8
2
0.00
625.82
18.73
15.61
2.00
2.00
2.00
0.00
1,251.65
37.47
31.22
1,320.34
0
KG
KG
KG
KG
KG
7.632
0.054
0.054
0.300
0.300
1.000
1.000
0.348
0.418
0.348
0.418
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
625.82
9.37
11.25
7.81
9.38
2.00
2.00
2.00
2.00
2.00
0.00
1,251.65
18.73
22.50
15.61
18.75
1,327.25
0
KG
7.242
1.000
1.000
1.000
1.000
0.00
82.00
0.00
593.84
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
593.84
PAG. 212 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
0.054
0.300
0.250
0.425
0.425
0.350
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
99.70
CANTIDAD X
PIEZA
8
2
1
KGS
22.88
19.07
8.72
PIEZAS
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
22.88
19.07
8.72
644.51
0
KG
KG
KG
KG
3.691
0.054
0.054
0.300
1.000
1.000
0.390
0.418
0.418
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
1
4
4
1
0.00
302.66
10.50
11.25
9.38
3.00
3.00
3.00
3.00
0.00
907.99
31.49
33.75
28.13
1,001.36
0
KG
KG
KG
KG
KG
3.691
0.054
0.054
0.300
0.220
1.000
1.000
0.389
0.418
0.418
2.702
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
174.47
1
4
4
1
2
0.00
302.66
10.47
11.25
9.38
207.42
1.00
1.00
1.00
1.00
1.00
0.00
302.66
10.47
11.25
9.38
207.42
541.18
0
0
KG
KG
0.150
9.586
7.549
0.054
1.000
1.000
0.338
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
2
1
2
0.00
0.00
619.02
4.55
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
3.00
2.00
2.00
0.00
0.00
1,238.04
9.10
PAG. 213 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.054
0.140
0.114
0.091
0.116
0.192
0.192
0.300
0.300
0.450
0.140
0.140
0.775
0.707
0.224
0.214
0.450
0.338
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
2
6
6
1
1
1
1
1
1
KGS
6.06
8.79
7.16
7.03
8.18
5.36
5.12
16.82
12.64
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
12.11
17.59
14.32
14.06
16.35
10.72
10.24
33.65
25.27
1,401.45
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.150
11.579
7.563
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
2
1
2
2
6
6
1
1
1
1
0.00
0.00
620.17
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
0.00
1,240.33
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
PAG. 214 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
0.300
0.300
0.450
0.363
1.000
1.000
KG/M2 O ML
124.62
124.62
CANTIDAD X
PIEZA
1
1
KGS
16.82
13.57
PIEZAS
2.00
2.00
SUBTOTALDE
KGS
TOTAL
33.65
27.14
1,407.81
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
1.000
7.576
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
621.23
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,242.46
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,409.94
0
0
KG
KG
7.815
0.428
7.589
0.054
1.000
1.000
0.450
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
1
1
2
0.00
0.00
622.30
6.06
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
3.00
1.00
1.00
0.00
0.00
622.30
6.06
PAG. 215 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
2
6
6
1
1
1
1
1
1
KGS
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
5.971
0.191
7.589
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
2
1
2
2
6
6
1
1
1
1
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
PAG. 216 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
0.300
0.300
0.450
0.363
1.000
1.000
KG/M2 O ML
124.62
124.62
CANTIDAD X
PIEZA
1
1
KGS
16.82
13.57
PIEZAS
1.00
1.00
SUBTOTALDE
KGS
TOTAL
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
1.000
7.616
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
708.25
0
KG
KG
KG
3.236
0.054
0.054
1.000
1.000
0.350
0.339
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
1
4
2
0.00
265.35
9.42
4.56
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
0.00
265.35
9.42
4.56
PAG. 217 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
0.054
0.300
0.300
0.250
0.400
0.350
0.400
0.350
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
74.77
99.70
CANTIDAD X
PIEZA
2
1
1
2
KGS
5.38
7.85
8.97
17.45
PIEZAS
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
5.38
7.85
8.97
17.45
318.99
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
7.586
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
705.79
0
0
KG
0.100
0.200
7.599
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
8
1
0.00
0.00
623.12
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
0.00
0.00
623.12
PAG. 218 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
2
2
6
6
1
1
1
1
1
1
KGS
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.86
0
KG
KG
KG
KG
KG
KG
KG
KG
4.274
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.733
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
1
4
2
6
1
1
1
1
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
408.73
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
6.202
0.054
0.114
0.091
0.191
0.192
0.300
1.000
1.000
0.450
0.140
0.775
0.549
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
74.77
99.70
74.77
124.62
124.62
CANTIDAD X
PIEZA
1
2
6
1
1
1
1
KGS
0.00
508.56
6.06
7.16
7.03
7.84
5.12
16.82
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
1,017.13
12.11
14.32
14.06
15.68
10.24
33.65
1,117.19
0
KG
KG
KG
KG
KG
KG
KG
KG
4.245
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
1
4
2
6
1
1
1
1
0.00
348.09
9.37
4.89
8.79
7.81
8.94
5.36
13.57
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
0.00
1,740.45
46.84
24.43
43.97
39.03
44.70
26.80
67.85
2,034.06
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
3.454
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
CANTIDAD X
PIEZA
1
4
2
6
1
1
1
1
KGS
PIEZAS
0.00
283.23
9.37
4.89
8.79
7.81
8.94
5.36
13.57
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
SUBTOTALDE
KGS
TOTAL
0.00
849.68
28.10
14.66
26.38
23.42
26.82
16.08
40.71
1,025.85
0
KG
KG
KG
KG
KG
7.535
0.054
0.054
0.300
0.300
1.000
1.000
0.340
0.375
0.375
0.340
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
99.70
99.70
1
4
4
1
1
0.00
617.87
9.15
10.09
11.22
10.17
3.00
3.00
3.00
3.00
3.00
0.00
1,853.61
27.46
30.28
33.65
30.51
1,975.50
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 221 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
7.535
0.054
0.300
1.000
0.375
0.375
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
99.70
CANTIDAD X
PIEZA
1
8
2
KGS
617.87
20.19
22.43
PIEZAS
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
617.87
20.19
22.43
660.49
0
KG
KG
KG
KG
6.131
0.054
0.300
0.191
1.000
1.000
0.375
0.375
0.549
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
99.70
74.77
1
4
1
1
0.00
502.74
10.09
11.22
7.84
1.00
1.00
1.00
1.00
0.00
502.74
10.09
11.22
7.84
531.89
0
KG
KG
KG
KG
KG
KG
KG
KG
3.492
0.054
0.054
0.054
0.054
0.140
0.300
0.116
1.000
1.000
0.471
0.299
0.443
0.328
0.140
0.443
0.663
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
124.62
74.77
74.77
99.70
1
1
1
2
2
5
1
1
0.00
286.34
3.17
2.01
5.96
4.41
7.33
9.94
7.67
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
286.34
3.17
2.01
5.96
4.41
7.33
9.94
7.67
PAG. 222 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
0.192
0.300
0.224
0.471
1.000
1.000
KG/M2 O ML
124.62
124.62
CANTIDAD X
PIEZA
1
1
KGS
5.36
17.61
PIEZAS
1.00
1.00
SUBTOTALDE
KGS
TOTAL
5.36
17.61
349.80
SUBTOTAL 1ER NIVEL=
0
KG
KG
KG
KG
KG
KG
3.236
0.054
0.054
0.054
0.300
0.250
1.000
1.000
0.350
0.339
0.400
0.400
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
74.77
99.70
1
4
2
2
1
2
0.00
265.35
9.42
4.56
5.38
8.97
17.45
1.00
1.00
1.00
1.00
1.00
1.00
0.00
265.35
9.42
4.56
5.38
8.97
17.45
311.14
0
KG
KG
KG
KG
KG
7.436
0.054
0.054
0.300
0.300
1.000
1.000
0.425
0.348
0.425
0.348
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
609.75
11.44
9.37
9.53
7.81
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
0.00
609.75
11.44
9.37
9.53
7.81
PAG. 223 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
TOTAL
647.90
0
KG
KG
KG
7.632
0.054
0.300
1.000
1.000
0.348
0.348
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
1
8
2
0.00
625.82
18.73
15.61
2.00
2.00
2.00
0.00
1,251.65
37.47
31.22
1,320.34
0
KG
KG
KG
KG
KG
7.632
0.054
0.054
0.300
0.300
1.000
1.000
0.348
0.418
0.348
0.418
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
625.82
9.37
11.25
7.81
9.38
2.00
2.00
2.00
2.00
2.00
0.00
1,251.65
18.73
22.50
15.61
18.75
1,327.25
0
KG
KG
KG
KG
7.242
0.054
0.300
0.250
1.000
1.000
0.425
0.425
0.350
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
1
8
2
1
0.00
593.84
22.88
19.07
8.72
1.00
1.00
1.00
1.00
0.00
593.84
22.88
19.07
8.72
644.51
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
3.691
0.054
0.054
0.300
1.000
1.000
0.390
0.418
0.418
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
CANTIDAD X
PIEZA
1
4
4
1
KGS
0.00
302.66
10.50
11.25
9.38
PIEZAS
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
605.32
21.00
22.50
18.75
667.58
0
KG
KG
KG
KG
KG
3.691
0.054
0.054
0.300
0.220
1.000
1.000
0.389
0.418
0.418
2.702
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
174.47
1
4
4
1
2
0.00
302.66
10.47
11.25
9.38
207.42
1.00
1.00
1.00
1.00
1.00
0.00
302.66
10.47
11.25
9.38
207.42
541.18
0
KG
KG
KG
KG
KG
KG
7.549
0.054
0.054
0.140
0.114
0.091
1.000
1.000
0.338
0.450
0.140
0.140
0.775
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
619.02
4.55
6.06
8.79
7.16
7.03
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,238.04
9.10
12.11
17.59
14.32
14.06
PAG. 225 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.116
0.192
0.192
0.300
0.300
0.707
0.224
0.214
0.450
0.338
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
8.18
5.36
5.12
16.82
12.64
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
16.35
10.72
10.24
33.65
25.27
1,401.45
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.150
11.579
7.563
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
620.17
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
0.00
1,240.33
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,407.81
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.576
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
621.23
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
1,242.46
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,409.94
0
KG
KG
KG
KG
KG
KG
7.589
0.054
0.054
0.140
0.114
0.116
1.000
1.000
0.450
0.363
0.140
0.140
0.773
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PAG. 227 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.091
0.192
0.192
0.300
0.300
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.03
5.36
5.12
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
5.971
0.191
7.589
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.04
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.616
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
708.25
0
KG
KG
KG
KG
KG
KG
7.586
0.054
0.054
0.140
0.114
0.116
1.000
1.000
0.450
0.363
0.140
0.140
0.773
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
622.05
6.06
4.89
8.79
7.16
8.94
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.05
6.06
4.89
8.79
7.16
8.94
PAG. 229 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.091
0.192
0.192
0.300
0.300
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.03
5.36
5.12
16.82
13.57
705.79
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.100
0.200
7.599
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
8
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
623.12
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
623.12
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.86
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 230 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
4.274
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
0.348
0.363
0.140
0.348
0.733
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
CANTIDAD X
PIEZA
1
4
2
6
1
1
1
1
KGS
PIEZAS
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
408.73
0
KG
KG
KG
KG
KG
KG
KG
6.202
0.054
0.114
0.091
0.191
0.192
0.300
1.000
1.000
0.450
0.140
0.775
0.549
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
74.77
124.62
124.62
1
2
6
1
1
1
1
0.00
508.56
6.06
7.16
7.03
7.84
5.12
16.82
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,017.13
12.11
14.32
14.06
15.68
10.24
33.65
1,117.19
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 231 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
4.245
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
CANTIDAD X
PIEZA
1
4
2
6
1
1
1
1
KGS
348.09
9.37
4.89
8.79
7.81
8.94
5.36
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
348.09
9.37
4.89
8.79
7.81
8.94
5.36
13.57
406.81
0
KG
KG
KG
KG
KG
KG
KG
KG
3.454
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
1
4
2
6
1
1
1
1
0.00
283.23
9.37
4.89
8.79
7.81
8.94
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
283.23
9.37
4.89
8.79
7.81
8.94
5.36
13.57
341.95
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.535
0.054
0.054
0.300
0.300
1.000
1.000
0.340
0.375
0.375
0.340
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
99.70
99.70
CANTIDAD X
PIEZA
1
4
4
1
1
KGS
0.00
617.87
9.15
10.09
11.22
10.17
PIEZAS
3.00
3.00
3.00
3.00
3.00
SUBTOTALDE
KGS
TOTAL
0.00
1,853.61
27.46
30.28
33.65
30.51
1,975.50
0
KG
KG
KG
7.535
0.054
0.300
1.000
1.000
0.375
0.375
1.000
1.000
1.000
1.000
0.00
82.00
124.62
99.70
1
8
2
0.00
617.87
20.19
22.43
1.00
1.00
1.00
0.00
617.87
20.19
22.43
660.49
0
KG
KG
KG
KG
6.131
0.054
0.300
0.191
1.000
1.000
0.375
0.375
0.549
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
99.70
74.77
1
4
1
1
0.00
502.74
10.09
11.22
7.84
1.00
1.00
1.00
1.00
0.00
502.74
10.09
11.22
7.84
531.89
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
3.236
0.054
0.054
0.054
0.300
0.300
0.191
0.250
1.000
1.000
0.350
0.339
0.400
0.350
0.400
0.400
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
124.62
74.77
74.77
74.77
99.70
CANTIDAD X
PIEZA
1
4
2
2
1
1
1
2
KGS
PIEZAS
0.00
265.35
9.42
4.56
5.38
7.85
8.97
5.71
17.45
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
265.35
9.42
4.56
5.38
7.85
8.97
5.71
17.45
324.70
0
KG
KG
KG
KG
KG
KG
3.175
0.054
0.140
0.116
0.192
0.300
1.000
1.000
0.363
0.140
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
124.62
124.62
1
2
6
1
1
1
0.00
260.35
4.89
8.79
8.94
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
0.00
260.35
4.89
8.79
8.94
5.36
13.57
301.90
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 234 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
1.655
0.054
0.300
1.000
0.348
0.348
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
74.77
CANTIDAD X
PIEZA
1
4
1
KGS
135.71
9.37
7.81
PIEZAS
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
135.71
9.37
7.81
152.88
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
4.687
0.054
0.054
0.054
0.054
0.140
0.300
0.116
0.350
0.192
0.300
1.000
1.000
0.443
0.328
0.437
0.323
0.140
0.443
0.792
0.445
0.224
0.470
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
1.00
2.00
2.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
0.00
384.33
5.96
4.41
2.94
2.17
8.79
9.94
9.16
15.53
5.36
17.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
384.33
5.96
4.41
2.94
2.17
8.79
9.94
9.16
15.53
5.36
17.57
466.17
0
KG
7.525
1.000
1.000
1.000
1.000
0.00
82.00
1.00
0.00
617.05
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
617.05
PAG. 235 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.054
0.054
0.054
0.054
0.140
0.191
0.116
0.300
0.250
0.350
0.192
0.300
0.471
0.384
0.437
0.323
0.140
0.400
0.793
0.471
0.350
0.445
0.224
0.470
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
124.62
124.62
124.62
74.77
74.77
99.70
74.77
99.70
99.70
124.62
124.62
CANTIDAD X
PIEZA
2.00
2.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
KGS
6.34
5.17
2.94
2.17
8.79
5.71
9.17
10.57
8.72
15.53
5.36
17.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
6.34
5.17
2.94
2.17
8.79
5.71
9.17
10.57
8.72
15.53
5.36
17.57
715.09
SUBTOTAL 2o NIVEL=
0
KG
KG
KG
3.236
0.054
0.054
1.000
1.000
0.350
0.339
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
1
4
2
0.00
265.35
9.42
4.56
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
0.00
265.35
9.42
4.56
PAG. 236 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
0.054
0.300
0.250
0.400
0.400
0.350
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
99.70
CANTIDAD X
PIEZA
2
1
2
KGS
PIEZAS
5.38
8.97
17.45
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
5.38
8.97
17.45
311.14
0
KG
KG
KG
KG
KG
7.436
0.054
0.054
0.300
0.300
1.000
1.000
0.425
0.348
0.425
0.348
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
609.75
11.44
9.37
9.53
7.81
1.00
1.00
1.00
1.00
1.00
0.00
609.75
11.44
9.37
9.53
7.81
647.90
0
KG
KG
KG
KG
7.242
0.054
0.300
0.250
1.000
1.000
0.425
0.425
0.350
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
1
8
2
1
0.00
593.84
22.88
19.07
8.72
1.00
1.00
1.00
1.00
0.00
593.84
22.88
19.07
8.72
644.51
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 237 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
3.691
0.054
0.054
0.300
1.000
0.390
0.418
0.418
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
CANTIDAD X
PIEZA
1
4
4
1
KGS
302.66
10.50
11.25
9.38
PIEZAS
3.00
3.00
3.00
3.00
SUBTOTALDE
KGS
TOTAL
907.99
31.49
33.75
28.13
1,001.36
0
KG
KG
KG
KG
KG
3.691
0.054
0.054
0.300
0.220
1.000
1.000
0.389
0.418
0.418
2.702
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
174.47
1
4
4
1
2
0.00
302.66
10.47
11.25
9.38
207.42
1.00
1.00
1.00
1.00
1.00
0.00
302.66
10.47
11.25
9.38
207.42
541.18
0
KG
KG
KG
KG
KG
KG
7.549
0.054
0.054
0.140
0.114
0.091
1.000
1.000
0.338
0.450
0.140
0.140
0.775
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
619.02
4.55
6.06
8.79
7.16
7.03
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,238.04
9.10
12.11
17.59
14.32
14.06
PAG. 238 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.116
0.192
0.192
0.300
0.300
0.707
0.224
0.214
0.450
0.338
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
8.18
5.36
5.12
16.82
12.64
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
16.35
10.72
10.24
33.65
25.27
1,401.45
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
7.563
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
620.17
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,240.33
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,407.81
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.576
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
621.23
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
1,242.46
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,409.94
0
KG
KG
KG
KG
KG
KG
7.589
0.054
0.054
0.140
0.114
0.116
1.000
1.000
0.450
0.363
0.140
0.140
0.773
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PAG. 240 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.091
0.192
0.192
0.300
0.300
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.03
5.36
5.12
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
5.971
0.191
7.589
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.04
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.616
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
708.25
0
KG
KG
KG
KG
KG
KG
3.236
0.054
0.054
0.054
0.300
0.300
1.000
1.000
0.350
0.339
0.400
0.350
0.400
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
74.77
74.77
1
4
2
2
1
1
0.00
265.35
9.42
4.56
5.38
7.85
8.97
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
265.35
9.42
4.56
5.38
7.85
8.97
PAG. 242 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.250
0.350
1.000
KG/M2 O ML
99.70
CANTIDAD X
PIEZA
KGS
17.45
PIEZAS
1.00
SUBTOTALDE
KGS
TOTAL
17.45
318.99
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
7.586
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
705.79
0
0
KG
KG
KG
0.100
0.200
7.599
0.054
0.054
1.000
1.000
0.450
0.363
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
8
1
2
2
0.00
0.00
623.12
6.06
4.89
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
0.00
0.00
623.12
6.06
4.89
PAG. 243 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
6
6
1
1
1
1
1
1
KGS
PIEZAS
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.86
0
KG
KG
KG
KG
KG
KG
KG
KG
4.274
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.733
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
0.00
0
0
0.00
0.00
1.000
1.000
1
4
2
6
1
1
1
1
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
408.73
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 244 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
6.202
0.054
0.114
0.091
0.191
0.192
0.300
1.000
0.450
0.140
0.775
0.549
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0
0
0
KG
KG
KG
KG
KG
82.00
124.62
74.77
99.70
74.77
124.62
124.62
CANTIDAD X
PIEZA
1
2
6
1
1
1
1
KGS
508.56
6.06
7.16
7.03
7.84
5.12
16.82
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
7.535
0.054
0.054
0.300
0.300
1.000
1.000
0.340
0.375
0.375
0.340
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
99.70
99.70
1,117.19
1
4
4
1
1
0.00
617.87
9.15
10.09
11.22
10.17
3.00
3.00
3.00
3.00
3.00
0.00
1,853.61
27.46
30.28
33.65
30.51
1,975.50
0.00
7.535
0.054
0.300
1.000
1.000
0.375
0.375
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
99.70
TOTAL
1,017.13
12.11
14.32
14.06
15.68
10.24
33.65
0.00
0
0
0
KG
KG
KG
KG/M2 O ML
1
8
2
0.00
617.87
20.19
22.43
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
0.00
617.87
20.19
22.43
PAG. 245 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
0
0
0
KG
KG
KG
KG
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
6.131
0.054
0.300
0.191
1.000
1.000
0.375
0.375
0.549
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
99.70
74.77
1
4
1
1
0.00
502.74
10.09
11.22
7.84
1.00
1.00
1.00
1.00
0.00
502.74
10.09
11.22
7.84
531.89
0.00
4.245
0.300
0.054
0.300
0.140
0.054
0.192
0.040
0.065
1.000
1.000
0.375
0.348
0.348
0.140
0.375
0.201
0.572
0.140
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
124.62
124.62
99.70
74.77
TOTAL
660.49
0.00
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG/M2 O ML
1
1
4
1
4
2
1
1
2
0.00
348.09
14.02
9.37
7.81
5.86
5.05
4.81
2.28
1.36
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
1,392.36
56.08
37.47
31.22
23.45
20.19
19.24
9.12
5.44
1,594.57
PAG. 246 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.629
0.300
0.054
0.300
0.140
0.054
0.192
0.040
0.065
1.000
1.000
0.375
0.348
0.348
0.140
0.375
0.201
0.572
0.140
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
124.62
124.62
99.70
74.77
CANTIDAD X
PIEZA
1
1
4
1
4
2
1
1
2
KGS
0.00
625.58
14.02
9.37
7.81
5.86
5.05
4.81
2.28
1.36
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
625.58
14.02
9.37
7.81
5.86
5.05
4.81
2.28
1.36
676.13
SUBTOTAL ER NIVEL=
TOTAL VIGA IR 18" X 82 KG/ML=
0
KG
7.438
1.000
1.000
1.000
1.000
0.00
56.70
0.00
421.73
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
421.73
PAG. 247 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
TOTAL
421.73
0
KG
KG
1.929
0.200
1.000
1.000
0.250
1.000
1.000
1.000
0.00
56.70
74.77
1
2
0.00
109.37
7.48
1.00
1.00
0.00
109.37
7.48
116.85
0
KG
7.637
1.000
1.000
1.000
1.000
0.00
56.70
0.00
433.02
4.00
0.00
1,732.07
1,732.07
0
KG
KG
6.895
0.200
1.000
1.000
0.250
1.000
1.000
1.000
0.00
56.70
74.77
1
4
0.00
390.95
14.95
1.00
1.00
0.00
390.95
14.95
405.90
0
KG
KG
4.833
0.200
1.000
1.000
0.250
1.000
1.000
1.000
0.00
56.70
74.77
1
3
0.00
274.03
11.22
1.00
1.00
0.00
274.03
11.22
285.25
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.242
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
56.70
CANTIDAD X
PIEZA
KGS
PIEZAS
0.00
410.62
1.00
SUBTOTALDE
KGS
TOTAL
0.00
410.62
410.62
TOTAL VIGA IR 14" X 56.7KG/ML=
1.000
0.00
0.00
0.00
KG
2.408
1.000
1.000
82.00
197.46
1.00
197.46
KG
0.054
0.425
1.000
124.62
11.44
1.00
11.44
KG
0.300
0.425
1.000
74.77
9.53
1.00
9.53
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
1.000
0.00
1.000
0.00
239.66
SUBTOTAL
0.00
0.00
KG
3.225
1.000
1.000
105.30
339.59
3.00
1,018.78
KG
0.250
0.350
1.000
99.70
17.45
3.00
52.34
KG
0.230
3.231
1.000
348.93
518.60
3.00
1,555.81
1.000
0.00
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
2,626.93
PAG. 249 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
KG
2.290
1.000
1.000
105.30
241.14
3.00
723.41
KG
0.053
0.425
1.000
199.39
17.97
3.00
53.90
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
1.000
0.00
1.000
0.00
841.01
SUBTOTAL
0.00
0.00
KG
2.368
1.000
1.000
105.30
249.35
3.00
748.05
KG
0.053
0.425
1.000
199.39
17.97
3.00
53.90
KG
0.250
0.426
1.000
99.70
10.62
3.00
31.85
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
833.80
SUBTOTAL
KG
2.408
1.000
1.000
105.30
253.56
2.00
507.12
KG
0.053
0.425
1.000
199.39
17.97
2.00
35.93
KG
0.249
0.428
1.000
99.70
21.25
2.00
42.50
1.000
0.00
1.000
0.00
585.55
SUBTOTAL
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
PAG. 250 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
1.000
0.00
CANTIDAD X
PIEZA
KGS
PIEZAS
0.00
SUBTOTALDE
KGS
0.00
KG
4.177
1.000
1.000
105.30
439.84
3.00
1,319.51
KG
0.110
0.140
1.000
99.70
6.14
3.00
18.42
KG
0.090
0.140
1.000
99.70
2.51
3.00
7.54
KG
0.038
0.625
1.000
99.70
2.37
3.00
7.10
KG
0.250
0.350
1.000
99.70
17.45
3.00
52.34
KG
0.230
3.559
1.000
348.93
285.63
3.00
856.88
KG
0.230
4.184
1.000
348.93
335.78
3.00
1,007.35
KG
0.300
0.445
1.000
348.93
46.58
3.00
139.75
KG
0.176
0.230
1.000
348.93
14.12
3.00
42.37
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
3,451.27
SUBTOTAL
KG
2.349
1.000
1.000
82.00
192.62
3.00
577.85
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
639.74
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
2.248
1.000
1.000
82.00
184.34
3.00
553.01
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
614.89
SUBTOTAL
KG
2.912
1.000
1.000
82.00
238.78
3.00
716.35
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
778.24
SUBTOTAL
KG
3.403
1.000
1.000
82.00
279.05
3.00
837.14
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
KG
0.220
2.426
1.000
174.47
186.23
3.00
558.70
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1,457.72
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
4.235
1.000
1.000
82.00
347.27
3.00
1,041.81
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.220
3.048
1.000
174.47
116.99
3.00
350.97
KG
0.220
3.233
1.000
174.47
124.09
3.00
372.27
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
1,888.31
SUBTOTAL
0.00
0.00
KG
4.244
1.000
1.000
82.00
348.01
3.00
1,044.02
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
1,167.28
SUBTOTAL
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
PAG. 253 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
1.000
0.00
CANTIDAD X
PIEZA
KGS
PIEZAS
0.00
SUBTOTALDE
KGS
0.00
KG
4.152
1.000
1.000
82.00
340.46
3.00
1,021.39
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
1,144.65
SUBTOTAL
0.00
0.00
KG
3.958
1.000
1.000
82.00
324.56
3.00
973.67
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1,096.93
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
3.658
1.000
1.000
82.00
299.96
3.00
899.87
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1,023.13
SUBTOTAL
KG
2.710
1.000
1.000
82.00
222.22
3.00
666.66
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
728.54
SUBTOTAL
KG
2.654
1.000
1.000
82.00
217.63
3.00
652.88
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
776.14
SUBTOTAL
KG
3.236
1.000
1.000
82.00
265.35
3.00
796.06
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1.000
0.00
1.000
0.00
919.31
SUBTOTAL
0.00
0.00
KG
4.167
1.000
1.000
82.00
341.69
3.00
1,025.08
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.191
0.464
1.000
74.77
6.63
3.00
19.88
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
LARGO
ANCHO
ALTO
KG
0.300
0.363
1.000
124.62
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
13.57
3.00
40.71
1,168.22
SUBTOTAL
KG
5.090
1.000
1.000
105.30
535.98
3.00
1,607.93
KG
0.053
0.425
1.000
199.39
17.97
3.00
53.90
KG
0.250
0.350
1.000
99.70
17.45
3.00
52.34
KG
0.317
0.426
1.000
99.70
13.46
3.00
40.39
KG
0.364
0.426
1.000
99.70
15.46
3.00
46.38
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1,800.93
SUBTOTAL
KG
3.886
1.000
1.000
82.00
318.65
3.00
955.96
KG
0.054
0.340
1.000
124.62
9.15
3.00
27.46
KG
0.300
0.340
1.000
99.70
10.17
3.00
30.51
1.000
0.00
1.000
0.00
1.000
82.00
KG
3.178
1.000
1,013.92
SUBTOTAL
0.00
1
260.60
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
3.00
781.79
PAG. 257 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.054
0.340
1.000
124.62
9.15
3.00
27.46
KG
0.300
0.340
1.000
99.70
10.17
3.00
30.51
1.000
0.00
1.000
0.00
839.75
SUBTOTAL
0.00
0.00
KG
2.708
1.000
1.000
82.00
222.06
3.00
666.17
KG
0.054
0.340
1.000
124.62
9.15
3.00
27.46
KG
0.300
0.340
1.000
99.70
10.17
3.00
30.51
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
724.13
SUBTOTAL
KG
2.347
1.000
1.000
105.30
247.14
1.00
247.14
KG
0.053
0.418
1.000
174.47
15.46
1.00
15.46
1.000
0.00
1.000
0.00
262.60
SUBTOTAL
0.00
0.00
KG
2.347
1.000
1.000
82.00
192.45
2.00
384.91
KG
0.054
0.418
1.000
124.62
11.25
2.00
22.50
KG
0.300
0.418
1.000
74.77
9.38
2.00
18.75
1.000
0.00
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
426.16
PAG. 258 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
0
KG
KG
KG
KG
0.425
0.450
0.416
0.506
0.571
0.559
0.670
0.579
36.29
6.00
217.74
217.74
SUBTOTAL
37.62
6.00
225.70
225.70
SUBTOTAL
41.68
6.00
250.08
250.08
SUBTOTAL
43.81
6.00
262.87
262.87
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
ANCHO
ALTO
KG
0.466
0.582
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
KG
KG
KG
0.434
0.434
0.450
0.450
1.057
1.057
0.559
0.556
KGS
PIEZAS
SUBTOTALDE
KGS
LARGO
KG
KG/M2 O ML
CANTIDAD X
PIEZA
UNIDAD
40.56
12.00
486.69
486.69
SUBTOTAL
0.00
1
68.60
0.00
3.00
205.80
205.80
SUBTOTAL
0.00
1
68.60
0.00
3.00
205.80
205.80
SUBTOTAL
37.62
6.00
225.70
225.70
SUBTOTAL
37.42
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
6.00
224.49
224.49
PAG. 260 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
KG
KG
KG
KG
KG
0.450
0.450
0.450
0.436
0.436
0.565
0.569
0.569
1.057
1.057
0.00
SUBTOTALDE
KGS
38.02
0.00
6.00
228.13
228.13
SUBTOTAL
38.29
6.00
229.74
229.74
SUBTOTAL
0.00
1
38.29
0.00
6.00
229.74
229.74
SUBTOTAL
0.00
1
68.92
0.00
3.00
206.75
206.75
SUBTOTAL
0.00
1
68.92
SUBTOTAL
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
3.00
206.75
206.75
PAG. 261 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
KG
KG
KG
KG
KG
0.483
0.450
0.414
0.547
0.560
0.581
0.573
0.670
0.580
1.016
CANTIDAD X
PIEZA
KGS
PIEZAS
0.00
1
SUBTOTALDE
KGS
0.00
41.97
6.00
251.79
251.79
SUBTOTAL
0.00
1
0.00
38.56
6.00
231.36
231.36
SUBTOTAL
0.00
1
0.00
41.48
6.00
248.88
248.88
SUBTOTAL
0.00
1
47.44
0.00
12.00
569.33
569.33
SUBTOTAL
0.00
1
85.08
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
6.00
510.50
PAG. 262 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
1.000
0.00
1.000
149.54
1.000
0.00
KG
KG
KG
0.576
0.476
0.409
0.653
0.581
0.549
0
0
0
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
510.50
SUBTOTAL
0.00
1
56.25
0.00
6.00
337.48
337.48
SUBTOTAL
0.00
1
41.36
0.00
6.00
248.14
248.14
SUBTOTAL
0.00
1
33.58
0.00
6.00
201.47
201.47
SUBTOTAL
0.00
0.00
0.00
1.000
0.00
0.00
0.00
KG
0.191
3.090
1.000
124.62
147.10
1.00
147.10
KG
0.428
3.158
1.000
74.77
101.06
1.00
101.06
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
KG
0.090
0.426
1.000
99.70
7.64
1.00
7.64
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
277.04
SUBTOTAL
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
KG
0.191
3.099
1.000
124.62
147.53
2.00
295.05
KG
0.428
3.158
1.000
74.77
101.06
2.00
202.13
KG
0.250
0.426
1.000
99.70
21.24
2.00
42.47
KG
0.090
0.426
1.000
99.70
7.64
2.00
15.29
KG
0.191
0.245
1.000
74.77
3.50
2.00
7.00
1.000
0.00
1.000
0.00
561.93
SUBTOTAL
0.00
0.00
KG
0.428
5.472
1.000
74.77
175.12
1.00
175.12
KG
0.191
5.312
1.000
124.62
126.44
1.00
126.44
KG
0.191
4.738
1.000
124.62
112.77
1.00
112.77
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
KG
0.184
0.427
1.000
124.62
9.79
1.00
9.79
KG
0.090
0.426
1.000
99.70
7.64
1.00
7.64
KG
0.170
0.195
1.000
124.62
4.13
1.00
4.13
KG
0.098
0.647
1.000
74.77
4.74
1.00
4.74
KG
0.080
0.080
1.000
74.77
2.87
1.00
2.87
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
464.74
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
5.472
1.000
74.77
175.12
2.00
350.23
KG
0.191
5.312
1.000
124.62
126.44
2.00
252.87
KG
0.191
4.738
1.000
124.62
112.77
2.00
225.55
KG
0.250
0.426
1.000
99.70
21.24
2.00
42.47
KG
0.184
0.427
1.000
124.62
9.79
2.00
19.58
KG
0.090
0.426
1.000
99.70
7.64
2.00
15.29
KG
0.170
0.195
1.000
124.62
4.13
2.00
8.26
KG
0.098
0.647
1.000
74.77
4.74
2.00
9.48
KG
0.191
0.254
1.000
74.77
3.63
2.00
7.25
KG
0.080
0.080
1.000
74.77
2.87
2.00
5.74
936.74
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
7.762
1.000
74.77
248.40
3.00
745.20
KG
0.191
7.580
1.000
124.62
180.42
3.00
541.26
KG
0.191
6.480
1.000
124.62
154.24
3.00
462.71
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
KG
0.090
0.426
1.000
99.70
7.64
3.00
22.93
KG
0.184
0.429
1.000
124.62
19.67
3.00
59.02
KG
0.184
0.382
1.000
124.62
17.52
3.00
52.56
KG
0.170
0.196
1.000
124.62
4.15
3.00
12.46
KG
0.080
0.080
1.000
74.77
0.48
3.00
1.44
KG
0.098
0.646
1.000
74.77
4.73
3.00
14.20
KG
0.098
0.644
1.000
74.77
28.31
3.00
84.94
2,060.43
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
4.852
1.000
74.77
155.27
2.00
310.55
KG
0.191
4.765
1.000
124.62
113.42
2.00
226.83
KG
0.191
4.195
1.000
124.62
99.85
2.00
199.70
KG
0.250
0.426
1.000
99.70
21.24
2.00
42.47
KG
0.184
0.423
1.000
124.62
9.70
2.00
19.40
KG
0.090
0.426
1.000
99.70
7.64
2.00
15.29
KG
0.170
0.195
1.000
124.62
4.13
2.00
8.26
KG
0.098
0.645
1.000
74.77
4.73
2.00
9.45
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.191
0.250
1.000
74.77
3.57
2.00
7.14
KG
0.080
0.080
1.000
74.77
2.87
2.00
5.74
844.84
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
4.933
1.000
74.77
157.87
1.00
157.87
KG
0.191
4.765
1.000
124.62
113.42
1.00
113.42
KG
0.191
4.195
1.000
124.62
99.85
1.00
99.85
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
KG
0.184
0.423
1.000
124.62
9.70
1.00
9.70
KG
0.090
0.426
1.000
99.70
7.64
1.00
7.64
KG
0.187
0.450
1.000
74.77
6.29
1.00
6.29
KG
0.170
0.195
1.000
124.62
4.13
1.00
4.13
KG
0.098
0.645
1.000
74.77
4.73
1.00
4.73
KG
0.191
0.250
1.000
74.77
3.57
1.00
3.57
KG
0.080
0.080
1.000
74.77
2.87
1.00
2.87
431.30
SUBTOTAL
0
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
PAG. 267 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.191
5.279
1.000
124.62
251.30
3.00
753.91
KG
0.428
5.340
1.000
74.77
170.89
3.00
512.67
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
KG
0.300
0.426
1.000
99.70
12.74
3.00
38.22
KG
0.090
0.426
1.000
99.70
7.64
3.00
22.93
KG
0.191
0.379
1.000
74.77
5.41
3.00
16.24
KG
0.191
0.255
1.000
74.77
3.64
3.00
10.93
1,418.61
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.191
5.835
1.000
124.62
277.77
3.00
833.31
KG
0.428
5.892
1.000
74.77
188.56
3.00
565.67
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
KG
0.250
0.426
1.000
99.70
10.62
3.00
31.85
KG
0.090
0.426
1.000
99.70
7.64
3.00
22.93
KG
0.100
0.426
1.000
99.70
4.25
3.00
12.74
KG
0.192
0.359
1.000
74.77
5.15
3.00
15.46
KG
0.191
0.267
1.000
74.77
3.81
3.00
11.44
SUBTOTAL
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
1,545.68
PAG. 268 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
TOTAL
###
0
0
KG
KG
KG
KG
KG
KG
1.000
1.000
1.000
0.00
0.00
0.00
3.236
0.054
0.054
0.054
0.300
0.250
1.000
1.000
0.350
0.339
0.400
0.400
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
74.77
99.70
0.00
265.35
9.42
4.56
5.38
8.97
17.45
0.00
265.35
9.42
4.56
5.38
8.97
17.45
1
4
2
2
1
2
1.00
1.00
1.00
1.00
1.00
1.00
311.14
0
KG
7.436
1.000
1.000
1.000
1.000
0.00
82.00
0.00
609.75
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
609.75
PAG. 269 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
0.054
0.054
0.300
0.300
0.425
0.348
0.425
0.348
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
124.62
74.77
74.77
CANTIDAD X
PIEZA
4
4
1
1
KGS
11.44
9.37
9.53
7.81
PIEZAS
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
11.44
9.37
9.53
7.81
647.90
0
KG
KG
KG
7.632
0.054
0.300
1.000
1.000
0.348
0.348
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
1
8
2
0.00
625.82
18.73
15.61
2.00
2.00
2.00
0.00
1,251.65
37.47
31.22
1,320.34
0
KG
KG
KG
KG
KG
7.632
0.054
0.054
0.300
0.300
1.000
1.000
0.348
0.418
0.348
0.418
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
625.82
9.37
11.25
7.81
9.38
2.00
2.00
2.00
2.00
2.00
0.00
1,251.65
18.73
22.50
15.61
18.75
1,327.25
0
KG
KG
7.242
0.054
1.000
1.000
0.425
1.000
1.000
1.000
0.00
82.00
124.62
1
8
0.00
593.84
22.88
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
0.00
593.84
22.88
PAG. 270 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
0.300
0.250
0.425
0.350
1.000
1.000
KG/M2 O ML
74.77
99.70
CANTIDAD X
PIEZA
2
1
KGS
19.07
8.72
PIEZAS
1.00
1.00
SUBTOTALDE
KGS
TOTAL
19.07
8.72
644.51
0
KG
KG
KG
KG
3.691
0.054
0.054
0.300
1.000
1.000
0.390
0.418
0.418
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
1
4
4
1
0.00
302.66
10.50
11.25
9.38
3.00
3.00
3.00
3.00
0.00
907.99
31.49
33.75
28.13
1,001.36
0
KG
KG
KG
KG
KG
3.691
0.054
0.054
0.300
0.220
1.000
1.000
0.389
0.418
0.418
2.702
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
174.47
1
4
4
1
2
0.00
302.66
10.47
11.25
9.38
207.42
1.00
1.00
1.00
1.00
1.00
0.00
302.66
10.47
11.25
9.38
207.42
541.18
0
0
KG
KG
KG
0.150
9.586
7.549
0.054
0.054
1.000
1.000
0.338
0.450
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
2
1
2
2
0.00
0.00
619.02
4.55
6.06
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
3.00
2.00
2.00
2.00
0.00
0.00
1,238.04
9.10
12.11
PAG. 271 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
0.140
0.114
0.091
0.116
0.192
0.192
0.300
0.300
0.140
0.140
0.775
0.707
0.224
0.214
0.450
0.338
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
6
6
1
1
1
1
1
1
KGS
8.79
7.16
7.03
8.18
5.36
5.12
16.82
12.64
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
17.59
14.32
14.06
16.35
10.72
10.24
33.65
25.27
1,401.45
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.150
11.579
7.563
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
0.00
0.00
620.17
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
0.00
1,240.33
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
PAG. 272 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.300
0.363
1.000
KG/M2 O ML
124.62
CANTIDAD X
PIEZA
KGS
13.57
PIEZAS
2.00
SUBTOTALDE
KGS
TOTAL
27.14
1,407.81
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
1.000
7.576
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
621.23
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,242.46
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,409.94
0
0
KG
KG
KG
7.815
0.428
7.589
0.054
0.054
1.000
1.000
0.450
0.363
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
1
1
2
2
0.00
0.00
622.30
6.06
4.89
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
3.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
PAG. 273 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
6
6
1
1
1
1
1
1
KGS
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
5.971
0.191
7.589
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
PAG. 274 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.300
0.363
1.000
KG/M2 O ML
124.62
CANTIDAD X
PIEZA
KGS
13.57
PIEZAS
1.00
SUBTOTALDE
KGS
TOTAL
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
1.000
7.616
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
708.25
0
KG
KG
KG
KG
3.236
0.054
0.054
0.054
1.000
1.000
0.350
0.339
0.400
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
1
4
2
2
0.00
265.35
9.42
4.56
5.38
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
0.00
265.35
9.42
4.56
5.38
PAG. 275 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
0.300
0.300
0.250
0.350
0.400
0.350
1.000
1.000
1.000
KG/M2 O ML
74.77
74.77
99.70
CANTIDAD X
PIEZA
1
1
2
KGS
7.85
8.97
17.45
PIEZAS
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.85
8.97
17.45
318.99
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
7.586
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
705.79
0
0
KG
KG
0.100
0.200
7.599
0.054
1.000
1.000
0.450
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
8
1
2
0.00
0.00
623.12
6.06
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
0.00
0.00
623.12
6.06
PAG. 276 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
2
6
6
1
1
1
1
1
1
KGS
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.86
0
KG
KG
KG
KG
KG
KG
KG
KG
4.274
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.733
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
1
4
2
6
1
1
1
1
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
408.73
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
6.202
0.054
0.114
0.091
0.191
0.192
0.300
1.000
1.000
0.450
0.140
0.775
0.549
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
74.77
99.70
74.77
124.62
124.62
CANTIDAD X
PIEZA
1
2
6
1
1
1
1
KGS
0.00
508.56
6.06
7.16
7.03
7.84
5.12
16.82
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
1,017.13
12.11
14.32
14.06
15.68
10.24
33.65
1,117.19
0
KG
KG
KG
KG
KG
KG
KG
KG
4.245
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
1
4
2
6
1
1
1
1
0.00
348.09
9.37
4.89
8.79
7.81
8.94
5.36
13.57
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
0.00
1,740.45
46.84
24.43
43.97
39.03
44.70
26.80
67.85
2,034.06
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
3.454
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
CANTIDAD X
PIEZA
1
4
2
6
1
1
1
1
KGS
0.00
283.23
9.37
4.89
8.79
7.81
8.94
5.36
13.57
PIEZAS
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
SUBTOTALDE
KGS
TOTAL
0.00
849.68
28.10
14.66
26.38
23.42
26.82
16.08
40.71
1,025.85
0
KG
KG
KG
KG
KG
7.535
0.054
0.054
0.300
0.300
1.000
1.000
0.340
0.375
0.375
0.340
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
99.70
99.70
1
4
4
1
1
0.00
617.87
9.15
10.09
11.22
10.17
3.00
3.00
3.00
3.00
3.00
0.00
1,853.61
27.46
30.28
33.65
30.51
1,975.50
0
KG
7.535
1.000
1.000
1.000
1.000
0.00
82.00
0.00
617.87
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
617.87
PAG. 279 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
0.054
0.300
0.375
0.375
1.000
1.000
KG/M2 O ML
124.62
99.70
CANTIDAD X
PIEZA
8
2
KGS
20.19
22.43
PIEZAS
1.00
1.00
SUBTOTALDE
KGS
TOTAL
20.19
22.43
660.49
0
KG
KG
KG
KG
6.131
0.054
0.300
0.191
1.000
1.000
0.375
0.375
0.549
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
99.70
74.77
1
4
1
1
0.00
502.74
10.09
11.22
7.84
1.00
1.00
1.00
1.00
0.00
502.74
10.09
11.22
7.84
531.89
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
3.492
0.054
0.054
0.054
0.054
0.140
0.300
0.116
0.192
1.000
1.000
0.471
0.299
0.443
0.328
0.140
0.443
0.663
0.224
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
124.62
74.77
74.77
99.70
124.62
1
1
1
2
2
5
1
1
1
0.00
286.34
3.17
2.01
5.96
4.41
7.33
9.94
7.67
5.36
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
286.34
3.17
2.01
5.96
4.41
7.33
9.94
7.67
5.36
PAG. 280 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.300
0.471
1.000
KG/M2 O ML
124.62
CANTIDAD X
PIEZA
KGS
17.61
PIEZAS
1.00
SUBTOTALDE
KGS
TOTAL
17.61
349.80
SUBTOTAL 1ER NIVEL=
0
KG
KG
KG
KG
KG
KG
3.236
0.054
0.054
0.054
0.300
0.250
1.000
1.000
0.350
0.339
0.400
0.400
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
74.77
99.70
1
4
2
2
1
2
0.00
265.35
9.42
4.56
5.38
8.97
17.45
1.00
1.00
1.00
1.00
1.00
1.00
0.00
265.35
9.42
4.56
5.38
8.97
17.45
311.14
0
KG
KG
KG
KG
KG
7.436
0.054
0.054
0.300
0.300
1.000
1.000
0.425
0.348
0.425
0.348
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
609.75
11.44
9.37
9.53
7.81
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
0.00
609.75
11.44
9.37
9.53
7.81
PAG. 281 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
TOTAL
647.90
0
KG
KG
KG
7.632
0.054
0.300
1.000
1.000
0.348
0.348
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
1
8
2
0.00
625.82
18.73
15.61
2.00
2.00
2.00
0.00
1,251.65
37.47
31.22
1,320.34
0
KG
KG
KG
KG
KG
7.632
0.054
0.054
0.300
0.300
1.000
1.000
0.348
0.418
0.348
0.418
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
625.82
9.37
11.25
7.81
9.38
2.00
2.00
2.00
2.00
2.00
0.00
1,251.65
18.73
22.50
15.61
18.75
1,327.25
0
KG
KG
KG
KG
7.242
0.054
0.300
0.250
1.000
1.000
0.425
0.425
0.350
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
1
8
2
1
0.00
593.84
22.88
19.07
8.72
1.00
1.00
1.00
1.00
0.00
593.84
22.88
19.07
8.72
644.51
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
3.691
0.054
0.054
0.300
1.000
1.000
0.390
0.418
0.418
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
CANTIDAD X
PIEZA
1
4
4
1
KGS
0.00
302.66
10.50
11.25
9.38
PIEZAS
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
605.32
21.00
22.50
18.75
667.58
0
KG
KG
KG
KG
KG
3.691
0.054
0.054
0.300
0.220
1.000
1.000
0.389
0.418
0.418
2.702
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
174.47
1
4
4
1
2
0.00
302.66
10.47
11.25
9.38
207.42
1.00
1.00
1.00
1.00
1.00
0.00
302.66
10.47
11.25
9.38
207.42
541.18
0
KG
KG
KG
KG
KG
KG
7.549
0.054
0.054
0.140
0.114
0.091
1.000
1.000
0.338
0.450
0.140
0.140
0.775
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
619.02
4.55
6.06
8.79
7.16
7.03
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,238.04
9.10
12.11
17.59
14.32
14.06
PAG. 283 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.116
0.192
0.192
0.300
0.300
0.707
0.224
0.214
0.450
0.338
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
8.18
5.36
5.12
16.82
12.64
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
16.35
10.72
10.24
33.65
25.27
1,401.45
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.150
11.579
7.563
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
620.17
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
0.00
1,240.33
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,407.81
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.576
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
621.23
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
1,242.46
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,409.94
0
KG
KG
KG
KG
KG
KG
7.589
0.054
0.054
0.140
0.114
0.116
1.000
1.000
0.450
0.363
0.140
0.140
0.773
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PAG. 285 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.091
0.192
0.192
0.300
0.300
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.03
5.36
5.12
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
5.971
0.191
7.589
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.04
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.616
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
708.25
0
KG
KG
KG
KG
KG
KG
7.586
0.054
0.054
0.140
0.114
0.116
1.000
1.000
0.450
0.363
0.140
0.140
0.773
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
622.05
6.06
4.89
8.79
7.16
8.94
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.05
6.06
4.89
8.79
7.16
8.94
PAG. 287 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.091
0.192
0.192
0.300
0.300
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.03
5.36
5.12
16.82
13.57
705.79
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.100
0.200
7.599
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
8
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
623.12
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
623.12
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.86
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 288 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
4.274
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
0.348
0.363
0.140
0.348
0.733
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
CANTIDAD X
PIEZA
1
4
2
6
1
1
1
1
KGS
PIEZAS
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
408.73
0
KG
KG
KG
KG
KG
KG
KG
6.202
0.054
0.114
0.091
0.191
0.192
0.300
1.000
1.000
0.450
0.140
0.775
0.549
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
74.77
124.62
124.62
1
2
6
1
1
1
1
0.00
508.56
6.06
7.16
7.03
7.84
5.12
16.82
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,017.13
12.11
14.32
14.06
15.68
10.24
33.65
1,117.19
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 289 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
4.245
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
CANTIDAD X
PIEZA
1
4
2
6
1
1
1
1
KGS
348.09
9.37
4.89
8.79
7.81
8.94
5.36
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
348.09
9.37
4.89
8.79
7.81
8.94
5.36
13.57
406.81
0
KG
KG
KG
KG
KG
KG
KG
KG
3.454
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
1
4
2
6
1
1
1
1
0.00
283.23
9.37
4.89
8.79
7.81
8.94
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
283.23
9.37
4.89
8.79
7.81
8.94
5.36
13.57
341.95
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.535
0.054
0.054
0.300
0.300
1.000
1.000
0.340
0.375
0.375
0.340
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
99.70
99.70
CANTIDAD X
PIEZA
1
4
4
1
1
KGS
0.00
617.87
9.15
10.09
11.22
10.17
PIEZAS
3.00
3.00
3.00
3.00
3.00
SUBTOTALDE
KGS
TOTAL
0.00
1,853.61
27.46
30.28
33.65
30.51
1,975.50
0
KG
KG
KG
7.535
0.054
0.300
1.000
1.000
0.375
0.375
1.000
1.000
1.000
1.000
0.00
82.00
124.62
99.70
1
8
2
0.00
617.87
20.19
22.43
1.00
1.00
1.00
0.00
617.87
20.19
22.43
660.49
0
KG
KG
KG
KG
6.131
0.054
0.300
0.191
1.000
1.000
0.375
0.375
0.549
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
99.70
74.77
1
4
1
1
0.00
502.74
10.09
11.22
7.84
1.00
1.00
1.00
1.00
0.00
502.74
10.09
11.22
7.84
531.89
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
3.236
0.054
0.054
0.054
0.300
0.300
0.191
0.250
1.000
1.000
0.350
0.339
0.400
0.350
0.400
0.400
0.350
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
124.62
74.77
74.77
74.77
99.70
CANTIDAD X
PIEZA
1
4
2
2
1
1
1
2
KGS
PIEZAS
0.00
265.35
9.42
4.56
5.38
7.85
8.97
5.71
17.45
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
265.35
9.42
4.56
5.38
7.85
8.97
5.71
17.45
324.70
0
KG
KG
KG
KG
KG
KG
3.175
0.054
0.140
0.116
0.192
0.300
1.000
1.000
0.363
0.140
0.773
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
124.62
124.62
1
2
6
1
1
1
0.00
260.35
4.89
8.79
8.94
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
0.00
260.35
4.89
8.79
8.94
5.36
13.57
301.90
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 292 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
1.655
0.054
0.300
1.000
0.348
0.348
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
74.77
CANTIDAD X
PIEZA
1
4
1
KGS
135.71
9.37
7.81
PIEZAS
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
135.71
9.37
7.81
152.88
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
4.687
0.054
0.054
0.054
0.054
0.140
0.300
0.116
0.350
0.192
0.300
1.000
1.000
0.443
0.328
0.437
0.323
0.140
0.443
0.792
0.445
0.224
0.470
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
1.00
2.00
2.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
0.00
384.33
5.96
4.41
2.94
2.17
8.79
9.94
9.16
15.53
5.36
17.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
384.33
5.96
4.41
2.94
2.17
8.79
9.94
9.16
15.53
5.36
17.57
466.17
0
KG
7.525
1.000
1.000
1.000
1.000
0.00
82.00
1.00
0.00
617.05
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
617.05
PAG. 293 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
0.054
0.054
0.054
0.054
0.140
0.191
0.116
0.300
0.250
0.350
0.192
0.300
0.471
0.384
0.437
0.323
0.140
0.400
0.793
0.471
0.350
0.445
0.224
0.470
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
124.62
124.62
124.62
124.62
74.77
74.77
99.70
74.77
99.70
99.70
124.62
124.62
CANTIDAD X
PIEZA
2.00
2.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
KGS
6.34
5.17
2.94
2.17
8.79
5.71
9.17
10.57
8.72
15.53
5.36
17.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
6.34
5.17
2.94
2.17
8.79
5.71
9.17
10.57
8.72
15.53
5.36
17.57
715.09
SUBTOTAL 2o NIVEL=
0
KG
KG
KG
3.236
0.054
0.054
1.000
1.000
0.350
0.339
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
1
4
2
0.00
265.35
9.42
4.56
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
0.00
265.35
9.42
4.56
PAG. 294 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
0.054
0.300
0.250
0.400
0.400
0.350
1.000
1.000
1.000
KG/M2 O ML
124.62
74.77
99.70
CANTIDAD X
PIEZA
2
1
2
KGS
PIEZAS
5.38
8.97
17.45
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
5.38
8.97
17.45
311.14
0
KG
KG
KG
KG
KG
7.436
0.054
0.054
0.300
0.300
1.000
1.000
0.425
0.348
0.425
0.348
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
1
4
4
1
1
0.00
609.75
11.44
9.37
9.53
7.81
1.00
1.00
1.00
1.00
1.00
0.00
609.75
11.44
9.37
9.53
7.81
647.90
0
KG
KG
KG
KG
7.242
0.054
0.300
0.250
1.000
1.000
0.425
0.425
0.350
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
74.77
99.70
1
8
2
1
0.00
593.84
22.88
19.07
8.72
1.00
1.00
1.00
1.00
0.00
593.84
22.88
19.07
8.72
644.51
0
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 295 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
3.691
0.054
0.054
0.300
1.000
0.390
0.418
0.418
1.000
1.000
1.000
1.000
KG/M2 O ML
82.00
124.62
124.62
74.77
CANTIDAD X
PIEZA
1
4
4
1
KGS
302.66
10.50
11.25
9.38
PIEZAS
3.00
3.00
3.00
3.00
SUBTOTALDE
KGS
TOTAL
907.99
31.49
33.75
28.13
1,001.36
0
KG
KG
KG
KG
KG
3.691
0.054
0.054
0.300
0.220
1.000
1.000
0.389
0.418
0.418
2.702
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
174.47
1
4
4
1
2
0.00
302.66
10.47
11.25
9.38
207.42
1.00
1.00
1.00
1.00
1.00
0.00
302.66
10.47
11.25
9.38
207.42
541.18
0
KG
KG
KG
KG
KG
KG
7.549
0.054
0.054
0.140
0.114
0.091
1.000
1.000
0.338
0.450
0.140
0.140
0.775
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
619.02
4.55
6.06
8.79
7.16
7.03
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,238.04
9.10
12.11
17.59
14.32
14.06
PAG. 296 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.116
0.192
0.192
0.300
0.300
0.707
0.224
0.214
0.450
0.338
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
8.18
5.36
5.12
16.82
12.64
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
16.35
10.72
10.24
33.65
25.27
1,401.45
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
7.563
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
620.17
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.00
1,240.33
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,407.81
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.576
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
621.23
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
TOTAL
0.00
1,242.46
12.11
9.77
17.59
14.32
17.88
14.06
10.72
10.24
33.65
27.14
1,409.94
0
KG
KG
KG
KG
KG
KG
7.589
0.054
0.054
0.140
0.114
0.116
1.000
1.000
0.450
0.363
0.140
0.140
0.773
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
1
2
2
6
6
1
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
PAG. 298 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
0.091
0.192
0.192
0.300
0.300
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
1
1
1
1
KGS
PIEZAS
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
7.03
5.36
5.12
16.82
13.57
706.04
0
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
5.971
0.191
7.589
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
2
1
2
2
6
6
1
1
1
1
1
1
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
622.30
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.04
0
1.000
1.000
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.616
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
1
2
2
6
6
1
1
1
1
1
1
KGS
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
624.51
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
708.25
0
KG
KG
KG
KG
KG
KG
3.236
0.054
0.054
0.054
0.300
0.300
1.000
1.000
0.350
0.339
0.400
0.350
0.400
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
124.62
74.77
74.77
1
4
2
2
1
1
0.00
265.35
9.42
4.56
5.38
7.85
8.97
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
1.00
1.00
0.00
265.35
9.42
4.56
5.38
7.85
8.97
PAG. 300 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.250
0.350
1.000
KG/M2 O ML
99.70
CANTIDAD X
PIEZA
KGS
17.45
PIEZAS
1.00
SUBTOTALDE
KGS
TOTAL
17.45
318.99
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
7.586
0.054
0.054
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
1.000
1.000
0.450
0.363
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
1
2
2
6
6
1
1
1
1
1
1
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
622.05
6.06
4.89
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
705.79
0
0
KG
KG
KG
0.100
0.200
7.599
0.054
0.054
1.000
1.000
0.450
0.363
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
8
1
2
2
0.00
0.00
623.12
6.06
4.89
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
1.00
0.00
0.00
623.12
6.06
4.89
PAG. 301 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
KG
0.140
0.114
0.116
0.091
0.192
0.192
0.300
0.300
0.140
0.140
0.773
0.775
0.224
0.214
0.450
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
74.77
74.77
99.70
99.70
124.62
124.62
124.62
124.62
CANTIDAD X
PIEZA
6
6
1
1
1
1
1
1
KGS
PIEZAS
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
8.79
7.16
8.94
7.03
5.36
5.12
16.82
13.57
706.86
0
KG
KG
KG
KG
KG
KG
KG
KG
4.274
0.054
0.054
0.140
0.300
0.116
0.192
0.300
1.000
1.000
0.348
0.363
0.140
0.348
0.733
0.224
0.363
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
99.70
124.62
124.62
0.00
0
0
0.00
0.00
1.000
1.000
1
4
2
6
1
1
1
1
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
350.47
9.37
4.89
8.79
7.81
8.48
5.36
13.57
408.73
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
PAG. 302 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
KG
KG
KG
KG
KG
KG
6.202
0.054
0.114
0.091
0.191
0.192
0.300
1.000
0.450
0.140
0.775
0.549
0.214
0.450
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0
0
0
KG
KG
KG
KG
KG
82.00
124.62
74.77
99.70
74.77
124.62
124.62
CANTIDAD X
PIEZA
1
2
6
1
1
1
1
KGS
508.56
6.06
7.16
7.03
7.84
5.12
16.82
PIEZAS
2.00
2.00
2.00
2.00
2.00
2.00
2.00
SUBTOTALDE
KGS
7.535
0.054
0.054
0.300
0.300
1.000
1.000
0.340
0.375
0.375
0.340
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
124.62
99.70
99.70
1,117.19
1
4
4
1
1
0.00
617.87
9.15
10.09
11.22
10.17
3.00
3.00
3.00
3.00
3.00
0.00
1,853.61
27.46
30.28
33.65
30.51
1,975.50
0.00
7.535
0.054
0.300
1.000
1.000
0.375
0.375
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
99.70
TOTAL
1,017.13
12.11
14.32
14.06
15.68
10.24
33.65
0.00
0
0
0
KG
KG
KG
KG/M2 O ML
1
8
2
0.00
617.87
20.19
22.43
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
1.00
1.00
0.00
617.87
20.19
22.43
PAG. 303 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
0
0
0
KG
KG
KG
KG
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
660.49
0.00
6.131
0.054
0.300
0.191
1.000
1.000
0.375
0.375
0.549
1.000
1.000
1.000
1.000
1.000
0.00
0.00
82.00
124.62
99.70
74.77
TOTAL
1
4
1
1
0.00
502.74
10.09
11.22
7.84
1.00
1.00
1.00
1.00
0.00
502.74
10.09
11.22
7.84
531.89
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
4.245
0.300
0.054
0.300
0.140
0.054
0.192
0.040
0.065
1.000
1.000
0.375
0.348
0.348
0.140
0.375
0.201
0.572
0.140
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
82.00
124.62
124.62
74.77
74.77
124.62
124.62
99.70
74.77
1
1
4
1
4
2
1
1
2
0.00
348.09
14.02
9.37
7.81
5.86
5.05
4.81
2.28
1.36
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
0.00
1,392.36
56.08
37.47
31.22
23.45
20.19
19.24
9.12
5.44
1,594.57
PAG. 304 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
KG
KG
KG
KG
KG
KG
KG
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.629
0.300
0.054
0.300
0.140
0.054
0.192
0.040
0.065
1.000
1.000
0.375
0.348
0.348
0.140
0.375
0.201
0.572
0.140
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
82.00
124.62
124.62
74.77
74.77
124.62
124.62
99.70
74.77
CANTIDAD X
PIEZA
1
1
4
1
4
2
1
1
2
KGS
0.00
625.58
14.02
9.37
7.81
5.86
5.05
4.81
2.28
1.36
PIEZAS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SUBTOTALDE
KGS
TOTAL
0.00
625.58
14.02
9.37
7.81
5.86
5.05
4.81
2.28
1.36
676.13
SUBTOTAL ER NIVEL=
TOTAL VIGA IR 18" X 82 KG/ML=
0
KG
7.438
1.000
1.000
1.000
1.000
0.00
56.70
0.00
421.73
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
1.00
0.00
421.73
PAG. 305 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
TOTAL
421.73
0
KG
KG
1.929
0.200
1.000
1.000
0.250
1.000
1.000
1.000
0.00
56.70
74.77
1
2
0.00
109.37
7.48
1.00
1.00
0.00
109.37
7.48
116.85
0
KG
7.637
1.000
1.000
1.000
1.000
0.00
56.70
0.00
433.02
4.00
0.00
1,732.07
1,732.07
0
KG
KG
6.895
0.200
1.000
1.000
0.250
1.000
1.000
1.000
0.00
56.70
74.77
1
4
0.00
390.95
14.95
1.00
1.00
0.00
390.95
14.95
405.90
0
KG
KG
4.833
0.200
1.000
1.000
0.250
1.000
1.000
1.000
0.00
56.70
74.77
1
3
0.00
274.03
11.22
1.00
1.00
0.00
274.03
11.22
285.25
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
0
KG
MUNICIPIO: MRIDA
LARGO
ANCHO
ALTO
7.242
1.000
1.000
1.000
1.000
KG/M2 O ML
0.00
56.70
CANTIDAD X
PIEZA
KGS
PIEZAS
0.00
410.62
1.00
SUBTOTALDE
KGS
TOTAL
0.00
410.62
410.62
TOTAL VIGA IR 14" X 56.7KG/ML=
1.000
#VALUE!
#VALUE!
KG
2.408
1.000
1.000
82.00
197.46
1.00
197.46
KG
0.054
0.425
1.000
124.62
11.44
1.00
11.44
KG
0.300
0.425
1.000
74.77
9.53
1.00
9.53
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
239.66
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
3.225
1.000
1.000
105.30
339.59
3.00
1,018.78
KG
0.250
0.350
1.000
99.70
17.45
3.00
52.34
KG
0.230
3.231
1.000
348.93
518.60
3.00
1,555.81
SUBTOTAL
1.000
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
2,626.93
PAG. 307 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.290
1.000
1.000
105.30
241.14
3.00
723.41
KG
0.053
0.425
1.000
199.39
17.97
3.00
53.90
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
841.01
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
2.368
1.000
1.000
105.30
249.35
3.00
748.05
KG
0.053
0.425
1.000
199.39
17.97
3.00
53.90
KG
0.250
0.426
1.000
99.70
10.62
3.00
31.85
833.80
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.408
1.000
1.000
105.30
253.56
2.00
507.12
KG
0.053
0.425
1.000
199.39
17.97
2.00
35.93
KG
0.249
0.428
1.000
99.70
21.25
2.00
42.50
585.55
SUBTOTAL
1.000
1.000
#VALUE!
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
#VALUE!
PAG. 308 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
1.000
KGS
PIEZAS
#VALUE!
SUBTOTALDE
KGS
#VALUE!
KG
4.177
1.000
1.000
105.30
439.84
3.00
1,319.51
KG
0.110
0.140
1.000
99.70
6.14
3.00
18.42
KG
0.090
0.140
1.000
99.70
2.51
3.00
7.54
KG
0.038
0.625
1.000
99.70
2.37
3.00
7.10
KG
0.250
0.350
1.000
99.70
17.45
3.00
52.34
KG
0.230
3.559
1.000
348.93
285.63
3.00
856.88
KG
0.230
4.184
1.000
348.93
335.78
3.00
1,007.35
KG
0.300
0.445
1.000
348.93
46.58
3.00
139.75
KG
0.176
0.230
1.000
348.93
14.12
3.00
42.37
3,451.27
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.349
1.000
1.000
82.00
192.62
3.00
577.85
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
639.74
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
2.248
1.000
1.000
82.00
184.34
3.00
553.01
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
614.89
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.912
1.000
1.000
82.00
238.78
3.00
716.35
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
778.24
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
3.403
1.000
1.000
82.00
279.05
3.00
837.14
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
KG
0.220
2.426
1.000
174.47
186.23
3.00
558.70
1,457.72
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
4.235
1.000
1.000
82.00
347.27
3.00
1,041.81
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.220
3.048
1.000
174.47
116.99
3.00
350.97
KG
0.220
3.233
1.000
174.47
124.09
3.00
372.27
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1,888.31
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
4.244
1.000
1.000
82.00
348.01
3.00
1,044.02
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1,167.28
SUBTOTAL
1.000
1.000
#VALUE!
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
#VALUE!
PAG. 311 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
1.000
KGS
PIEZAS
#VALUE!
SUBTOTALDE
KGS
#VALUE!
KG
4.152
1.000
1.000
82.00
340.46
3.00
1,021.39
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1,144.65
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
3.958
1.000
1.000
82.00
324.56
3.00
973.67
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1,096.93
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
3.658
1.000
1.000
82.00
299.96
3.00
899.87
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
1,023.13
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.710
1.000
1.000
82.00
222.22
3.00
666.66
KG
0.054
0.418
1.000
124.62
11.25
3.00
33.75
KG
0.300
0.418
1.000
74.77
9.38
3.00
28.13
728.54
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.654
1.000
1.000
82.00
217.63
3.00
652.88
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
776.14
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
3.236
1.000
1.000
82.00
265.35
3.00
796.06
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
KG
0.300
0.363
1.000
124.62
13.57
3.00
40.71
919.31
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
4.167
1.000
1.000
82.00
341.69
3.00
1,025.08
KG
0.054
0.363
1.000
124.62
4.89
3.00
14.66
KG
0.140
0.140
1.000
74.77
8.79
3.00
26.38
KG
0.116
0.733
1.000
99.70
8.48
3.00
25.43
KG
0.191
0.464
1.000
74.77
6.63
3.00
19.88
KG
0.192
0.224
1.000
124.62
5.36
3.00
16.08
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.300
0.363
1.000
KG/M2 O ML
124.62
CANTIDAD X
PIEZA
KGS
PIEZAS
13.57
3.00
SUBTOTALDE
KGS
40.71
1,168.22
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
5.090
1.000
1.000
105.30
535.98
3.00
1,607.93
KG
0.053
0.425
1.000
199.39
17.97
3.00
53.90
KG
0.250
0.350
1.000
99.70
17.45
3.00
52.34
KG
0.317
0.426
1.000
99.70
13.46
3.00
40.39
KG
0.364
0.426
1.000
99.70
15.46
3.00
46.38
1,800.93
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
3.886
1.000
1.000
82.00
318.65
3.00
955.96
KG
0.054
0.340
1.000
124.62
9.15
3.00
27.46
KG
0.300
0.340
1.000
99.70
10.17
3.00
30.51
1.000
KG
3.178
1.000
1.000
1,013.92
SUBTOTAL
1.000
#VALUE!
82.00
260.60
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
#VALUE!
3.00
781.79
PAG. 315 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.054
0.340
1.000
124.62
9.15
3.00
27.46
KG
0.300
0.340
1.000
99.70
10.17
3.00
30.51
839.75
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
2.708
1.000
1.000
82.00
222.06
3.00
666.17
KG
0.054
0.340
1.000
124.62
9.15
3.00
27.46
KG
0.300
0.340
1.000
99.70
10.17
3.00
30.51
724.13
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
KG
2.347
1.000
1.000
105.30
247.14
1.00
247.14
KG
0.053
0.418
1.000
174.47
15.46
1.00
15.46
262.60
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
KG
2.347
1.000
1.000
82.00
192.45
2.00
384.91
KG
0.054
0.418
1.000
124.62
11.25
2.00
22.50
KG
0.300
0.418
1.000
74.77
9.38
2.00
18.75
SUBTOTAL
1.000
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
426.16
PAG. 316 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
1.000
KG
0.425
0.571
1.000
149.54
0.450
0.559
0.416
0.670
0.506
0.579
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
36.29
6.00
217.74
#VALUE!
1.000
#VALUE!
#VALUE!
1.000
149.54
37.62
6.00
225.70
225.70
SUBTOTAL
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
1.000
149.54
41.68
6.00
250.08
250.08
SUBTOTAL
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
1.000
149.54
43.81
6.00
262.87
262.87
SUBTOTAL
1.000
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
217.74
#VALUE!
1.000
KG
SUBTOTALDE
KGS
1.000
1.000
KG
PIEZAS
SUBTOTAL
1.000
KG
KGS
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
UNIDAD
LARGO
ANCHO
ALTO
KG
0.466
0.582
1.000
KG/M2 O ML
149.54
CANTIDAD X
PIEZA
1.000
0.434
1.057
1.000
149.54
1.057
1.000
0.450
0.559
149.54
0.450
0.556
486.69
#VALUE!
3.00
205.80
205.80
68.60
#VALUE!
3.00
205.80
205.80
SUBTOTAL
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
1.000
149.54
37.62
6.00
225.70
225.70
SUBTOTAL
1.000
KG
68.60
1.000
#VALUE!
#VALUE!
1.000
#VALUE!
#VALUE!
1.000
149.54
37.42
SUBTOTAL
1.000
TOTAL
486.69
#VALUE!
1.000
KG
SUBTOTALDE
KGS
SUBTOTAL
1.000
0.434
12.00
#VALUE!
1.000
KG
40.56
PIEZAS
SUBTOTAL
1.000
KG
KGS
6.00
224.49
224.49
1.000
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
1.000
KG
0.450
0.565
1.000
0.450
0.569
149.54
0.569
1.057
#VALUE!
#VALUE!
149.54
1.000
1.000
1.057
1.000
6.00
229.74
229.74
#VALUE!
149.54
38.29
#VALUE!
6.00
229.74
229.74
SUBTOTAL
#VALUE!
149.54
68.92
#VALUE!
3.00
206.75
206.75
SUBTOTAL
1.000
0.436
38.29
SUBTOTAL
1.000
KG
228.13
1.000
1.000
0.436
228.13
#VALUE!
1.000
KG
6.00
#VALUE!
1.000
#VALUE!
149.54
68.92
SUBTOTAL
1.000
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
#VALUE!
1.000
1.000
0.450
38.02
SUBTOTALDE
KGS
SUBTOTAL
1.000
KG
PIEZAS
#VALUE!
1.000
KG
KGS
#VALUE!
3.00
206.75
206.75
PAG. 319 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
1.000
KG
0.483
0.581
1.000
149.54
0.573
1.000
149.54
0.414
0.670
1.000
149.54
0.580
1.000
149.54
1.016
1.000
#VALUE!
38.56
6.00
231.36
231.36
#VALUE!
41.48
6.00
248.88
248.88
47.44
#VALUE!
12.00
569.33
569.33
SUBTOTAL
1.000
0.560
251.79
#VALUE!
1.000
KG
251.79
SUBTOTAL
1.000
0.547
6.00
#VALUE!
1.000
KG
41.97
SUBTOTAL
1.000
#VALUE!
149.54
85.08
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
#VALUE!
#VALUE!
1.000
KG
SUBTOTALDE
KGS
SUBTOTAL
1.000
0.450
PIEZAS
#VALUE!
1.000
KG
KGS
#VALUE!
6.00
510.50
PAG. 320 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
1.000
0.576
0.653
1.000
149.54
0.581
1.000
149.54
0.549
1.000
337.48
41.36
#VALUE!
6.00
248.14
248.14
#VALUE!
149.54
33.58
#VALUE!
6.00
201.47
201.47
SUBTOTAL
1.000
0
337.48
SUBTOTAL
1.000
0.409
6.00
#VALUE!
1.000
KG
56.25
0.00
0.00
0.00
1.000
0.00
0.00
0.00
KG
0.191
3.090
1.000
124.62
147.10
1.00
147.10
KG
0.428
3.158
1.000
74.77
101.06
1.00
101.06
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
KG
0.090
0.426
1.000
99.70
7.64
1.00
7.64
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
#VALUE!
SUBTOTAL
1.000
0.476
SUBTOTALDE
KGS
510.50
#VALUE!
1.000
KG
PIEZAS
SUBTOTAL
1.000
KG
KGS
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
277.04
SUBTOTAL
1.000
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
0.00
KG
0.191
3.099
1.000
124.62
147.53
2.00
295.05
KG
0.428
3.158
1.000
74.77
101.06
2.00
202.13
KG
0.250
0.426
1.000
99.70
21.24
2.00
42.47
KG
0.090
0.426
1.000
99.70
7.64
2.00
15.29
KG
0.191
0.245
1.000
74.77
3.50
2.00
7.00
1.000
0.00
1.000
0.00
561.93
SUBTOTAL
0.00
0.00
KG
0.428
5.472
1.000
74.77
175.12
1.00
175.12
KG
0.191
5.312
1.000
124.62
126.44
1.00
126.44
KG
0.191
4.738
1.000
124.62
112.77
1.00
112.77
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
KG
0.184
0.427
1.000
124.62
9.79
1.00
9.79
KG
0.090
0.426
1.000
99.70
7.64
1.00
7.64
KG
0.170
0.195
1.000
124.62
4.13
1.00
4.13
KG
0.098
0.647
1.000
74.77
4.74
1.00
4.74
KG
0.080
0.080
1.000
74.77
2.87
1.00
2.87
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
464.74
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
5.472
1.000
74.77
175.12
2.00
350.23
KG
0.191
5.312
1.000
124.62
126.44
2.00
252.87
KG
0.191
4.738
1.000
124.62
112.77
2.00
225.55
KG
0.250
0.426
1.000
99.70
21.24
2.00
42.47
KG
0.184
0.427
1.000
124.62
9.79
2.00
19.58
KG
0.090
0.426
1.000
99.70
7.64
2.00
15.29
KG
0.170
0.195
1.000
124.62
4.13
2.00
8.26
KG
0.098
0.647
1.000
74.77
4.74
2.00
9.48
KG
0.191
0.254
1.000
74.77
3.63
2.00
7.25
KG
0.080
0.080
1.000
74.77
2.87
2.00
5.74
936.74
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
7.762
1.000
74.77
248.40
3.00
745.20
KG
0.191
7.580
1.000
124.62
180.42
3.00
541.26
KG
0.191
6.480
1.000
124.62
154.24
3.00
462.71
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
KG
0.090
0.426
1.000
99.70
7.64
3.00
22.93
KG
0.184
0.429
1.000
124.62
19.67
3.00
59.02
KG
0.184
0.382
1.000
124.62
17.52
3.00
52.56
KG
0.170
0.196
1.000
124.62
4.15
3.00
12.46
KG
0.080
0.080
1.000
74.77
0.48
3.00
1.44
KG
0.098
0.646
1.000
74.77
4.73
3.00
14.20
KG
0.098
0.644
1.000
74.77
28.31
3.00
84.94
2,060.43
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
4.852
1.000
74.77
155.27
2.00
310.55
KG
0.191
4.765
1.000
124.62
113.42
2.00
226.83
KG
0.191
4.195
1.000
124.62
99.85
2.00
199.70
KG
0.250
0.426
1.000
99.70
21.24
2.00
42.47
KG
0.184
0.423
1.000
124.62
9.70
2.00
19.40
KG
0.090
0.426
1.000
99.70
7.64
2.00
15.29
KG
0.170
0.195
1.000
124.62
4.13
2.00
8.26
KG
0.098
0.645
1.000
74.77
4.73
2.00
9.45
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.191
0.250
1.000
74.77
3.57
2.00
7.14
KG
0.080
0.080
1.000
74.77
2.87
2.00
5.74
844.84
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.428
4.933
1.000
74.77
157.87
1.00
157.87
KG
0.191
4.765
1.000
124.62
113.42
1.00
113.42
KG
0.191
4.195
1.000
124.62
99.85
1.00
99.85
KG
0.250
0.426
1.000
99.70
21.24
1.00
21.24
KG
0.184
0.423
1.000
124.62
9.70
1.00
9.70
KG
0.090
0.426
1.000
99.70
7.64
1.00
7.64
KG
0.187
0.450
1.000
74.77
6.29
1.00
6.29
KG
0.170
0.195
1.000
124.62
4.13
1.00
4.13
KG
0.098
0.645
1.000
74.77
4.73
1.00
4.73
KG
0.191
0.250
1.000
74.77
3.57
1.00
3.57
KG
0.080
0.080
1.000
74.77
2.87
1.00
2.87
431.30
SUBTOTAL
0
1.000
0.00
0.00
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
0.00
PAG. 325 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
MUNICIPIO: MRIDA
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
UNIDAD
LARGO
ANCHO
ALTO
KG
0.191
5.279
1.000
124.62
251.30
3.00
753.91
KG
0.428
5.340
1.000
74.77
170.89
3.00
512.67
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
KG
0.300
0.426
1.000
99.70
12.74
3.00
38.22
KG
0.090
0.426
1.000
99.70
7.64
3.00
22.93
KG
0.191
0.379
1.000
74.77
5.41
3.00
16.24
KG
0.191
0.255
1.000
74.77
3.64
3.00
10.93
1,418.61
SUBTOTAL
0
1.000
0.00
0.00
0.00
KG
0.191
5.835
1.000
124.62
277.77
3.00
833.31
KG
0.428
5.892
1.000
74.77
188.56
3.00
565.67
KG
0.250
0.426
1.000
99.70
21.24
3.00
63.71
KG
0.250
0.426
1.000
99.70
10.62
3.00
31.85
KG
0.090
0.426
1.000
99.70
7.64
3.00
22.93
KG
0.100
0.426
1.000
99.70
4.25
3.00
12.74
KG
0.192
0.359
1.000
74.77
5.15
3.00
15.46
KG
0.191
0.267
1.000
74.77
3.81
3.00
11.44
SUBTOTAL
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
TOTAL
1,545.68
PAG. 326 DE 452
RIO DE EST. MET. DEL AREA DE LOSACERO DEL 1ER, 2O Y 3ER NIVEL
LARGO
ANCHO
MUNICIPIO: MRIDA
ALTO
KG/M2 O ML
CANTIDAD X
PIEZA
KGS
PIEZAS
SUBTOTALDE
KGS
TOTAL
###
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
475
475
475
475
475
475
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
476
476
476
476
476
CROQUIS 477
CROQUIS 477
CROQUIS 477
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
478
478
478
478
478
CROQUIS 479
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 479
CROQUIS 479
CROQUIS 479
CROQUIS
CROQUIS
CROQUIS
CROQUIS
480
480
480
480
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
481
481
481
481
481
CROQUIS 482
CROQUIS 482
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
482
482
482
482
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
483
483
483
483
483
483
483
483
483
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 483
CROQUIS 483
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
484
484
484
484
484
484
484
484
484
484
484
CROQUIS 485
CROQUIS 485
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
485
485
485
485
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
486
486
486
486
486
486
486
486
486
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 486
CROQUIS 486
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
487
487
487
487
487
487
487
487
487
487
487
CROQUIS 488
CROQUIS 488
CROQUIS 488
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
488
488
488
488
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
489
489
489
489
489
489
CROQUIS 490
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
490
490
490
490
490
490
490
490
490
490
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
491
491
491
491
491
491
491
491
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
492
492
492
492
492
492
492
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
493
493
493
493
493
493
493
493
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
494
494
494
494
494
494
494
494
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
495
495
495
495
495
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 496
CROQUIS 496
CROQUIS 496
CROQUIS
CROQUIS
CROQUIS
CROQUIS
497
497
497
497
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
498
498
498
498
498
498
498
498
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 498
CROQUIS 498
21,968.38
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
475
475
475
475
475
475
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
476
476
476
476
476
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 477
CROQUIS 477
CROQUIS 477
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
478
478
478
478
478
CROQUIS
CROQUIS
CROQUIS
CROQUIS
479
479
479
479
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
480
480
480
480
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
481
481
481
481
481
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
482
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
483
483
483
483
483
483
483
483
483
483
483
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
484
484
484
484
484
484
484
484
484
484
484
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
485
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
486
486
486
486
486
486
486
486
486
486
486
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
487
487
487
487
487
487
487
487
487
487
487
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
489
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
490
490
490
490
490
490
490
490
490
490
490
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
491
491
491
491
491
491
491
491
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
492
492
492
492
492
492
492
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
493
493
493
493
493
493
493
493
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
494
494
494
494
494
494
494
494
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
495
495
495
495
495
CROQUIS 496
CROQUIS 496
CROQUIS 496
CROQUIS
CROQUIS
CROQUIS
CROQUIS
497
497
497
497
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
499
499
499
499
499
499
499
499
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
500
500
500
500
500
500
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 501
CROQUIS 501
CROQUIS 501
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
502
502
502
502
502
502
502
502
502
502
502
CROQUIS 503
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
503
503
503
503
503
503
503
503
503
503
503
503
20,615.40
CROQUIS 475
CROQUIS 475
CROQUIS 475
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 475
CROQUIS 475
CROQUIS 475
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
476
476
476
476
476
CROQUIS
CROQUIS
CROQUIS
CROQUIS
479
479
479
479
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
480
480
480
480
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
481
481
481
481
481
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
482
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
483
483
483
483
483
483
483
483
483
483
483
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
484
484
484
484
484
484
484
484
484
484
484
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
485
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
486
486
486
486
486
486
486
486
486
486
486
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
487
487
487
487
487
487
487
487
487
487
487
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
488
488
488
488
488
488
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 488
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
489
489
489
489
489
489
CROQUIS 490
CROQUIS 490
CROQUIS 490
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
490
490
490
490
490
490
490
490
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
491
491
491
491
491
491
491
491
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
492
492
492
492
492
492
492
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
495
495
495
495
495
CROQUIS 496
CROQUIS 496
CROQUIS 496
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
497
497
497
497
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
504
504
504
504
504
504
504
504
504
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
505
505
505
505
505
505
505
505
505
18,181.77
60,765.55
CROQUIS 506
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 507
CROQUIS 507
CROQUIS 508
CROQUIS 509
CROQUIS 509
CROQUIS 510
CROQUIS 510
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 511
3,372.43
CROQUIS 512
CROQUIS 512
CROQUIS 512
CROQUIS 512
CROQUIS 513
CROQUIS 513
CROQUIS 513
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 514
CROQUIS 514
CROQUIS 514
CROQUIS 515
CROQUIS 515
CROQUIS 515
COQUIS 516
COQUIS 516
COQUIS 516
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 518
CROQUIS 518
CROQUIS 518
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 519
CROQUIS 519
CROQUIS 519
CROQUIS 520
CROQUIS 520
CROQUIS 520
CROQUIS 521
CROQUIS 521
CROQUIS 521
CROQUIS 521
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 523
CROQUIS 523
CROQUIS 523
CROQUIS 523
CROQUIS 523
CROQUIS 523
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 525
CROQUIS 525
CROQUIS 525
CROQUIS 525
CROQUIS 525
CROQUIS 525
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 527
CROQUIS 527
CROQUIS 527
CROQUIS 528
CROQUIS 528
CROQUIS 528
CROQUIS 528
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 528
CROQUIS 528
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 530
CROQUIS 530
CROQUIS 530
CROQUIS 530
CROQUIS 530
CROQUIS 530
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 530
CROQUIS 531
CROQUIS 531
CROQUIS 531
CROQUIS 531
CROQUIS 531
CROQUIS 532
CROQUIS 532
CROQUIS 532
CROQUIS 533
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 533
CROQUIS 533
CROQUIS 534
CROQUIS 534
CROQUIS 534
CROQUIS 535
CROQUIS 535
CROQUIS 546
CROQUIS 546
CROQUIS 546
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 547
CROQUIS 548
CROQUIS 549
CROQUIS 550
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 551
CROQUIS 552
CROQUIS 553
CROQUIS 554
CROQUIS 555
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 556
CROQUIS 557
CROQUIS 558
CROQUIS 559
CROQUIS 560
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 561
CROQUIS 562
CROQUIS 563
CROQUIS 564
CROQUIS 565
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 566
CROQUIS 567
CROQUIS 568
CROQUIS 569
CROQUIS 569
CROQUIS 569
CROQUIS 569
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 570
CROQUIS 570
CROQUIS 570
CROQUIS 570
CROQUIS 570
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 573
CROQUIS 573
CROQUIS 573
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 574
CROQUIS 574
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
475
475
475
475
475
475
CROQUIS 476
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
476
476
476
476
CROQUIS 477
CROQUIS 477
CROQUIS 477
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
478
478
478
478
478
CROQUIS 479
CROQUIS 479
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 479
CROQUIS 479
CROQUIS
CROQUIS
CROQUIS
CROQUIS
480
480
480
480
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
481
481
481
481
481
CROQUIS 482
CROQUIS 482
CROQUIS 482
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
482
482
482
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
483
483
483
483
483
483
483
483
483
483
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 483
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
484
484
484
484
484
484
484
484
484
484
484
CROQUIS 485
CROQUIS 485
CROQUIS 485
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
485
485
485
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
486
486
486
486
486
486
486
486
486
486
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 486
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
487
487
487
487
487
487
487
487
487
487
487
CROQUIS
CROQUIS
CROQUIS
CROQUIS
488
488
488
488
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 488
CROQUIS 488
CROQUIS 488
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
489
489
489
489
489
489
CROQUIS 490
CROQUIS 490
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
490
490
490
490
490
490
490
490
490
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
491
491
491
491
491
491
491
491
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
492
492
492
492
492
492
492
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
493
493
493
493
493
493
493
493
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
494
494
494
494
494
494
494
494
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
495
495
495
495
495
CROQUIS 496
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 496
CROQUIS 496
CROQUIS
CROQUIS
CROQUIS
CROQUIS
497
497
497
497
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
498
498
498
498
498
498
498
498
498
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 498
21,968.38
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
475
475
475
475
475
475
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
476
476
476
476
476
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 477
CROQUIS 477
CROQUIS 477
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
478
478
478
478
478
CROQUIS
CROQUIS
CROQUIS
CROQUIS
479
479
479
479
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
480
480
480
480
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
481
481
481
481
481
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
482
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
483
483
483
483
483
483
483
483
483
483
483
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
484
484
484
484
484
484
484
484
484
484
484
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
485
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
486
486
486
486
486
486
486
486
486
486
486
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
487
487
487
487
487
487
487
487
487
487
487
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
489
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
490
490
490
490
490
490
490
490
490
490
490
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
491
491
491
491
491
491
491
491
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
492
492
492
492
492
492
492
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
493
493
493
493
493
493
493
493
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
494
494
494
494
494
494
494
494
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
495
495
495
495
495
CROQUIS 496
CROQUIS 496
CROQUIS 496
CROQUIS
CROQUIS
CROQUIS
CROQUIS
497
497
497
497
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
499
499
499
499
499
499
499
499
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
500
500
500
500
500
500
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 501
CROQUIS 501
CROQUIS 501
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
502
502
502
502
502
502
502
502
502
502
502
CROQUIS 503
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
503
503
503
503
503
503
503
503
503
503
503
503
20,615.40
CROQUIS 475
CROQUIS 475
CROQUIS 475
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 475
CROQUIS 475
CROQUIS 475
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
476
476
476
476
476
CROQUIS
CROQUIS
CROQUIS
CROQUIS
479
479
479
479
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
480
480
480
480
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
481
481
481
481
481
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
482
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
482
482
482
482
482
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
483
483
483
483
483
483
483
483
483
483
483
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
484
484
484
484
484
484
484
484
484
484
484
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
485
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
485
485
485
485
485
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
486
486
486
486
486
486
486
486
486
486
486
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
487
487
487
487
487
487
487
487
487
487
487
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
488
488
488
488
488
488
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 488
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
489
489
489
489
489
489
489
489
489
489
489
CROQUIS 490
CROQUIS 490
CROQUIS 490
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
490
490
490
490
490
490
490
490
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
491
491
491
491
491
491
491
491
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
492
492
492
492
492
492
492
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
495
495
495
495
495
CROQUIS 496
CROQUIS 496
CROQUIS 496
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
497
497
497
497
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
504
504
504
504
504
504
504
504
504
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
CROQUIS
505
505
505
505
505
505
505
505
505
18,181.77
60,765.55
CROQUIS 506
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 507
CROQUIS 507
CROQUIS 508
CROQUIS 509
CROQUIS 509
CROQUIS 510
CROQUIS 510
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 511
3,372.43
CROQUIS 512
CROQUIS 512
CROQUIS 512
CROQUIS 512
CROQUIS 513
CROQUIS 513
CROQUIS 513
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 514
CROQUIS 514
CROQUIS 514
CROQUIS 515
CROQUIS 515
CROQUIS 515
COQUIS 516
COQUIS 516
COQUIS 516
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 517
CROQUIS 518
CROQUIS 518
CROQUIS 518
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 519
CROQUIS 519
CROQUIS 519
CROQUIS 520
CROQUIS 520
CROQUIS 520
CROQUIS 521
CROQUIS 521
CROQUIS 521
CROQUIS 521
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 522
CROQUIS 523
CROQUIS 523
CROQUIS 523
CROQUIS 523
CROQUIS 523
CROQUIS 523
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 524
CROQUIS 525
CROQUIS 525
CROQUIS 525
CROQUIS 525
CROQUIS 525
CROQUIS 525
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 526
CROQUIS 527
CROQUIS 527
CROQUIS 527
CROQUIS 528
CROQUIS 528
CROQUIS 528
CROQUIS 528
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 528
CROQUIS 528
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 529
CROQUIS 530
CROQUIS 530
CROQUIS 530
CROQUIS 530
CROQUIS 530
CROQUIS 530
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 530
CROQUIS 531
CROQUIS 531
CROQUIS 531
CROQUIS 531
CROQUIS 531
CROQUIS 532
CROQUIS 532
CROQUIS 532
CROQUIS 533
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 533
CROQUIS 533
CROQUIS 534
CROQUIS 534
CROQUIS 534
CROQUIS 535
CROQUIS 535
CROQUIS 546
CROQUIS 546
CROQUIS 546
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 547
CROQUIS 548
CROQUIS 549
CROQUIS 550
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 551
CROQUIS 552
CROQUIS 553
CROQUIS 554
CROQUIS 555
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 556
CROQUIS 557
CROQUIS 558
CROQUIS 559
CROQUIS 560
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 561
CROQUIS 562
CROQUIS 563
CROQUIS 564
CROQUIS 565
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 566
CROQUIS 567
CROQUIS 568
CROQUIS 569
CROQUIS 569
CROQUIS 569
CROQUIS 569
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 570
CROQUIS 570
CROQUIS 570
CROQUIS 570
CROQUIS 570
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
CROQUIS 571
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 572
CROQUIS 573
CROQUIS 573
CROQUIS 573
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 573
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
CROQUIS 574
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 574
CROQUIS 574
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
CROQUIS 575
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 576
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
CROQUIS 577
NIDELVIA DELS. AVILA CHAN:
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
VEL
O: 7-NOV-2016 AL 6-ENE-2017
PIO: MRIDA
OBSERVACIONES
PROSER:
__________________________
Ing. Rufino pasteln Alcal.
__________________________
ING. LUSI BURGOS.
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
1Y2
MUNICIPIO: MRIDA
CONCEPTO:
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
CONCEPTO:
1Y2
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
MUNICIPIO: MRIDA
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
CONCEPTO:
1Y2
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
MUNICIPIO: MRIDA
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
CONCEPTO:
1Y2
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
MUNICIPIO: MRIDA
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
CONCEPTO:
1Y2
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
MUNICIPIO: MRIDA
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
CONCEPTO:
1Y2
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
MUNICIPIO: MRIDA
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
CONCEPTO:
1Y2
SANDBLAST Y PRIMARIO
REALIZO:
________________________
ING. RUFINO PASTELIN A.
MUNICIPIO: MRIDA
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER
REPORTE FOTOGRFICO
FECHA DE ELABORACIN: 6 DE ENERO DEL 2017
OBRA: "PALACIO DE LA MUSICA" EN EL LA CIUDAD DE MERIDA, ESTADO DE YUCATAN. LOSACERO PLANTA BAJA
CONTRATO:
PERODO: 7-NOV-2016 AL 6-ENE-2017
CONTRATISTA: CONSTRUCTORA PRSER S.A DE C.V.
LOCALIDAD: MRIDA
CLAVE:
MUNICIPIO: MRIDA
CONCEPTO:
REALIZO:
________________________
ING. RUFINO PASTELIN A.
Vo.Bo.
_______________________
ING. LUIS BURGOS
CONSTRUCTORA PROSER