Académique Documents
Professionnel Documents
Culture Documents
qult
qall
(Kgf/cm )
(MPa)
(MPa)
(MPa)
79.23
111.85
93.21
74.57
39.61
20.97
16.31
6.99
13.98
18.64
16.73
27.19
31.38
25.10
25.10
23.01
14.64
16.73
16.73
18.83
17.08
17.08
17.08
18.97
22.77
18.97
20.87
18.97
18.97
22.77
22.57
22.57
24.31
20.84
26.04
27.78
24.31
52.09
62.51
65.98
62.41
68.81
67.21
65.61
65.61
54.41
48.01
48.01
44.81
33.61
7.92
11.18
9.32
7.46
3.96
2.10
1.63
0.70
1.40
1.86
1.67
2.72
3.14
2.51
2.51
2.30
1.46
1.67
1.67
1.88
1.71
1.71
1.71
1.90
2.28
1.90
2.09
1.90
1.90
2.28
2.26
2.26
2.43
2.08
2.60
2.78
2.43
5.21
6.25
6.60
6.24
6.88
6.72
6.56
6.56
5.44
4.80
4.80
4.48
3.36
1.32
1.86
1.55
1.24
0.66
0.35
0.27
0.12
0.23
0.31
0.28
0.45
0.52
0.42
0.42
0.38
0.24
0.28
0.28
0.31
0.28
0.28
0.28
0.32
0.38
0.32
0.35
0.32
0.32
0.38
0.38
0.38
0.41
0.35
0.43
0.46
0.41
0.87
1.04
1.10
1.04
1.15
1.12
1.09
1.09
0.91
0.80
0.80
0.75
0.56
0.44
0.62
0.52
0.41
0.22
0.12
0.09
0.04
0.08
0.10
0.09
0.15
0.17
0.14
0.14
0.13
0.08
0.09
0.09
0.10
0.09
0.09
0.09
0.11
0.13
0.11
0.12
0.11
0.11
0.13
0.13
0.13
0.14
0.12
0.14
0.15
0.14
0.29
0.35
0.37
0.35
0.38
0.37
0.36
0.36
0.30
0.27
0.27
0.25
0.19
dn
Rd
(m)
(blows)
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5
34
48
40
32
17
9
7
3
6
8
8
13
15
12
12
11
7
8
8
9
9
9
9
10
12
10
11
10
10
12
13
13
14
12
15
16
14
30
36
38
39
43
42
41
41
34
30
30
28
21
0
0
Rd
Depth
1
2
3
4
5
6
7
8
9
10
0.0
0
Rod No.
1
2
3
4
5
6
7
8
9
10
Project: Building
Location: Sangkat Sen Sok, Khan Dong Kuor
Field tested by: Mr. Tot Chinheng
0.00
0
1
2
3
4
5
6
7
8
9
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
Project:
Location:
Field tested by: Mr. Tot Chinheng
Rod No.
Rd
qult
qall
(Kgf/cm )
(MPa)
(MPa)
(MPa)
35.62
35.62
28.20
37.10
31.17
22.26
40.07
41.56
37.10
68.27
80.25
85.79
74.72
66.41
67.80
70.57
69.18
56.73
52.58
77.48
67.39
69.98
98.49
152.92
139.96
161.99
209.94
213.82
440.61
3.56
3.56
2.82
3.71
3.12
2.23
4.01
4.16
3.71
6.83
8.03
8.58
7.47
6.64
6.78
7.06
6.92
5.67
5.26
7.75
6.74
7.00
0.59
0.59
0.47
0.62
0.52
0.37
0.67
0.69
0.62
1.14
1.34
1.43
1.25
1.11
1.13
1.18
1.15
0.95
0.88
1.29
1.12
1.17
1.64
2.55
2.33
2.70
3.50
3.56
7.34
0.20
0.20
0.16
0.21
0.17
0.12
0.22
0.23
0.21
0.38
0.45
0.48
0.42
0.37
0.38
0.39
0.38
0.32
0.29
0.43
0.37
0.39
0.55
0.85
0.78
0.90
1.17
1.19
2.45
Depth
dn
Rd
(m)
(blows)
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
24
24
19
25
21
15
27
28
25
46
58
62
54
48
49
51
50
41
38
56
52
54
76
118
108
125
162
165
340
9.85
15.29
14.00
16.20
20.99
21.38
44.06
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
1276425
GRAPH OF DCP TEST RESULTS, DCP-01
Blow s /0.1m
0 20 40 60 80 100120140160180200220240260280300320340360
De pth below pres ent ground le vel (m )
0
1
2
3
4
5
6
7
8
9
10
0.00
0
5.00
10.00
15.00
20.00
25.00
30.00
1
2
3
4
5
6
7
8
9
10
0.50
1.00
1.50
2.00
2.50
3.00
1
2
3
4
5
6
7
8
9
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
1277211
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
Rod No.
Rd
qult
qall
Depth
dn
Rd
(m)
(blows)
(Kgf/cm )
(MPa)
(MPa)
(MPa)
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5
0
38
39
41
47
51
94
135
148
78
55
49
61
60
44
21
30
32
31
34
30
28
27
22
23
26
17
19
25
29
22
22
26
28
41
56
32
52
47
45
34
23
18
18
19
20
20
17
16
18
#DIV/0!
88.55
90.88
95.54
109.52
118.84
219.04
314.57
344.86
181.75
115.04
102.49
127.59
125.50
92.03
43.93
62.75
66.93
64.84
71.12
56.92
53.13
51.23
41.74
43.64
49.33
32.26
36.05
47.44
55.03
38.20
38.20
45.14
48.62
71.19
97.23
55.56
90.29
81.61
78.13
54.41
36.81
28.81
28.81
30.41
32.01
32.01
27.21
25.61
28.81
#DIV/0!
8.85
9.09
9.55
10.95
11.88
21.90
31.46
34.49
18.18
11.50
10.25
12.76
12.55
9.20
4.39
6.28
6.69
6.48
7.11
5.69
5.31
5.12
4.17
4.36
4.93
3.23
3.61
4.74
5.50
3.82
3.82
4.51
4.86
7.12
9.72
5.56
9.03
8.16
7.81
5.44
3.68
2.88
2.88
3.04
3.20
3.20
2.72
2.56
2.88
#DIV/0!
1.48
1.51
1.59
1.83
1.98
3.65
5.24
5.75
3.03
1.92
1.71
2.13
2.09
1.53
0.73
1.05
1.12
1.08
1.19
0.95
0.89
0.85
0.70
0.73
0.82
0.54
0.60
0.79
0.92
0.64
0.64
0.75
0.81
1.19
1.62
0.93
1.50
1.36
1.30
0.91
0.61
0.48
0.48
0.51
0.53
0.53
0.45
0.43
0.48
#DIV/0!
0.49
0.50
0.53
0.61
0.66
1.22
1.75
1.92
1.01
0.64
0.57
0.71
0.70
0.51
0.24
0.35
0.37
0.36
0.40
0.32
0.30
0.28
0.23
0.24
0.27
0.18
0.20
0.26
0.31
0.21
0.21
0.25
0.27
0.40
0.54
0.31
0.50
0.45
0.43
0.30
0.20
0.16
0.16
0.17
0.18
0.18
0.15
0.14
0.16
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
Project: Building
Four flat stories
Location: Sangkat Sen Sok, Khan Dong Kuor
Field tested by: Mr. Tot Chinheng
0.
0
1
2
3
4
5
6
7
8
9
10
Project:
Location:
Field tested by: Mr. Tot Chinheng
Rod No.
Rd
qult
qall
(Kgf/cm )
(MPa)
(MPa)
(MPa)
26.71
29.68
29.68
31.17
34.13
44.52
46.01
50.46
54.91
117.25
53.96
65.03
73.33
78.87
85.79
84.40
96.85
101.01
112.07
127.29
108.86
101.08
112.74
117.93
106.26
115.34
120.52
124.41
115.34
132.18
149.03
156.80
186.61
220.30
479.48
2.67
2.97
2.97
3.12
3.41
4.45
4.60
5.05
5.49
11.72
5.40
6.50
7.33
7.89
8.58
8.44
9.69
10.10
11.21
12.73
10.89
10.11
0.45
0.49
0.49
0.52
0.57
0.74
0.77
0.84
0.92
1.95
0.90
1.08
1.22
1.31
1.43
1.41
1.61
1.68
1.87
2.12
1.81
1.68
1.88
1.97
1.77
1.92
2.01
2.07
1.92
2.20
2.48
2.61
3.11
3.67
7.99
0.15
0.16
0.16
0.17
0.19
0.25
0.26
0.28
0.31
0.65
0.30
0.36
0.41
0.44
0.48
0.47
0.54
0.56
0.62
0.71
0.60
0.56
0.63
0.66
0.59
0.64
0.67
0.69
0.64
0.73
0.83
0.87
1.04
1.22
2.66
Depth
dn
Rd
(m)
(blows)
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
8
8.1
8.2
8.3
8.4
8.5
18
20
20
21
23
30
31
34
37
79
39
47
53
57
62
61
70
73
81
92
84
78
87
91
82
89
93
96
89
102
115
121
144
170
370
11.27
11.79
10.63
11.53
12.05
12.44
11.53
13.22
14.90
15.68
18.66
22.03
47.95
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
1276425
40
20
80
60
0
1
2
3
4
5
6
7
8
9
10
0.00
0
5.00
10.00
15.00
20.00
25.00
30.00
1
2
3
4
5
6
7
8
9
10
0.50
1.00
1.50
2.00
2.50
3.00
1
2
3
4
5
6
7
8
9
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88
1277211
Calculated by: Mr. HENG SOK SAMBO (Civil Engineer), H/P : (855) 12 73 00 88