Vous êtes sur la page 1sur 150

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
u
a@ in
y
G
n
t
R12.x Oracle
Work
Process
ta den
i
a
Fundamentals
ch StuSupplemental

k
l
is
i ( thPractices
Student
n
e
e
an o us
m
t
a
k
e
k
s
La licen
a
ny ble
a
t
i
ha sfera
C
na -tran
h
s
i
Kr
non

D59820GC10
Edition 1.0
February 2010
D64752

Copyright 2007, 2009, Oracle. All rights reserved.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Disclaimer
This document contains proprietary information and is protected by copyright and other intellectual property laws. You may copy and
print this document solely for your own use in an Oracle training course. The document may not be modified or altered in any way.
Except where your use constitutes "fair use" under copyright law, you may not use, share, download, upload, copy, print, display,
perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part without the express authorization
of Oracle.
The information contained in this document is subject to change without notice. If you find any problems in the document, please
report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not
warranted to be error-free.
Restricted Rights Notice
If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the United
States Government, the following notice is applicable:
U.S. GOVERNMENT RIGHTS
The U.S. Governments rights to use, modify, reproduce, release, perform, display, or disclose these training materials are restricted
by the terms of the applicable Oracle license agreement and/or the applicable U.S. Government contract.
Trademark Notice

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
Author
ta den
i
a
ch Stu

k
l
Reena Titus
i ( this
n
e
e
n
s
a
u
Technical Contributors and Reviewers
am e to
k
k
a ens
L
Susan Saperstein, April Nelson
a e lic
y
n
ta rabl
i
a
h published
fe using: Oracle Tutor
This bookCwas
s
n
a
shn on-tra
i
r
K
n

Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective
owners.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Table of Contents
R12.x Oracle Work in Process Fundamentals Supplemental Student Practices........................................1-1
R12.x Oracle Work in Process Fundamentals ...............................................................................................1-3
Objectives ......................................................................................................................................................1-4
Lesson 1 - Overview of Work in Process .......................................................................................................1-5
Lesson 2 - Setting Up Work in Process ..........................................................................................................1-6
Practice - Defining Finished Goods Assemblies, Components, and Subinventories ..................................1-7
Solution - Practice - Defining Finished Goods Assemblies, Components, and Subinventories ..................1-10
Practice - Creating a Bill of Material ...........................................................................................................1-17
Solution Creating a Bill of Material ..........................................................................................................1-19
Practice - Setting Work in Process Parameters .........................................................................................1-23
Solution Setting Work in Process Parameters.........................................................................................1-24
Practice - Defining an Accounting Class, Shop Floor Status, and Employee Labor Rate ..........................1-26
Solution Defining an Accounting Class, Shop Floor Status, and Employee Labor Rate .........................1-28
Lesson 3 - Creating Discrete Jobs .................................................................................................................1-31
Practice - Creating Resources, Departments, and Routings ......................................................................1-32
Solution - Creating Resources, Departments, and Routings ......................................................................1-36
Practice - Creating and Releasing a Discrete Job ......................................................................................1-47
Solution Creating and Releasing a Discrete Job .....................................................................................1-50
Lesson 4 - Updating Material Requirements ..................................................................................................1-59
Practice - Inventory Material Setup ............................................................................................................1-60
Solution Inventory Material Setup ...........................................................................................................1-61
Guided Demonstration - Using the Component Pick Release Program .....................................................1-63
Practice - Viewing and Creating Material Transactions ..............................................................................1-67
Solution Viewing and Creating Material Transactions .............................................................................1-69
Lesson 5 - Assigning and Managing Resources ............................................................................................1-75
Lesson 6 - Scheduling Jobs and Resources ..................................................................................................1-76
Practice - Using the Job and Resource Workbenches ...............................................................................1-77
Solution Using the Job and Resource Workbenches ..............................................................................1-79
Lesson 7 - Creating Shop Floor Transactions ................................................................................................1-85
Practice - Assembly Move Transactions ....................................................................................................1-86
Solution Assembly Move Transactions ...................................................................................................1-89
Practice - Reviewing and Updating Resource Information .........................................................................1-93
Solution Reviewing and Updating Resource Information ........................................................................1-95
Practice - Creating a Non-standard Job for Rework ...................................................................................1-101
Solution Creating a Non-standard Job for Rework ..................................................................................1-103
Practice - Using the Discrete Workstation ..................................................................................................1-106
Solution Using the Discrete Workstation .................................................................................................1-109
Practice - Completing Discrete Jobs ..........................................................................................................1-114
Solution Completing Discrete Jobs .........................................................................................................1-116
Lesson 8 - Work in Process Cost Transactions..............................................................................................1-121
Lesson 9 - Special Topics for Work in Process ..............................................................................................1-122
Practice - Closing Discrete Jobs ................................................................................................................1-123
Solution Closing Discrete Jobs................................................................................................................1-125
Lesson 10 - Appendix - Manufacturing Execution System (MES) Workstation ..............................................1-129

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
i

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 11 - Appendix - Repetitive Scheduling ...............................................................................................1-130


Practice - Defining a Repetitive Schedule ..................................................................................................1-131
Solution Defining and Releasing a Repetitive Schedule..........................................................................1-133
Practice - Performing a Move Transaction on a Schedule .........................................................................1-137
Solution Performing a Move Transaction on a Schedule.........................................................................1-139

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
ii

Preface
Profile

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Before You Begin This Course

Thorough knowledge of Oracle Inventory


Working experience with Oracle Bills of Material

Working experience with Oracle Engineering

Prerequisites

There are no prerequisites for this course.

s
) ha

How This Course Is Organized


R12.x Oracle Work in Process Fundamentals is an instructor-led course featuring lecture and
hands-on exercises. Online demonstrations and written practice sessions reinforce the concepts
and skills introduced.

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
iii

Related Publications
Oracle Publications

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Title

Part Number

Oracle Work in Process Users Guide

E13678-03

Oracle Bills of Material User's Guide

E13688-03

Oracle Inventory Users Guide

E13450-03

Additional Publications

System release bulletins


Installation and users guides
Read-me files
International Oracle Users Group (IOUG) articles
Oracle Magazine

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
iv

Typographic Conventions

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Typographic Conventions in Text


Convention
Bold italic
Caps and
lowercase
Courier new,
case sensitive
(default is
lowercase)

Element
Glossary term (if
there is a glossary)
Buttons,
check boxes,
triggers,
windows
Code output,
directory names,
filenames,
passwords,
pathnames,
URLs,
user input,
usernames

Example
The algorithm inserts the new key.
Click the Executable button.
Select the Cant Delete Card check box.
Assign a When-Validate-Item trigger to the ORD block.
Open the Master Schedule window.
Code output: debug.set (I, 300);
Directory: bin (DOS), $FMHOME (UNIX)
Filename: Locate the init.ora file.
Password: User tiger as your password.
Pathname: Open c:\my_docs\projects
URL: Go to http://www.oracle.com
User input: Enter 300
Username: Log on as scott
Customer address (but Oracle Payables)

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
Initial cap
Graphics labels
ta den
i
(unless the term is a
a
ch Stu

proper noun)
k
l
is
i ( to thethdatabase.
Do not save n
changes
Italic
Emphasized words
e
e
For further
information,
and phrases,
s see Oracle7 Server SQL Language
an Manual.
u
m
titles of books and
Reference
o
t
aEnter user_id@us.oracle.com,
k
e
k
courses,
where user_id is the
s
a name
nof the user.
e
variables a L
c
yelementsle liSelect Include a reusable module component and click Finish.
n
Quotation
Interface
a
it long names
ab
awith
marks
r
h
e
f
C thatnhave
s only
This subject is covered in Unit II, Lesson 3, Working with
a
a
n
r
Objects.
caps;
sh on-t initial
i
r
lesson
and
chapter
K
n

Arrow
Brackets
Commas

titles in crossreferences
SQL column
names, commands,
functions, schemas,
table names
Menu paths
Key names
Key sequences

Plus signs

Key combinations

Uppercase

Use the SELECT command to view information stored in the


LAST_NAME
column of the EMP table.
Select File > Save.
Press [Enter].
Press and release keys one at a time:
[Alternate], [F], [D]
Press and hold these keys simultaneously: [Ctrl]+[Alt]+[Del]

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
v

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Typographic Conventions in Code


Convention
Caps and
lowercase
Lowercase

Element
Oracle Forms
triggers
Column names,
table names

Example
When-Validate-Item

Passwords

DROP USER scott


IDENTIFIED BY tiger;
OG_ACTIVATE_LAYER
(OG_GET_LAYER (prod_pie_layer))

PL/SQL objects

Lowercase
italic
Uppercase

Syntax variables

SELECT last_name
FROM s_emp;

CREATE ROLE role

s
) ha

om
c

cs ide
t
@ Gu
aPaths
Typographic Conventions in Oracle Application Navigation
y
n
tto direct you
a
n
t
This course uses simplified navigation paths, such as the following
example,
i
e
ha Stud
through Oracle Applications.
c

k
(lQueryth> Find
is (B) Approve
i
(N) Invoice > Entry > Invoice Batches Summaryn(M)
e
e
an o us
This simplified path translates to the following:
m
t then Entry then Invoice Batches
aselect Invoice
k
e
1. (N) From the Navigator window,
k
s
La licen
Summary.
a
ny select
leQuery then Find.
a
2. (M) From theitmenu,
b
a
a
hthe Approve
er button.
f
3. (B) Click
C
s
na -tran
h
s
i
Kr Notations:
non
SQL commands and SELECT userid
FROM emp;
functions

(N) = Navigator
(M) = Menu
(T) = Tab
(B) = Button
(I) = Icon
(H) = Hyperlink

(ST) = Sub Tab

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
vi

Typographical Conventions in Oracle Application Help System Paths


This course uses a navigation path convention to represent actions you perform to find
pertinent information in the Oracle Applications Help System.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

The following help navigation path, for example


(Help) General Ledger > Journals > Enter Journals
represents the following sequence of actions:
1.

In the navigation frame of the help system window, expand the General Ledger entry.

2.

Under the General Ledger entry, expand Journals.

3.

Under Journals, select Enter Journals.

4.

Review the Enter Journals topic that appears in the document frame of the help system
window.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
vii

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices Table of Contents
viii

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
R12.x Oracle
nin Process
ta Work
i
e
a
d
Fundamentals
ch StuSupplemental

k
l
is
i ( thPractices
Student
n
e
e
an Chapter
us1
m
o
t
a
k
k
se
a
n
L
e
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 1

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 2

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

R12.x Oracle Work in Process Fundamentals

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 3

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Objectives

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 4

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 1 - Overview of Work in Process

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h Practices
There are
no
fe and Demonstrations in this Lesson.
C
s
n
a
shn on-tra
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 5

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 2 - Setting Up Work in Process

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 6

Practice - Defining Finished Goods Assemblies, Components, and


Subinventories

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
Oracle Work in Process is integrated with other Oracle applications, so you will be setting up
functions to be used later in executing transactions. In Oracle Inventory you define the items to
be produced, the components used production, and the subinventories where they reside.
Templates are used to specify sets of attributes for simplifying item definitions. Once defined,
items are assigned to organizations. In this practice, you will:

Create master items and components using templates


Associate those items with inventory organizations

Create subinventories where material and final assemblies are stored

Create a part by copying an existing item

s
) ha

Assumptions

om
c

cs youridinstructor
e
t

Students log into Oracle with User Name mfg and Password welcome;
a@ t Gu
might have a different User Name and Password for you n
toy
use.
ta den
i
a

Students use the M1 organization.


tuor something easy to
chas initials

S
k

Students replace XX with a unique identifier,


such
l
i ( this
n
remember.
e
n
se
a
u
am e to
Tasks
k
k
a ens
L
aassembly
Defining a master item
licand components
y
n
e
l
1. Navigate to the
b window, and use the information in the following table to create
itaMasterraItem
a
h
a finished
item
fe that you will use to build a discrete job (work order):
C goods
s
n
a
a for your unique identifier
trstands
-Apply
shn onXX
i
r
the Finished Good template
K
n

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Set the attributes for the item, as indicated


Note: System entry is case sensitive, so you need to remember the case of the items
you are creating.
Item
(Main tab)

XX-PC
2.
3.
4.

Description (Main
tab)
XX PC Assembly

BOM Allowed
(Bill of Material
tab)
Yes

Build in WIP
(Work in Process
tab)
Yes

Remaining in the Master item window, assign the assembly to the M1 organization.
Save your work.
Remaining in the Master Item window, use the following table to create components for
your finished goods assembly:

XX stands for your unique identifier

Apply the Subassembly template for the CPU and the Cable Set
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 7

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Apply the Purchased Item template for all the other components
Assign the items to the M1 organization while remaining in the Master Items window

Item
(Main tab)

Description
(Main tab)

Template

XXCPU

CPU for PC

Subassembly

XXCable

Cable Set

Subassembly

XXMonitor

21 inch Monitor

Purchased
Item

XXKeyboard

Keyboard

Purchased
Item

XXWire

Wire

Purchased
Item

s
) ha

om
c

cs ide
t
XXBox
Box for shipping Purchased
a@ t Gu
y
n
Item
ta den
i
a
ch Stu

k
Defining subinventories
l
i ( this
n
1. Navigate to the Subinventories window.
e
n
se
a
u
amfor eyourtoassemblies and components, using the
k
2. Create two subinventorykrecords
s
a table.
n
L
information in the following
e
c
ya le li
n
a
ab
ait feName
r
h
Subinventory
Subinventory Description
C ns
a
n -tra
Finished Goods Inventory
shXXFGI
i
n
r
K XXMAIN
Main Storeroom
no
XXPlug

Plug

Purchased
Item

3. Save your work and close all windows.


Creating a part by copying an existing item
You will now create an outside processing item for a test on this set of items.
1. Navigate to the Master Items window, and use the information in the following table to
create an outside processing item for the special test that has to be run on the lot of PCs
that you created.

XX stands for your unique identifier


Item Name

XX OSP Testing

Description
Testing Service for special lot of PCs

2. Copy the information from the item XX-PC.


Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 8

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

3. Enter the following attributes in the Purchasing tabbed region:

Purchased = Yes
Purchasable = Yes

Use Approved Supplier = No

List Price = 1.00


Outside Processing Item = Yes

Unit Type = Assembly


4. Enter the following attributes in the Lead Times tabbed region:

Preprocessing = 1

Processing = 5
Post Processing = 0
5. Save your work.
6. Assign the item to the M1 organization while remaining in the Master Items window.
7. Save your work and close the window.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 9

Solution - Practice - Defining Finished Goods Assemblies,


Components, and Subinventories

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Defining a master item assembly and components


Responsibility = Inventory, Vision Operations
1. Navigate to the Master Item window.
(N) Inventory > Items > Master Items

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
2. Enter the following information where XX stands for your unique identifier:

Item = XX-PC

Description = XX PC Assembly
3. Apply the Finish Good template.
(M) Tools > Copy From.
(B) Apply (B) Done

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 10

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

4. On the Bill of Material tab, enable the BOM Allowed flag.


5. On the Work in Process tab, enable the Build in WIP flag.
6. Save your record.
(M) File > Save
7. The assembly is assigned to the Master Organization V1, now assign the assembly to
the M1 Inventory organization. Remaining in the Master Items window, select the
Organization Assignment icon. It is enabled after you save your record.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

8. Enable the Assigned check box for the M1 organization.


9. Save your record.
(M) File > Save
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 11

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

10. Select the Attribute Groups icon to display the Master Item window again.
11. Select the New icon, or (M) File > New to clear the Master Item window, this enables you
to enter more part numbers.
12. Repeat Steps 2 11 using the following information. Ensure that you enter all data
within those steps.
Remember to save each record after entry to enable the Organization Assignment icon.
Item
(Main tab)

Description
(Main tab)

Template

XXCPU

CPU for PC

Subassembly

XXCable

Cable Set

Subassembly

XXMonitor

21 inch Monitor

Purchased
Item

XXKeyboard

Keyboard

Purchased
Item

s
) ha

om
c

cs ide
t
XXWire
Wire
Purchased
a@ t Gu
Item
y
n
ta den
i
XXPlug
Plug
Purchased
a
ch Stu

Item
k
l
i ( this
n
XXBox
Box for shipping Purchased
e
n
se
a
Item
u
m
to
awindows.
k
e
13. Save your work and close
all
k
a ens
L
(M) File > Close Form
a e lic
y
n
ta rabl
i
a
Defining subinventories
Ch sfeSubinventories window.
1. a
Navigate tonthe
n Inventory
tra > Setup > Organizations > Subinventories
sh(N)
i
n
r
K
no

2. In the Subinventories Summary window, choose New to display the Subinventories


window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 12

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
l records for your assemblies and components using information
tasubinventory
b
i
3. Create a
two
a
r where XX stands for your unique identifier.
etable,
f
in C
thehfollowing
s
anyour first record, select New from the File menu to clear the window and
naAfter-saving
r
h
t
s
i
on you second record.
Kr
nenter
(M) File > Save
(M) File > New

Subinventory Name

Subinventory Description

XXFGI

Finished Goods Inventory

XXMAIN

Main Storeroom

4. Save your work and close the window.


(M) File > Save
(M) File > Close Form
Creating a part by copying an existing item
1. Navigate to the Master Items window.
(N) Inventory > Items > Master Items
2. Enter the following information where XX stands for your unique identifier:
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 13

Item = XX OSP Testing

Description = Testing service for special lot of PCs


3. Select the Copy From option from the Tools menu. The Copy From window appears.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

(M) Tools > Copy From

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
fefield and query the item XX-PC.
Chon thenItem
s
4. a
Click
raitem XX-PC.
tthe
sh5.n Apply
i
n
r
K
no
(B) Apply (B) Done
6. On the Purchasing tab, enter the following information:

Purchased = Yes

Purchasable = Yes
Use Approved Supplier = No

List Price = 1.00

Outside Processing Item = Yes


Unit Type = Assembly

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 14

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
e
n
s
a
u
7. Click on the Lead Times tab. m
o
t
a
k
e
k
Enter the following attributes:
a ens
L
a= 1 e lic
Preprocessing
y
n
ta = r5abl
Processing
i
a
h sfe = 0
C
Post Processing
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 15

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
e
n
s
a
u
8. Save your record.
am e to
k
k
(M) File > Save
a ens
L
a e tolicthe Master Organization V1, now assign the assembly to
9. The assembly is
assigned
y
n
the M1 Inventory
Remaining in the Master Items window, select the
ta rorganization.
bl
i
a
a
Organization
Assignment
icon.
It is enabled after you save your record.
h
e
f
C
s
10.
the
anAssigned check box for the M1 organization.
naEnable
r
h
t
s
i
on your record and close the window.
Kr 11.nSave
(M) File > Save

(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 16

Practice - Creating a Bill of Material

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
Bills of material are the hierarchy of your items forming the product assembly. They also are
used to associate the assemblies with a supply type and subinventory.
In this practice you will create a bill of material for your assembly with the component items and
required quantities.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

Students use M1 organization.


XX is your unique identifier, such as initials or something easy to remember.

You have completed all previous practices.

s
) ha

om
c

cs ide
t
Tasks
a@ t Gu
y
n
Creating a bill of material for your assembly
ta den
i
a
tua phantom subassembly.
You will be creating bill of material for your assembly which
chincludes

S
k
l
s together to form a
( group
Phantom assemblies are non-stocked assembliesi that
himaterial
t
n
mechanism to collect components.
e
e
an andoenter
us information as listed in the table for a
1. Navigate to the Bills of Material window,
m
t
a
k used
phantom sub assembly for XXCable
k
se in your top level PC assembly:
a
n
L
e
Enter the components
a e linicthe following order.
y
n
l
a unique
XX isityour
identifier.
b
a
a
hthe Material
er Control tab, select the values for Supply Type and Subinventory.
CIn
f
s
n component has a yield of .90 in the Component Details tab. Use the
aplug
na The
r
h
t
s
i
Kr
nondefault of 1 for the other items.
Item
Sequence

Component Item

Qty

Yield

Supply
Type

Subinventory

10

XXWire

Bulk

XXMAIN

10

XXPlug

.90

Push

XXMAIN

2.
3.

Save your work, and choose OK for the prompt: Warning: Item Sequence #10 is used more
than once.
Clear the Bills of Material window and enter information as listed in the table for your top
level assembly XX-PC:
Enter the components in the following order.
In the Material Control tab, select the values for Supply Type and Subinventory.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 17

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Item
Sequence

Component Item

Qty

Yield

Supply
Type

Subinventory

10

XXCPU

Operation
Pull

XXMAIN

20

XXMonitor

Push

XXMAIN

30

XXKeyboard

Operation
Pull

XXMAIN

40

XXCable Set

Phantom

XXMAIN

50

XX Box

Assembly
Pull

XXMAIN

4.
5.

Save your work, and close the window.


Navigate to the Indented Bills of Material window to view the two bills of material you just
created.
Select Item: XX-PC and choose Find. Then select XX-Cable and choose Find.
Ensure that it is correct and verify that the Supply Types are correct.
Close all windows.

s
) ha

om
c

cs ide
t
a@ t Gu
y
7.
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
6.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 18

Solution Creating a Bill of Material

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Creating a bill of material for your assembly


Responsibility = Bills of Materials, Vision Operations
You will be creating bill of material for your assembly which includes a phantom subassembly.
Phantom assemblies are non-stocked assemblies that group material together to form a
mechanism to collect components.
1. Navigate to the Bills of Material window, and enter information as listed in the table for a
phantom sub assembly for XXCable used in your top level PC assembly.
(N) Bills of Materials > Bills > Bills

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Enter the components in the following order.


XX is your unique identifier.
In the Material Control tab, select the values for Supply Type and Subinventory.
The plug component has a yield of .90 in the Component Details tab. Use the
default of 1 for the other items.
Item
Sequence

Component Item

Qty

Yield

Supply
Type

Subinventory

10

XXWire

.90

Bulk

XXMAIN

10

XXPlug

Push

XXMAIN

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 19

2.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

3.

Save your work, and choose OK for the prompt: Warning: Item Sequence #10 is used more
than once.
(M) File > Save
Clear the Bills of Material window and enter information as listed in the table for your top
level assembly XX-PC.
(M) File > New
Enter the components in the following order.
In the Material Control tab, select the values for Supply Type and Subinventory.

Item
Sequence

Component Item

Qty

Yield

Supply
Type

Subinventory

10

XXCPU

Operation
Pull

XXMAIN

20

XXMonitor

Push

XXMAIN

30

XXKeyboard

Operation
Pull

XXMAIN

s
) ha

om
c

cs ide
t
u
40
XXCable
1
1
Phantom ya@
XXMAIN
G
n
t
n
ta deXXMAIN
i
50
XX Box
2
1
Assembly
a
chPull Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 20

4.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

5.

Save your work, and close the window.


(M) File > Save
(M) File > Close Form
Navigate to the Indented Bills of Material window to view the two bills of material you just
created.
N) Bills of Materials > Bills > Indented Bills

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h XX-PC
6. SelectCItem:
fe and choose Find. Then select XX-Cable and choose Find.
s
n
a
Ensure
that
it
is
n -tra correct and verify that the Supply Types are correct.
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 21

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
7. Close all windows.
am e to
k
k
s
M) File > Close Form a
n
L
e
c
ya le li
n
a
ait ferab
h
C ns
a
n
sh on-tra
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 22

Practice - Setting Work in Process Parameters

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
Parameters define modes of operation and default values effecting transactions and functions in
your organization. You define a set of WIP parameters for each organization.
In this practice, you will review parameter settings for various operations in work in process that
you will perform in other practices.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

Students use M1 and M3 organizations.


You have completed all previous practices.

s
) ha

om
c

cs ide
t
Reviewing parameter settings for your organizations
a@ t Gu
y
n
1. Navigate to the WIP Parameters window using the M1 organization.
ta den
i
a
Note: M1 is the standard costing organization, and
thetu
average costing
chM3 is S

k
l
organization.
i ( this
n
e
2. Check the parameters and change settings
to
values if required:
e
n the
sfollowing
a
u
am e to
k
k
s
Tabbed Region
Value
a eParameter
n
L
c
li Scrap Account disable
ya lRequire
Move Transaction
n
e
a
ait ferab Allow Creation of New enable
MovehTransaction
C ns
Operations
a
a
n
r
h
t
s onAll steps enabled
Kri nInteroperation
Tasks

3.
4.

5.
6.

If a Scrap Account is required, you cannot scrap parts unless an account value is
entered during the transactions.
Notice that in the Material tabbed region, the Supply Subinventory is set to a particular
value. When you created your bills of material, you entered your own supply
subinventory (XXMAIN) for your components. This value is the default when a
subinventory is not named.
Save your work if applicable.
Change organizations to review settings for average costing parameters:
- Default Completion Source
- Cost type
Change back to organization M1.
Close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 23

Solution Setting Work in Process Parameters

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Reviewing parameter settings for your organizations


Responsibility = Work in Process, Vision Operations
1. Navigate to the WIP Parameters window using the M1 organization.
(N) Work in Process > Setup > Parameters
Note: M1 is the standard costing organization, and M3 is the average costing
organization.
2. Check the parameters and change settings to the following values if required:
Tabbed Region

Parameter

Value

Move Transaction

Require Scrap Account

disable

Move Transaction

Allow Creation of New


Operations

enable

s
) ha

om
c

cs ide
t
u
a@
y
G
n
t
If a Scrap Account is required, you cannot scrap parts unless
an
account
value
is
a
n
t
i
e
entered during the transactions.
ha Stud
c

Notice that in the Material tabbed region, the


Supply
Subinventory
is set to a particular
k
l
s
(
i
i
h
value. When you created your bills of material,
youtentered your own supply
e value is the default when a
nen usThis
subinventory (XXMAIN) for your components.
a
subinventory is not named. am
to
k
e
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
Interoperation

All steps enabled

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 24

3.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

4.

5.
6.

Save your work if applicable.


(M) File > Save
Change organizations to review settings for average costing parameters:
- Default Completion Source
- Cost type
N) Work in Process > Other > Change Organization > M3
The Cost tabbed region is only visible in average costing organizations.
Change back to organization M1.
N) Work in Process > Other > Change Organization > M1
Close the window.
(M) File > Save

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 25

Practice - Defining an Accounting Class, Shop Floor Status, and


Employee Labor Rate

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
In this practice, you will define an accounting class, a shop floor status preventing moves on
your routing, and an employee record for labor rate information:

Accounting classes are used to group job costs. When you issue materials to a job
using a specific accounting class, the appropriate valuation accounts are charged.
When the job is closed, final costs and variances are calculated. And when the
accounting period is closed, these journal entries are automatically posted to the
general ledger.

Shop floor statuses are used to control move transactions on the routing. You may find
the need to create custom status types for your particular environment.

Labor rates are used for your person-type resources, that is, employees. You can track
these resources by defining employee numbers for your labor. If Oracle HRMS has not
been installed, you manually enter employee names and employee rates.

s
) ha

om
c

cs ide
Assumptions
t
u training

You must have access to an Oracle Application Vision database


a@or comparable
y
G
n
t
or test instance at your site on which to complete this tpractice.
a den
i
a

Students log into Oracle with User Name mfg and


tuwelcome; your instructor
chforPassword

S
k
l
might have a different User Name and Password
you
to
( this use.
i
n

Students use M1 organization. ne


se
a
u
m identifier,

Students replace XX with aaunique


to such as your initials or something easy to
k
e
k
remember.
a ens
L
a alleprevious

You have completed


lic practices.
y
n
l
aita ferab
Tasks
h
C ns
a
n
tra
Defining
class for your production work
-accounting
sh oan
i
n
r
K 1. Navigate
n to the WIP Accounting Classes window.
2.
3.
4.
5.

6.
7.

Enter an accounting class name XX _acclass, where XX is your unique identifier.


Enter the description XXAccounting Class
Select an accounting class Type of Asset Non-standard.
In the Inactive On field, select a date you can no longer use this accounting class.
Note: Do not enter a date that includes your training class dates. If this field is null, the
accounting class is active indefinitely.
Enter General Ledger accounts for each required Valuation and Variance account. You can
use the Miscellaneous accounting alias for each required Valuation and Variance account.
Save your work and close the window.

Defining a shop floor status on your routing


1. Navigate to the Shop Floor Statuses window.
2. Enter XX_SHOP in the Status Name field.
3. Enter a description.
4. Uncheck the Allow Moves flag.
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 26

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

5.

Optionally, you can select an Inactive On date.

6.

Do not enter a date that includes your training class dates. If this field is null, the status is
active indefinitely.
Save your work and close the window.

Defining employee labor rates


1. Navigate to the Employee Labor Rates window.
2. Search for an employee Name or Number. Your instructor may assign the record to you.
Note your employee record, it will be used in another practice.
3. In the Effective Date field, select todays date.
4. In the Hourly Labor Rate field, enter $50.00.
5. Save your record.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 27

Solution Defining an Accounting Class, Shop Floor Status, and


Employee Labor Rate

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Defining an accounting class for your production work


Responsibility = Work in Process, Vision Operations
1. Navigate to the WIP Accounting Classes window.
(N) WIP > Setup > WIP Accounting Classes
2. Enter an accounting class name XX _acclass, where XX is your unique identifier.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe XXAccounting Class.
3. EnterC
the description
an
na an-traccounting
h
4.
Select
class Type of Asset Non-standard.
s
i
n
r
o
K 5. Innthe Inactive On field, select a date you can no longer use this accounting class.
6.

7.

Note: Do not enter a date that includes your training class dates. If this field is null, the
accounting class is active indefinitely.
Enter General Ledger accounts for each required Valuation and Variance account.
Use the list of values to open the Account Alias window. In this practice you can use the
Miscellaneous accounting alias for each required Valuation and Variance account.
Save your work and close the window.
(M) File > Save
(M) File > Close Form

Defining a shop floor status on your routing


1. Navigate to the Shop Floor Statuses window.
(N) WIP > Move Transactions > Shop Floor Statuses > Shop Floor Statuses
2. Enter XX_SHOP in the Status Name field.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 28

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
3. Enter a description.
a@ t Gu
y
4. Uncheck the Allow Moves flag.
n
ta den
i
a
5. Optionally, you can select an Inactive On date.
ch Stu

k
l
i (class dates.
Do not enter a date that includes your training
hisIf this field is null, the status is
t
n
e
e
active indefinitely.
an o us
m
t
6. Save your work and close thekwindow.
a
e
k
s
(M) File > Save
La licen
a
(M) File > Close
nyFormble
a
t
i
ha slabor
erarates
Defining employee
f
C
na -ttorathen Employee Labor Rates window.
1. hNavigate
s
i
Kr (N)
nonWIP > Setup > Employees > Labor Rates

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 29

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
o instructor may assign the record to you.
tYour
aorm
k
2. Search for an employee Name
Number.
e
k
s
a it ewillnbe
L
Note your employee
record,
used in another practice.
c
a e li
y
n
3. In the Effective
Date
field,
select
todays
date.
l
ta rab
i
a
h Labor
4. In the Hourly
eRate field, enter $50.00.
f
C
s
n
a yourtrarecord.
5. n
Save
h
s
i
Kr M)
nonFile > Save
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 30

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 3 - Creating Discrete Jobs

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 31

Practice - Creating Resources, Departments, and Routings

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
You can control material for your jobs by combining bills of material with routings to create
requirements. Routings define the step-by-step operations required to manufacture an
assembly. Each routing can have any number of operations. You associate material with an
operation on the routing, specifying when and where materials are issued and backflushed.
In this practice, you will create first create resources, assign the resources to a department, and
create the routing. You will also create an outside processing resource for the routing and
assign the outside processing resource to the department. The last step is to relate component
material required for each routing step.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.
Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

s
) ha

om
c

Students use the M1 organization.


cs ide
t

Students replace XX with a unique identifier, such as initials or


somethingueasy to
a@
y
G
n
t
remember.
a
n
t
i
ha Stude

You have completed all previous practices.


c

lk his
(
i
Tasks
nen use t
a
am e to
Creating Resources
k
k
s
awindow.
n
1. Navigate to the Resources
L
e
c
li table to create three resources:
yain thelfollowing
2. Use the information
n
e
a
it for ryour
abunique identifier.
- XX
astands
h
e
f
s data for each record, with the exception of the XXTemp resource, choose
- C
After entering
n
a
a
n
r
-t to display the Resource Costs window to enter resource rate information.
sh onRates
i
r
K
n- For the Absorption and Variance Accounts, use the Account Alias window to pick absorption
and variance account records.

Resources
XXAssemblr

XXTester

XXPacker

XXTemp

Assembler

WIP Inspector

Packer

Temporary
Worker

Person

Person

Person

Person

HR

HR

HR

HR

WIP Move

WIP Move

WIP Move

Manual

Basis

Item

Item

Item

Item

Costed

Yes

Yes

Yes

Yes

Resource
Description
Type
Unit of
Measure
Charge Type

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 32

Resources
Standard Rate

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Absorption
Acct.
Variance Acct.

Yes

Yes

Yes

Yes

Absorption

Absorption

Absorption

Absorption

Variance

Variance

Variance

Variance

Rates

3.

Cost Type

Frozen

Frozen

Frozen

N/A

Unit Cost

12.50

32.00

10.00

N/A

Save your work.

Creating the department record


1.
2.

Navigate to the Departments window.


Enter information in the following fields to create your department record:

5.

Save your work and close all windows.

s
) ha

om
c

cs ide
- Department:
XX-MFG
t
- Description:
XX Assembly Department
a@ t Gu
y
n
- Location
M1-Seattle
ta den
i
a
3. Choose Resources to display the Resources window.
ch Stu

k
l
is
4. Enter information from the following table to assign
to this department.
i ( your
hresources
t
n
e
Choose Shifts for your temporary worker
to
enter
the
shift
number.
e
an o us
m
t
a
k
e
k
s
XXAssemblr
XXTester
XXPacker
XXTemp
Resource
a en
L
c
a
i
Yes
Yes
No
Available 24 nyYes le l
a
b
Hrsait
h sfera
C
No
No
No
n No
a Share
a
n
r
h
t
s
n2
1
1
1
Kri noUnits

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 33

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Creating a routing
You will create a routing consisting of three operations (Assemble, Test, Pack). The Assemble
operation has two resources: a lot-based resource for the setup, and an item-based resource for
the runtime. The Test and Pack operations have only one resource associated with them.
1. Navigate to Routings window.
2. In the Item field, select XX-PC where XX stands for your unique identifier. Use the default
values for the other fields in the Routing window header region.
3. In the Operations section of the window, the Main tabbed region, enter the information in
the following table. Use default information for the fields not listed.
Operation Seq

Department

10

XX-MFG

20

XX-MFG

s
) ha

om
c

4. In the Description tabbed region, enter descriptions for each Operation Sequence
the
cs idusing
e
t
information in the following table:
a@ t Gu
y
n
ta den
i
a
Operation Seq
Description
ch Stu

k
l
10
Assemble PC
i ( this
n
e
20
Test PC an
se
u
aPCm e to
30
Pack
k
k
a ens
L
5. For each individual operation,
your cursor in the Seq field, and choose Operation
a e lplace
ic Resources
y
n
Resources totdisplay
the
Operation
window.
l
a ab
i
a
6. Enter the
hinformation
erin the following table for each individual operation. Use default
f
C
s
information
for
the
a tran fields not listed. Note that the Assemblr resource has two resource
n
h
- Save your record after each entry:
s sequences.
Kri non
30

Operation
Sequence

7.
8.
9.

XX-MFG

Resource

Usag
e

Schedul
e

Charge Type
(Costing
Tab)

Basis

Resource
Seq

10

XXAssemblr

Lot

Yes

WIP move

10

XXAssemblr

Item

.04

Yes

WIP move

20

XXTester

Item

.02

Yes

WIP move

30

XX Packer

Item

.04

Yes

WIP move

Close the Operation Resources window, and select Routing Details on the Routings
window to display the Routing Details window.
In the Completion Subinventory field, select XXFGI.
Save your work and close all windows.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 34

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Creating an outside processing resource for the routing


You will create an outside processing resource for the routing.
1. Navigate to the Resources window.
2. Enter the resource information in the following fields to create an outside processing
resource record:

Resource = XX-OP
Description = Team XX Outside Processing Test Resource
Type = Miscellaneous
UOM = HR
Charge Type = PO Move
Basis = Item
Outside Processing = Enabled
Item = XX-PC
Costed = Yes
Standard Rate = No

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
Resource = XX-OP
k
a ens
L
Available 24 Hours
=
Yes
a e lic
y
n
l
Units = 1 ta
b
i
a
a
hrecordsand
5. Save your
erclose the window.
f
C
an to routing steps
na components
r
h
t
Assigning
s
i
Kr
non

3. Save your work and close the window.


Assigning the outside processing resource to the department
You will assign the outside processing resource to the department that you created.
1. Navigate to the Departments window.
2. Query for the Department XX-MFG that you created.
3. Choose Resources to display the Resources window.
4. Enter the following information to assign the outside processing resource to this department.

You will now create a relationship between the component material required for each routing
step.
1. Navigate to the Bill of Materials window and query assembly XX-PC.
2. Enter the following operation sequences as shown in the table:
Item

3.

Routing Operation
Sequence

XXCPU

10

XXCable

10

XXMonitor

10

XXKeyboard

10

XXBox

30

Save your work and close the window.


Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 35

Solution - Creating Resources, Departments, and Routings

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Creating Resources
Responsibility = Bills of Materials, Vision Operations
1. Navigate to the Resources window.
(N) Bills of Material > Routings > Resources
2. Use the information in the following table to create three resources:
- XX stands for your unique identifier.
- After entering data for each record, with the exception of the XXTemp resource,
choose Rates to display the Resource Costs window to enter resource rate
information.
- For the Absorption and Variance Accounts, use the Account Alias window to pick
absorption and variance account records.

s
) ha

om
c

cXXTemp
XXAssemblr
XXTester
XXPacker
Resource
e
t
d
i
u
a@ t Temporary
G
Assembler
WIP Inspector
Packerny
Description
ta den Worker
i
a
chPersonStu
Person
Person (lk
Person
Type
s
i
i
h
en se t HR
HR
HR
HR
Unit of
n
a
u
Measure
am e to
k
k
s Move
WIP Move
WIP Move
Manual
Charge Type
a enWIP
L
c
a e li Item
yItem
Item
Item
Basis
n
l
a
t
b
i
ra
Yes
Yes
Yes
Yes
Costed
ha sfe
C
a trRate
Yes
Yes
Yes
an Yes
nStandard
h
s
i
on
Absorption
Absorption
Absorption
Absorption
Kr
nAbsorption
Resources

Acct.

Variance Acct.

Variance

Variance

Variance

Variance

Rates
Cost Type

Frozen

Frozen

Frozen

N/A

Unit Cost

12.50

32.00

10.00

N/A

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 36

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

3.

Save your work and close all windows.


(M) File > Save
(M) File > Close Form
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 37

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Creating the department record


1. Navigate to the Departments window.
(N) Bill of Materials > Routings > Departments
2. Enter the information in the following fields to create your department record:
Department:

XX-MFG

Description:
Location

XX Assembly Department
M1-Seattle

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n window.
se
3. Choose Resources to display the Resources
a
u
amtablee totoassign your resources to this department:
4. Enter information from the following
k
k
a ens
L
a e lic XXTester
XXPacker
XXTemp
Resource anyXXAssemblr
l
t
b
i
a
a
r
h 24 sfeYes
Yes
Yes
No
Available
C
n
a
Hrs
-tra No
shn oShare
i
n
r
No
No
No
K
n
Units

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 38

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
5. Save your work and close all windows.
u
am e to
k
(M) File > Save
k
a ens
L
(M) File > Close Form
a e lic
y
n
ta rabl
i
Creating a routing
a
h a routing
feconsisting of three operations (Assemble, Test, Pack). The Assemble
C
s
You will
create
n
a
ra resources: a lot-based resource for the setup, and an item-based resource for
operation
hn has
ttwo
s
i
n
r
K the runtime.
no The Test and Pack operations have only one resource associated with them.
1.

2.

Navigate to Routings window.


(N) Bills of Material > Routings > Routings
In the Item field, select XX-PC where XX stands for your unique identifier. Use the default
values for the other fields in the Routing window header region.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 39

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
e region, enter the information in
n the Main
stabbed
3. In the Operations section of the window,
a
u
m
o the fields not listed.
the following table. Use default
tfor
ainformation
k
e
k
a ens
L
a e licDepartment
y
n
Operation
Seq
ta rabl
i
a
10Ch
fe XX-MFG
s
n
a
XX-MFG
shn 20on-tra
i
r
K
XX-MFG
n30
4.

In the Description tabbed region, enter descriptions for each Operation Sequence using the
information in the following table:
Operation Seq

5.
6.

Description

10

Assemble PC

20

Test PC

30

Pack PC

For each individual operation, place your cursor in the Seq field, and choose Operation
Resources to display the Operation Resources window.
Enter the information in the following table for each individual operation. Use default
information for the fields not listed. Note that the Assemblr resource has two resource
sequences. Save your record after each entry:

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 40

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Operation
Sequence

Resource

Basis

Resource
Seq

Usag
e

Schedul
e

Charge Type
(Costing
Tab)

10

XXAssemblr

Lot

Yes

WIP move

10

XXAssemblr

Item

.04

Yes

WIP move

20

XXTester

Item

.02

Yes

WIP move

30

XX Packer

Item

.04

Yes

WIP move

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr (M)
nonFile > Save
7.

8.

Close the Operation Resources window, and select Routing Details on the Routings
window to display the Routing Details window.
(M) File > Close Form
In the Completion Subinventory field, select XXFGI.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 41

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
9. Save your work and close all windows.
a
ch Stu

(M) File > Save


k
l
i ( this
(M) File > Close Form
n
e
nfor theurouting
se
Creating an outside processing resource
a
am e to
1. Navigate to the Resources window.
k
k
ns
La lic>eResources
(N) Bills of Materiala
> Routings
nyinformation
2. Enter the resource
le in the following fields to create an outside processing
a
t
i
a ferab
resourceh
record:
C ns= XX-OP
a
Resource
n
-tra = Team XX Outside Processing Test Resource
sh onDescription
i
r
K
n Type = Miscellaneous

UOM = HR
Charge Type = PO Move
Basis = Item
Outside Processing = Enabled
Item = XX-PC
Costed = Yes
Standard Rate = No

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 42

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
s
athe window.
n
3. Save your work and close
L
e
c
ya le li
(M) File > Save
n
a
ab
a>itClosefeForm
r
(N) File
h
Cthe outside
s processing resource to the department
Assigning
n
a
a
n
r
-tot the Departments window.
shNavigate
1.
i
n
r
o
K
n

(N) Bills of Material > Routings > Departments


2. Query for the Department XX-MFG that you created.
3. Choose Resources to display the Resources window.
4. Enter the following information to assign the outside processing resource to this department.

Resource = XX-OP
Available 24 Hours = Yes

Units = 1

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 43

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
5. Save your record and close
s
a the window.
n
L
e
c
(M) File > Saveya
li
n
e
l
a
(N) File >itClose Form
a ferab
h
Ccomponents
s to routing steps
n
a
Assigning
a
n
r
-tto the Bill of Materials window and query assembly XX-PC, where XX is your
shNavigate
i
1.
n
r
o
K
n
2.

unique identifier.
(N) Bills of Material > Bills > Bills
Enter the following operation sequences as shown in the table:
Item

Routing Operation
Sequence

XXCPU

10

XXCable

10

XXMonitor

10

XXKeyboard

10

XXBox

30

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 44

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 45

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

3.

Save your work and close the window.


(M) File > Save
(N) File > Close Form

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 46

Practice - Creating and Releasing a Discrete Job

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
A discrete job is a production order for the manufacture of a specific quantity of an assembly,
and may use a routing and operations. You can create both standard and non-standard discrete
jobs. You can also simulate a job to material availability and resources before creating the job.
In this practice, you will simulate a discrete job for your production, create an unreleased job,
and release it. You will then attach documents to a job operation. You will also create a discrete
order, add an outside processing step to the discrete job, and issue material to the job.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

Students use the M1 organization.

Students replace XX with a unique identifier, such as initials or something easy to


remember.

s
) ha

om
c

cs ide
t
a@ t Gu

You have completed all previous practices.


y
n
ta den
i
a
Tasks
ch Stu

k
l
i ( this
n
Simulating a Discrete Job
e
se The simulation may show shortages,
an requirements.
u
You will first simulate a discrete job tom
check
to In reality, shortages would be an
aanotherepractice.
but you will take care of them later
in
k
k
s
n
indication that you may not L
beaable to e
manufacture
the required quantity of this assembly.
c
a
i
l
1. Navigate to the Simulate
ny bDiscrete
e Jobs window.
l
a
t
i
2. In the Assembly
raselect XX-PC.
ha sfield,
e
f
C
3. Enter
n Quantity field.
a 100trinathe
n
h
4.
s Use the-list of values in the Completion Date field, and choose a date 2 weeks from today.
Kri non
5.

6.
7.

Choose Components to view material shortages.


Do you have shortages?
Choose Operations to view the start and completion dates for the first two operations.
What are the dates?
Close the window.

Creating a Discrete Job


1. Navigate to the Discrete Jobs window. When the Find Discrete Jobs window appears,
choose New.
2. In the Job field, enter a job number of your choice. It is helpful if you use your unique
identifier in the name.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 47

3.

Enter information for the following fields as shown in this table. Use default information for
the other fields.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Field

Value

Type

Standard

Assembly

XX-PC

Status

Unreleased

Quantity

100

Completion Date

2 weeks from Today

4.
5.
6.

Save your work.


Select the Attachments icon to attach a document to this job.
In the Attachments window, for Sequence 10 in the Category field, search the list of values
for WIP Job/Schedule Attachment.
7. In the Description field enter: Special Instructions. Or you can enter any other descriptive
text.
8. In the Data type field, select Short Text from the list of values.
9. In the note region of the window, enter This is a rush job for Bruce Planner and needs to
be finished on schedule.
10. Save your work and close all windows.
11. Navigate to the View Discrete Jobs window and review your job and attachment.
How do you know there is an attachment for this job?

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
Releasing a discrete
job
n
l
b
a
aitato fstart
You are nowh
ready
production.
Authorize the start of production by releasing the discrete
r
e
C
s
job. a
n -ttorathen Discrete Jobs window and enter your job number.
h
1.
Navigate
s
i
Kr 2. Change
non the value in the status field to Released. Use the list of values in the Completion
3.

Date field, and choose a date 2 weeks from today.


Save your work and close the window.

Creating a discrete order


You will now create a discrete order to manufacture 100 PCs. This is the same as what you have done in
Creating a Discrete Job. However, the job has to be in the Released Status.
1. Navigate to the Discrete Jobs window.
2. Enter information for the following fields as shown in this table. Use default information for
the other fields.
Field

Value

Job

XX-ABC

Assembly

XX-PC
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 48

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Type

Standard

Class

Discrete

Status

Released

Firm

No

Start

100

MRP Net

Leave as defaulted

Start (Date)

System date

3. Save your work and close the window.


Adding the outside processing step to the discrete job
Since the outside processing that you are going to do on this job is not a part of the standard
routing, you will now add this outside processing step to the job.
1. Navigate to the Operations window.
2. Query for the discrete job XX-ABC.
3. Enter the following information in the respective fields

s
) ha

om
c

cs ide
t
Sequence = 15
a@ t Gu
y
n
ta den
Department = XX-MFG
i
a
tu
ch Swindow,
4. Enter the following information in the Resources Requirements

k
l
i ( this
Sequence = 10
n
e
n
se
Resource = XX-OP
a
u
am e to
Basis = Item
k
k
a ens
L
Value = 1
a e lic
y
n
5. On the Costing
tab,
enable
ta rabl the Charge Type as PO move.
i
a
6. Save your
h worksand
eclose the window.
f
C
an to the job
nathe -material
r
h
t
Issuing
s
i
n push material listed to the job. This is an optional step for the students to perform.
Kr You willnonow
1. Navigate to the WIP Material Transactions window.
2. Enter the following information in the respective fields:
Job = XX-ABC

Type = WIP issue (default)

Include = All Material


3. Click the Continue button.
4. Click the Done button.
5. Close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 49

Solution Creating and Releasing a Discrete Job

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Simulating a Discrete Job.


Responsibility = Work in Process, Vision Operations
1. Navigate to the Simulate Discrete Jobs window.
(N) WIP > Discrete > Simulate Discrete Jobs

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
2. In the Assembly field, select XX-PC.
ch Stu

k
l
3. Enter 100 in the Quantity field.
i ( this
n
e
4. Use the list of values in the CompletionnDate field,
seand choose a date 2 weeks from today.
a
u
5. Choose Components to view material
to
am shortages.
k
e
k
Do you have shortages?
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 50

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

6.

Choose Operations to view the start and completion dates for the first two operations.
What are the dates?
This information is on the Dates tabbed region of the Operations window.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
lic
7. Close the window.ya
n
e
l
a Form
(M) Filea>itClose
ab
r
h
e
f
C ns
a
Creating
a Discrete
a Job
n
r
h
t
s
i
Kr 1. Navigate
non to the Discrete Jobs window. When the Find Discrete Jobs window appears,
2.

choose New.
(N) WIP > Discrete > Discrete Jobs
In the Job field, enter a job number of your choice. It is helpful if you use your unique
identifier in the name.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 51

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
nas shown
3. Enter information for the following fields
sine this table. Use default information for
a
u
the other fields.
am e to
k
k
a ens
L
a e lic Value
Fieldny
ta rabl
i
a
Typeh
e Standard
f
C
s
an
naAssembly
XX-PC
r
h
t
s
i
n
r
o
K
Unreleased
nStatus

4.
5.

Quantity

100

Completion Date

2 weeks from Today

Save your work.


(M) File > Save
Select the Attachments paperclip icon to display the Attachments window for referencing a
document to this job.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 52

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

6.

In the Attachments window, for Sequence 10 in the Category field, search the list of values
for WIP Job/Schedule Attachment.

7.

In the Description field enter: Special Instructions. Or you can enter any other descriptive
text.
In the Data type field, select Short Text from the list of values.
In the note region of the window, enter This is a rush job for Bruce Planner and needs to
be finished on schedule.

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

8.
9.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 53

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

10. Save your work and close all windows.


(M) File > Save
(M) File > Close Form
11. Navigate to the View Discrete Jobs window to review your job and attachment.
(N) WIP > Discrete > View Discrete Jobs
12. Choose Find to display the View Discrete Jobs window.
How do you know there is an attachment for this job? The icon has changed from a
paperclip icon to a lock icon.

s
) ha

om
c

cs ide
t
Releasing a discrete job
a@ t Gu
y
n
n by releasing the
You are now ready to start production. You will authorize the start
ta of production
i
e
a
d
discrete job.
ch Stu

k
l
1. Navigate to the Discrete Jobs window and enter
your
s
( tjobhinumber.
i
n
(N) WIP > Discrete > Discrete Jobsne
e
a o usAnd use the list of values in the
m
2. Change the value in the status a
field
to Released.
t weeks from today.
k
e
k
Completion Date field, and
choose
a
date
2
s
n
Lathelwindow.
e
c
3. Save your work and
close
a
i
ny ble
a
(M) File >itSave
ra
ha> Close
eForm
(M)CFile
f
s
na -tran
h
s
Creating
andiscrete order
i
Kr You willnonow
create a discrete order to manufacture 100 PCs.
1. Navigate to the Discrete Jobs window.
(N) WIP > Discrete > Discrete Jobs
2. Enter information for the following fields as shown in this table. Use default information for
the other fields.
Field

Value

Job

XX-ABC

Assembly

XX-PC

Type

Standard

Class

Discrete

Status

Released

Firm

No
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 54

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Start

100

MRP Net

Leave as defaulted

Start (Date)

System Date

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
hwork sandfeclose the window.
C
3. Save
your
a>nSave
na (M)-File
r
h
t
s
i
Kr
non
(M) File > Close Form

Adding the outside processing step to the discrete job


1. Navigate to the Operations window.
(N) WIP > Job/Schedule Details > Operations
2. Query for the discrete job XX-ABC.
3. Enter the following information in the respective fields

Sequence = 15
Department = XX-MFG

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 55

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
4. Click on Resources
n
se
a
u
(B) Resources
am e to
k
k
s enter the following information
a window,
n
5. In the Resources Requirements
L
e
c
ya le li
Sequence = 10
n
a
ab
ait= XX-OP
Resource
r
h
e
f
C ns
na
Basis = Item
t=ra1
sh Value
i
n
r
K
no

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 56

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i (PO move.
his
t
6. On the Costing tab, enable the Charge Type
as
n
e
e
an o us
m
t
a
k
e
k
s
La licen
a
ny ble
a
t
i
ha sfera
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 57

7. Save your work and close the window.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

(M) File > Save


(M) File > Close Form
Issuing the material to the job (optional step)
1. Navigate to the WIP Material Transactions window.
(N) WIP > Material Transactions > WIP Material Transactions
2. Enter the following information in the respective fields:

Job = XX-ABC

Type = WIP issue (default)


Include = All Material

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
3. Click the Continue button.
You can see the push material listed.
4. Click the Done button to issue the material to the job.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 58

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 4 - Updating Material Requirements

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 59

Practice - Inventory Material Setup

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
When you simulated a discrete job to see what your material shortages might be, there was no
quantity in your subinventory for any of the items. This practice is to process Inventory
transactions to establish initial on-hand balances in your main stores area.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

Students use the M1 organization.


Students replace XX with a unique identifier, such as initials or something easy to
remember.

s
) ha

om
c

cs ide
Tasks
t
a@ t Gu
y
n
Issuing material to the stockroom
ta den
i
a
1. Navigate to the Miscellaneous Transaction window.ch
tu

S
k
l
2. Select values for the following fields:
i ( this
n
e
Date: Todays date
n
se
a
u
Type Account Alias Receipt
am e to
k
k
a ens
Source: STD_MTL_CST
L
aLines eto display
lic the Account alias receipt window.
y
3. Choose Transaction
n
l
ab in the window:
4. Enter the following
aita feinformation
r
h
C ns
a
n
-tra Subinventory Quantity
sh onItem
i
r
K
n

5.

You have completed all previous practices.

XXCPU

XXMAIN

120

XXMonitor

XXMAIN

120

XXKeyboard XXMAIN

120

XXWire

XXMAIN

500

XXPlug

XXMAIN

240

XXBox

XXMAIN

120

Save your work and close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 60

Solution Inventory Material Setup

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Issuing material to the stockroom


Responsibility = Inventory, Vision Operations
1. Navigate to the Miscellaneous Transaction window.
(N) Inventory > Transactions > Miscellaneous Transaction

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
to
am
k
2. Select values for the following
fields: se
k
a en
Ldate
Date: Todays
a
lic
y
n
e
l
TypeitaAccountb
Alias Receipt
a
a
r
h
fe
CSource: s
STD_MTL_CST
n
a
3. hChoose
Lines to display the Account alias receipt window.
tra
s n on-Transaction
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 61

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
4. Enter the following information a
in m
the window:
to
k
e
k
a ens
L
a Subinventory
lic
Item ny
Quantity
e
l
a
t
b
i
XXCPU
120
ha sferaXXMAIN
C
an
naXXMonitor
XXMAIN
120
r
h
t
s
i
n
r
o
K
XXMAIN
120
nXXKeyboard

5.

XXWire

XXMAIN

500

XXPlug

XXMAIN

240

XXBox

XXMAIN

120

Save your work and close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 62

Guided Demonstration - Using the Component Pick Release Program

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Responsibility: Work in Process


Using the Component Pick Release window to select requirements
1. Navigate to the Component Pick Release window.
(N) WIP > Discrete > Component Pick Release > Component Pick Release (Form)
The Find Discrete Jobs window displays fields to search for jobs. You can query by Job,
Operation, Assembly, Schedule Group, Build Sequence, Line, and other criteria.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
ancriteria and choose Find to display the Component Pick Release window.
na search
r
h
t
2.
Select
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 63

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
s displays in the summary view of push type
a ewindow
n
L
The Component Pick
Release
c
ya leforli your job. The following fields display:
component requirements
n
a
ab check box defaults as marked for all the records. Uncheck
ait in fRelease
r
Include
h
e
Crecordsnsyou do not want to release, or clear a record from the Edit menu.
a
n
-traSlip Grouping Rule is used to group tasks based on the pick method.
sh onPick
i
r
K
n

Print Pick Slips box is used to indicate if you want to print the Move Order Pick
Slip Report, in Oracle Inventory as part of this component pick release. Check this
box to enable printing.

3.

For Oracle Warehouse Management enabled organizations, the Plan


Tasks box flag provides the option to plan tasks automatically or manually at the
time of pick release. This option is used if you want to create the allocations, but
postpone the dispatching.
To display a summary window of one of the records, select a record in the navigation tree.
Information for top level records display on the summary window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 64

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
n
4. Select a component detail to display the detail window. aita
e
d
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 65

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

5.

Choose Release to perform the pick release process.


All jobs or schedules displayed in the tree are released. Move orders are generated for
records where the Include in Release check box is unchecked.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 66

Practice - Viewing and Creating Material Transactions

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
After a job is released, you build it by issuing components. A component's supply type
determines how it is issued to the job. Push and bulk components are issued directly to jobs as
required. You can manually issue components to the job, use picking programs, or inventory
transaction processing. In this practice you will review component material reports, and issue
parts to your job.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.
Students use the M1 organization.

as

Students replace XX with a unique identifier, such as initials or something easy )to h
om
remember.
c

cs ide

You have completed all previous practices.


t
a@ t Gu
y
n
Tasks
ta den
i
a
ch Stu

Viewing Material Requirements


k
l
is requirements on the job
i (for yourthmaterial
n
In this first task you will view the supply typeseagain
e
you created. Supply types control how material
an ois delivered
us to a job.
m
t
a
1. Navigate to the View Material
kRequirements
e window.
k
s
a
n
2. Enter your discrete job L
number c
ine
the Find Material Requirements window, and choose
a
i
l
y
Find.
le
tantabbed
b
i
a
3. Select the
Supply
region
to view your supply types:
a
h sfer
C
n pull components are issued when you complete assemblies into
a Assembly
a
n
r
h
t
inventory.
s
Kri nonPush components are issued directly to the job.

Bulk components are issued to jobs when required.


Operation pull components are issued when you complete the transaction at the
operation where they are consumed.

4.
5.

Phantom subassemblies are a collection of their components, the components are


issued for the phantom assemblies.
Select the Quantities region.
Why is the requirement for the plug not a whole number?
Close the window.

Creating a Pick List Report


You will next be creating a pick list for stockroom personnel to pick and issue material for your
job.
1. Navigate to the Request window and select Single Request.
2. On the Submit Request window use the list of values in the Request Name field to select
the Discrete Job Pick List Report.
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 67

3.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

4.

5.
6.
7.
8.

In the Parameters window, select values in the following fields, and leave the other fields
blank:
Sort By: WIP Material transactions
Jobs From and To: Your discrete job number
Choose OK to display the Submit Requests window again, and choose Submit. Record the
Request ID number that displays on the Decision dialog box. Choose No for the response
to Submit another request?
When your report has completed, select the View Output option to view the report. On the
Find Requests window, select Specific Requests.
Enter your transaction number in the Request ID field and choose Find to display the
Requests window. You will see your record on this window.
Choose View Output to display the pick list for your job, and print your report.
Close the window.

Issuing push and bulk components to your job


In this next practice you will issue several components directly to your job.
1. Navigate to the WIP Material Transactions window.
2. Enter your discrete job number in the Job field.
3. In the Transaction region of the window, use the following defaulted values for:

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
Type: WIP Issue
ch Stu

k
l
Date: Todays Date
i ( this
n
e
Include: All Material
n
se
a
u
m Issuetwindow.
4. Choose Continue to display theaWIP
All push material on your job is
o
k
e
displayedthe monitor and
the
plug.
k
a ens
L
5. Choose Done to process
transaction.
a this
lic
y
n
e
l
a that still
There is another ipart
bneeds to be issued, the bulk item. Bulk items are not automatically
a
a tjob.
r
transacted tohthe
The
bulk
item, wire, is part of a phantom subassembly in your assembly.
e
f
C
s
6. In
Material
an Transactions window, enter your discrete job number again in the Job
nathe WIP
r
h
t
s
field,
and
use
the same values for Type and Date as your last transaction.
i
Kr
non
7.
8.

Select Specific Component in the Include region, and choose Continue.


In the WIP Issue window, select the following information in the fields:
Item

XXWire

Subinventory

XXMAIN

Operation Sequence

10

Quantity

100

9. Choose Done to process this transaction.


10. Close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 68

Solution Viewing and Creating Material Transactions

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Viewing Material Requirements


Responsibility = WIP, Vision Operations
1. Navigate to the View Material Requirements window.
(N) WIP > Job/Schedule Details > View Material Requirements
2. Enter your discrete job number in the Find Material Requirements window, and choose
Find.
3. Select the Supply tabbed region to view your supply types:
Assembly pull components are issued when you complete assemblies into
inventory.
Push components are issued directly to the job.
Bulk components are issued to jobs when required.

has
Operation pull components are issued when you complete the transaction at )the
om
operation where they are consumed.
c

s
are
ccomponents
e
Phantom subassemblies are a collection of their components, the
t
d
i
issued for the phantom assemblies.
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

4.

Select the Quantities region.


Why is the requirement for the plug not a whole number?

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 69

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
sisethe amount required to build the
This component has a yield valueaofn.90. Yield
u
assembly plus the amount you
to in production. A yield of .90 means that 90
amlose ore waste
k
k
percent of the usage quantity
a onenthes bill of material becomes part of the finished
L
assembly. When
the
bill
ic is exploded, it adds extra parts to the quantity
ya leof lmaterial
needed. tan
i
ab
awindow.
r
5. Close the
h
e
f
CFile > Close
s Form
n
a
(M)
a
n
r
sh on-t
i
r
K
n
Creating a Pick List Report
You will next be creating a pick list for stockroom personnel to pick and issue material for your
job.
1. Navigate to the Request window
WIP > Report
2. Select Single Request, and choose OK to display the Submit Request window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 70

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
Jobs From and To: Your discrete job numberch
tu

S
k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
3.
4.

Use the list of values in the Request Name field to select the Discrete Job Pick List Report.
In the Parameters window, select values in the following fields, and leave the other fields
blank:
Sort By: WIP Material transaction

5.
6.

Choose OK to display the Submit Requests window again.


Choose Submit and record the Request ID number that displays on the Decision dialog
box.
Choose No for the response to Submit another request?

7.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 71

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

8.
9.

When your report has completed, select the View Output option to view the report. On the
Find Requests window, select Specific Requests.
Enter your transaction number in the Request ID field and choose Find to display the
Requests window. You will see your record on this window.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

10. Choose View Output to display the pick list for your job.
11. Print your pick list.
(M) File > Print
12. Close all windows.
(M) File > Close Form
Issuing push and bulk components to your job
In this next practice you will issue several components directly to your job.
1. Navigate to the WIP Material Transactions window.
(N) Material Transactions > WIP Material Transactions
2. Enter your discrete job number in the Job field.
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 72

3.

In the Transaction region of the window, use the following defaulted values for:
Type: WIP Issue
Date: Todays Date

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Include: All Material

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n window.
seAll push material on your job is
4. Choose Continue to display the WIPa
Issue
u
am e to
displayedthe monitor and the
plug.
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 73

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
5. Choose Done to process thisk
transaction.
am e to
k
aneeds toebensissued, the bulk item. Bulk items are not automatically
There is another part that still
L
abulk item,
licwire, is part of a phantom subassembly in your assembly.
transacted to the job. The
y
n
e
l
ita Transactions
6. In the WIPaMaterial
enter your discrete job number again in the Job
rabvalues forwindow,
h
e
f
field, C
and use the
same
Type
and
Date as your last transaction.
s
n
a
n Specific
7. hSelect
tra Component in the Include region, and choose Continue.
s
i
n
r
K 8. Inntheo WIP Issue window, select the following information in the fields:
Item

XXWire

Subinventory

XXMAIN

Operation Sequence

10

Quantity

100

9. Choose Done to process this transaction.


10. Close the window.
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 74

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 5 - Assigning and Managing Resources

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe and Demonstrations in this Lesson
C
There are
no Practices
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 75

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 6 - Scheduling Jobs and Resources

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 76

Practice - Using the Job and Resource Workbenches

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
The Job and Resource Workbenches provide a visual display of work on the shop floor. The Job
Workbench provides a job oriented view, while the Resource Workbench displays a resource
oriented view. In this practice you will:

Navigate on both workbenches

View scheduling information on the Gantt chart


Drag and drop to reschedule

View tool tip and property windows

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
has
)
might have a different User Name and Password for you to use.
om
c

Students use the M1 organization.


cs ide
t

Students replace XX with a unique identifier, such as initials or


somethingueasy to
a@
y
G
n
t
remember.
a
n
t
i

You have completed all previous practices.


ha Stude
c

lk his
(
i
Tasks
nen use t
a
am e to
Using the Job Workbench
k
k
a ens
1. Navigate to the Job Workbench.
L
a Startup
licwindow appears as it connects to the server. This may take
y
The Job Workbench
n
e
l
ita before
severala
seconds
ab the Job Workbench appears. Your standard job for XX-PC
r
h
e
f
assembly
displays
C ns when the Discrete Workstation appears.
a
a operations to view the resources.
2. hExpand
all
trthe
s n The
i
n
r
o Tree Hierarchy displays jobs and resources. You can expand and collapse records.
K
nThe
Gantt chart consists of a timeline in a horizontal bar chart for data on the tree.
3.
4.

5.
6.

Change the scheduling mode to automatic scheduling. How does the window look
different?
Select a record on the Gantt chart, and right-click to display the popup menu. Choose
Automatically Reschedule to display the Automatic Reschedule tool.
You can select a scheduling direction, Backward or Forward, a start date, and operation
scheduling criteria.
Change the scheduling mode to manual.
Select the top level job, and with your cursor rightclick on the record to display the popup
menu. Choose Job Properties.
Information for each job, operation, and resource is displayed in properties windows.
Properties windows contain information about dates, quantities, descriptions of the
scheduling data, and sales order and customer information. The Job Properties displays
job information in three tabbed areas: General, Sales Order Lines, and Components.
The Resource Properties window displays resources assigned to a particular job
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 77

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

7.
8.

9.

10.
11.
12.

operation in two tabbed areas: the General (data from the Resource Requirements
window) and the Instances tab.
Choose OK to close the window.
Select the top level job, and roll your cursor over the job to display the Job Tool Tip window.
The tool tip windows display information progress of completed operations, and date
information. The Job Operation tool tip window displays operation information including
number, sequence, progress and quantities in the intraoperation steps.
Select your job for rescheduling on the Gantt chart.
With your cursor, move the job scheduling bar one week. Grab and drag forward. The
Bar Inspector tool tip window displays. This provides scheduling accuracy by displaying
start date and end date information during a drag and drop action.
Save your work.
Enable Resource Load.
Choose Select Resources to display the Select Resources window.
Both workbenches contain the Select Resource window, and the Resource Load pane to
display shop floor resources.
In the Available Resources column, select department XX-MFG. Move the resources you
created, individually using the arrows to the Selected Resources column.
Choose OK to display them on the Resource Load pane.
The load for each resource selected is displayed on the bar or table view graph.
Resource load includes all shop floor demand, not just demand displayed on the
workbench.
Close the Job Workbench.

s
) ha

m
o
c

13.
cs ide
t
a@ t Gu
y
14.
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
15.
a
u
am e to
k
k
Using the Resource Workbench
a ens
L
a displays
The Resource Workbench
liacresource centric view of your scheduling.
y
n
e
l
1. Navigate to the
ab Workbench.
aitaResource
r
h
e
f
2. If yourCresources
s do not display on the workbench, select Preferences, and select
n
a
a
n
department
XX-MFG.
r
-t arrow tool, and move the resources from the Unselected column, to the My
shSelect
i
n
r
3.
the
o
K
n
4.
5.
6.

Resources column.
Data display on the workbench is controlled by preferences selected in the Preference
window. You can select options for the tree display, bar display, and scheduling
behavior.
Choose OK to save your work and display the selected resources on the workbench.
With your cursor, select a resource, and right-click to display the popup menu.
Close the Job Workbench.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 78

Solution Using the Job and Resource Workbenches

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Using the Job Workbench


Responsibility = Work in Process, Vision Operations
1. Navigate to the Job Workbench.
(N) WIP > Discrete > Job Workbench
The Job Workbench Startup window appears as it connects to the server. This may
take several seconds before the Job Workbench appears. Your standard job for XXPC assembly displays when the Discrete Workstation appears.
2. Expand all the operations to view the resources.
The Tree Hierarchy displays jobs and resources. You can expand and collapse records.
The Gantt chart consists of a timeline in a horizontal bar chart for data on the tree.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

3.

4.

Change the scheduling mode to automatic scheduling.


(M) Schedule > Automatic
How does the window look different?
The color of the canvas changes.
Select a record on the Gantt chart, and right-click to display the popup menu. Choose
Automatically Reschedule to display the Automatic Reschedule tool.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 79

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

5.
6.

You can select a scheduling direction, Backward or Forward, a start date, and operation
scheduling criteria.
Change the scheduling mode to manual.
(M) Schedule > Manual
Select the top level job, and with your cursor rightclick on the record to display the popup
menu. Choose Job Properties.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Information for each job, operation, and resource is displayed in properties windows.
Properties windows contain information about dates, quantities, descriptions of the
scheduling data, and sales order and customer information. The Job Properties displays
job information in three tabbed areas: General, Sales Order Lines, and Components.
The Resource Properties window displays resources assigned to a particular job
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 80

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

7.
8.

operation in two tabbed areas: the General (data from the Resource Requirements
window) and the Instances tab.
Choose OK to close the window.
Select the top level job, and roll your cursor over the job to display the Job Tool Tip window.
The tool tip windows display information progress of completed operations, and date
information. The Job Operation tool tip window displays operation information including
number, sequence, progress and quantities in the intraoperation steps.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e licon the Gantt chart.
9. Select your job foryrescheduling
n
l the job scheduling bar one week. Grab and drag forward. The
a move
tcursor,
b
i
With your
a
a
h stool
ertip window displays. This provides scheduling accuracy by displaying
Bar
Inspector
f
C
n end date information during a drag and drop action.
aand
nastart -date
r
h
t
s
i
Kr
non

10. Save your work.


(M) File > Save
11. Enable Resource Load.
(M) View > Resource Load > check box
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 81

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

12. Choose Select Resources to display the Select Resources window.


Both workbenches contain the Select Resource window, and the Resource Load pane to
display shop floor resources.
13. In the Available Resources column, select department XX-MFG. Move the resources you
created, individually using the arrows to the Selected Resources column.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
lthe resources, choose OK to display them on the Resource Load
ta moved
b
i
14. When youa
have
all
a
er
f
pane.Ch
s
aforn each resource selected is displayed on this bar or table view graph.
naThe load
r
h
t
s
i
on load includes all shop floor demand, not just demand displayed on the
Kr
nResource
workbench.

15. Close the Job Workbench.


(M) File > Close
Using the Resource Workbench
The Resource Workbench displays a resource centric view of your scheduling.
16. Navigate to the Resource Workbench.
(N) WIP > Discrete > Resource Workbench

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 82

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

17. If your resources do not display on the workbench, select Preferences, and select
department XX-MFG.
18. Select the arrow tool, and move the resources from the Unselected column, to the My
Resources column.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Data display on the workbench is controlled by preferences selected in the Preference


window. You can select options for the tree display, bar display, and scheduling
behavior.
19. Choose OK to save your work and display the selected resources on the workbench.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 83

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
chdisplaySthetupopup menu.
20. With your cursor, select a resource, and right-click
to

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

21. Close the Job Workbench.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 84

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 7 - Creating Shop Floor Transactions

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 85

Practice - Assembly Move Transactions


Overview

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

In this practice you will be performing production work on your shop floor. As you move
assemblies through the shop floor, you will be:

Moving parts through the various interoperation steps and operations

Completing operations and assemblies


Resolving problem parts through scrap and rework steps

Moving all the parts from the Queue of operation sequence 10 to the Queue of the
outside processing operation 15

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
has
)
might have a different User Name and Password for you to use.
om
c

Students use the M1 organization.


cs ide
t

Students replace XX with a unique identifier, such as initials or


somethingueasy to
a@
y
G
n
t
remember.
a
n
t
i

You have completed all previous practices.


ha Stude
c

lk his
(
i
Tasks
nen use t
a
to
am e steps
Moving assemblies through interoperation
k
k
s operation step of the first operation, to the Run
afrom theenQueue
You will be moving assemblies
L
c
lito begin production on your job. Some of the assemblies are
operation step of then
first
yaoperation
e
l
a
t operation,
completed at theifirst
and will be moved to the To move interoperation step to
atheb next
a ready
r
h
e
indicate they
are
for
operation.
f
C ns
a
1. hNavigate
n -ttorathe Move Transactions window, select your record in the Job field, and enter
s the
i
in the following table:
n
r
K
noinformation

2.

From Operation
Sequence

10

Step

Queue

To Operation
Sequence

10

Step

Run

Quantity

100

Save your work.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 86

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

3.

4.

Next, move assemblies from the Run step to the To move step using the following
information:
From Operation
Sequence

10

Step

Run

To Operation
Sequence

10

Step

To move

Quantity

80

Save your work and close the window.


There is a problem with a few of the parts at the Run step. In an earlier practice you
created a shop floor status preventing moves in the routing. You will assign this status to
your routing so that quantities moved into the Reject step cannot be moved until the QA
inspector reviews these parts.
Navigate to the Assign Shop Floor Status window, enter your job number in the Find
window, and choose Find.
Enter the following information in the window:

s
) ha

om
c

5.
cs ide
t
a@ t Gu
y
n
6.
ta den
i
a
Operation Sequence: 10
ch Stu

k
l
Step: Reject
i ( this
n
e
nyou named
Status: XX_SHOP (or whatever
seyour shop floor status)
a
u
7. Save your work.
am e to
k
k
sat the first operation. Navigate to the Move
n
8. Some assemblies needLtoabe rejected
e
c
li
Transactions window
yaagain.
n
e
l
a
b the Run operation step of the first operation, to the Reject
it
9. Move five a
assemblies
afrom
r
h
e
f
operation
step
of
the
first
operation.
C ns
a
n the Reason
10.hIn
tra field, select an appropriate value from the list of values.
s
i
n
r
K 11. Save
noyour work.

12. Perform another move transaction, move 3 assemblies from the Reject step of Operation
10, to the Queue step of Operation 20.
What happened when you attempted to move these parts?
The quality on hold has been resolved. You will now cancel the hold of the assemblies in Reject
at the first operation.
13. Navigate to the Assign Shop Floor Status window and find the record for your discrete job.
14. Select your record, and delete the row. Confirm the caution note that appears asking you if
you want to delete this record.
15. Save your work
You can now move assemblies out of Reject at first operation. The inspector has determined
that all five of the rejected assemblies must be scrapped.
16. Navigate to the Move Transactions window, and move the 5 assemblies from the Reject
operation step of the first operation, to the Scrap operation step at the first operation.
17. Save your work and close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 87

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Moving all the parts from the Queue of operation sequence 10 to the Queue of the
outside processing operation 15
You will be moving all the parts of the job from the Queue at operation sequence 10 to the
Queue of the outside processing operation 15, which you added in the Operations window.
1. Navigate to the Move Transactions window.
2. Query for your discrete job number. Select your record in the Job field and enter the
following information in the table in the respective fields:
Job

XX-ABC

Transaction Type

Move

From Sequence

10

Step

Queue (default)

To Sequence

15 (outside processing
operation)

s
) ha

om
c

Queue
Step
cs ide
t
a@ t Gu
100
Quantity
y
n
ta den
i
3. Save your work and close the window.
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 88

Solution Assembly Move Transactions

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Moving assemblies through interoperation steps


Responsibility = Work in Process, Vision Operations
1. Navigate to the Move Transactions window, select your record in the Job field, and enter
the information in the following table:
From Operation
Sequence

10

Step

Queue

To Operation
Sequence

10

Step

Run

s
) ha

om
c

cs ide
(N) WIP > Move Transactions > Move Transactions
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
Quantity

2.

100

Save your work.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 89

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

3.

4.

Next, move assemblies from the Run step to the To move step using the following
information:
From Operation
Sequence

10

Step

Run

To Operation
Sequence

10

Step

To move

Quantity

80

Save your work and close the window.


(M) File > Close Form
There is a problem with a few of the parts at the Run step. In an earlier practice you
created a shop floor status preventing moves in the routing. You will assign this status to
your routing so that quantities moved into the Reject step cannot be moved until the QA
inspector reviews these parts.
Navigate to the Assign Shop Floor Status window.
(N) WIP > Move Transactions > Shop Floor Statuses > Assign Shop Floor Statuses
Enter your job number in the Find window, and choose Find.

s
) ha

om
c

cs ide
t
5.
a@ t Gu
y
n
ta den
i
a
6.
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 90

7.

Enter the following information in the window:

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Operation Sequence: 10
Step: Reject
8.
9.

10.
11.
12.
13.

Status: XX_SHOP (or whatever you named your shop floor status)
Save your work.
(M) File > Save
Some assemblies need to be rejected at the first operation. Navigate to the Move
Transactions window again.
(N) WIP > Move Transactions > Move Transactions
Move five assemblies from the Run operation step of the first operation, to the Reject
operation step of the first operation.
In the Reason field, select an appropriate value from the list of values.
Save your work.
Perform another move transaction, move 3 assemblies from the Reject step of Operation
10, to the Queue step of Operation 20.
What happened when you attempted to move these parts?
A message displays regarding the operation step assigned that prevents moves.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

You can now move assemblies out of Reject at first operation. The inspector has determined
that all five of the rejected assemblies must be scrapped.
14. Navigate to the Move Transactions window, and move the 5 assemblies from the Reject
operation step of the first operation, to the Scrap operation step at the first operation.
15. Save your work and close the window.
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 91

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Moving all the parts from the Queue of operation sequence 10 to the Queue of the
outside processing operation 15
1. Navigate to the Move Transactions window.
(N) WIP > Move Transactions > Move Transactions
2. Query for your discrete job number. Select your record in the Job field, and enter the
information in the following table:
Job

XX-ABC

Transaction Type

Move

From Sequence

10

Step

Queue (default)

To Sequence

15 (outside processing
operation)

s
) ha

om
c

cs ide
t
100
Quantity
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
Step

Queue

3. Save your work and close the window.


(M) File > Save
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 92

Practice - Reviewing and Updating Resource Information

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
You defined resources in Oracle Bills of Materials and associated them with the assemblys bill
of material. When you created the job, the resources were assigned to the job. In this practice
you are updating resource assignments to reflect the changes on your shop floor.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.
Students use the M1 organization.

s
) ha

Students replace XX with a unique identifier, such as initials or something easy to


remember.
You have completed all previous practices.

om
c

cs ide
t
a@ t Gu
Tasks
y
n
ta den
i
a
Reviewing and updating job resources
ch Stu

k
l
In an earlier practice, you defined an employee for
your
and created a
s
( labor
iresources,
i
h
t
n
temporary resource. You will review your resources
ne uand
seassign the temporary resource to an
a
operation.
to
am ewindow.
k
1. Navigate to the DepartmentkResources
a inenthesDepartment field, and choose Resources to display
L
2. Enter your department,
XX-MFG
licthe resources you created earlier, and make note of the
ya Review
the Resourcesawindow.
n
e
l
abresource your created earlier.
name for the
aittemporary
r
h
e
f
Cthe window.
s
3. Close
n
a
a
n
r
4.
-tto the View Resource Requirements window and select your job number. Review
shNavigate
i
n
r
o
K then job operation and resources for your job. You will be adding a resource to Operation 20.

5.
6.
7.
8.

Close the window.


Navigate to the Operations window, and enter your record in the Job field. Choose Find to
display your job operations.
Place your cursor at Operation 20 to display the Resource Requirements window.
Select the information for the fields in the following table.
Sequence

Name

XXTemp

Basis

Item

Usage Rate

1 (hours resource
requires to do one
operation

Charge Type

Manual
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 93

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

9. Save your work and close the window.


In an earlier practice you were assigned an employee and set a labor rate of $50. Note your
employee name.
10. Navigate to the Move Transactions window and enter the following information in the fields:
From Operation
Sequence

20

Step

Queue

To Operation
Sequence

30

Step

Queue

Quantity

s
) ha

You will notice that the Manual Resources Exist checkbox is enabled. Why?
11. Choose Resources and select the appropriate value in the Employee or Employee Number
field for the temporary employee you set up in an earlier practice. Enter 5 in the Quantity
field.
12. Save your work and close all windows.

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 94

Solution Reviewing and Updating Resource Information

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Reviewing and updating job resources


Responsibility = Work in Process, Vision Operations
1. Navigate to the Department Resources window.
(N) Bills of Materials > Routings > Departments
2. Enter your department, XX-MFG in the Department field, and choose Resources to display
the Resources window. Review the resources you created earlier, and make note of the
name for the temporary resource.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
3.
4.

Close the window.


(M) File > Close Form
Navigate to the View Resource Requirements window and select your job number. Review
the job operation and resources for your job. You will be adding a resource to Operation 20.
(WIP) Job/Schedule Details > View Resource Requirements

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 95

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
5. Close the window.
am e to
k
k
(M) File > Close Form
a ens
L
a ewindow,
lic and enter your record in the Job field. Choose Find to
6. Navigate to the Operations
y
n
l
ta operations.
display yourijob
ab
a
r
h
e
f
(WIP)
Details > Operations
C Job/Schedule
s
n
a
a
n
r
sh on-t
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 96

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n theuResource
se
7. Place your cursor at Operation 20 toa
display
Requirements window.
m
o
t
a
k
k
se
a
n
L
e
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 97

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

8.

In the Resource Requirements window, select the information for the fields in the following
table. The Charge Type field is located in the Costing tabbed region.
Sequence

Name

XXTemp

Basis

Item

Usage Rate

1 (hours resource
requires to do one
operation

Charge Type

Manual

9.

Save your work and close all windows.


(M) File > Save
(M) File > Close Form
10. Navigate to the Move Transactions window.
(N) WIP > Move Transactions > Move Transactions
11. Enter the information in the fields from the following table:

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
20
From Operation
ch Stu

k
l
Sequence
i ( this
n
e
Queue
Step
n
se
a
u
m
to
30 ka
To Operation
e
k
a ens
Sequence
L
a Queue
lic
y
Step
n
e
l
aita ferab 5
Quantity
h
C ns
a
n
You
-tranotice that the Manual Resources Exist checkbox is enabled. Why?
sh onwill
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 98

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
This indicates that there is at least one
n resource
seat this operation step charged manually.
a
u
The box is enabled when you
m
tano operation. If the transaction goes from 10
kacomplete
e
Queue to 10 Run, the a
operation
is s
not
completed and the box is not checked. But it is
k
n and 30 Queue.
Lfrom 20
e
checked if you move
Queue
c
a
i
l
nyandbselect
12. Choose Resources
le the appropriate value in the Employee or Employee Number
a
t
i
a
a
field for h
the temporary
er employee you set up in an earlier practice. Enter 5 in the Quantity
f
C
s
field.
na -tran
h
s
i
Kr
non

13. Save your work and close all windows.


(M) File > Close Form
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 99

Practice - Creating a Non-standard Job for Rework

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
Non-standard job activity can include rework, field service repair, upgrade, maintenance,
engineering prototypes, and other projects. For rework assemblies, you can manually create
rework operations or use a predefined rework routing.
In this practice you will move damaged material to the MRB subinventory and create a nonstandard job for rework on your parts.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.
Students use the M1 organization.

s
) ha

om
c

cs ide
t

a@ t Gu
y
n
Tasks
ta den
i
a
tu
ch subinventory

S
k
l
Moving assemblies into the Material Review Board
(MRB)
( this
i immediately.
n
When material is rejected, it is often not reworked
It is sent to a subinventory set
e
n assemblies
seto create
a
u
aside for this purpose until there are enough
a work order to authorize the
m
o
t
a
rework.
k
se window, and select the following information:
ak Transactions
n
L
1. Navigate to the Miscellaneous
e
a e lic
y
n
Date: tUse
the
l date
a adefault
b
i
a
Type:
Receipt
h Miscellaneous
er
f
C
s
an Use any account
na Account:
r
h
t
s
i
Kr 2. Choose
non Transaction Lines to display the entry window and enter the following information in
Students replace XX with a unique identifier, such as initials or something easy to
remember.
You have completed all previous practices.

the fields:
Item: XX-PC

Subinventory: MRB
3.

Quanitity: 10
Save your work and close the window.

Creating an alternate rework routing


You will reference this rework routing when creating your non-standard job.
1. Navigate to the Routings window.
2. Select the following values in the header of the window:
Item: XX-PC
3.

Alternate: Rework
In the Main tabbed region select the following values:
Sequence: 10
Department: XX-MFG
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 100

4.

Save your work and close the window.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Creating a non-standard job for rework using a routing


1. Navigate to the Find Discrete Jobs window and choose New.
2. Select the following values in the fields:
Field

Value

Job

Use a name or number


of your choice. Use your
unique identifier in the
name.

Type

Non-standard

Assembly

XX-PC

Class

XXRework or Rework

Status

Released

s
) ha

om
c

cs ide
t
Quantity
10
a@ t Gu
y
Start
Today
n
ta den
i
a
Completion
Today
ch Stu

k
l
i ( information:
3. In the Routing tabbed region, select the following
his
t
n
e
e
an o us
m
t
a Value
k
Field
e
k
s
n
LaXX-PC
e
Reference
c
a
i
l
ny blRework
e
a
t
Alternate
i
a
a
h worksand
erclose the window.
f
C
4. Save
your
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 101

Solution Creating a Non-standard Job for Rework

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Moving assemblies into the Material Review Board (MRB) subinventory


Responsibility = Manufacturing and Distribution Manager, Vision Operations
1. Navigate to the Miscellaneous Transactions window, and select the following information:
Date: Use the default date

2.

Type: Miscellaneous Receipt


Account: Use any account
Inventory > Transactions > Miscellaneous Transactions
Choose Transaction Lines to display the entry window and enter the following information:
Item: XX-PC
Subinventory: MRB
Quanitity: 10
Save your work and close the window.
(M) File > Save
(M) File > Close Form

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
Creating an alternate rework routing
a
h Stu job.
cnon-standard
You will reference this rework routing when creating your

k
l
i ( this
1. Navigate to the Routings window.
n
e
n
se
Bills of Materials > Routing > Routings
a
u
o
am
2. Select the following values k
ink
the
header
oft the window:
e
a ens
Item: XX-PCa L
lic
y
n
e
Alternate:
Rework
l
aita ferab
h
C ns
a
n
sh on-tra
i
r
K
n
3.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 102

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
3. In the Main tabbed region select the following
n values:
se
a
u
Sequence: 10
am e to
k
k
a ens
Department: XX-MFG
L
aclose the
ic
lwindow.
y
4. Save your work n
and
e
l
ta
(M) Filea>i Save rab
h
feForm
CFile > Close
s
(M)
n
a
hn n-tra
s
i
r
K Creating
noa non-standard job for rework using a routing
1.

2.

Navigate to the Find Discrete Jobs window and choose New.


WIP > Discrete > Discrete jobs
Select the following values in the fields:
Field

Value

Job

Use a name or number


of your choice. Use your
unique identifier in the
name.

Type

Non-standard

Assembly

XX-PC

Class

XXRework or Rework

Status

Released
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 103

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Quantity

10

Start

Today

Completion

Today

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe region, select the following information:
3. In theC
Routing tabbed
na -tran
h
s
i
Kr
non
Field

4.

Value

Reference

XX-PC

Alternate

Rework

Save your work and close the window.


(M) File > Save
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 104

Practice - Using the Discrete Workstation

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
The Discrete Workstation provides a single interface to perform multiple shop floor functions
without navigating to a number of transaction windows. It displays information by department or
resource, and it lists all of the job operations for immediate and future dispatch. You can
perform transactions directly on the workstation's tabs, or navigate to the corresponding Work in
Process windows. In this practice you will view information and create transactions on the
Discrete Workstation.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

s
) ha

Students use the M1 organization.

Students replace XX with a unique identifier, such as initials or something easy to


remember.

om
c

cs ide
t

You have completed all previous practices.


a@ t Gu
y
n
ta den
i
a
Tasks
ch Stu

k
l
i ( this
Using the Discrete Workstation
n
e
n window,
se select department XX-MFG, and
1. Navigate to the Discrete WorkstationaStartup
u
am e to
choose Launch.
k
k
s of two panes, the tree hierarchy and the detail
a is composed
n
The workstation window
L
e
c
i
ldisplays
canvas. The tree
a hierarchical listing of the workstation contents. The
yahierarchy
n
e
l
a
tree displays
branches
ab or levels of information. You will see two branches:
ait four
r
h
e
f
CImmediate
s Dispatch List branch displays all of the job operations that are ready to
n
a
a
n
be
worked
(quantity of assemblies in Queue).
r
-t
sh onUpstream
i
r
Dispatch List branch displays all of the job operations that are to be
K
n
2.

3.

worked on in the future (quantity of assemblies ready to be moved in the previous


operation).
Expand the Immediate Dispatch branch and select your discrete standard job for XX-PC for
Operation 10.
The job operation information displays on the on the detail canvas pane of the
workstation.
The header portion of this canvas displays button to access other Work in Process
windows. This includes Issue Components, Quality Collection, Move Assemblies, View
Instructions, and View Contracts.
Select the Components node, and the Resources node to view the components you issued
to this job, and the resources you assigned to this operation.

Issuing parts on the Discrete Workstation


You have found that you need to issue items to the non-standard job you created for rework as
part of the rework process.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 105

1.

Select Issue Components to navigate to the WIP Material Transactions window, select the
following values for the fields, and choose Continue.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Field

2.

Value

Assembly

XX-PC

Job

Your job name

Type

WIP Issue

Date

Today

Subinventory

MRB

Include

Specific Component

On the WIP Issue window, enter XXCable and XXKeyboard in the item field, and select the
following values for the fields.

s
) ha

om
c

cs ide
t
Subinventory
XXMAIN
a@ t Gu
y
n
Operation Sequence 10
ta den
i
a
ch Stu
Department
XX-MFG

k
l
i ( this
Unit of Measure
EA
n
e
e
n
s
a
u
Quantity
10
am e to
k
k
a ens
L
3. Choose Done to save
your
a ework.
lic
y
n
l
a purposes,
Note: Foritclass
b respond OK if you receive the following messages:
a
a
r
h
fecomponent is not required at this operation.
CNote: This
s
n
a
-tracomponent is not on the bill of materials.
shn onThis
i
r
K
n Quantity will drive inventory negative.
Field

Value

Do you know why these messages display?

Moving assemblies on the Discrete Workstation by drop and drag


You move assembly quantities by dragging the red ball icon to the bucket at the step selected.
You can also navigate directly to the Move Transactions window by choosing Move Assemblies.
1. Select the Assembly Moves tabbed region.
2. Select your non-standard discrete job for rework, operation 10, to display it on the
workstation canvas.
3. With your cursor, select the red ball icon at the Queue step, and drag and drop the ball at
the To Move step. The ball icon will change to the color blue when you move successfully.
The Move dialog window displays. The To Operation field defaults to the current
operation.
4. Enter a move quantity of 5, and save your work.
5. Select your standard discrete job, operation 10, to display it on the workstation canvas.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 106

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

6.

Select any step that has quantity to move. With your cursor, select the red ball icon and
drag it to the To Move step.
7. When the Move dialog box appears, select the list of values icon to select another operation
to move quantities to another operations. Select operation 20 on the list of values window,
and choose OK.
8. Enter the entire quantity at this step, and choose OK.
9. Repeat steps 5 through 8 until you move all quantities to the To Move step at operation 30.
Do not move any quantities you may have in a Scrap step.
10. Close the Discrete Workstation.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 107

Solution Using the Discrete Workstation

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Using the Discrete Workstation


Responsibility = Work in Process, Vision Operations
1. Navigate to the Discrete Workstation Startup window, select department XX-MFG, and
choose Launch.
(N) WIP > Discrete > Discrete Workstation

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
s of two panes, the tree hierarchy and the detail
a is composed
n
The workstation window
L
e
c
i
ldisplays
yahierarchy
canvas. The tree
a hierarchical listing of the workstation contents. The
n
e
l
a
t
b
tree displays
four
branches
or
levels
of information. You will see two branches:
i
a fera
h
CImmediate
s Dispatch List branch displays all of the job operations that are ready to
n
a
a
n
be
worked
(quantity of assemblies in Queue).
r
-t
sh onUpstream
i
r
Dispatch List branch displays all of the job operations that are to be
K
n
worked on in the future (quantity of assemblies ready to be moved in the previous
operation).

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 108

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
s and select your discrete standard job for XX-PC for
2. Expand the Immediate Dispatch
a branch
n
L
e
Operation 10.
c
li
yainformation
n
e
l
a
The job operation
displays on the on the detail canvas pane of the
ait ferab
workstation.
h
C nportion
s of this canvas displays button to access other Work in Process
a
The header
a
n
r
-t This includes Issue Components, Quality Collection, Move Assemblies, View
sh windows.
i
n
r
o
K
n
3.

Instructions, and View Contracts.


Select the Components node, and the Resources node to view the components you issued
to this job, and the resources you assigned to this operation.

Issuing parts
You have found that you need to issue items to the non-standard job you created for rework as
part of the rework process.
1. Select Issue Components to navigate to the WIP Material Transactions window, select the
following values for the fields, and choose Continue.

Field

Value

Assembly

XX-PC

Job

Your job name

Type

WIP Issue
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 109

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Date

Today

Subinventory

MRB

Include

Specific Component

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
m
o XXKeyboard in the item field, and select the
tand
aXXCable
2. On the WIP Issue window, enter
k
e
k
a ens
following values for theL
fields.
a e lic
y
n
a abl
t
i
a
Value
h Fieldsfer
C
XXMAIN
an
naSubinventory
r
h
t
s
i
on Sequence 10
Kr
nOperation

3.

Department

XX-MFG

Unit of Measure

EA

Quantity

10

Choose Done to save your work.


Note: For class purposes, respond OK if you receive the following messages:
Note: This component is not required at this operation.
This component is not on the bill of materials.
Quantity will drive inventory negative.
Do you know why these messages display?
This job is for specified rework on certain parts. A bill of material is not created because
it is a one-time task.
The inventory specified may not have the parts. This is a warning message and the
issue task can still be performed.
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 110

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Moving assemblies on the workstation by drop and drag


You move assembly quantities by dragging the red ball icon to the bucket at the step selected.
You can also navigate directly to the Move Transactions window by choosing Move Assemblies.
1. Select the Assembly Moves tabbed region.
2. Select your non-standard discrete job for rework, operation 10, to display it on the
workstation canvas.
3. With your cursor, select the red ball icon at the Queue step, and drag and drop the ball at
the To Move step. The ball icon will change to the color blue when you move successfully.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
4.
5.
6.
7.

The Move dialog window displays. The To Operation field defaults to the current
operation.
Enter a move quantity of 5, and save your work.
Select your standard discrete job, operation 10, to display it on the workstation canvas.
Select any step that has quantity to move. With your cursor, select the red ball icon and
drag it to the To Move step.
When the Move dialog box appears, select the list of values icon to select another operation
to move quantities to another operation.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 111

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
aon the elistloficvalues window, and choose OK.
y
n
8. Select operation
20
a abl
t
i
a
9. Enter the
hentiresquantity
er at this step, and choose OK.
f
C
10. Repeat
an5 through 9 until you move all quantities to the To Move step at operation 30.
na -steps
r
h
t
s
i
Do not move any quantities you may have in a Scrap step.
Kr
non
11. Close the Discrete Workstation.
(M) File > Close
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 112

Practice - Completing Discrete Jobs

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
You can complete job assemblies into inventory using a number of different Work in Process
windows. Work in Process considers an assembly to have completed an operation if the
assembly is at the To Move, Reject, or Scrap steps. Completion transactions automatically
update operation completion quantities, charge appropriate resources and overheads, and
assembly pull material designated on the bill of material is backflushed.
In the practice you will perform a quick completion of jobs on the Move Transactions window,
and a two step completion on the Completion Transactions window.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

s
) ha

om
c

cs easy

Students replace XX with a unique identifier, such as initials or something


to
e
t
d
i
remember.
a@ t Gu
y
n

You have completed all previous practices.


ta den
i
a
ch Stu

k
l
Tasks
i ( this
n
e
n window
se
Completing jobs on the Move Transactions
a
u
toand query your non-standard job for rework.
amwindow,
1. Navigate to the Move Transactions
k
e
k
s in the Queue step of operation 10.
a 5 assemblies
n
L
This job should still have
e
c
i
lTransaction
ya in lthe
n
2. Select your jobanumber
type region, and choose Complete.
e
t
b
i
a
a
Whath
happens?er
f
C
s
n
a
3. Close
the
Move
Transactions
window.
n -tra
h
s
i
to the Discrete Jobs window, find your non-standard job for rework, and select the
Kr 4. Navigate
non

Students use the M1 organization.

Routing tabbed region.


5. Enter XXFGI in the Subinventory field.
6. Save your work and close the window.
7. Navigate to the Move Transactions window again.
8. Select your non-standard job for rework.
9. In the Transaction type region, choose Complete.
10. Move all available quantities at the Queue step for operation 10. Move those assemblies to
the To Move step of operation 10.
11. Save your work.
Completions using the Completion Transactions window
Your standard job used components with several different supply types. In this task you will
review the quantities issued to your job, before and after completion.
You have more options for completing work orders when using the Completions Transactions
window such as changing the completion subinventory. You can also add applicable revisions
or locator information.
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 113

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

1.
2.
3.

Navigate to the Discrete Jobs window and search for you standard job for XX-PC.
Choose Components to access the Material Requirements window.
Select the Quantities tabbed region.
How many of the boxes have been issued? Why?
4. Navigate to the Completion Transactions window.
5. Select your standard job and use the WIP Completion transaction type.
You will notice in the Quantities region, the initial quantity of this job appears in the Job
Quantity field, and the amount you can complete in the Available to Complete field.
6. Choose Continue to display the WIP Completion entry window.
7. Your completion subinventory XXFGI should display in the Subinventory field. If not, select
this value. Also enter all of the available quantity to complete in the Quantity field.
8. Choose Done to save your work.
9. Now navigate back to the Discrete Jobs window and search for you standard job for XX-PC.
10. Choose Components to access the Material Requirements window, and select the
Quantities tabbed region.
How many of the boxes have been issued? Why?
11. Close all windows.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 114

Solution Completing Discrete Jobs

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Completing jobs on the Move Transactions window


Responsibility = Oracle Work in Process, Vision Operations
1. Navigate to the Move Transactions window, and query your non-standard job for rework.
This job should still have 5 assemblies in the Queue step of operation 10.
(N) WIP > Move Transactions > Move Transactions
2. Select your job number in the Transaction type region, and choose Complete.
What happens?
You receive an error because the completion subinventory has not been defined on the
work order. To complete a quantity of your assemblies directly to stock in a single
transaction, you must specify a default completion subinventory on the job.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
( this
3. Close the Move Transactions window. eni
n
se
a
u
(M) File > Close Form
o non-standard job for rework, and select the
am e tyour
k
4. Navigate to the Discrete Jobs
window,sfind
k
n
Routing tabbed region. La
e
c
a
i
l
(N) WIP > Discrete
ny >bDiscrete
le Jobs
a
t
i
a
a
r
5. Enter XXFGI
field.
h in sthefeSubinventory
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 115

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
6. Save your work and close the window.
se
a
u
toagain.
amwindow
7. Navigate to the Move Transactions
k
e
k
s Transactions
a e> Move
n
(N) WIP > Move Transactions
L
c
li rework.
ya ljob
8. Select your non-standard
for
n
e
a
abregion, choose Complete.
ait fetype
9. In the Transaction
r
h
Call available
s quantities at the Queue step for operation 10. Move those assemblies to
10. Move
n
a
a
n
r
-t step of operation 10.
shthe oTonMove
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 116

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
11. Save your work.
n
se
a
u
to window
am
k
e
Completions using the Completion
Transactions
k
a ens
L
Your standard job used components
a e licwith several different supply types. In this task you will
y
n
review the quantities
issued
ta rabtolyour job, before and after completion.
i
a
You have more
efor completing work orders when using the Completions Transactions
f
Ch options
s
windowasuch asa
changing
the completion subinventory. You can also add applicable revisions
n
n
r
h
t
or
locator
information.
s
Kri non
1.

2.
3.

4.

Navigate to the Discrete Jobs window and search for you standard job for XX-PC.
(N) WIP > Discrete > Discrete Jobs
Choose Components to access the Material Requirements window.
Select the Quantities tabbed region.
How many of the boxes have been issued?
Nothing at this time. This item has a supply type of assembly pull, components are
issued when you complete assemblies into inventory.
Navigate to the Completion Transactions window.
(N) WIP > Material Transactions > Completion Transactions

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 117

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
6.
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
5.

Select your standard job and use Transaction Type of WIP Completion.
You will notice in the Quantities region, the initial quantity of this job appears in the Job
Quantity field, and the amount you can complete in the Available to Complete field.
Choose Continue to display the WIP Completion entry window.

7.

Your completion subinventory XXFGI should display in the Subinventory field. If not, select
this value. Also select the available quantity to complete in the Quantity field.
Choose Done to save your work.

8.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 118

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

9.

Now navigate back to the Discrete Jobs window and search for you standard job for XX-PC.
(N) WIP > Discrete > Discrete Jobs
10. Choose Components to access the Material Requirements window, and select the
Quantities tabbed region.
How many of the boxes have been issued?
The amount issued is the amount you completed for your assembly. The boxes were
issued after you completed assemblies into inventory because the supply type is
assembly pull.
11. Close all windows.
(M) File > Close Form

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 119

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 8 - Work in Process Cost Transactions

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h Practices
There are
no
fe and Demonstrations in this Lesson
C
s
n
a
shn on-tra
i
r
K
n

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 120

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 9 - Special Topics for Work in Process

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 121

Practice - Closing Discrete Jobs

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
Once your jobs are complete, cost accounting reviews the charges and potential variances on
the job. If production or inventory charges are missing, cost accounting can still charge time and
materials to the job at the Complete status. Once all time and materials have been charged to
the job, the status should be changed to Complete - No charges. This indicates that all charges
have been made and reconciled, and costs are ready to be posted to the general ledger. This
status does not allow any other charges to the job.
When you close jobs, you can use either the concurrent request or Close Discrete Jobs window.
The concurrent request is typically run on a periodically basis such as daily, weekly, monthly, or
quarterly. This concurrent request searches for all job records with a status of Complete - No
charges and any other criteria selected.
Jobs are closed and material and resource variances are generated and posted to the general
ledger. In this practice you will review your job statuses, change the status, and close the job.

s
) ha

om
c

cs ide
t
@ Gu
awelcome;
y

Students log into Oracle with User Name mfg and Password
n
t your instructor
a
n
t
i
e
might have a different User Name and Password for
you
to
use.
ha Stud
c

Students use the M1 organization.


k
(l suchthasisinitials or something easy to
i
n

Students replace XX with a unique identifier,


ne use
remember.
a
to
am practices.

You have completed allkprevious


k
e
a ens
L
a e lic
y
Tasks
n
ta rabl
i
a
h jobsfrecords
e
Closing discrete
C
n
a
a of your non-standard job for rework by navigating to the Discrete Jobs
1. hCheck
n the
trstatus
s window.
i
n
r
K
no
Assumptions

2.
3.

4.
5.
6.
7.

8.
9.

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

What is the status? Do you know why?


Change the status to Complete - No Charges.
Remaining in the Discrete Jobs window, find your standard job for assembly XX-PC and
check the status of the job.
What is the status? Do you know why?
Change the status to Complete - No Charges.
Close all windows.
Navigate to the to the Close Discrete Jobs window.
In the Find Discrete Jobs window, enter your two job numbers in the Job field range, and
choose Find.
Your records display on the Close Discrete Jobs Summary window.
Select one of your job records, and in the Tools menu, choose Close 1 to display the Close
Discrete Jobs Request dialog window.
You have three choices for report types, or the choice to have no report. Select one of the
output types, and choose OK.
Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 122

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Summary lists each job and includes job header, period-to-date summary, and
cumulative-to-date summary information.
Detail using actual completion quantity lists each job using the actual completion
quantity of the job to calculate the material usage variance.
Detail using planned start quantity lists each job using the planned start quantity of
the job to calculate the material usage variance.
Your request is submitted to perform the close process. The job status will automatically
change to Pending Close, while the system verifies that there are no outstanding
transactions remaining to post to this job. If there are none, the next time you query this
job, it will have a status of Closed. If there are remaining transactions that have not
posted, the job status will be Failed Close and you will have to wait until these
transactions have posted before attempting to close the job again.
10. Close all windows.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 123

Solution Closing Discrete Jobs

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Closing discrete job records


Responsibility = Work in Process, Vision Operations
1. Check the status of your non-standard job for rework by navigating to the Discrete Jobs
window.
(N) WIP > Discrete > Discrete Jobs
What is the status? Do you know why?
The non-standard job should have a status of Complete. If the entire job quantity has
been satisfied, the status is changed to Complete automatically.
2. Change the status to Complete - No Charges.
3. Remaining in the Discrete Jobs window, find your standard job for assembly XX-PC and
check the status of the job.
What is the status? Do you know why?
The standard job did not change the status automatically to Complete because there is a
quantity scrapped, and the entire job quantity was not completed.
4. Change the status to Complete - No Charges.
5. Close all windows.
(M) File > Close Form
6. Navigate to the to the Close Discrete Jobs window.
WIP > Discrete > Close Jobs (Form)
7. In the Find Discrete Jobs window, enter your two job numbers in the Job field range, and
choose Find.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 124

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
Your
n display on the Close Discrete Jobs Summary window.
a records
a
n
r
h
t
s
Kri non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 125

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
u 1 to display the Close
8. Select one of your job records, and in the Tools menu,
chchooseStClose

k
l
Discrete Jobs Request dialog window.
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

9.

You have three choices for report types, or the choice to have no report. Select one of the
output types, and choose OK.
Summary lists each job and includes job header, period-to-date summary, and
cumulative-to-date summary information.
Detail using actual completion quantity lists each job using the actual completion
quantity of the job to calculate the material usage variance.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 126

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Detail using planned start quantity lists each job using the planned start quantity of
the job to calculate the material usage variance.
Your request is submitted to perform the close process. The job status will automatically
change to Pending Close, while the system verifies that there are no outstanding
transactions remaining to post to this job. If there are none, the next time you query this
job, it will have a status of Closed. If there are remaining transactions that have not
posted, the job status will be Failed Close and you will have to wait until these
transactions have posted before attempting to close the job again.
10. Close all windows.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 127

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 10 - Appendix - Manufacturing Execution System (MES)


Workstation

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
an
naare no
There
Practices
and Demonstrations in this Lesson
r
h
t
s
i
n
r
K
no

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 128

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Lesson 11 - Appendix - Repetitive Scheduling

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 129

Practice - Defining a Repetitive Schedule

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
You will define repetitive schedules to build an assembly repetitively on a production line.
Repetitive schedules are used to schedule production, resources, and material requirements,
and to collect the costs of manufacturing a repetitive assembly on a production line.
You will also specify the line, the assembly you are building, daily quantity, processing days, or
the total quantity, as well as a date around which to schedule. In this practice, you will:

Define and enable one production line.


Associate lines and assemblies to the production line.

Define a repetitive schedule.

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

s
) ha

om
c

cs ide
t

Students use M1 organization.


u
ato@remember.
y
G
n
t

XX is your unique identifier, such as initials or something


easy
ta den
i
a

You have completed all previous practices.


ch Stu

k
l
i ( this
n
Tasks
e
n
se
a
u
Defining a production line
am e to
k
k
s a production line. A production line describes a
acannotedelete)
You will define and update (but
n
L
c
unique set of operations,
li and/or manufacturing cells that produce one or more of
nyadepartments,
e
l
your products. ita
ab Lines window.
athe Production
r
h
e
1. Navigate
to
f
s
n
aC
a
n
2. hEnter
information
for the following fields as shown in this table. Use default information for
r
t
s the other
i
n
r
fields.
K
no

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.

Field Name

Value

Name

LINE2

Description

LINE2

Exception Set

Standard

ATP Rule

ATP Total

Minimum Hourly Rates

12

Maximum Hourly Rates

20

Start Time (Production Line)

08:00:00

Stop Time (Production Line)

16:00:00

Lead Time Basis

Routing-Based

3. Save your work and close the window.


Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 130

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Associating Lines and Assemblies


You can associate production lines with repetitive assemblies, discrete jobs, and workorderless
completions. You will now associate the production line with an assembly that you had created.
1. Navigate to the Repetitive Line/Assembly Associations window. When the Repetitive
Line/Assembly Associations Summary window appears, choose New.
2. Query for LINE2 in the Line field.
3. In the Assembly field, search the list of values for the assembly XX-PC.
4. Enter information for the following fields as shown in this table. Use default information for
the other fields.
Field Name

Value

Subinventory

FGI

Supply Type

Push

Class

Defaults to Repetitive

Priority

s
) ha

om
c

cs ide
t
Hourly Production Rate
20
a@ t Gu
y
n
5. Save your work and close the window.
ta den
i
a
ch Stu

Defining a repetitive schedule


k
l
s
( thirepetitively
iassemblies
n
You will now define a repetitive schedule to build
on a production line.
e
e
nyou areubuilding,
s daily quantity, processing days,
You will also specify the line, the assembly
a
to to schedule.
amarounde which
and/or total quantity, as well as a k
date
k
s
aSchedules
n
1. Navigate to the Repetitive
window.
L
e
c
li that you had defined and the repetitive Assembly.
ya Line
2. Query for the production
number
n
e
l
a
ait ferab
Line =
LINE2
h
C n= XX-PC
s
a
Assembly
a
n
r
-t
shEnteroinformation
3.
for the following fields as shown in the table.
i
n
r
K
n
Field Name

Value

Status

Unreleased

Daily Quantity

20

Days

Total Quantity

Defaults to 40

4. Save your work and close the window.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 131

Solution Defining and Releasing a Repetitive Schedule

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Defining a production line


Responsibility = WIP, Vision Operations
1. Navigate to the Production Lines window.
(N) WIP > Setup > Production Lines
2. Enter information for the following fields as shown in this table.
Field Name

Value

Name

LINE2

Description

LINE2

Exception Set

Standard

ATP Rule

ATP Total

s
) ha

m
o
c

Minimum Hourly Rates


12
cs ide
t
Maximum Hourly Rates
20
a@ t Gu
y
n
ta den
Start Time (Production Line) 08:00:00
i
a
ch Stu

Stop Time (Production Line) 16:00:00


k
l
i ( this
n
Lead Time Basis
Routing-Based
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 132

3. Save your work and close the window.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

(M) File > Save.


(M) File > Close Form.
Associating Lines and Assemblies
1. Navigate to the Repetitive Line/Assembly Associations window. When the Repetitive
Line/Assembly Associations Summary window appears, choose New.
(N) WIP > Repetitive > Repetitive Line/Assembly Associations
2. Query for LINE2 in the Line field.
3. In the Assembly field, search the list of values for the assembly XX-PC.
4. Enter information for the following fields as shown in this table. Use default information for
the other fields.
Field Name

Value

s
) ha

om
c

Supply Type
Push
cs ide
t
a@ t Gu
Class
Defaults to Repetitive
y
n
ta den
i
Priority
1
a
ch Stu

k
Hourly Production Rate
20
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
Subinventory

FGI

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 133

5. Save your work and close the window.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

(M) File > Save.


(M) File > Close Form
Defining a repetitive schedule
1. Navigate to the Repetitive Schedules window. When the Repetitive Schedules window
appears, choose New.
(N) WIP > Repetitive > Repetitive Schedules
2. Query for the production Line number that you had defined and the repetitive Assembly in
the Repetitive Schedules window.
Line = LINE2
Assembly = XX-PC
3. Enter information for the following fields as shown in the table.

s
) ha

m
o
c

Status
Unreleased
cs ide
t
Daily Quantity
20
a@ t Gu
y
n
ta den
Days
2
i
a
tu and
chDaily Quantity

S
Total Quantity
40 (calculates with
the
k
l
i ( this
Days)
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
Field Name

Value

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 134

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
s
athe window.
n
4. Save your work and close
L
e
c
a e li
(M) File > Save.ny
l
a
b
it
a
(M) Fileh>aClose Form
er
f
C
s
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 135

Practice - Performing a Move Transaction on a Schedule

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Overview
The Move Transactions window enables you to record movement between or within operation
on the routing of a job or repetitve schedule. Move transactions can optionally charge
resources, either automatically or manually. You can also view status information that you have
assigned to an intraoperation step.
You can perform move transactions for discrete jobs and repetitive schedules with routings. In
this practice, you will:

Release a repetitive schedule

Perform move transaction on the repetitive schedule

Assumptions

You must have access to an Oracle Application Vision database or comparable training
or test instance at your site to complete this practice.

s
) ha

om
c

cs ide
t

u
ato@remember.
y
G

XX is your unique identifier, such as initials or something


easy
n
t
ta den
i
a

You have completed all previous practices.


ch Stu

k
l
i ( this
Tasks
n
e
n
se
a
u
Releasing a repetitive schedule am
to
k
e
k
s to production before transacting against it.
a eschedule
You will first release a singleLrepetitive
n
c
Releasing a repetitive schedule
ya lewithli a routing automatically loads the total number of
nfor
a
assemblies to beitbuilt
thebrepetitive schedule into the Queue intraoperation step of the first
a Receipt resource requirements exist at the first operation,
aMoveforerPO
operation. If h
PO
C
s
purchase
n are automatically generated for these resources.
a requisitions
a
n
r
h
t
s on-to the Repetitive Schedules window.
Kri1.2. Navigate
n for the repetitive schedule that you had created.
Query

Students log into Oracle with User Name mfg and Password welcome; your instructor
might have a different User Name and Password for you to use.
Students use M1 organization.

Line = LINE2
3. Update the selected schedules status to Released.
Status = Released
4. Save your work and close the window.
Performing a move transaction on the repetitive schedule
You will now move assemblies within an operation (for example, from Queue to Run) or from
one operation to the next.
1. Navigate to the Move Transactions window.
2. Query for the line LINE2 that you had created.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 136

3. Enter information for the following fields as shown in the table.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Field Name

Value

Assembly

XX-PC

From Operations Seq

10

Step

Queue

To Operations Seq

20

Step

Run

Quantity

50

4. Save your work and close the window.

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 137

Solution Performing a Move Transaction on a Schedule

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Releasing a repetitive schedule


Responsibility = Work in Process, Vision Operations
1. Navigate to the Repetitive Schedules window. The Repetitive Schedules Summary window
appears.
(N) WIP > Repetitive > Repetitive Schedules
2. Query for the repetitive schedule that you had created.
Line = LINE2
3. Update the selected schedules status to Released.

Status = Released

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

4. Save your work and close the window.


(M) File > Save.
(M) File > Close Form
Performing a move transaction on the repetitive schedule
1. Navigate to the Move Transactions window.
(N) WIP > Move Transactions > Move Transactions
2. Query for the line LINE2 that you had created.

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 138

3. Enter information for the following fields as shown in the table.

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

Field Name

Value

Assembly

XX-PC

From Operations Seq

10

Step

Queue

To Operations Seq

20

Step

Run

Quantity

50

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non
4. Save your work and close the window.
(M) File > Save.
(M) File > Close Form

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 139

Unauthorized reproduction or distribution prohibited Copyright 2011, Oracle and/or its affiliates

s
) ha

om
c

cs ide
t
a@ t Gu
y
n
ta den
i
a
ch Stu

k
l
i ( this
n
e
n
se
a
u
am e to
k
k
a ens
L
a e lic
y
n
ta rabl
i
a
h sfe
C
na -tran
h
s
i
Kr
non

Copyright Oracle, 2009. All rights reserved.

R12.x Oracle Work in Process Fundamentals Supplemental Student Practices


Chapter 1 - Page 140

Vous aimerez peut-être aussi