Académique Documents
Professionnel Documents
Culture Documents
SITE
PP13 PROJECT SITE
A.
GAMA Questions
1.
2.
3.
4.
5.
Requirement of lifeline
6.
Requirement of scaffolding
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Requirement of crane
B.
WORLEYPARSONS
1.
What is the difference between flash back arrestor and whiplash arrestor
2.
3.
4.
5.
If your construction manager is not interested in safety how will you convince him to follow
safety?
6.
What is the amount of light required for various construction activity at night ?
7.
What is the difference between an engineered lift and a non engineered lift
8.
What are the requirements for a scaffold that is higher than 38 meters ?
9.
10.
11.
12.
13.
14.
What is the ANSI code for helmet shoes and other PPE
15.
16.
17.
18.
19.
20.
21.
For a grinding machine which RPM should be greater the shaft Rpm/ disc rpm
22.
23.
There are 3 sections in the worley paper 1)written 15 questions to be answered in paragraph
2)practical -10 photographs will be given and the number of hazards in each photo have to be
circled and the type of hazard written on the back of the photo,at least ten hazards have to be
identified on each photo 3)interview cum practical will make sketch of crane and ask how the
load calculations are done? Will show hand grinder or other such implements and ask about
the hazards associated with it like seaman switch guards which rpm should be greater the
spindle or the disk?
GENERAL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
What is work at height and what is the minimum level to work without FBH
14.
15.
16.
Safety rules while using Scaffolding, ladder, compressed air, working in confined space etc.
17.
What is PASS
18.
B.
TYPE
OF
QUESTION
IN VARIOUS INTERVIEWS
TYPE #1:
a) Personal Details.
b) Certificate Verification and Question about It.
c) Details of Course.
d) Confined Space (What is Confined Space? What are The Requirements? ).
e) Hot Works.
f)
TYPE #2
a) Past working experience and what are the activities in the company.
b) Certificate verification and details of course.
How you test Gas Jams with Gas Detector device in Confined Space?
If Hydrogen Sulfide is 5 PPM then you will allow to do work in Confined Space.
j)
TYPE #3
a)
b)
c)
d)
Lifting Procedures
e)
PTW System.
f)
g)
h)
i)
Lifting Procedures
j)
k)
Job Description on CV
l)
Scaffolding
m)
Confined Space
n)
Lifting
o)
Incident Report
p)
q)
r)
s)
What is Scaffolding?
t)
Type of Scaffolding?
u)
Importance of JSA.
v)
w)
x)
Previous Experience.
y)
z)
aa)
ab)
In Site You found a worker in un conscious then How Can You Treat and will you do?
ac)
You Imagine You Are a Clint and I am Your Contractor Then What Qualities You See the Contractor.
When it will give a project?
ad)
ae)
af)
What is the Toxic Gas and which is the most Toxic Gas?
ag)
ah)
ai)
Working at Height.
aj)
ak)
Permit to Work.
al)
am)
an)
ao)