Light hazard occupancies include occupancies having uses and conditions similar to the following:
Churches, Clubs, Eaves and overhangs, if of combustible construction with no combustibles beneath, Educational, Hospitals, Institut
except large stack rooms, Museums, Nursing or convalescent homes, Offices, including data processing, Residential, Restaurant sea
Theaters and auditoriums, excluding stages and prosceniums, Unused attics
Ordinary hazard occupancies (Group 1) include occupancies having uses and conditions similar to the following:
Automobile parking and showrooms, Bakeries, Beverage manufacturing, Canneries, Dairy products manufacturing and processing, E
Glass and glass products manufacturing, Laundries, Restaurant service areas
Ordinary hazard occupancies (Group 2) include occupancies having uses and conditions similar to the following:
Cereal mills, Chemical plants ordinary, Confectionery products, Distilleries, Dry cleaners, Feed mills, Horse stables, Leather goods
Libraries large stack room areas, Machine shops, Metal working, Mercantile, Paper and pulp mills, Paper process plants, Piers and
Post offices, Printing and publishing, Repair garages, Resin application area, Stages, Textile manufacturing, Tire manufacturing,
Tobacco products manufacturing, Wood machining, Wood product assembly
Extra hazard occupancies (Group 1) include occupancies having uses and conditions similar to the following:
Aircraft hangars (except as governed by NFPA 409, Standard on Aircraft Hangars), Combustible hydraulic fluid use areas, Die casting
Metal extruding, Plywood and particle board manufacturing, Printing [using inks having flash points below 100F (38C)], Rubber rec
compounding, drying, milling, vulcanizing, Saw mills, Textile picking, opening, blending, garnetting, or carding, combining of cotton,
synthetics, wool shoddy, or burlap, Upholstering with plastic foams
Extra hazard occupancies (Group 2) include occupancies having uses and conditions similar to the following:
Asphalt saturating, Flammable liquids spraying, Flow coating, Manufactured home or modular building assemblies (where finished e
is present and has combustible interiors), Open oil quenching, Plastics processing, Solvent cleaning, Varnish and paint dipping
ccupancies where the quantity and combustibility of contents is very high and dust, lint
lleries, Dry cleaners, Feed mills, Horse stables, Leather goods manufacturing,
cantile, Paper and pulp mills, Paper process plants, Piers and wharves,
area, Stages, Textile manufacturing, Tire manufacturing,
Date:
Sheet no.:
Subject:
of
Computed by:
Checked by:
Approved by:
System
Light Hazard
Ordinary Hazard
Extra Hazard
Sprinklers Coverage
Type
Hydraulically calculated
Pipe schedule
Building of combustible construction
Area
ft2
225
200
168
130
100
m2
20.9
18.6
15.6
12.1
9.3
4.6
15
12
4.6
3.7
Date:
Sheet no.:
of
Subject:
Computed by:
Checked by:
Approved by:
Pendant
UpRight
3400
3400
3400
3400
4800
3.4
4800
3.4
11.6
m2
Date:
Sheet no.:
of
Computed by:
Checked by:
Approved by:
Table 8.6.2.2.1(a) Protection Areas and Maximum Spacing (Standard Spray Upright/Standard Spray Pendent) for Light Hazard
Protection Area
Spacing (maximum)
2
2
Construction Type
System Type ft
m
ft
m
Noncombustible obstructed Pipe schedule 200
18.6
15
4.6
unobstructed and combustible
unobstructed with member 3ft
or more on center
Noncombustible obstructed Hydraulically 225
20.9
15
4.6
unobstructed and combustib calculated
unobstructed with member 3ft
or more on center
Combustible obstructed with All
168
15.6
15
4.6
members 3ft or more on center
Combustible obstructed or
All
130
12.1
15
4.6
unobstructed with members less than
3 ft on center
Unoccupied attics having co All
120
11.1
8 x 15
4.6
wood joist or wood truss construction
(minimum psi)
with members less than 3 ft on center
10 x 12
with slopes having a pitch of 4 in 12
(minimum 20 psi)
Sprinklers Coverage
or greater
arrangements for Hydraulically calculated systems :
4.5
4.2
x
x
4.5
4.2
=
=
20.3
17.6
Date:
12/30/1899
Sheet no.:
Subject:
of
Computed by:
Checked by:
Approved by:
Table 8.6.2.2.1(b) Protection Areas and Maximum Spacing (Standard Spray Upright/Standard Spray Pendent) for Ordinary Hazard
Protection Area
Spacing (maximum)
2
2
ft
Construction Type
System Type
ft
m
m
All
All
130
12.1
15
4.6
ossible arrangements for ordinary hazard systems :
3
3.4
2.7
3.5
x
x
x
x
4
3.4
4.4
3.3
=
=
=
=
12.0
11.6
11.9
11.6
Table 8.6.2.2.1(c) Protection Areas and Maximum Spacing (Standard Spray Upright/Standard Spray Pendent) for Extra Hazard
Protection Area
Spacing (maximum)
Construction Type
System Type
ft2
m2
m
ft
All
Pipe schedule
90
8.4
12
3.7
[In buildings with storage bays 25 ft (7.6 m) wide,
12 ft 6 in. (3.8 m) shall be permitted]
All
Hydraulically calculated
100
9.3
12
3.7
with density >= 0.25
[In buildings with storage bays 25 ft (7.6 m) wide,
Sprinklers Coverage
All
Hydraulically calculated
with density < 0.25
arrangements for Hydraulically calculated systems :
with density < 0.25 gpm/ft2
130
12.1
3
3.4
2.5
x
x
x
4
3.4
4.5
=
=
=
12.0
11.6
11.3
Date:
12/30/1899
Sheet no.:
of
Subject:
Computed by:
Checked by:
Approved by:
Table 8.6.2.2.1(d) Protection Areas and Maximum Spacing (Standard Spray Upright/Standard Spray Pendent) for High Piled Storage
Protection Area
Spacing (maximum)
2
2
Construction Type
System Type
ft
m
m
ft
All
Hydraulically calculated
100
9.3
12
3.7
with density >=0.25
[In buildings with storage bays 25 ft (7.6 m) wide,
12 ft 6 in. (3.8 m) shall be permitted]
All
Hydraulically calculated
130
12.1
15
4.6
with density <0.25
m2
9.3
9.3
9.3
ft
12
12
12
m
3.7
3.7
3.7
m2
9.3
9.3
9.3
ft
10
10
10
m
3.1
3.1
3.1
Combustible Obstructed
N/A
Minimum protection area 80 ft2 (7.4 m2)
arrangements for Hydraulically calculated systems :
Sprinklers Coverage
N/A
N/A
9.0
m2
N/A
Sprinkler Type
Sidewall Sprinkler
Window Sprinkler
Normal
Recessed
Concealed
Date:
Sheet no.:
Subject:
Computed by:
Checked by:
Approved by:
25
32
40
50
65
80
100
2 sprinklers
3 sprinklers
5 sprinklers
10 sprinklers
30 sprinklers
60 sprinklers
100 sprinklers
See Section 8.2
For SI units, 1 in. =
Copper
1 in.
1 in.
1 in.
2 in.
2 in.
3 in.
3 in.
4 in.
25.4 mm.
2 sprinklers
3 sprinklers
5 sprinklers
12 sprinklers
40 sprinklers
65 sprinklers
115 sprinklers
See Section 8.2
25
32
40
50
65
80
100
125
150
200
Copper
2 sprinklers
1 in.
2 sprinklers
3 sprinklers
1 in.
3 sprinklers
5 sprinklers
1 in.
5 sprinklers
10 sprinklers
2 in.
12 sprinklers
20 sprinklers
2 in.
25 sprinklers
40 sprinklers
3 in.
45 sprinklers
65 sprinklers
3 in.
75 sprinklers
100 sprinklers
4 in.
115 sprinklers
160 sprinklers
5 in.
180 sprinklers
275 sprinklers
6 in.
300 sprinklers
See Section 8.2
8 in.
See Section 8.2
For SI units, 1 in. = 25.4 mm.
Date:
Sheet no.:
Subject:
Computed by:
Checked by:
Approved by:
Hydraulic Calculation:
Hazard Type
Light
Ordinary
Extra
3- Calculate minimum flow and pressure at the hydraulically most demanding sprinkler
Flow
Pressure
Design Density
(
Sprinkler Flow
Q=K P
2
Q
P=
K
()
Date:
Subject:
Sheet no.:
of
Computed by:
Checked by:
Approved by:
Exception: Where the sprinkler system water supply requirement, including the hose stream allowance as determined in accordance with
Standard for the Installation of Sprinkler Systems, exceeds the system demand established by Section 5-7 and 5-9.1,
the larger of the two values shall be provided.
The flow rate required for the standpipe demand of a combined system in a building protected throughout by an automatic sprinkler system
shall not be required to exceed 1000 gpm (3785 L/min) unless required by the authority having jurisdiction.
WATER REQUIREMENTS ACCORDING TO NFPA 14
Date:
Sheet no.:
Subject:
of
Computed by:
Checked by:
Approved by:
rinkler system, the system demand established by Section 5-7 and 5-9.1
y most remote standpipe shall be 500 gpm (1893 L/min). The minimum flow rate
the total not to exceed 1250 gpm (4731 L/min). For combined systems, see 5-9.1.3.
d most remote standpipe shall be designed to accommodate 500 gpm (1893 L/min).
D0414
Computed by:
R.G.H
Subject:
Checked by:
U.M
Approved by:
U.M
Date:
25/11/2004
Sheet no.:
of 1
Zone
Warehouse
Storage
Date:
Sheet no
of
Area Limitations
Computed by:
Checked by:
Approved by:
Storage High-piled storage (as defined in 1-4.2) and storage covered by other NFPA standards
40,000 ft2 (3716 m2)
Exception No. 1: The floor area occupied by mezzanines shall not be included in the above area.
Exception No. 2: Where single systems protect extra hazard, high-piled storage, or storage covered
other NFPA standards, and ordinary or light hazard areas, the extra hazard or storage area
coverage shall not exceed the floor area specified for that hazard and the total area covera
shall not exceed 52,000 ft2 (4831 m2).
Pendant
Upright
Hazard
Density Area of Sprinkler operation
Light
0.10
1500
Ordinary Group I
0.15
1500
Ordinary Group II
0.20
1500
Extra Hazard Group I 0.30
2500
Extra Hazard Group II 0.40
2500