PROJECT : Proposed Private Villa (Ground +Service Block)

Plot No:0574 ,Humaideya-2,Ajman.

OWNER : Maryam Obaid Bakheet Obaid Al Matrooshi


CONSULTANT : Mazaya Consultant
BILL OF QUANTITIES
S/NO

DESCRIPTION

QTY

UNIT UNIT PTICE

TOTAL

REMARKS

1,368,504
1

MOBILIZATION & PRELIMINARIES

1.00

LS

15,000.00

15,000

Site preparation and mobilization including office facilities and utilities, material
storing area fencing etc

15,000
2

SUB STRUCTURE
2-1

Excavation

1,316.00

M3

8.00

10,528

2-2

Back Filling

2,214.00

M3
LS
M3
M3
M3
m
M3
LS
M3
LS
LS
M3

8.00
500.00
80.00
350.00
1,000.00
85.00
1,050.00
28,720.00
1,000.00
4,898.87
1,800.00
450.00

17,712
500
15,120
8,611
51,000
47,090
14,700
28,720
41,000
4,899
1,800
27,900

2-3
2-4
2-5
2-6
2-7
2-8
2-9
2-10
2-11
2-12
2-13

50cm compacted sand filling under road base


Road Base (T=.25m)
PCC (Footing & Under Solid Blocks+Tie Beams)
RCC Footing
Solid Blocks 8"
Neck Column
Water Proofing for Footing / Subsructure (2COATS)
Tie Beams+STB
Anti Termite Treatment & Polyethelene Sheet
RCC Ground Stair @ External
Slab on Grade with BRC mesh

1.00
189.00
24.60
51.00
554.00
14.00
1.00
41.00
1.00
1.00
62.00

269,580
3

SUPER STRUCTURE
3-1
3-2
3-3
3-4

RCC Column
R.C.C FLAT Slab
R.C.C BEAMS
Parapet Wall & Dcor

26.00
162.00
25.00
61.40

M
M3
M3
M3

641.00
1.00
652.00

M
LS
M2

1,563.00
1,341.00

1,050.00
1,000.00
1,000.00
1,000.00

27,300
162,000
25,000
61,400

275,700
4

BLOCK WORKS
4-1
4-2
4-3

Hollow Blocks
Lintels
Hollow Blocks(Thermal Block)

59.00
3,025.00
79.00

37,819
3,025
51,508

92,352
5

PLASTERING
5-1
5-2

Internal Plastering
External Plastering

M
M2

23.00
28.00

35,949
37,548

73,497
6
A
A-1
A-2
A-3
A-4
A-5
A-6

B
B-1

C
C-1

D
D-1
D-2
D-3
D-4

E
F
F-1
F-2
F-3

FINISHING
FLOORING
Ceramics for Kitchen & Bathroom (Supply rate-20/m)
Porceline Ceramics (60*60 cm)for majlis,Sitting,Kids Play & Dress Room (Supply rate-35m)

Granite for Stair Landing (External) (Supply rate-100/m)


Granite Bush Hammered with Groove 5cmX2mm (RAMP) (Supply rate-100/m)
Ceramic (20*20) for Store Rooms(Supply rate-20/m)
Ceramic (40*40) for Bed Rooms(Supply rate-20/m)

117.00
269.00
13.00
4.00
33.00
131.00

M2
M2
M2
M2
M2
M2

59.00
74.00
200.00
200.00
59.00
59.00

6,903
19,906
2,600
800
1,947
7,729
39,885

424.00

M2

59.00

25,016
25,016

24.00

RM

200.00

4,800
4,800

168.00
24.00
165.73
144.00

RM
RM
RM
RM

35.00
35.00

15.50

RM

100.00

5,880
840
3,168
9,888
1,550

1,480.00
119.00
1,341.00

M2
M2
M2

16.00
16.00
26.00

23,680
1,904
34,866

6.31
40.66
-

M
M2
RM

1.76
7.00
68.00
10.85
8.16
40.91
1.00
1.00

WALL FINISH
Ceramics for Kitchen & Bathroom (Supply rate-20/m)

STAIR STEPS

(Thread & Riser)

Granite Tread & Riser (External)

SKIRTING
Porceline Ceramic Skirting (Supply rate-15/m)
Granite Skirting (Supply rate-20/m)
Roof compo floor skirting
Ceramic Skirting (Supply rate-8/m)

THRESHOLD
PAINT WORKS
Internal Walls , Emultion paint System (National)
Internal Ceiling For Bed,maid Room &Near lobby,Emultion paint System (National)
External Paints Epoxy Acrylic Paint system (National)

22.00

60,450
G
G-1
G-2
G-3

WOOD WORKS
D1 Wooden doors
Wooden doors (60% semi solid)
Wardrobes by Owner (not in scope) by Owner

1,200.00
680.00
1,100.00

7,572
27,646 Semi Solid
By Owner
-

35,218
H
H-1
H-2
H-3
H-4
H-5
H-6
H-7
H-8

ALUMINIUM WORKS
Sandwhich panel door for Bath room
Aluminum/Steel Handrails-External
Aluminum Windows
Powder Coated Aluminum Doors
Fixed glass
Kitchen Cabinet
Spiral Staircase
Cat Ladder

M
RM
M2
M2
M2
RM
LS
LS

650.00
450.00
650.00
650.00
450.00
900.00
4,000.00
2,800.00

1,144
3,150
44,200
7,053
3,671
36,819
4,000
2,800

102,837
I
I-1
I-2

FALSE CEILING
60*60 gypsum tile with vinyil cover (Wet Areas)
Gypsum Works(Majlis,Dress,Dining,kids play,Store,Sitting room) by owner

117.00
314.00

M2
M2

50.00
-

5,850
By Owner
-

5,850
J

WATER PROOFING

J-1

Roof Water Proofing (Area)

644.40

M2

100.00

64,440

64,440
K
K-1

GRC Works/Stone
Stone cladding & GRC Cladding by OWNER

27.00

M2

7
A
A-1
A-2

SERVICES
SANITARY WORKS

1.00

Common Bathrooms
WC, Showers, Mixers, Fexible Hose, Mirror Etc

1.00

LS
sets
sets

12,371.00

12,371
-

12,371
B
B-1
B-2

WATER TANK
GWT GRB Tank 1500 gal cap
OHW GRB Tank 500+200 gal cap

1.00
2.00

LS
LS

4,000.00
1,000.00

4,000
2,000

6,000
C

PLUMBING WORKS

C-1

Septic Tank & Manholes

1.00

LS

15,000.00

C-2

Plumbing

1.00

LS

35,000.00

15,000
35,000

50,000

D
D-1
D-2
D-3
D-4

ELECTRICAL
Electrical
Light Fixtures purchase by owner (scope of work only fixing)
Heaters
Pumps

1.00
7.00
2.00

ls
ls
ls
ls

45,000.00
350.00
2,500.00

TELEPHONE

1.00

ls

15,000.00

52,450
15,000

15,000
1,211,884

SUB-TOTAL 1
8

45,000
By Owner
2,450
5,000

INTERLOCK WORKS
8-1
8-2
8-3
8-4

9
10
11
12
13

INTERNAL Interlocks (full inside plot)


INTERNAL Kerbstone
EXTERNAL Interlocks
EXTERNAL Kerbstone

AC WORKS only Civil Work (A/C works by Owner)


Garages (Steel Structre)
Gates
COMPOUND WALL
Fencing Works And Sign Board
SUB-TOTAL 2
GRAND TOTAL

1,200.00
100.00
200.00
100.00
1.00
30.48
2.00
130.00
1.00

M2
LM
M2
LM
LS
LS
LS
LM
LS

35.00
35.00
35.00
35.00
5,000.00
250.00
4,000.00
600.00
2,000.00

42,000
3,500
7,000
3,500
5,000
7,620
8,000
78,000
2,000

Maximum only
Maximum only
Maximum only
Maximum only
By Owner

156,620

1,368,504

AED

Vous aimerez peut-être aussi