Vous êtes sur la page 1sur 6

Correct

1)

The success of testing is not influenced by the Psychological factor :


A.
B.
C.

Blindness to one's own errors


Clear test objectives determine testers effectiveness
Gaining confidence about the level of quality and providing information (Your
Answer)
Courteous communication and feedback on defects

D.
Correct
2)

What is operational testing?


A.

Testing the changes to an operational system or the impact of a changed


environment to an operational system
B. Testing conducted to evaluate a component or system in its operational environment
(Your Answer)
C. Acceptance testing by users or customers at their site, normally including h/w as well
as s/w
D. The process of testing to determine the maintainability of a software product.

Incorrect
3)

Testing Must be Planned is stated in


A.
B.
C.
D.

Bill hetzel principle (Correct Answer)


Ed Kit principle
IEEE 829 (Your Answer)
IEEE 8295

Incorrect
4)

The component test plan must consist of a single document


A.
B.

True (Correct Answer)


False (Your Answer)

Incorrect
5)

A fault fix doesn't cause side effect endured by-------A.


B.
C.
D.

Re testing (Correct Answer)


Regression testing (Your Answer)
Functional testing
Unit testing

Correct
6)

which activity in the fundamental test process includes evaluation of the testability of
the requirements and the system?

A. Testing implementation and execution


B. Test analysis
C. Test analysis and design (Your Answer)
D. Test planning and control

Correct
7)

.IEEE standard for software test documentation is


A.
B.
C.
D.

IEEE
IEEE
IEEE
IEEE

829 (Your Answer)


827
828
8295

Incorrect
8)

which of the following statements about regression testing is false?


A.
B.
C.

regression testing should be performed whenever software is changed.


Regression tests can be run many times
Automated regression testing is always more efficient than manual regression testing.
(Your Answer)
Regression tests should be reviewed to ensure that they are still relevant to the
business. (Correct Answer)

D.

Correct
9)

Test control is done to compare project progress


A. At initial stage of the project plan
B. when defining the entry and exit criteria of the project
C. When defining the entry criteria
D. throughout the project (Your Answer)

Incorrect
10)

A programmer is working on code which is very complex. Which of the following is a


general testing principle that may affect his work?
A.
B.
C.
D.

Pesticide Paradox
Component testing
Defect clustering (Correct Answer)
Early testing (Your Answer)

Correct
11)

During which fundamental test process activity we determine if more Test s are needed?
A.
B.
C.

Test analysis and design


Test implementation and execution
Test exit criteria (Your Answer)

D.

Test entry criteria

Correct
12)

A useful glossary of terms used in software testing is called BS___________


A.
B.
C.
D.

BS
BS
BS
BS

7925 -1 (Your Answer)


7295 -1
7529 - 5
7952- 5

Incorrect
13)

The quality and effectiveness of software testing are primarily determined by the quality
of the test processes used is stated in
A.
B.
C.
D.

Bill hetzel principle


Ed Kit principle (Correct Answer)
IEEE 829 (Your Answer)
IEEE 8295

Incorrect
14)

A programmer is writing and executing unit tests against code which he has written.
Which of the following is a tester mindset that the programmer should adopt to perform
unit testing effectively?
A.
B.
C.
D.

Good communication skills


Code coverage (Your Answer)
Probe effect
Attention to detail (Correct Answer)

Correct
15)

what is true of a Quality system?


A. It is secure
B. It meets specified requirements, customer needs (Your Answer)
C. It costs more than other systems with the same feature
D. It was delivered on time and budget.

Incorrect
16)

The component test plan must specify test completion criteria?


A.
B.

Incorrect

True (Correct Answer)


False (Your Answer)

17)

which of the following is a major task of test planning?


A.
B.
C.
D.

Determining test approach (Your Answer)


evaluating entry criteria
Preparing test specifications (Correct Answer)
Measuring and analyzing results.

Correct
18)

Which is not an exit criteria measure


A. Cost
B. Time
C. No of resources (Your Answer)
D. Fault found or coverage

Incorrect
19)

A phone ringing in an adjacent cubicle momentarily distracts a a programmer, causing


him to improperly program the logic that checks the upper boundary of an input
variable. Later, during system testing, a tester notices that this variable accepts input
values. The improperly coded logic for the upper boundary check is :
A.
B.
C.
D.

The
The
The
The

root cause
error (Your Answer)
defect (Correct Answer)
Failure

Correct
20)

Which of the following is a fundamental test activity?


A. Test design and Implementation
B. Test Implementation and Execution (Your Answer)
C. Test Planning and design
D. Evaluating Test plan

Incorrect
21)

which of the following is a general testing principle?


A.
B.
C.
D.

Exploratory testing (Correct Answer)


Confirmation testing
Defect masking or Defect clustering (Your Answer)
Defect masking

Correct
22)

Which of the following is not a test objective


A.
B.

Gaining confidence about the quality of the code


finding defects

C.

Analyzing cause of failure


(Your Answer)
Preventing defects

D.

Correct
23)

Which of the following is a common test objective?


A.
B.
C.
D.

Comparing actual results to expected results


Casual analysis
Preventing defects (Your Answer)
analyzing cause of failure

Incorrect
24)

Defects occur not because of


A.
B.
C.
D.

Complexity of Infrastructure
Execution of software by changing hardware conditions (Correct Answer)
System interactions (Your Answer)
Changed technologies

Correct
25)

Deciding how much testing is enough depends on


A. Business and project risks
B. Business and technical risks
C. Technical and product risks
D. Business, technical and product risks (Your Answer)

Incorrect
26)

What is a Test condition?


A.
B.

C.
D.

An item or event of a component or system that could be verified by one or more


test cases (Correct Answer)
A condition or capability needed by a user to solve a problem or achieve an
objective that must be met or possessed by a system or system component to
satisfy a contract, standard, specification, or other formally imposed document.
An approach to testing in which test cases are designed based on test objectives
and test conditions derived from requirements (Your Answer)
A set of input values, execution preconditions, expected results and execution post
conditions.

Correct
27)

what does a test design specification contain?


A.
B.

Test Inputs
Expected results

C. Procedure steps
D. Test conditions (Your Answer)

Incorrect
28)

Writing test summary report is an test closure activity


A.
B.

True (Your Answer)


False (Correct Answer)

Vous aimerez peut-être aussi