B
6.50
7.00
C-4
C-2
6.50
C-2
C-4
6.00
C-3
C-1
C-1
C-3
6.00
C-3
C-1
C-1
C-3
5.00
C-4
C-2
C-2
C-4
Datos:
f'c
350 Kg/Cm2
h1
4.5m
h2
3.0m
Area Total
340.00 m2
METODO JAPONES
Tabiqueria
Acabado
Aligerado
w de Vigas
120
100
350
100
Kg/m2
Kg/m2
Kg/m2
Kg/m2
=/(^ )
>/
> /
</
< /
falla fragil
falla ductil
b
METRADO DE CARGA MUERTA
Aligerado 25 cm
350 Kg/m2
Tabiqueria
120 Kg/m2
Acabados
100 Kg/m2
Vigas
100 Kg/m2
Columnas
60 Kg/m2
730 Kg/m2
carga total CV +CD
980 Kg/m2
PREDIMENSIONAMIENTO
C-1 Eje B-2 Y C-2
A.T.
40.50 Cm2
Peso Total
A.T. * Carga Total
Asumiendo: n
fac. sismico
bt =
b=t=
4158 Cm2
64.48 Cm
39690 Kg
=(. )/( ^ )
0.30
1.10
65Cm x 65Cm
36383 Kg
=(. )/( ^ )
0.30
1.10
65Cm x 65Cm
19845 Kg
=(. )/( ^ )
0.25
1.25
55Cm x 55Cm
16538 Kg
=(. )/( ^ )
=(. )/( ^ )
Asumiendo: n
fac. sismico
bt =
2363 Cm2
b=t=
48.61 Cm
0.25
1.25
50Cm x 50Cm
9555 Kg
=(. )/( ^ )
0.25
1.25
40Cm x 40Cm
9555 Kg
=(. )/( ^ )
Asumiendo: n
0.20
fac. sismico
1.50
bt =
2048 Cm2
b=t=
45.25 Cm
45Cm x 45Cm
7963 Kg
=(. )/( ^ )
Asumiendo: n
fac. sismico
bt =
1706 Cm2
b=t=
41.31 Cm
0.20
1.50
45Cm x 45Cm
TRABAJO DOMICILIARIO
A
B
6.50
C-4
C
7.00
C-2
D
6.50
C-2
C-4
6.00
C-3
C-1
C-1
C-3
6.00
C-3
C-1
C-1
C-3
5.00
C-4
C-2
C-2
C-4
Datos:
f'c
350 Kg/Cm2
h1
4.5m
h2
3.0m
Area Total
340.00 m2
METODO DR. YAMASHIRO
Tabiqueria
Acabado
Aligerado
w de Vigas
120
100
350
100
Kg/m2
Kg/m2
Kg/m2
Kg/m2
Procedimiento de dimensionamiento
1. Determine las secciones Ag de las columnas del segundo y del
antepenltimo piso mediante la siguiente frmula: Ag = K At , donde K
se obtiene de la tabla y At es el rea tributaria de la columna
considerada.
2. Determine los lados de las columnas de los pisos considerados
suponindolas cuadradas
a) Si h1 = h2 extrapolar linealmente
b) si h1 = 1.5*h2 ; t1 = t2 + 7Cm
c) otros nivles se interpolan o extrapolan
DIMENSIONAMIENTO DE COLUMNAS
Areas Tributareas
C-1 Eje B-2 Y C-2
A.T. 40.5 m2
C-1 Eje B-3 Y C-3
A.T. 37.125 m2
C-2 Eje B-1 Y C-1
A.T. 20.250 m2
C-2 Eje B-4 Y C-4
A.T. 16.875 m2
DESCRIPCION
AREA TRIBUTAREA
K
A.T
(m2)
ANTEPENULTIM
O PISO
A.G (m2)
T (Cm)
K
A.T (m2)
2 PISO
A.G (m2)
T (Cm)
C-1
40.5 m2
0.0011
121.500
1336.50
36.56
0.0012
364.5
4374
66.14
DESCRIPCION
C-3
AREA TRIBUTAREA
9.750 m2
K
0.0022
A.T (m2)
29.25
ANTEPENULTIM
O PISO
A.G (m2)
643.50
T (Cm)
25.37
K
0.0014
A.T (m2)
87.75
2 PISO
A.G (m2)
1228.50
T (Cm)
35.05
DIMENSION FINAL DE LAS COLUMNAS
2 PISO
ANTEP. PISO
C-1 Eje B-2 Y C-2
70Cm X 70Cm
40Cm X 40Cm
C-1 Eje B-3 Y C-3
65Cm X 65Cm
35Cm X 35Cm
C-2 Eje B-1 Y C-1
50Cm X 50Cm
40Cm X 40Cm
C-2 Eje B-4 Y C-4
50Cm X 50Cm
35Cm X 35Cm
C-1
37.1 m2
0.0011
111.375
1225.13
35.00
0.0012
334.125
4009.5
63.32
C-2
20.250 m2
0.002394
60.750
1454.36
38.14
0.0014
182.25
2551.5
50.51
C-4
9.750 m2
0.004
29.25
1170.00
34.21
0.0015
87.75
1316.25
36.28
C-4
8.125 m2
0.004
24.375
975.00
31.22
0.0015
73.125
1096.88
33.12
2 PISO
ANTEP. PISO
C-3 Eje A-2, A-3,D-2 Y D3
35Cm X 35Cm 25Cm X 25Cm
C-4 Eje A-1, D-1
40Cm X 40Cm 35Cm X 35Cm
C-4 Eje A-1, D-1
35Cm X 35Cm 35Cm X 35Cm
C-1
40.500 m2
36.56
36.56
36.56
41.49
46.42
51.35
56.28
61.21
66.14
73.14
C-1
37.125 m2
35.00
35.00
35.00
39.72
44.44
49.16
53.88
58.6
63.32
70.32
C-2
20.250 m2
38.14
38.14
38.14
40.202
42.26
44.32
46.38
48.45
50.51
57.51
PISO
A.T.
10
9
8
7
6
5
4
3
2
1
C-3
9.750 m2
25.37
25.37
25.37
26.98
28.59
30.21
31.82
33.44
35.05
42.05
C-4
9.750 m2
34.21
34.21
34.21
34.56
34.91
35.26
35.6
35.94
36.28
43.28
C-4
8.125 m2
31.22
31.22
31.22
31.54
31.856
32.172
32.488
32.804
33.12
40.12
C-2
16.875 m2
35.42
35.42
35.42
37.202
38.98
40.76
42.54
44.33
46.11
53.11
D
C-4
6.00
C-3
6.00
C-3
5.00
C-4
C-2
16.875 m2
0.002478
50.625
1254.49
35.42
0.0014
151.875
2126.25
46.11