Annexure-IV

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT


(110 mm / 150 mm dia PVC Pipelines)
A. 110 mm dia PVC Pipeline (to collect rainwater from roof)
Laying and fitting of 110 mm PVC pipes of 6 metres length including
transportation of pipe to work sites
Plumber
0.25 no
@ Rs.190.00/no
Helper to Plumber
0.25 no
@ Rs.150.00/no
Sangi mulia
2
no
@ Rs.170.00/no
O.H.C. 10%
Cost & Carriage of pipes for 6 m
@ Rs.250.00/mtr.
Cost of solvent, bend, socket etc. for jointing
LS

Rs. 47.50
Rs. 37.50
Rs. 340.00
Rs. 42.50
Rs. 1500.00
Rs. 432.50
Rs.2400.00/6 m
Rs. 400.00/m
For 12 m length 110 mm dia PVC pipe Rs.400.00 x 12 =
Rs. 4800.00
Cost of 2 PVC Control Valves
@ Rs.350.00/no =
Rs. 700.00
Sub-Total (A) Rs. 5500.00

B. 150 mm dia PVC Pipeline (to covey collected rainwater to underground


Filter Unit / Storage Unit / Recharge Unit
Laying and fitting of 150 mm PVC pipes of 6 metres length including
transportation of pipe to work sites
Plumber
0.50 no
@ Rs.190.00/no
Helper to plumber
0.50 no
@ Rs.150.00/no
Sangi mulia
02 no
@ Rs.170.00/no
O.H.C. 10%
Cost & Carriage of pipes for 6 mtr.
@ Rs.450.00/m
Cost of solvent, bend, socket etc. for jointing
LS

Rs. 95.00
Rs. 75.00
Rs. 340.00
Rs. 51.00
Rs. 2700.00
Rs. 39.00
Rs.3300.00/6 m
Rs. 550.00/m

1. Earth work in hard soil or gravelly soil within 50m initial lead
and 1.5m initial lift incl. rough dressing and breaking clods to
maximum 5 -7 cm size, as directed by the engineer in charge
20.00m.x0.45m.x0.60m. = 5.40 cum.

@ Rs.8746.20/ % cum.

Rs.

472.29

Rs.

367.07

Rs.

314.86

2. Filling the F & P with sand well watered & rammed.


20.00m.x0.45m.x0.15 m. = 1.35 cum

@ Rs.271.91/cum.

3. Filling the F & P with excavated materials


Qnty as per item no.1 = 5.40 cum

@ Rs.5830.80/% cum.

4. Cost of 150 mm dia PVC pipe including


labour charges for laying pipeline ,carriage at site,
cost of fitting materials such as sockets, bends,
T-joints, solvent for joints etc. complete @ Rs.550.00/m for 20 m
5. Add for unforeseen items.

LS

Rs. 11000.00

Rs. 345.78
Sub-Total (B) Rs. 12500.00
TOTAL (A+B)

Rs. 18000.00

(Rupees Twelve Thousand) Only

Annexure-V
TYPICAL ESTIMATE OF A BRICK MASONRY RAINWATER FILTER UNIT
(L-100 cm X B-100 cm X D-120 cm Size)
1.

Earth work in hard soil within 50m. initial lead and


1.5 m initial lift including rough dressing and braking
clods to max. 5- 7cm size as directed by the engineer in charge
1.82 m.x 1.82 m.x 0.65 m = 2.153 cum.

2.

3.

4.

5.

6.

8.

Rs. 188.30

Filling the F & P with sand well watered and rammed


1.82 m.x 1.82 m.x 0.15 m = 0.496 cum.
@ Rs.271.91/ cum

Rs. 134.86

CC (1:4:8) with 40 mm. size hard broken granite metal


Hard granite metal
1.82 m.x 1.82 m.x 0.15 m = 0.496 cum.
@ Rs.3129.53/ cum

Rs. 1552.24

Well burnt K.B. brick (25cm x12cm x8cm) having


crushing strength not less than 75Kg/cm2 in C.M. (1:6)
including mortar joint with necessary scaffolding carrying etc.
2x 1.50 m.x 0.25 m.x 1.21 m = 0.907 cum.
2x 0.50 m.x 0.25 m.x 1.21 m. = 0.302 cum.
Total :
1.209 cum. @ Rs.3400.01/ cum

Rs. 4110.61

C.C. (1:2:4) with 12 mm. size hard broken granite chips


Hard granite chips
Top Slab :
1x1.50 m.x 1.50 m.x 0.10 m.= 0.225 cum.
( - ) Opening = 0.785x (0.45)2 x 0.10 m.
= 0.015 cum.
Net = 0.210 cum.
@ Rs.4723.62/ cum

Rs. 991.96

Rigid and smooth centering and shuttering for


RCC works including false works and dismantling
then after casing including cost of materials
1 x 1.82 m.x 1.82 m. = 3.312 sqm.

7.

@ Rs.8746.20/% cum

@ Rs.258.43/ sqm

Cost of MS steel for reinforcement including


cost of bending & binding with cost of wire
etc. complete.
Quantity = 0.210 cum @ 78.50/cum = 0.16 qntl. @ Rs.6647.97/qntl

Rs. 855.92

Rs.1063.67

12mm. thick cement plaster in CM (1:6) over brick work.


Inside : 4x1.00 m.x 1.21 m
=
Outside : 2x1.50 m.x 1.21 m.
=
Top
: 2x0.25 mx (1.50+0.50)m =
Total

9.

Cost of one manhole / filter materials

10.

Add for unforeseen items

4.840 sqm.
3.630 sqm.
1.000 sqm.
9.470 sqm. @ Rs.80.69/ sqm
LS

Rs. 764.13
Rs. 1000.00
Rs. 338.31

TOTAL

Rs.11,000.00

(Rupees Eleven Thousand) Only

Annexure-VI
TYPICAL ESTIMATE OF A RCC RAINWATER STORAGE UNIT
(5000 Litres Capacity)
1.

2.
3.

4.

5.

Earth work in hard soil within 50m. initial lead and


1.5m initial lift including rough dressing and braking
clods to max. 5-7cm.size as directed by the engineer in charge
1.82 m.x 1.82 m.x 2.28 m = 7.552 cum @ Rs.8746.20/% cum

Rs.

660.51

Filling the F & P with sand well watered and rammed


1.82 m.x 1.82 m.x 0.30 m = 0.993 cum. @ Rs.271.91/ cum

Rs.

270.00

CC (1:4:8) with 40 mm. size hard broken granite metal


hard granite metal
1.82 m.x 1.82 m.x 0.15 m = 0.496 cum. @ Rs.3129.53/ cum

Rs. 1552.24

C.C. (1:2:4) with 12 mm. size hard broken granite chips


Hard granite chips
2x1.52 m.x 1.52 m.x 0.10 m =
0.462 cum
4x1.82 m.x 1.52 m.x 0.10 m.=
1.106 cum
Total :
1.568 cum
( - )Opening=0.785x (0.45)2 x 0.10 m.= 0.015 cum
Net =
1.553 cum @ Rs.4723.62/ cum

Rs. 7335.78

Rigid and smooth centering and shuttering for


RCC works including false works and dismantling
then after casing including cost of materials
1 x 2.13 m.x 2.13 m. = 4.536 sqm.
1 x 2.43 m. x 2.43 m. = 5.904 sqm.
Total : 10.440 sqm. @ Rs.258.43/ sqm

6.

Rs. 2698.00

Cost of MS steel for reinforcement including


cost of bending & binding with cost of wire
etc. complete.
Quantity = 1.553 cum @ 100 kg/cum = 1.55 qntl.@ Rs.6647.97/qntl

Rs. 10304.35

7.

Cost of one manhole

Rs. 1000.00

8.

Add for unforeseen items

LS

Rs.
TOTAL

179.12

Rs.24000.00
(Rupees Twenty Four Thousand) Only

Annexure-VII
TYPICAL ESTIMATE OF A RCC RAINWATER STORAGE UNIT
(10000 Litres Capacity)
1. Earth work in hard soil within 50m. initial lead and
1.5m initial lift including rough dressing and braking
clods to maximum 5-7cm size as directed by the engineer in charge
3.35 m.x 1.82 m.x 2.28 m = 13.901 cum.

@ Rs.8746.20/% cum

Rs.1215.80

2. Filling the F & P with sand well watered and rammed


3.35 m.x 1.82 m.x 0.30 m = 1.829 cum.

@ Rs.271.91/ cum

Rs. 497.32

3. C.C. (1:4:8) with 40 mm. size hard broken granite metal


Hard granite metal
3.35 m.x 1.82 m.x 0.15 m = 0.914 cum.
@ Rs.3129.53/ cum

Rs.2860.39

4. C.C. (1:2:4) with 12 mm. size hard broken granite chips


Hard granite chips
2x3.05 m.x 1.52 m.x 0.10 m =
0.927 cum.
4x1.82 m.x 1.52 m.x 0.10 m.=
1.106 cum.
Total :
2.033 cum.
( - ) Opening = 0.785x (0.45)2 x 0.10m.= 0.015 cum.
Net =
2.018 cum. @ Rs.4723.62/ cum

Rs.9532.26

5. Rigid and smooth centering and shuttering for


RCC works including false works and dismantling
then after casing including cost of materials
1 x 3.65 m.x 2.13 m. =
7.774 sqm.
1 x 2.43 m. x 2.43 m. =
5.904 sqm.
Total :
13.678 sqm @ Rs.258.43/ sqm

Rs.3534.80

6. Cost of MS steel for reinforcement including


cost of bending & binding with cost of wire etc. complete.
Quantity = 2.018 cum @ 100 kg/cum = 2.01 qntl. @ Rs.6647.97/qntl
7. Cost of one manhole

LS

8. Add for unforeseen items

Rs.13362.41
Rs. 1000.00
Rs.

TOTAL

497.02

Rs.32500.00

(Rupees Thirty Two Thousand Five Hundred) Only

Annexure-VIII
TYPICAL ESTIMATE OF A RECHARGE DUG WELL
[Size - 110 cm dia X 10 metres depth]
1.

Earth work in hard soil within 50m Initial lead and


1.5m initial lift including rough dressing and braking of
clods to maximum 5 -7 cm size as directed by the engineer in charge
1st depth = /4 x (2.00 m)2 x 1.50 m = 4.710 cum.
@ Rs.8746.20 /% cum
2nd depth = /4 x (2.00 m)2 x 1.50 m = 4.710 cum
@ Rs.14161.72 /% cum
3rd depth = /4 x (2.00 m) 2 x 1.50 m = 4.710 cum
@ Rs.19229.77 /% cum

2.

Rs. 411.94
Rs. 667.01
Rs. 905.72

Earth work excavation in stony earth and gravel mixed


with stone and boulder not exceeding on 0.014 cum in
volume within 50m initial lead and 1.5m initial lift including
rough dressing and breaking clods and maximum 5- 7 cm
and lying in layer not exceed 0.3 m in depth as per
specification approved by the department.
4th depth = /4 x (1.50 m.)2 x 1.50 m. = 2.649 cum
@ Rs.36532.32 /% cum
5th depth = /4 x (1.50 m.)2 x 1.50 m. = 2.649 cum
@ Rs.44047.27 /% cum
6th depth = /4 x (1.50 m.)2 x 1.50 m. = 2.649 cum
@ Rs.51562.22 /% cum
7th depth = /4 x (1.50 m.)2 x 1.00 m. = 1.766 cum
@ Rs.59077.17 /% cum

3.

4.

Rs. 967.74
Rs.1166.81
Rs.1365.88
Rs.1043.30

Lowering of 1.00 m. dia x 0.30m height precast


RCC Ring including cost and transportation.
Qnty =. 33 nos. for 10.00 mtr. @ Rs.600.00 /each

Rs.19800.00

Add for other unforeseen items / well cover L.S.

Rs.
TOTAL

171.60

Rs. 26500.00

(Rupees Twenty Six Thousand Five Hundred) Only

Annexure-IX
LEAD STATEMENT
1.

Carriage of sand(screened & washed): 10 Kms. Distance


by truck including cost & tax. .
S.R.cost
1st. 5Kms.
Next 5 Kms. @Rs.7.30/km.
Royality
Total :

2.

3.

4.

5.

6.

Rs.42.00/cum.
Rs.124.00
Rs.36.50
Rs.19.60
_____________________
Rs.222.10/cum.

Carriage of Cement : 5 kms.distance


by truck including cost & tax.
S.R.cost
1st 5 kms.

Rs.670.00/qntl
Rs.134.00
_____________________
Total :Rs.134.00/10.00 tons
Or ,
Rs.1.34 /qntl.
Total = Rs.670.00+Rs.1.34 = Rs.671.34/qntl.
Carriage of K.B. bricks brick (25cm x12cm x8cm) having
crushing strength not less than 75Kg/cm2 incl.cost & tax.
20 kms. Distance by truck
SR Cost
Rs.4500.00/1000 nos.
1st 5 kms.
Rs. 799.00
Next 15 kms @ Rs.33.00/km
Rs.495.00
____________________
Total : Rs.1294.00/2000 nos.
Or,
Rs.647.00/1000 nos.
Total = Rs.4500.00+Rs.647.00 = Rs.5147.00/1000 nos.
Or.
Rs.1801.45/350 nos.(1 cum.)
Carriage of pebbles/gravels of 4 cm size : 20 kms distance
S.R.cost
Rs.1000.00/cum.
Rs.124.00
1st. 5Kms.
Next 15 Kms. @Rs.7.30/km.
Rs.109.50
Royality
Rs.19.60/cum.
_____________________
Total : Rs.1253.10/cum.
Carriage of 40 mm.size H.G.C.B.chips : 20 kms.Distance
By Truck including cost & tax.
S.R.cost
1st 5 kms.
Next 15 kms. .@ Rs.7.30/km.
Royality

Carriage of 12 mm.size H.G.C.B.chips : 20 kms.distance


by truck including cost & tax.
S.R.cost
1st 5 kms.
Next 15 kms. .@ Rs.7.30/km.
Royality

Rs.620.00/cum.
Rs.124.00
Rs.109.50
Rs.70.56
____________________
Total
Rs.924.06/ cum.

Rs.910.00/cum.
Rs.124.00
Rs.109.50
Rs.70.56
____________________
Total
Rs.1214.06/ cum.

Annexure-X
ANALYSIS OF RATES
1.

Earth work in hard soil within 50m. initial lead and


1.5m initial lift including rough dressing and braking
clods to max. 5cm. to 7cm.as directed by the engineer in charge
Man mulia 21.50 nos.
@ Rs.150.00/each
Female mulia 21.50 nos.
@ Rs.150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

Add 20 % for foundation excavation

2.

3.

4.

Extra lift of 1.5 m or part there of over the initial lift of


1.5 mtr. in all kinds of embankment and road works
and ordinary in general
1st extra lift of 1.5 mtr.
Man mulia 4.10 nos. @ 150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

(i)
2nd depth of 1.5 mtr. = 1.50 x8746.20 + 1.5 x 694.95
Rs.14161.72/%cum.
(ii)
3nd depth of 1.5 mtr. = 2.0 x 8746.20 + 2.5 x 694.95
Earth work excavation in stony earth and gravel mixed
with stone and boulder not exceeding on 0.014 cum in
volume within 50m initial lead and 1.5m initial lift including
rough dressing and breaking clods and max. 5 cm to 7 cm
and lying in layer not exceed 0.3 mtr in depth as per
specification approved by the department.
Man mulia 33.53 nos.
@ 150.00/each
Women mulia 33.53 nos. @ 150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

Add 20 % for foundation excavation

5.

(i)
4th depth of 1.5 mtr. = 2.5 x 13640.00 + 3.5 x 694.95
Rs.36532.32/%cum.
(ii)
5th depth of 1.5 mtr. = 3.0 x 13640.00 + 4.5 x 694.95
Rs.44047.27/%cum.
(iii)
6th depth of 1.5 mtr. = 3.5 x 13640.00 + 5.5 x 694.95
Rs.51562.22/%cum.
(iv)
7th depth of 1.5 mtr. = 4.0 x 13640.00 + 6.5 x 694.95
Rs.59077.17/%cum.
(v)
8th depth of 1.5 mtr. = 4.5 x 13640.00 + 7.5 x 694.95
Rs.66592.12/%cum.
(vi)
9th depth of 1.5 mtr. = 5.0 x 13640.00 + 8.5 x 694.95
Rs.74107.07/%cum.
(vii)
10th depth of 1.5 mtr. = 6.0 x 13640.00 + 9.5 x 694.95
Rs.88442.02/%cum.

Rs.3225.00
Rs.3225.00
Rs. 645.00
Rs. 129.00
Rs.64.50
___________________
Total : Rs.7288.50/% cum.
Rs.1457.70
____________________
G.Total :Rs.8746.20 /% cum.

Rs.615.00
Rs.61.50
Rs.12.30
Rs.6.15
____________________
Total : Rs.694.95/% cum

Rs.19229.77/%cum.

Rs.5029.50
Rs.5029.50
Rs.1005.90
Rs.201.18
Rs.100.59
____________________
Total : Rs.11366.67/% cum.
Rs.2273.33
____________________
G.Total :Rs.13640.00 /% cum.

6.

7.

8.

9.

10.

Filling the F & P with sand well watered and rammed


Sand 1.00 cum.
@ Rs.222.10/cum.
Man mulia 0.1236 nos.
@ Rs.150.00/no.
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

Well burnt K.B. brick (25cm x12cm x8cm) having


crushing strength not less than 75Kg/cm2 in C.M. (1:6)
including mortar joint with necessary scaffolding carrying etc.
Bricks 350 nos.
@ Rs.1801.45/ 350 nos.
Sand 0.28cum.
@ Rs.222.10/cum
Cement 0.672qtl.
@ Rs.671.34/cum
Mason special 0.35nos.
@ Rs.205.00/each
Mason 2nd class 1.05nos.
@ Rs.190.00/each
Man mulia 1.41nos.
@ Rs.150.00/each
Woman mulia 1.41nos.
@ Rs.150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

C.C. (1:4:8) with 40 mm. size hard broken granite metal


Hard granite metal 0.96cum
@ Rs.924.06 /cum.
Sand 0.48cum
@ Rs.222.10/cum
Cement 1.72 qtl
@ Rs.671.34/qntl.
Rs.1154.70
Mason 0.18 nos.
@ Rs.190.00/each
Man mulia 2.50 nos.
@ Rs.150.00/each
Woman mulia 1.40 nos.
@ Rs.150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

C.C. (1:2:4) with 12 mm. size hard broken granite chips


Hard granite chips 0.90cum
@ Rs.1214.06 / cum.
Sand 0.45cum
@ Rs.222.10/cum
Cement 3.23qtl
@ Rs.671.34/qntl.
Mason 0.68nos.
@ Rs.190.00/each
Man mulia 3.20nos.
@ Rs.150.00/each
Woman mulia 1.40nos.
@ Rs.150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

Rigid and smooth centering and shuttering for


RCC works including false works and dismantling
then after casing including cost of materials
complete in ground floor.
RCC floor and roof slabs, landings, balconies
projecting sub shades and chajjas up to 4.3 m height
Details for 10 sqm
Non sal wood scantling 0.112 cum @Rs.7280.00/cum.
Planks 38mm
0.34 cum@Rs 16800.00/cum.
120 mm dia bullah
56 meter @Rs.84.00/mtr.
Carriage of wood
1.142 cum @Rs.328.00/ cum

Rs.222.10
Rs.18.54
Rs.24.06
Rs. 4.81
Rs. 2.40
____________________
Total : Rs.271.91/ cum.

Rs.1801.45
Rs.62.18
Rs.451.14
Rs.71.75
Rs.199.50
Rs.211.50
Rs.211.50
Rs.300.90
Rs.60.18
Rs.30.09
_____________________
Total : Rs.3400.01/cum
Rs.887.09
Rs.106.60

Rs.34.20
Rs.375.00
Rs.210.00
Rs.276.95
Rs.55.35
Rs.29.64
___________________
Total : Rs.3129.53/cum.
Rs.1092.65
Rs.99.94
Rs.2168.42
Rs.129.20
Rs.480.00
Rs.210.00
Rs.418.02
Rs.83.60
Rs.41.80
___________________
Total : Rs.4723.62/cum.

Rs.815.36
Rs.5712.00
Rs.4704.00
Rs.374.57
__________________
Total : Rs.11605.93/10
Or Say, Rs.1160.59

Considering 10 times use of the materials for use once


Carpenter (2nd class)
2.75 nos.@Rs.205.00/each
Semi-skilled mulia
2.75 nos.@Rs.170.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

11.

Cost of MS steel for reinforcement including


cost of bending & binding with cost of wire
etc. complete.
Bars including 5%
Overlaps and wastage 1.05 MT. @ Rs.55000.00/ton.
Blinding Wire 8.0 kg. @ Rs.60.00/Kg.
Blacksmith 1st Class 3.00 nos. @129.00/day
Mate
0.44 nos. @Rs170.00/day
Man Mulia
8 nos.@Rs150.00/day
Overhead charges @ 10%
Cess @1%

12.

13.

14.

12mm. thick cement plaster in CM (1:6) over brick work.


Sand 0.015cum
@ Rs.222.10/cum
Cement 0.035qtl
@ Rs.671.34/cum
Mason 0.14nos.
@ Rs.190.00/each
Man mulia 0.07nos.
@ Rs.150.00/each
Woman mulia 0.05nos.
@ Rs.150.00/each
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

Filling of pebbles/gravels
Cost and transportation of pebbles. 1cum
Mason 0.17 nos.
@ Rs.190.00/each.
Stone packer 0.35 nos.
@ Rs.190.00/each.
Women mulia 0.52 nos.
@ Rs.150.00/each.
Man mulia 0.52 nos.
@ Rs.150.00/each
Extra mulia 0.35 nos.
@ Rs.150.00/each.
Overhead charges @ 10%
Sundries and T & P @ 2%
Cess @1%

Rs.563.75
Rs.467.50
Rs.103.12
Rs.20.62
Rs.10.31
_____________________
Total : Rs.2325.89/9 sqm.
Or Say; Rs.258.43 /sqm.

Rs.57750.00
Rs.480.00
Rs.387.00
Rs.74.80
Rs.1200.00
Rs.5989.08
Rs 598.91
___________________
Total : Rs.66479.79/10qtl
Or
Rs.6647.97/qntl.
Rs.3.33
Rs.23.49
Rs.26.60
Rs.10.50
Rs.7.50
Rs.7.14
Rs.1.42
Rs.0.71
____________________
Total : Rs.80.69/ sqm.
Rs.1253.10
Rs.32.30
Rs.66.50
Rs.78.00
Rs.78.00
Rs.52.50
Rs.156.04

Rs.31.20
Rs.15.60
____________________
Total : Rs.1763.24/ cum
Cost of RCC ring 1.00 m. dia x 0.30 m. height including transportation and
laying in the well etc. complete as per local market rate.
Rs.500.00/each

Annexure-XI
TYPICAL ESTIMATE OF RECHARGE BORE WELL IN HARD ROCK FORMATION
[Size 125 X 100 mm dia X 50 metres depth]
Sl.
No.

Item of Work

Unit

Unit Rate
in Rupees

Quantity

Total Cost
in Rupees

Metre

600/-

20

12000/-

Metre

500/-

30

15000/-

Metre

100/-

20

2000/-

LS

2000/-

Metre

550/-

20

11000/-

A
1

Labour Cost
Drilling a perfectly vertical
150 mm dia bore hole in
hard rock formation from
ground level to 20 metres
depth
Drilling of 100 mm dia bore
hole from 20 metres depth
to 50 metres depth
Lowering of 125 mm dia PVC
casing pipe of with or
without slots from ground
level to 20 meters depth in
perfectly vertical position

Operation of air-compressor
for development of bore well

Material Cost

PVC pipe (125 mm dia) for


20 meter

PVC well cap

No.

500/-

01

500/-

Unforeseen items

LS

500/-

Total Cost (in Rupees)

43000/-

(Rupees Forty Three Thousand Only)

Annexure-XII
TYPICAL ESTIMATE OF A RECHARGE TUBE WELL IN ALLUVIAL FORMATION
[Size 125 mm dia X 30 metres depth]
Sl.
No.

Item of Work

Unit

Unit Rate
in Rupees

Quantity

Total Cost
in Rupees

Metre

1700/-

30

51000/-

A
1

Labour Cost
Sinking a perfectly vertical
tube well of 125 mm dia X
30 metres depth below
ground level in alluvial
formation including gravel
packing and assembly
lowering

Operation of air-compressor
for development of tube well

LS

3400/-

Slotting cost of PVC pipe


(125 mm dia) for 10 metres

Metre

300/-

10

3000/-

Material Cost

PVC pipe (125 mm dia) for


30 meters

Metre

550/-

30

16500/-

PVC well cap

No.

500/-

01

500/-

Unforeseen items

LS

600/-

Total Cost (in Rupees)

75000/-

(Rupees Seventy Five Thousand Only)