Vous êtes sur la page 1sur 8

TERRAPLENAGEM - CUBAO TOTAL

EMPRESA:
OBRA: EDIFICIO UNIFAMILIAR
LOCAL: PEREIRO / CE
VOLUMES POR TRECHO
TRECHO DE CONTENO
AGEM - CUBAO TOTAL

DATA 2/1/2017
CORTE ATERRO
252.86 m 389.14 m
QUANTITATIVOS - CONTENO
EMPRESA:
OBRA: EDIFICIO UNIFAMILIAR

LOCAL: PEREIRO / CE
DATA 2/1/2017
VOLUMES POR TRECHO CORTE ATERRO
VOLUME DE CONTENO 132.76 m R$ 38,348.28
TERRAPLENAGEM - REA DE CONTENO
EMPRESA:
OBRA: EDIFICIO UNIFAMILIAR
LOCAL: PEREIRO / CE
ESTACAS AREAS (m2) SOMA AREAS (m2) D/2 VOLUMES
INTEI. INTER. CORTE ATERRO CORTE ATERRO (m) CORTE ATERRO
0.00 10.58 7.14
5.00 8.33 7.17 18.91 14.31 2.50 47.272 35.765
10.00 6.49 7.22 14.83 14.39 2.50 37.064 35.972
15.00 5.15 7.27 11.64 14.50 2.50 29.098 36.239
1 0.00 3.37 7.34 8.52 14.61 2.50 21.295 36.536
1 5.00 2.21 7.39 5.58 14.73 2.50 13.957 36.827
1 19.00 1.15 6.49 3.36 13.87 7.00 23.548 97.122
2 0.00 1.41 6.43 2.56 12.92 0.50 1.282 6.460
2 6.00 1.12 4.42 2.53 10.85 3.00 7.599 32.560
2 10.00 6.09 3.54 7.21 7.96 5.00 36.038 39.799
2 11.00 4.95 3.54 11.04 7.08 4.50 49.660 31.860
TOTAIS
EM - REA DE CONTENO

DATA 2/1/2017
VOL. ACUMULADOS
CORTE ATERRO
###
47.272 35.765
84.336 71.737
113.434 107.976
134.729 144.512
127.391 181.339
158.277 278.461
159.559 284.921
167.158 317.481
203.196 357.280
252.856 389.140
252.856 389.140
TERRAPLENAGEM - REA DE TERRAPLENAGEM
EMPRESA:
OBRA: EDIFICIO UNIFAMILIAR
LOCAL: PEREIRO / CE
ESTACAS AREAS (m2) SOMA AREAS (m2) D/2 VOLUMES
INTEI. INTER. CORTE ATERRO CORTE ATERRO (m) CORTE ATERRO
0.00 0.00 0.00
5.00 0.00 0.00 0.00 0.00 2.50 0.000 0.000
10.00 11.19 0.00 11.19 0.00 2.50 27.975 0.000
15.00 15.91 0.00 27.10 0.00 2.50 67.750 0.000
1 0.00 20.03 0.00 35.94 0.00 2.50 89.850 0.000
1 5.00 25.22 0.00 45.25 0.00 2.50 113.125 0.000
1 10.00 0.00 0.00 25.22 0.00 2.50 63.050 0.000
1 15.00 5.94 20.22 5.94 20.22 2.50 14.850 50.550
2 0.00 22.43 4.41 28.37 24.63 2.50 70.925 61.575
2 5.00 40.00 0.32 62.43 4.73 2.50 156.075 11.825
2 10.00 0.00 0.00 40.00 0.32 2.50 100.000 0.800
2 15.00 0.00 0.00 0.00 0.00 2.50 0.000 0.000
2 16.93 0.00 0.00 0.00 0.00 0.97 0.000 0.000
TOTAIS
- REA DE TERRAPLENAGEM

DATA 2/1/2017
VOL. ACUMULADOS
CORTE ATERRO
###
0.000 0.000
27.975 0.000
95.725 0.000
185.575 0.000
298.700 0.000
361.750 0.000
376.600 50.550
447.525 112.125
603.600 123.950
703.600 124.750
703.600 124.750
703.600 124.750
703.600 124.750
VOLUME DE ALVENARIA ARGAMASSADA
EMPRESA:
OBRA: EDIFICIO UNIFAMILIAR
LOCAL: PEREIRO / CE DATA: 2/1/2017
VOLUME DE VOLUME
ESTACA INICIAL ESTACA FINAL EXTENSO REA LATERAL
TRECHO ALVENARIA ACUMULADO

INTEI. INTER. INTEI. INTER. (m) (m2) (m3) (m3)


1 0.00 1 19.00 39.00 2.940 114.660 114.660
2 1 19.00 2 6.00 7.00 1.900 13.300 127.960
3 2 6.00 2 11.00 5.00 0.960 4.800 132.760
TOTAL = 132.760