Impact on our Quotation submitted How to achieve without any additional cost to

Client requirements Can we do it ? Remarks


to plural client

Actual CCTV design, features & specifications of


It can be defined as a provisional sum item in the
cameras shall be decided by client and the
Partially Yes BOQ.
specialist.
When contractor is appointed client can define his
We can provide containment dwgs and requirements to contractor and he will design the
CCTV design / Access control design As per DM requirements all CCTV layouts shall be N/A
location of cameras/access control in our system, take approval from Dubai police and install
approved by Dubai Police.
tender drawings for contractor to have an the complete system as per the client requirements.
idea for pricing during tender stage. Generally contractors don't quote for design fees
Only Dubai police registered contractors can apply
when the service is design & built.
for approval.

SMATV system design Yes Was not included in our scope of works Quotation shall be revised N/A
Client informed during the meeting that one of his
Consultant to check - Laundry friends informed him that there are machines
We cannot coordinate with laundry machine
machines with built in gold dust No N/A available in the market with this option.
suppliers, as we have never done this before.
recovery system We advise client to find it out from his known
sources.
Previously we have been dealing with water
treatment suppliers for waste water treatment
systems. We can coordinate with them for the size
of plant, capacity and all other technical matters. Client can provide us the details of any supplier /
Waste Treatment plant with built in Partially Yes
N/A contractor who is aware of the system to guide us in
gold dust recovery
Regarding gold dust recovery we have to developing the details during detail design.
coordinate if suppliers can help us out. Only then
we will be able to provide the details on the
tender drawings
Staff Accommodation
RO plant Yes Was not included in our scope of works Quotation shall be revised N/A
Solar water heating etc
Plural /Client to appoint a DEWA registered 'Solar
PV Contractor' to develop the Solar design and in
return we can specify the same contractor in our
vendor list as the 1st preferred option for solar
installation works (On mutual agreement, need not
Solar system for energy use in factory
be compulsory)
building. Solar design should be done by DEWA registered
As anyhow main contractor should appoint the
Detailed analysis of capacity of power No 'Solar PV Consultants / Contractors N/A
DEWA registered 'Solar PV Contractor' for
generation on the project and reuse
installation works.
strategies
Generally contractors do the design free of cost if
we specify them as a preferred option in our vendor
list

Scurbers design for chemical fume We have never done this before, but will try to
N/A N/A
extract system coordinate with suppliers
Food disposal & Fertilizer creation No Its not part of our subject

LPG Design Yes Was not included in our scope of works Quotation shall be revised N/A