1. Cement
1.1 Ordinary Portland Cement, 50 kg bag Bag 60 Del 16.73 17.30 17.57 16.73 - - - - - - - -
1.2 Ordinary Portland Cement in Bulk MT 60 Del 333.67 345.00 350.33 333.67 - - - - - - - -
2. Aggregate
3. Sand
3.2 Fine River Sand for Plastering -Ex MT 30 Ex 45.53 45.53 45.53 47.63 - - - - - - - -
3.4 Fine Mining Sand for Plastering MT 30 Ex 41.97 41.97 41.97 43.90 - - - - - - - -
4. Steel Reinforcement
4.1 Mild Steel Round Bar R10, MS1646 MT 60 Del 1,829.67 1,847.67 2,376.00 2,607.00 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 1/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
4.2 Mild Steel Round Bar R12, MS1646 MT 60 Del 1,829.67 1,847.67 2,376.00 2,607.00 - - - - - - - -
4.3 Mild Steel Round Bar R16, MS1646 MT 60 Del 1,745.67 1,763.00 2,270.33 2,490.33 - - - - - - - -
4.4 High Tensile Deformed Bar-Y10, MS146 MT 60 Del 1,745.67 1,763.00 2,270.33 2,490.33 - - - - - - - -
4.5 High Tensile Deformed Bar-Y12, MS146 MT 60 Del 1,745.67 1,763.00 2,270.33 2,490.33 - - - - - - - -
4.6 High Tensile Deformed Bar-Y16, MS146 MT 60 Del 1,695.33 1,712.00 2,206.67 2,420.67 - - - - - - - -
4.7 High Tensile Deformed Bar-Y20, MS146 MT 60 Del 1,695.33 1,712.00 2,206.67 2,420.67 - - - - - - - -
4.8 High Tensile Deformed Bar-Y25, MS146 MT 60 Del 1,695.33 1,712.00 2,206.67 2,420.67 - - - - - - - -
4.9 High Tensile Deformed Bar-Y32, MS146 MT 60 Del 1,695.33 1,712.00 2,206.67 2,420.67 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 2/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
5.1 Ready Mix Concrete - Normal Mix - Grade15, Granite m3 30 Del 197.86 197.86 198.85 198.85 - - - - - - - -
5.2 Ready Mix Concrete - Normal Mix - Grade 20, Granite m3 30 Del 206.81 206.81 207.85 207.85 - - - - - - - -
5.3 Ready Mix Concrete - Normal Mix - Grade25, Granite m3 30 Del 218.98 218.98 220.07 220.07 - - - - - - - -
5.4 Ready Mix Concrete - Normal Mix - Grade 30, Granite m3 30 Del 228.28 228.28 229.43 229.43 - - - - - - - -
5.5 Ready Mix Concrete - Normal Mix - Grade 35, Granite m3 30 Del 237.23 237.23 238.41 238.41 - - - - - - - -
6. Bricks
6.1 Common Clay Bricks - Pallet piece 30 Del 0.44 0.44 0.44 0.46 - - - - - - - -
6.2 Cement Sand Bricks - Pallet piece 30 Del 0.33 0.33 0.33 0.35 - - - - - - - -
6.3 Smooth Face Facing Brick, Red piece 30 Del 1.37 1.37 1.37 1.37 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 3/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
7. Roofing
7.1 Interlocking Concrete Tiles - Standard Duotone Colour 420mm x 330mm piece 60 Del 2.40 2.40 2.40 2.40 - - - - - - - -
7.2 MS Decking - Step Roofing M350 G24, 0.53mm TCT, Clean Colourbond m2 30 Del 49.09 49.35 49.48 49.61 - - - - - - - -
MS Decking - Ajiya Euro Step Roofing M350 G28, 0.40mm TCT, Clean
7.5 m2 60 Del 50.98 51.26 51.39 51.53 - - - - - - - -
Colourbond
MS Decking - Ajiya Euro Step Roofing M350 G26, 0.47mm TCT, Clean
7.6 m2 60 Del 56.78 57.08 57.23 57.38 - - - - - - - -
Colourbond
7.8 MS Decking-Lysaght Colourbond-Spandex Hi- Ten 0.47mm TCT m2 60 Del 58.20 58.51 58.67 58.82 - - - - - - - -
7.9 MS Decking-Lysaght Colourbond-Trimdex Hi-Ten 0.47mm TCT m2 60 Del 54.30 54.58 54.73 54.88 - - - - - - - -
7.10 MS Decking-Lysaght Colourbond-Kliplok Hi-Ten 0.53mm TCT m2 60 Del 68.49 68.85 69.03 69.22 - - - - - - - -
Page 4/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
9. Ceiling Board
9.3 Plain Gysum Board, 610mm x 1220mm x 9.5mm, (Boral/Armstrong) sheet 60 Del 6.48 6.48 6.48 6.48 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 5/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
10.1 Galvanised Iron Pipes, Class A 20mm Diameter (Maruichi), MS863 6m run 60 Del 41.87 41.87 41.97 41.97 - - - - - - - -
10.2 Galvanised Iron Pipes, Class B 25mm Diameter (Maruichi), MS863 6m run 60 Del 71.10 71.10 71.23 71.23 - - - - - - - -
10.3 Galvanised Iron Pipes, Class C 25mm Diameter (Maruichi), MS863 6m run 60 Del 83.07 83.07 83.20 83.20 - - - - - - - -
10.7 HDPE Pipe PN 16 - 25mm Diameter, MS 1058 100m roll 60 Del 147.53 147.53 151.20 151.20 - - - - - - - -
10.8 HDPE Pipe PN 16 - 50mm Diameter, MS 1058 100m roll 60 Del 451.43 451.43 462.70 462.70 - - - - - - - -
10.9 ABS Pipe PN 15 Class E - 20mm, MS1419 5.8m run 60 Del 25.23 25.23 25.23 25.43 - - - - - - - -
10.10 ABS Pipe PN 15 Class E - 25mm, MS1419 5.8m run 60 Del 31.27 31.27 31.27 31.50 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 6/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Fibre reinforced plastic sectional tank - 1000 litre / 220 gallons, Mui
11.2 6 panels 60 Del 2,392.37 2,392.37 2,392.37 2,410.73 - - - - - - - -
Tank. 6 Panels
Urinal Bowl, santana 320 c/w hanger, flange, ceramic waste &
11.7 item 60 Del 491.83 491.83 491.83 491.83 - - - - - - - -
cleaning set, johnson-suisse
12. Paints
12.1 Paint-ICI dulux standard colour-Undercoat speed 5 litre 60 Del 102.70 102.70 102.70 104.37 - - - - - - - -
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
12.6 Paint-Nippon standard colour-undercoat, 9000 undercoat 5 litre 60 Del 69.63 69.63 69.63 70.83 - - - - - - - -
12.7 Paint-Nippon standard colour-timber/wood, timber finish 5 litre 60 Del 99.40 99.40 99.40 101.07 - - - - - - - -
12.8 Paint-Nippon standard colour-gloss oil based, 9000 gloss finish 5 litre 60 Del 111.73 111.73 111.73 113.87 - - - - - - - -
12.12 Paint - ICI Dulux Standard Colour Gloss Oilbased, Gloss Finish 5 Litres 60 Del 133.57 133.57 133.57 135.77 - - - - - - - -
13.1 Square hollow sections-12mm x 12mm x 1.0mm (0.357kg/m) MT 60 Del 3,069.83 3,069.83 3,069.83 3,069.83 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 8/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
13.2 Square hollow sections- 50mm x 50mm x 3.0mm (4.38kg/m) MT 60 Del 3,195.90 3,195.90 3,195.90 3,195.90 - - - - - - - -
13.3 Square hollow sections- 150mm x 150mm x 4.45mm (20.5kg/m) MT 60 Del 3,337.93 3,337.93 3,337.93 3,337.93 - - - - - - - -
13.4 Universal beams-102mm x 102mm x 8.76mm (19.35kg/m) MT 60 Del 3,284.67 3,284.67 3,284.67 3,284.67 - - - - - - - -
13.5 Universal beams-400mm x 400mm (2.17kg/m) MT 60 Del 3,760.50 3,760.50 3,760.50 3,760.50 - - - - - - - -
13.6 Equal angles-38mm x 38mm x 3.8mm (2.17kg/m) MT 60 Del 3,053.87 3,053.87 3,053.87 3,053.87 - - - - - - - -
13.7 Equal angles-50mm x 50mm x 4mm (3.06kg/m) MT 60 Del 3,062.70 3,062.70 3,062.70 3,062.70 - - - - - - - -
14. Plywood
14.2 Mixed Medium Hardword Papan Plank (GMS) 1" x 6" MT - 134.07 134.07 134.07 134.07 - - - - - - - -
15. Timber
15.2 GMS light Hardword, Dark Red Meranti MT - 3,334.30 3,334.30 3,334.30 3,334.30 - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 9/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
16. Glass
16.1 Clear Float Glass 5mm Thk, Local/Imported m2 - 63.30 63.30 63.30 63.30 - - - - - - - -
16.2 Figure/Obscured Glass 5mm Thk, Local/Imported, Inclusive Cutting m2 - 50.13 50.13 50.13 50.13 - - - - - - - -
16.3 Tinted Float Glass 6mm Thk, Local / Imported, Inclusive of Cutting m2 - 75.97 75.97 75.97 75.97 - - - - - - - -
17. Ironmongery
Page 10/11
2016 BUILDING MATERIAL PRICES SELANGOR
2016(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
17.4 Concorde 102mm x 76mm x 2.0mm SS hinge SUS 304 pair 60 Del 31.13 31.13 31.13 31.13 - - - - - - - -