Académique Documents
Professionnel Documents
Culture Documents
A GENERAL
+ Image as overview attached.
+ Scope of Works;
The works construction of Structure, Architecture and MEP works for Operation & Locker Room Building PT. NS. BlueScope Indonesia of
Expansion & Renovation Facilities at Cilegon Factory.
+ The contractor will carry out works as shown in the approved construction drawings.
+ Detail Drawing as construction preference will be submitted separately after winner annauncement.
ID DESCRIPTION AMOUNT
1 PRELIMINARY 326,274,000.00