Académique Documents
Professionnel Documents
Culture Documents
AATIP
ASEAN Air Transport Integration Project
Strategic Background
ASEAN Vision
Requirement for Master Plan
European ATM Master Plan
From vision to plan
Linking the plan and ICAO ASBU
From planning to performanc
GANP
ICAO ASBU
Asia Pacific
Seamless ATM Master Plan
APAC
Plan
ATWG 31 Vision
STOM 39 2025
Vision A seamless, interoperable and harmonized air navigation system ensuring the success of the ASEAN
Single Aviation Market (ASAM) and the ASEAN Economic Community (AEC)
Develop
Implement
Measure
7
Planning Levels
8
Overview
Level Europe ICAO ASEAN
10
28/07/2015 AATIP 4.2 11
12
Some planning perspectives Level 2 -
AATIP
1. PBN, B0-ATPA;
2. Network Operations, B0-NOPS
3. AIM, B0-DATM
4. FF-ICE, B0-FICE
5. Civil/Military, B0-FRTO
6. Ground Surveillance, B0-ASUR
7. Data Link En-Route, B0-TBO