DATE: 26-1-2017
An inspection has been carried out by POWER GRID and KEC to check the
ground clearance at various locations in 765KV D/C Kadapa-Chilakaluripeta line.
The ground clearance found from the lowest conductor has been follows-
1. The road clearance between 75/1 to 75/2 -
(a) Left phase -20.124 m
(b) Right phase-22.950 m
1.
2.
2.
3.