Vous êtes sur la page 1sur 3

CURRICULUME VITAE

NAME : MUKTI SYARIF


CLASSIFICATION : INSTRUMENT SUPERVISOR
NATIONALITY : INDONESIAN
RELIGION : MOSLEM
PLACE/DATE OF BIRTH : KEBAKALAN, AUGUST 21ST 1953
MARITAL STATUS : MARRIED
ADDRESS : IN FRONT OF MTs MAARIF MANDIRAJA,
KEBAKALAN RT 01 RW III, MANDIRAJA,
BANJARNEGARA, 53473
EDUCATION : SENIOR HIGH SCHOOL
PHONE : +6281328729816

EXPERIENCES

Oct 24, 2006 Sept 30, 2015 : PT. EXTERRAN INDONESIA


Classification : Instrument Tech Senior and Operator Engine
Compressor
Client : PT. Exxon Mobil, PT. Cikarang Listrindo, PT.
Lapindo Brantas
Responsibility : 2006 2008
Operator Compressor Engine, PT. Lapindo Brantas
and PT. Cikarang Listrindo
2009 2015
Instrument Technisi and Fabrication on Plant
Ground Oil Exxon Mobil, Hook-up, Modification,
Pulling Cable, Maintenance Instrument,
Calibrating, Function Test. All Instrument are
Calibrating Continue for Processing Plant Area
one year, If there are Instrument Trouble
Recalibrating, Check Gas Chromatograph Routine
3 months, Routine Instrument Metering 1 month,
Instrument Gas Compressor 6 monthly and
Modification Instrument Process

July 15, 1998 Dec 30, 2000 : PT. Rabana Gasindo Usama
Classification : Instrument Technisi
Client : Indocement Tunggal Prakarsa
Responsibility : Supervising Calibration, Maintenance Instrument
Gas Compressor In Turbine / Power Plant System
PLC, Swear Gear, MCC.

May 01, 1997 June 30, 1998 : PT. Remaja Bangun Kencana
Classification : Instrument Supervisor
Client : Energy Equity, Plant Gas Project Sengkang, South
Sulawesi
Responsibility : Supervising, Calibrating Instrument, Cable Tray
Fabrication Support, Loop Test, Pulling Cable,
Wiring Termination, Continuity Test, Megger
Test,Commissioning and Start-up

Oct 07, 1996 April 30, 1997 : PT. ODG Wormald Indonesia
Classification : Instrument General Foremen
Client / Project : UNOCAL, Plant Geothermal Project Gunung
Salak, Bogor
Responsibility : Instrument Calibration, Fabrication, Pulling Cable,
Wiring Termination, Loop Check, Function Test,
Commissioning, Trouble Shorting and Start-up

June 01, 1996 August 05, 1996 : PT. Panata Tama


Classification : Instrument / Electrical Supervisor
Client / Project : Chandra Asri Petrochemical Centre, Revision
Control Showdown Project, Anyer, Cilegon
Responsibility : Supervising, Installing Control Showdown,
Installing Air Supply, Pulling Cable, Installing
Junction Box, Wiring Termination, Function Test,
Commissioning and Trouble Shorting

Jan 05, 1994 July 10, 1995 : PT. Gamuo Indonesia Engineering
Classification : Instrument Foremen
Client / Project : ARCO MM Junction Project
Responsibility : Calibration, Fabrication Support, Installing
Instrument Air Supply, Running Tubing, Function
Test

Jan 21, 1991 Nov 12, 1994 : PT. Guna Nusa Utama Fabrication Grenyang
Bojonegoro, Cilegon
Classification : Instrument Technisi
Client / Project : 1. Total Indonesia Project
2. Amoseas, Platform Project
3. Kodeco, Platform Central Processing Plant
Gresik
4. ARCO Bali Nouth, Skid Module Project
5. ARCO, Platform Project
6. Maxuse, Platform Project
Responsibility : Instrument Calibration, Hydro Test, Function Test,
Precommissioning.

August 09, 1989 Nov 12, 1990 : PT. Wira Matra Guna
Location : PT. Guna Nusa Utama Fabricator Grenyang
Classification : Instrument Foremen
Client / Project : Total Indonesia, Central Processing Unit 1 Project
Responsibility : Instrument Calibration, Fabrication Support,
Pulling Cable, Wiring Termination, Continuity
Test, Loop Check, Function Test,
Precommissioning
Jun 22, 1987 Feb 01, 1988 : PT. Gamuo Indonesia Engineering
Location : PT. Guna Nusa Utama Fabricator Grenyang
Bojonegoro, Cilegon
Classification : Instrument First Class
Client / Project : 1. Caltex, Pressure Vessel Project
2. Total Indonesia, Floating Project
3. Stanvex, Pressure Vessel Project
Responsibility : Instrument Calibration, Fabrication Support, Leak
Test, Running Tubing, Function Test, Hydro Test

Nov 26, 1985 Nov 31, 1986 : PT. Gamuo Indonesia Engineering
Classification : Instrument First Class
Client / Project : ARCO Indonesia Offshore Platform MBA-MBA2,
AFSA
Responsibility : Modification, Service, Expansion

Nov 26, 1985 Dec 31, 1985 : PT. IOC 200


Classification : Instrument Foremen
Client / Project : ARCO Indonesia Offshore Platform LD
Responsibility : Fabrication, Modification and Service

August 28, 1984 Dec 25, 1984 : PT. Guna Nusa Utama Fabricator
Classification : Instrument First Class
Client / Project : ARCO Offshore Fabrication Project, PB, PD, PF,
and LD Platform
Responsibility : Fabrication Support, Tubing Tray, Function Test,
Running Tubing

Sept 15, 1982 May 31, 1984 : PT. Fluor Eastern Inc. Cilacap, Central Java
Classification : Instrument First Class
Client / Project : Pertamina Expansion Reffenary Cilacap, Central
Java
Responsibility : Hook-up, Fabrication Support, Tubing Tray, Loop
Check, Running Tubing, Function Test, Continuity
Test, Instrument Calibration, Assistant Start-up for
Commissioning

Vous aimerez peut-être aussi