Pulse Information Technologies

Title 2G Cluster Drive Test Report


Network : XXXXX
Phase : XX
Drive Date : XX/XX/XXXX to XX/XX/XXXX
Report Date : XX/XX/XXXX

Signature

Prepared by Checked by(PULSE) Approved by(Operator)

1
Pulse Information Technologies

Contents
1. EXECUTIVE SUMMARY. ..................................................................................................................................................... 3
2. TEST SETUP. ........................................................................................................................................................................... 3
3. DT PERFORMANCE. ............................................................................................................................................................ 4
3.1 2G RX LEVEL VARIATION (IDLE). ........................................................................................................................................ 4
3.2 2G RX LEVEL VARIATION (DEDICATED MODE).................................................................................................................... 5
3.3 2G RX QUALITY VARIATION. ............................................................................................................................................... 6
3.4 TIMING ADVANCE(TA) VARIATION. ..................................................................................................................................... 7
3.5 BAD EVENTS: ...................................................................................................................................................................... 8
4. ANALYSIS & RECOMMENDATION FOR BAD EVENTS/PATCHES ...................................................................... 9
4.1 IDLE UE COVERAGE SAMPLE PATCHES -01 ...................................................................................................................... 9
4.2 DEDICATED MODE UE COVERAGE SAMPLE PATCHES -01 .............................................................................................. 10
4.3 DEDICATED MODE UE QUALITY SAMPLE PATCHES -01 .................................................................................................. 11
4.4 DEDICATED MODE UE DROPPED CALL SAMPLE PATCHES-01 ......................................................................................... 12
4.5 DEDICATED MODE UE HANDOVER FAILURE SAMPLE PATCHES-01 ................................................................................ 13
4.6 DEDICATED MODE UE BLOCKED CALL SAMPLE PATCHES-01 ......................................................................................... 14
4.7 DEDICATED MODE UE PING-PONG HANDOVER SAMPLE PATCHES-01 ............................................................................ 15
5. CONCLUSION ..................................................................................................................................................................... 16

2
Pulse Information Technologies

1. Executive Summary.
This document is a report for the sample cluster drive in "xxxx" area. This will provide all the
issues found in the field during the drive test with root cause analysis.

The following activities have been taken during the network optimization of mentioned Cluster.
Physical Verification of Sites for any discrepancies in implementation versus planning data.
Parameter consistency checks and implementation of Change Requests if required.
Coverage optimization by means of physical changes at site.
Neighbor Relations Added & Deleted during optimization.
2. Test Setup.
Following devices and tools used during this cluster drive & Optimization to analyze network
performance by means of accessibility, mobility & retain ability.

Devices Configuration

Device Type of Mode Duration Comments


Call
MS1 Idle 2G Locked From Start to End

MS2 Voice Call 2G Locked 30 Sec. Call/ 10 Sec idle between


calls to allow reselection
30 Min. Call/10 Sec idle between
MS3 Voice Call 2G Locked
calls to allow reselection

MS4 Scanner 2G Scanner

Tools;
TEMS Investigation 13.1
TEMS Discovery 3.2.1
MapInfo professional 11.0
Actix Analyzer 4.05

3
Pulse Information Technologies

3. DT Performance.
3.1 2G Rx Level variation (Idle).

Figure 3.1.1 : 2G Idle Rx Level Variation

Figure 3.1.2 : Histogram view of 2G Idle Rx Level Variation

4
Pulse Information Technologies

3.2 2G Rx Level variation (Dedicated Mode).

Figure 3.2.1 : 2G Dedicated Rx Level Variation

Figure 3.2.2 : Histogram view of 2G Dedicated Rx Level

5
Pulse Information Technologies

3.3 2G Rx Quality variation.

Figure 3.3.1 : 2G Rx Quality Variation

Figure 3.3.2 : Histogram view of 2G Rx Quality

6
Pulse Information Technologies

3.4 Timing Advance(TA) variation.

Figure 3.4.1 : Timing Advance Variation

Figure 3.4.1 : Histogram view of Timing Advance Variation

7
Pulse Information Technologies

3.5 Bad Events:

TBALE 3.5.1 : Event KPI & Cluster Acceptance Level


Integrity Events & Impairments No. of Occurrences
Call Attempts Xxx
CS Accessibility Call Setup failures Xxx
CSR (Target 99.99%) Xxx
Handover Attempt Xxx
Handover Failures Xxx
HSR (Target 99.5%) Xxx
Mobility
Location update attempt Xxx
Location update failures Xxx
LAC Update SR (Target 99.99%) Xxx
Call Setup Complete Xxx
Retain ability
Drop Call (Target 99.3%) Xxx

8
Pulse Information Technologies

4. Analysis & Recommendation for Bad events/patches


4.1 Idle UE Coverage Sample Patches -01

Analysis Approach:
1. Physical optimization :
The building obstructions in coverage path of main serving cell must be checked since this
is dense urban cluster.
Proper Azimuth & tilts must be applied and impact must be also checked then and there.
Recommendations for new site or cell splitting or external power booster (Downlink).

2. Parameter optimization :
Enhancing the parameter control downlink power boost technology.
The serving cell idle BA list (Neighbor list) & access permitted parameter (NCCPERM)
must be rechecked in order to have proper cell resection.
Cell resection controlling parameters (CRO, TO and PT) can be tuned so that cell would
initiate the resection at proper condition. Bot operator defined default values also will be
also taken into consideration.

9
Pulse Information Technologies

4.2 Dedicated Mode UE Coverage Sample Patches -01

Analysis Approach:
1 Physical optimization :
Identify the best server & Proper Azimuth/tilts must be ensured.
Alarm free RBS operation must be ensured (reading RBS Alarm log).
The building obstructions in coverage path of main serving cell must be checked (cell
relocation may require) since this is dense urban cluster.
According to the coverage demand & subscriber density, the antenna type can be changed
Recommendations for new site or cell splitting or external power booster (Downlink).

2 Parameter optimization :
BA list & Neighbor tuning.
RBS & Channel power control parameters retune(Ex: BSPWRB, BSPWRB, BSPWRMIN so )

10
Pulse Information Technologies

4.3 Dedicated Mode UE Quality Sample Patches -01

Analysis Approach:
1 Physical optimization :
Interferer Identification & Elimination of overshooting cells (Can be double checked by cell
level measurement report recoding) with proper tilt planning.
Frequency reuses pattern analysis & new BCCH/BSIC planning.
2 Parameter optimization :
Interferer channel power control parameters retune.
Improving performance by fine tune the better cell handover parameters.
Hooping, AMR and HR/FR controlling parameter retune.

11
Pulse Information Technologies

4.4 Dedicated Mode UE Dropped call Sample Patches-01

Analysis Approach:
Dropped call reasons (Ex: Hardware issue, Quality issue, Signaling issue, traffic demand
analysis so on...) identification & proper remedies.
Monitoring Call drops rate for busy and non-busy hours using row stats.
Cable SWAP tracing, identification & rectification (all the way from dTRU to Antenna
Tx/Rx Port).
Uplink interference analysis & recommendation for TMA.
Call trace log analysis.

12
Pulse Information Technologies

4.5 Dedicated Mode UE Handover Failure Sample Patches-01

Analysis Approach:
Handover Failure causal (Ex: Hardware issue, TCH unavailability, BA list tuning, Missing
neighbor etc) identification & proper remedies.
Monitoring handover attempt & HSR for busy and non-busy hours using row stats.
Cable SWAP tracing, identification & rectification (all the way from dTRU to Antenna
Tx/Rx Port).
Uplink interference analysis & recommendation for TMA.
Impairments analysis in handover control parameters.

13
Pulse Information Technologies

4.6 Dedicated Mode UE Blocked Call Sample Patches-01

Analysis Approach:
Resource Availability analysis (Ex: SDCCH, TCH & PDCH) & recommendations for
capacity expansion.
HCS parameter tuning for dual band cell or different channel group.
Optimizing the availability of resources with a proper parameter tuning (Ex: AMR/HR/FR
& Dynamic PDCH allocations).

14
Pulse Information Technologies

4.7 Dedicated Mode UE Ping-Pong Handover Sample Patches-01

Analysis Approach:
The overlapping coverage zone of serving cell & candidate cells must be identified &
restricted properly with proper Azimuth/tilt planning.
Locating parameter also can be used to tune the handover performance.

15
Pulse Information Technologies

5. Conclusion

The report shows the clear picture of the 2G network performance according to the cluster Drive
Test carried out. The above mentioned bad patches and the events were thoroughly analyzed with
the drive test logs, OSS KPI and the RNC parameter configurations and the recommendations
have been made.

Once you approved the recommendations we will do the necessary modifications and then the DT
will be carried out to show the network performance has improved.

****End of Document***