Vous êtes sur la page 1sur 3

Sub: Commercial Bid (Total Pages 3 including this page)

COMPANY Frijns Structural steel ME W.L.L


CONTACT PERSON Mr. Jibin Alex
CLIENT TITLE HSE Manager
CONTACT DETAILS Mob : +974 5000 3980
EMAIL jibin@frijnsqatar.com
NAME Load test witnessing & Certification
PROJECT DETAILS Lifting Hooks of SWL 550Kg
REFERENCE NO FO-AMQ-4051/16
QUOTATION ISSUE DATE 19th November 2016
DETAILS VALIDITY 30 Days

Dear Sir,

Further to the enquiry received from your good company Frijns Structural
steel ME for doing Load test witnessing & certification of Lifting hooks at Shahaniya
frijns yard, we here by forwarding you our best offer to carry out the same.

Kind Regards

From Aries Marine, Qatar


Siju Varghese
___________________
Dy.General Manager
Mob: +974 55699854
Email: siju@ariesgroup.ae
Page 2
1. Scope Of Work:

1. To carry out Load test witnessing & Certification of Lifting hooks of SWL 550kg at
Shahaniya frijns yard as per the client requirements.
2. Submission of final certificate after successful job completion.

2. Personnel:

Personnels shall be qualified in respective inspection Methods.

3. Cost of Works:

Sl No Description Total (Qr)

180/Hr/Inspector
1 Load test Witnessing & Certification of Minimum chargeable hours in a day
Lifting hook shall be 6Hrs.

2 NDT inspection 500/Lumpsum

3 Load cell charges ( If used) 350/Day

160/Trip
4 Transportation charges ( Doha- Mesaieed/Shahaniya-Doha)

Above rate is inclusive of inspection and reporting.


Normal working hours in a day shall be 8 Hrs. Overtime/job on holidays shall be 1.25 times
the provided rate.
Client shall arrange crane, test weight, nut and bolts and sufficient man power assistance at
site.
NDT inspection areas shall be free from paint, slag, spatter and other foreign particles.

4. Standard Terms & Condition:


1. ARIES would require LPO or written work order to be issued by the Client before the
Commencement of work.
2. Payment to be made within 30 days from the date of invoice submission.
3. Detailed work instruction and permit to work to be given to Aries Marine personnel by
clients Technical/Safety Department.
Page 3

4. Where there is a variation/ increase in work requirements, those works


will need to be supported by an amended Purchase Order & / or signed verification
on the Work Scope Assessment Request where applicable.
5. Client shall provide sufficient notice to mobilize the personnels.
6. Client shall provide the Reasonable and continuous access to the test locations with
adequate light and ventilation, if required.
7. In any circumstances the maximum compensation which Aries shall be liable is the
total invoice amount of the particular project only.
8. Late payment fee @ 2% per month will be levied on bills if not settled with in the
credit period.
9. In the event of any approach to the companys employees by the contractor/ its
Employees for any direct or indirect employment during the contract period/within
one year from the completion of the contract, the contractor shall be liable for all the
Direct/indirect loss to the company due to the same and shall be abide for all the
legal Consequences and the expense incurred for the same.
10. The Inspection report issued will be subject to the conditions that are understood
and agreed that nothing herein shall be deemed to relieve any designer,
manufacturer, seller, supplier, repairer, or operator of any warranty both express &
implied and Our Liability shall be limited to the acts and omissions of its
employees, agents, Inspectors and subcontractors. Under any circumstances we
shall not be liable for any indirect consequential loss damages, injury or damage to
any person or property occurring by reason of negligent operation, misuse of, or any
defect in materials, machinery, equipment, or any other items other than defects in
items actually inspected by us and which are covered by the report provided.

We trust, we have interpreted your requirement correctly; however, should you require any further
information or clarification please do not hesitate to contact the undersigned.

Kind Regards
From Aries Marine, Qatar
Siju Varghese
___________________
Dy.General Manager
Mob: +974 55699854
Email: siju@ariesgroup.ae

Vous aimerez peut-être aussi