- Anlisis de Cargas
Material.CaractersticasDensidad.
Loseta. 32 X 32 X 1 cm 1.80 Ton/m3
Mortero. Cemento-Arena 1.99 Ton/m3
Capa de Com.
fc=200 kg/cm2 2.40 Ton/m2
Nervadura fc=200 kg/cm2 2.40 Ton/m3
Block hueco10 X 20 X 40 cm 1.50 Ton/m3
Plafon Yeso-Agua 1.40 Ton/m3
Material.CaractersticasDensidad.
Solera. 20 X 20 X 1.5 cm1.80 Ton/m3
Mortero. Cemento-Arena 1.99 Ton/m3
Relleno. Tezontle-Cemento1.20 Ton/m3
Capa de Com.
fc=200 kg/cm2 2.40 Ton/m3
Nervadura fc=200 kg/cm2 2.40 Ton/m3
Block hueco10 X 20 X 40 cm 1.50 Ton/m3
Plafon Yeso-Agua 1.40 Ton/m3
Material.CaractersticasDensidad.
Ladrillo 7 X 14 X 28 cm 1.80 Ton/m3
Juntas Cemento-Arena 1.99 Ton/m3
RevestimientCemento-Arena 1.99 Ton/m3
E).- Trabe.
Materiales necesarios para un metro de Trabe.
Peso
Concepto Ancho Largo Espesor Material Peso kg/m
Kg/m
Rampa 0.80 1.00 0.10 2400 192.00
Relleno 0.80 1.00 0.01 1800 14.40
Loseta 0.80 1.00 0.08 1300 83.20
Concreto 0.80 1.00 0.10 2400 192.00
Yeso 0.80 1.00 0.02 1500 24.00
Escalones 1.00 1.00 0.05 2200 110.00
Total= 615.60
Peso
Concepto Capacidad lt. Material Peso kg/m
Kg/m
Tanque 120.00 53 53.00
Gas LP. 120.00 60 60.00
Total= 113.00
Ton/m3
Ton/m3
Ton/m3
Ton/m3
Ton/m3
Ton/m3
Ton/m3
Azotea
Entrepiso
NOTA:
Seccion
practica. Tipo
Tramo. Tipo. W S/C (kg/m) W S/T (kg/m) W U (kg/m) B=W U/Rt V=B-C V=(B-C)/2 h=1.72V
Cim.
B H
1(C-E) L 6962.30 7797.78 10916.89 74.26 44.26 76.13 80 90 CL-2
1(E-G) L 6962.30 7797.78 10916.89 74.26 44.26 76.13 80 90 CL-2
2(B-C) I 5183.16 5805.14 8127.19 55.29 12.64 21.75 60 30 CI-1
2(C-D) I 7115.30 7969.14 11156.79 75.90 22.95 39.47 80 60 CI-2
2(D-E) I 6234.44 6982.57 9775.60 66.50 18.25 31.39 80 60 CI-2
2(E-F) I 6234.44 6982.57 9775.60 66.50 18.25 31.39 80 60 CI-2
2(F-G) I 7115.30 7969.14 11156.79 75.90 22.95 39.47 80 60 CI-2
2(G-H) I 5183.16 5805.14 8127.19 55.29 12.64 21.75 60 30 CI-1
3(A-B) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
3(H-I) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
4(C-D) I 7499.93 8399.92 11759.89 80.00 25.00 43.00 80 60 CI-2
4(F-G) I 7499.93 8399.92 11759.89 80.00 25.00 43.00 80 60 CI-2
5(A-C) I 7243.44 8112.65 11357.71 77.26 23.63 40.65 80 60 CI-2
5(G-I) I 7243.44 8112.65 11357.71 77.26 23.63 40.65 80 60 CI-2
6(B-C) I 6517.58 7299.69 10219.57 69.52 19.76 33.99 80 60 CI-2
6(C-D) I 5619.50 6293.84 8811.38 59.94 14.97 25.75 60 30 CI-1
6(D-E) I 7021.74 7864.35 11010.09 74.90 22.45 38.61 80 60 CI-2
6(E-F) I 7021.74 7864.35 11010.09 74.90 22.45 38.61 80 60 CI-2
6(F-G) I 5619.50 6293.84 8811.38 59.94 14.97 25.75 60 30 CI-1
6(G-H) I 6517.58 7299.69 10219.57 69.52 19.76 33.99 80 60 CI-2
7(A-B) I 4134.50 4630.64 6482.90 44.10 7.05 12.13 60 30 CI-1
7(H-I) I 4134.50 4630.64 6482.90 44.10 7.05 12.13 60 30 CI-1
8(C-F) I 4358.85 4881.91 6834.68 46.49 8.25 14.19 60 30 CI-1
9(C-D) I 2860.98 3204.30 4486.02 30.52 0.26 0.44 40 30 CI-5
9(ED) I 2860.98 3204.30 4486.02 30.52 0.26 0.44 40 30 CI-5
A(3-5) L 5396.85 6044.47 8462.26 57.57 27.57 47.41 60 60 CL-3
A(5-6) L 5912.76 6622.29 9271.21 63.07 33.07 56.88 80 60 CL-1
A(6-7) L 6337.05 7097.50 9936.49 67.60 37.60 64.66 80 90 CL-2
B(2-3) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
B(6-7) I 6337.05 7097.50 9936.49 67.60 18.80 32.33 80 60 CI-2
C(2-3) I 8106.64 9079.44 12711.21 86.47 28.24 48.56 100 60 CI-4
C(3-4) I 8054.91 9021.50 12630.10 85.92 27.96 48.09 100 60 CI-4
C(4-5) I 7833.44 8773.45 12282.83 83.56 26.78 46.06 100 60 CI-4
C(5-6) I 7833.44 8773.45 12282.83 83.56 26.78 46.06 100 60 CI-4
C(8-9) I 5911.28 6620.63 9268.89 63.05 16.53 28.43 80 30 CI-3
D(2-4) I 7788.78 8723.43 12212.81 83.08 26.54 45.65 100 60 CI-4
E(1-2) I 6300.59 7056.66 9879.33 67.21 18.60 32.00 80 60 CI-2
E(2-4) I 8272.96 9265.72 12972.00 88.24 29.12 50.09 100 60 CI-4
E(4-6) I 9971.26 11167.81 15634.94 106.36 38.18 65.67 120 90 CI-6
F(2-4) I 7788.77 8723.42 12212.79 83.08 26.54 45.65 100 60 CI-4
F(8-9) I 5911.28 6620.63 9268.89 63.05 16.53 28.43 80 30 CI-3
G(2-3) I 8106.64 9079.44 12711.21 86.47 28.24 48.56 100 60 CI-4
G(3-4) I 8054.91 9021.50 12630.10 85.92 27.96 48.09 100 60 CI-4
G(4-5) I 7833.44 8773.45 12282.83 83.56 26.78 46.06 100 60 CI-4
G(5-6) I 7837.44 8777.93 12289.11 83.60 26.80 46.10 100 60 CI-4
H(2-3) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
H(6-7) I 6337.05 7097.50 9936.49 67.60 18.80 32.33 80 60 CI-2
I(3-3) I 7940.31 8893.15 12450.41 84.70 27.35 47.04 100 60 CI-4
I(3-5) I 5396.85 6044.47 8462.26 57.57 13.78 23.71 60 30 CI-1
I(5-6) I 5912.76 6622.29 9271.21 63.07 16.53 28.44 80 30 CI-3
I(6-7) I 6337.05 7097.50 9936.49 67.60 18.80 32.33 80 60 CI-2