1. Draw the network diagram for the activities listed. Indicate the alphabetical designation and the
corresponding duration of each activity.
2. Compute the total duration of the project in days.
3. Determine the Critical Path.
4. Solve for the Slack or Float for each activity.
Prepared by:
JOENIFER L. MONTEBON JR., RCE
Instructor
Recommending Approval:
AL EMMANUEL L. CABALLES, IE, MSME ENGR. MA. CARLA Y.
ABAQUITA, CHE, Dev. Ed. D
Chairperson, College of Engineering Director, College of
Engineering