DRAFT CONSTRUCTION SCHEDULE

SL.N Actual Revised Start MANPOWE


DESCRIPTION Mtls Start Finish Finished Date Status Reason for Delay Remarks Group
O TONNAGE date R
Task Name Duration
1 Zone-1 61 days
2 671-AS1 Trestle & Gallery erection 10.48 6 days A 30.09.16 Completed 4 G1
3 Airslide erection 4.776 3 days 29.09.16 03.10.16 Completed 4 G2
671 AS1 Feed end Chute and discharge chute Feed end side online Diverting gate not yet
4 days NA Expected date on 30/11/16
erection received, Structure fouling with discharge chute.
4 671-FN1 - Fan erection 0.614 2 days A 01.10.16 02.10.16 Completed 3 MW
671-FN1 - Motor alignment 2 days A 10/11/16 Completed Man power shotage
5 Airline Connection 0.32 3 days A 04.10.16 06.10.16 G2
6 671BF1 - Bag filter erection 1.1 2 days A 17/11/16 Completed Man power shotage
7 671BF1 - Bag filter Internals fixing 2 days A 28/11/16 01/11/16
7 671FN2- Fan erection 0.654 2 days A 03.10.16 05.10.16 08/11/16 Completed MW
671FN2- Motor alignment 2 days 15/11/16 Completed
8 Ducting 1.194 7 days A 01.10.16 07.10.16 19/11/16 G1

lot of modification on tie beams and bracings miss


matching, 1. As per
17 nos tie beams and 8 nos bracings
Erected upto 35 mtr, tie bracing schedule we would have to started on 08/09/16 but
9 Bucket elevetor supporting structural up to 35 mtr lve 40 18 days A 28.09.16 13.10.16 27/10/16 modification work done due to end 6 G3
work is in progress, partial material received on 28/09 and work started
plate slope wrongly fabricated
on 30/09 2.
Inadequate man power deployed by SIGMA,

work held up due to verticality and


diagonal reading not got as per the
1. Bottom boot completed, 2. 1. Bottom Boot received on 09/10, 2.
671-BE-1 Bottom boot ,Intermediate casing and Top requirement, client objected and
10 7 days PA 14.10.16 20.10.16 03.11.16 Intermediate casing assembly in Modification work done in makeup casing due to 4 G4
boot necessery modification done to get the
progress excess diagonal error.
2.7 requirement. BUMER service engr is
expected on 27.10.16

Not done ( after completion of


11 Head and tail pulley and platform 7 days PA 22.10.16 28.10.16 06.11.16 MW
casing)
12 Drive 2 days PA 28.10.16 30.10.16 08.11.16 MW
13 Belt erection 2 days NA 31.10.16 2.11.16 10.11.16 4 G5
14 Buckets erection 4 days A 03.11.16 06.11.16 14.11.16 G5

Pre assembly for next stage in


15 Bucket elevator supporting structural 35m to 62m lvl 16 days PA 14.10.16 29.10.16 07.11.16 progress and excepected to G3
40 completed erection on 7/11/16

16 Structure 62m to 78m lvl 8 days A 29.10.16 5.11.16 15/11/16


work not started, due to structure Lot of modification on tie beams and bracings miss
17 671-BE-2 Bottom boot ,casing,top casing 35-78m lvl 8 days PA 21.10.16 07.11.16 30/10/16 12/11/16 G4
not completed matching,
2.7
18 Head and tail pulley 4 days PA bb 11.11.16 16/11/16 MW
19 Drive 4 days PA 12.11.16 14.11.16 19/11/16 MW
20 Belt erection 2 days NA 12.11.16 14.11.16 21/11/16 G4
21 Buckets erection 3 days A 15.11.16 19.11.16 25/11/16 G4
work not started, due to structure
22 711-BF-2 Bag filter 2.99 4 days A 14.10.16 17.10.16 03/11/16 6/11/16 G1
not completed
23 711-BF-2 Bag filter Internals 3 days A 10/11/16 12/11/16
work not started, due to structure
24 711-FN-9 Fan Erection 0.705 2 days A 15.10.16 17.10.16 03/11/16 4/11/16 MW
not completed
25 711-FN-9 Motor alignment 1 day A 05/11/16 5/11/16
work not started, due to structure
26 Ducting 2.506 6 days A 18.10.16 21.10.16 07/11/16 12/11/16 G1
not completed
27 Silo all compartment manholes 4 days NA 15/11/16
Zone-2 64 days

29 Manhole platform at 16.5 mtr lvl 6 days A 04.10.16 30/10/16 Partially completed inadvicate man power of sigma Expected to completed on 30/10 G5

Completed, except monkey lader


30 Silo staircase up 16.5 mtr 8 days A 23.09.16 28.09.16 Shotage of landing gratings Informe to HO G5
and landing grating

work not started, due to


31 Silo Staircase up to 62 mtr lvl + platform 22 days A 06.10.16 20.10.16 30/10/16 10/11/16 G5
Inadvicate of Man power
32 Silo roof girder 12 days A 05.10.16 14.10.16 19/10/16 Civil clearence has given on 10/10/16 Completed G1 + G2
33 Deck plate & civil works A 10.10.16 21.10.16 21/10/16 Completed
34 671-AS-2 & 3 trestle & Gallery 9 days
35 671-AS-2 &3 airslide 9 days
36 Airline connection 6 days
37 671- FN3 & 3A 3 days
38 671 -FN 4 &4A 6 days
39 Motorised distributor (671-AD2&AD1 4 days A
work not started, due to awating After civil clearence 5days required for
40 671-AS-4 trestle & Gallery 4 days A 22.10.16 24.10.16 01/11/16 4/11/16 G1
for civil clearence erection

work not started, due to awating


41 Motorised diverting gate (671-DG-1) 3 days A 25.10.16 25.10.16 17/11/16 20/11/16 G1
for civil clearence

work not started, due to awating


42 671-AS-4 airslide 5 days A 26.10.16 27.10.16 05/11/16 10/11/16 G1
for civil clearence
43 Airline connection 4 days A 28.10.16 29.10.16 10/11/16 13/11/16 G1
work not started, due to awating
44 671- FN5 Fan Erection 2 days A 22.10.16 23.10.16 01/11/16 2/11/16 G2
for civil clearence
45 671- FN5 Motor alignment 1 day 06/11/16 6/11/16
work not started, due to awating
46 671-AS-5 -12 Feeding to silo 9 days A 23.10.16 29.10.16 03/11/16 14/11/16 G2
for civil clearence
47 Airline connection 4 days A 30.10.16 01.11.16 12/11/16 16/11/16 G2
work not started, due to awating
48 671- FN6 Fan Erection 4 days A 22.10.16 24.10.16 03/11/16 4/11/16 G1
for civil clearence
49 671- FN6- Motor alignment 1 day A 07/11/16 7/11/16
work not started, due to awating
50 Bagfilter671- BF2 erection 3 days A 25.10.16 26.10.16 01/11/16 3/11/16 4 G6
for civil clearence
51 Bagfilter671- BF3 Internals erection 3 days A 20/11/16 23/11/16
work not started, due to awating
52 671-FN7 3 days A 25.10.16 26.10.16 02/11/16 3/11/16 MW
for civil clearence
53 671-FN7 - Motor alignment 1 day A 08/11/16 8/11/16
54 Ducting 6 days A 27.10.16 29.10.16 14/11/16 19/11/16 G6
55 Silo top Auxillaries Like doors & level indicators 6 days NA 25.10.16 29.10.16 20/11/16 25/11/16 G6
56 Zone-3 47 days

civil insert plates are out, 2. wrong supply of beams Delay in approved drawing from DT, it
57 Silo Bottom platform at 12.5 m lvl 12 days A 26.09.16 7.10.16 23/10/16 6/11/16 Work in progress 4 G4+G7
from HO, needs lot of modification of beams. was received on 20/10/16

work not started, due to awating


58 Silo Bottom platform at 8.5 m lvl 15 days A 8.10.16 22.10.16 06/11/16 15/11/16 G4+G7
for drawing approval
59 Silo Bottom platform at 6 m lvl 10 days A 18.10.16 27.10.16 30/11/16 5/12/16 G4+G7
60 Silo inside Aeration pads Erection 10 days A 22.10.16 2.11.16 01/11/16 12/11/16 4 G10+G11
61 Silo inside Aeration pipe line connection 10 days A 08/11/16 20/11/16
62 Silo Aeration blowers 711-BL 1-3 7 days A 30/11/16 5/12/16

63 Silo Extraction slide gate for silo 711-SG-1-8 4 days A 03.11.16 06.11.16 12/11/16 25/11/16 4 G10
work not started, due to plat form
64 Hopper 711-HP-1 4 days A 08.10.16 12.10.16 08/11/16 12/11/16 6 G9
not completed
65 Hopper 711-HP-2 4 days A 12/11/16 16/11/16
work not started, due to plat form
66 711-FN 3 & 4 Fan Erection 3 days A 23.10.16 06.11.16 08/11/16 10/11/16 5 G8
not completed
67 711-FN 3 & 4-Motor alignment 2 days A 12/11/16 13/11/16
68 Hopper aeration blower 711-BL-4 & 5 6 days A 28/11/16 1/12/16
69 Airline 5 days A 01/12/16 5/12/16
work not started, due to plat form
70 711-BF-1 bagfilter 4 days A 13.10.16 15.10.16 10/11/16 11/11/16 G9
not completed
71 711-BF-1 bagfilter internals 2 days A 26/11/16 27/11/16
work not started, due to plat form
72 711-FN-1 Erection 3 days A 12.10.16 14.10.16 09/11/16 10/11/16 MW
not completed
73 711-FN-1- Motor alignment 1 day A 12/11/16 12/11/16
work not started, due to plat form
74 Ducting 6 days A 19.10.16 23.10.16 21/11/16 25/11/16 G9
not completed
work not started, due to plat form
75 711-BF-1A bagfilter 2 days A 15.10.16 18.10.16 16/11/16 17/11/16 G9
not completed
76 711-BF-1A bagfilter internals 2 days 26/11/16 27/11/16
work not started, due to plat form
77 711-FN-1A Erection 4 days A 17.10.16 20.10.16 05/11/16 8/11/16 MW
not completed
78 711-FN-1A Motor alignment 1 day A 09/11/16 9/11/16
work not started, due to plat form
79 Ducting 5 days A 24.10.16 28.10.16 21/11/16 25/11/16 G9
not completed
80 Bulk loading flow control gate 711-FG-1 6 days 5/12/2016 15/12/16
NA 28.10.16 08.11.16 G9
81 Travel arrangement 4 days
82 Bulk loading spout 5 days
83 Weigh bridge 5 days A 25/11/16 2/12/16
84 Zone-4 27 days
85 711-AS 13 & 14 Trestle & gallery 11 days NA 30.10.16 08.11.16 G1+G7
86 Airslide As-13 & 14 8 days A 09.11.16 12.11.16 G1+G7
87 711- FN 6 & 8 with motor alignment 3 days A 06.10.16 10.11.16 MW
88 Airline connection 4 days A 13.11.16 17.11.16 G1+G7
89 711-FN-5 & 7 With Motor alignment 3 days A 19.11.10 21.11.10 MW
90 711BF3 & 4 Structure A 05.11.16 10.11.16 G6
91 711-BF-3 bagfilter 7 days A 11.10.16 13.11.16 G3
92 711--FN-10 Fan 5 days A 11.10.16 12.10.16 MW
93 711--FN-10 Motor alignment 1 day A 03.11.16
94 Ducting 9 days A 14.11.16 18.11.16 G6
95 711-BF-4 bagfilter 4 days A 14.11.16 16.11.16 G3
96 711--FN-11 Fan 3 days A 13.10.16 14.10.16 MW
97 711--FN-11 - Motor alignment 1 day A 02.11.16
98 Ducting 8 days A 17.11.16 20.11.16 G6

55
UTILITY
99 Blower pipe line & Bag filters air line 10/12/16 12 3 groups
SL.NO DESCRIPTION Duration
1 Bucket Elevator structure upto +47m lvl
16m lvl
35m lvl
38m lvl
41m lvl
47m lvl
2 Bucket elevator structure for BE-2
35m lvl
39.5m lvl
47 m lvl
56 m lvl
62m lvl
71.5m lvl
74m lvl

3 671 BE1
Head casing erection & alignment
Head & tail pulley fixing & alignment
Main drive and auxillary drive installation & alignment
Belt laying , joint, lead pouring
Bucket fixing

4 671 BE2
Bottom boot erection and alignment
casing erection up to 47m lvl
casing erection up to 56m lvl
casing erection upto 62m lvl
casing erection upto 71.5m lvl
Head casing erection & alignment
Head & tail pulley fixing & alignment
Main drive and auxillary drive installation & alignment
Belt laying , joint, lead pouring
Bucket fixing

5 711 BF2 bagfilter


Pre assembly
Erection
Ducting
Fan erection
Fan alignment

6 671 AS1 feeding arrangement


7 671 BE1 and BE2 interconnecting chutes
8 Silo top feeding airslide
9 Silo top distribution system
10 Silo top venting system
11 Silo top accessories

12 12.5m platform
13 8.5m platform
Silo inside extraction airslides bin 2
Silo inside bagfilter
Silo compartment aeration pads
6.5m lvl platform
bulk loading system
Blowers erection
Weigh bridge erection
Utility airline
Start Finish MANPOWER Group Remarks
8/11/2016

11/11/2016

13/11/2016

14/11/2016

21/11/2016 24/11/2016 erection engineer ticket

15/11/2016
22/11/2016
17/11/2016
18/11/2016
20/11/2016
10/11/2016
15/11/2016
8/11/2016

12/11/2016
15/11/16
18/11/16
20/11/16
20/11/16
24/11/16
28/11/16
20/11/16

28/11/16
DRAFT CONSTRUCTION SCHEDULE

SL.N Revised Start


DESCRIPTION Duratio
O date
n
Task Name
Zone-1
1 671 AS1 Feed end Chutes erection 3 30/11/16
2 Discharge chute erection 1
3 671BF1 - Bag filter Internals fixing 2 25/11/16
4 Bucket elevetor supporting structural up to 47 mtr lvl 18 01/11/16
5 0.00m lvl to 47m lvl structure welding 10 15/11/16
6 Head and tail pulley and platform 3 13/11/16
7 Drive 2 14/11/16
8 Belt laying and Jointing 3 16/11/16
9 Buckets erection 4 20/11/16
10 Bucket elevator supporting structural 35m to 62m lvl 16 04/11/16
11 Structure 62m to 78m lvl 7 17/11/16
12 Casings & Head casing upto 73.5m lvl 9 14/11/16
13 Head and tail pulley 4 25/11/16
14 Drive 4 26/11/16
15 Belt laying and Jointing 3 28/11/16
16 Buckets erection 3 01/12/16
17 711-BF-2 Bag filter 3 23/11/16
18 711-BF-2 Bag filter Internals 3
19 711-FN-9 Fan Erection 2 25/11/16
20 711-FN-9 Motor alignment 2 27/11/16
21 Ducting 5 25/11/16
22 Silo all compartment manholes 4 29/11/16
23 Zone-2
24 Manhole platform at 16.5 mtr lvl 2 16/11/16
25 Silo Staircase 35m lvl to 62 mtr lvl + platform 12 15/11/16
26 671-AS-4 trestle & Gallery 3 24/11/16
27 671-AS-4 airslide 2 26/11/16
28 Bucket elevator interconnecting chutes 3 28/11/16
29 Airline connection 2 28/11/16
30 671- FN5 Fan Erection 2 18/11/16
31 671- FN5 Motor alignment 1 21/11/16
32 671-AS-5 -12 Feeding to silo 4 25/11/16
33 Airline connection 4 23/11/16
34 671- FN6 Fan Erection 4 19/11/16
35 671- FN6- Motor alignment 1 22/11/16
36 Bagfilter671- BF2 erection 1 20/11/16
37 Bagfilter671- BF3 Internals erection 3 27/11/16
38 671-FN7 3 20/11/16
39 671-FN7 - Motor alignment 1 23/11/16
40 Ducting 5 21/11/16
41 Silo top Auxillaries Like doors & level indicators 6 20/11/16

42 Zone-3
43 Silo Bottom platform at 12.5 m lvl 18 03/11/16
44 Silo Bottom platform at 8.5 m lvl 20 06/11/16
45 Silo Bottom platform at 6 m lvl 6 20/11/16
46 Silo inside Aeration pads Erection 13 07/11/16
47 Silo inside Aeration pipe line connection 12 18/11/16
48 Silo Aeration blowers 711-BL 1-3 4 20/11/16

49 Silo Extraction slide gate & air slide for silo 711-SG-1-8 12 18/11/16
50 Hopper 711-HP-1 & aeration trough 2 24/11/16
51 Hopper 711-HP-2 & aeration trough 2 27/11/16
52 711-FN 3 & 4 Fan Erection 3 22/11/16
53 711-FN 3 & 4-Motor alignment 2 24/11/16
54 Hopper aeration blower 711-BL-4 & 5 4 25/11/16
55 Airline 5 25/11/16
56 711-BF-1 bagfilter internals 2 27/11/16
57 711-FN-1 Erection 2 20/11/16
58 711-FN-1- Motor alignment 2 22/11/16
59 Ducting 5 23/11/16
60 711-BF-1A bagfilter 2 16/11/16
61 711-BF-1A bagfilter internals 2 01/12/16
62 711-FN-1A Erection 2 22/11/16
63 711-FN-1A Motor alignment 2 24/11/16
64 Ducting 5 25/11/16
65 Bulk loading flow control gate 711-FG-1 3 30/11/16
66 Travel arrangement 4 days 28/11/16
67 Bulk loading spout 5 days 01/12/16
68 Weigh bridge 5 30/11/16
69 Zone-4
70 711-AS 13 & 14 Trestle & gallery 14 06/11/16
71 Airslide As-13 & 14 8 12/11/16
72 711- FN 6 & 8 with motor alignment 3 27/11/16
73 Airline connection 4 13/11/16
74 711-FN-5 & 7 With Motor alignment 3 24/11/16
75 711BF3 & 4 Structure 5 11/11/16
76 711-BF-3 bagfilter 7 15/11/16
77 711--FN-10 Motor alignment 1 27/11/16
78 Ducting 5 17/11/16
79 711-BF-4 bagfilter 2 16/11/16
80 Bag filter internals 3 25/11/16
81 711--FN-11 Fan 3 28/11/16
82 711--FN-11 - Motor alignment 1 29/11/16
83 Ducting 5 18/11/16
UTILITY
99 Blower pipe line & Bag filters air line 12 20/11/16
SCHEDULE

Finished Date Remarks

03/12/16

26/11/16
19/11/16
25/11/16
16/11/16
15/11/16
19/11/16
21/11/16
19/11/16
24/11/16
25/11/16
26/11/16
27/11/16
30/11/16
02/12/16
25/11/16

26/11/16
28/11/16
30/11/16
30/11/16

18/11/16
27/11/16
26/11/16
27/11/16
30/11/16
29/11/16
19/11/16
21/11/16
29/11/16
26/11/16
20/11/16
22/11/16
20/11/16
29/11/16
21/11/16
24/11/16
26/11/16
25/11/16

21/11/16
26/11/16
26/11/16
20/11/16
28/11/16
24/11/16

30/11/16
25/11/16
28/11/16
24/11/16
28/11/16
28/11/16
30/11/16
28/11/16
21/11/16
23/11/16
27/11/16
17/11/16
02/12/16
23/11/16
25/11/16
30/11/16
02/12/16
03/12/16
08/12/16
06/12/16

20/11/16
18/11/16
28/11/16
21/11/16
26/11/16
16/11/16
16/11/16
28/11/16
22/11/16
17/11/16
27/11/16
29/11/16
30/11/16
23/11/16

2/12/16